  • UPCOMMING AND REALIZED PROJECTS

    OF UP-TO-DATE GAS FIRED POWER PLANTS

    Rozmarínová 4

    934 01 LEVICE

    Slovakia WE KNOW

    HOW

  • • General introduction

    • Main business activities

    • Experience with EPC projects

    • Project financing

    • Main advantages of gas fired CCPP and Co-gen Plants

    • Realized projects

    • Upcoming projects

    Content

    ISTROENERGO GROUP a.s.

  • ISTROENERGO GROUP a.s.

    Important milestones in company history:

    1992 Establishment of IEG

    1994 First combined cycle delivered on "turn-key" basis

    1996 First combined cycle outside Slovakia

    2002 First combined cycle outside Europe

    2003 First combined cycle with more than 100 MWe

    2005 First participation on the project with more than 1000 MWe

    2005 IEG was awarded with „Deal of the year“ by Trade Finance for ECA backed loan facality for Kayseri 154 MW CC Power Plant Project

    General Introduction - History

  • ISTROENERGO GROUP a.s.

    • IEG has 250 employees, head office in Levice and other satellite offices located in Bratislava, Kosice, Brno (Czech Republic) and Saint Petersburg (Russia).

    • Company has 11 shareholders (all of them are original founders of the company), working in IEG for more then 18 years. Board of directors of IEG consist of shareholders of the company only.

    • IEG has solid track record of references in ‘’turn-key’’ installation of power plants and main power plant equipment in 19 countries of the world.

    • The company has own know-how for creating the power plant technical concept and design of steam boilers and HRSGs which is proven by the experience from real installations. This gives the IEG ability to prepare most feasible ‘’tailor-made’’ technical solution for each project.

    • Based on long term cooperation IEG has very good relations with and strong support of most reputable companies supplying the power plant equipment (General Electric, Siemens, ABB,...)

    • IEG is one of the most important EPC contractors in Slovakia in design and delivery of power plants and power plant equipment.

    General introduction - Presence

  • ISTROENERGO GROUP a.s.

    • Full EPC ‘’Turn-Key’’ delivery of small and mid-size power plants up to 300MW

    • Consortium partner role and technical leader in power plant projects above 300MWe

    • Engineering services for power plants (without limitation by fuel type or capacity)

    • Delivery of complete Steam boiler & HRSG packages for power plants

    • Delivery of mechanical and electrical BOP equipment

    • Site services (erection, commissioning, personnel training)

    • Project financing

    Main business activities

  • ISTROENERGO GROUP a.s. Scope of supply and services

  • ISTROENERGO GROUP a.s.

    Experience with EPC projects

  • ISTROENERGO GROUP a.s.

    • IEG has been often involved in financing arrangement processes, including but not limited to project financing and/or export financing.

    • In particular IEG has been working with large financial institutions such as:

    ECAs: US Exim, Slovak Exim Bank, EGAP from Czech Republic or COFACE

    Commercial banks: BNPP Fortis (Formerly “Fortis”), HSBC, Citibank, Intesa San Paolo

    • Kayseri 154 MW CC Power Plant Project - ECA backed loan facility in amount of 97 mil. USD was awarded as “Deal of the year” by Trade Finance in 2005.

    Project financing

  • MAIN ADVANTAGES of natural gas firing Power Plants based on Gas Turbine up-to-date technology

    ISTROENERGO GROUP a.s.

    HIGH ELECTRICAL EFFICIENCY

    GT type GT el. output

    (MWe)

    SC el. eff.

    (%)

    CC el. output

    (MWe)

    CC el. eff.

    (%)

    LM6000 PH 50 41 66 53.8

    LMS100 100 44 (40% at 50% load)

    122 53.5

    F 6FA 77 35.5 120 55.0

    F 9FA 260 37.5 390 57.5

    F 9FB 290 38.4 440 58.6

    F 9H - - 520 60.0

  • ISTROENERGO GROUP a.s.

    HIGH USAGE OF FUEL ENERGY

    ► CHP EFFICIENCY 85-90% (in case of hot water supply)

    HIGH OPERATIONAL FLEXIBILITY

    ► FAST START UP

    - LM6000 can reach full load in 10 minutes

    ► FAST LOAD RAMPING (FAST LOAD RESPONSE)

    - LM6000 can accommodate up to 7MW instant load and stay

    within 5% frequency fluctuation with recovery in 1-2 seconds

    - LMS100 can accommodate up to 21MW load acceptance

    from zero load

    ► LOW TURNDOWN

    - emission compliance down up to 35-40% load of the gas turbine

    ► DAILY START / STOP CAPABILITY

  • ISTROENERGO GROUP a.s.

    LOW EMISSIONS

    ► NOx = 15 ppm (30 mg/Nm3 at 15% O2 in dry flue gas)

    HIGH AVAILABILITY

    ► 97 – 98 %

    SMALL FOOTPRINT (HIGH SPACE UTILIZATION)

    ► 70 MW CCPP approx. 100 x 80 m

    ► 380 MW CCPP approx. 200 x 150 m

    QUICK POWER (SHORT DELIVERY TIME)

    ► 12 – 14 months (Simple Cycle)

    ► 22 – 24 months (Combine Cycle)

  • 12

    ISTROENERGO GROUP a.s.

    Realized projects

  • Biotika Slovenska Lupca 4MWe Co-gen power plant SLOVAKIA Year: 1994 GTG – 4MWe HRSG – 25tph, 6bara, 200degC

    ISTROENERGO GROUP a.s.

  • KRPA Hostinne 14MWe CCPP Czech Republic Year: 1996 2 x GTG – 4.5MWe HRSG – 53tph, 65bara, 490degC STG – 5MWe

    ISTROENERGO GROUP a.s.

  • SCP Ruzomberok 48MWe CCPP Slovakia Year: 1998 2 x GTG – 17MWe HRSG – 60tph, 60bara, 465degC STG – 20MWe

    ISTROENERGO GROUP a.s.

  • IZMIR Baticim 45MWe CCPP Turkey Year: 2002 6 x GTG – 5MWe 2 x HRSG – 24/5,5 t/h, 45/5,2 bar(g), 445/220degC STG – 15MWe

    ISTROENERGO GROUP a.s.

  • Kemal Pasa 120MWe CCPP Turkey Year: 2005 2 x GTG GE F6C (new!!!) – 41MWe 2 x HRSG - 57/18 t/h; 58/4 bara, 537/200degC STG – 38MWe

    ISTROENERGO GROUP a.s.

  • NUH Enerji 120MWe CCPP Turkey Year: 2005 2 x GTG GE LM6000PC – 47MWe 2 x HRSG - 42/13 t/h; 55.5/6.4 bara, 426/252degC STG – 26MWe

    ISTROENERGO GROUP a.s.

  • Kayseri 154MWe CCPP Turkey Year: 2005 3 x GTG GE LM6000 – 40MWe 3 x HRSG - 40/20 t/h; 47/2 bara, 400/200degC STG – 34MWe

    ISTROENERGO GROUP a.s.

  • IPO Oberbruch 17MWe Co-gen Plant Germany Year: 2005 1 x GTG - 17MWe 1 x HRSG - 45 t/h, 58 bara, 510degC

    ISTROENERGO GROUP a.s.

  • Rudeshur 2000MWe SC Plant (750MWe 1st stage) Iran Year: 2005 3 x GTG Siemens V94.3A- 250MWe

    ISTROENERGO GROUP a.s.

  • DOW Chemicals 40MWe Co-gen Plant Netherlands Year: 2006 1 x GTG – GE F3 40MWe 1 x HRSG - 46t/h, 35 bara, 390degC

    ISTROENERGO GROUP a.s.

  • Panevezio 32MWe Co-gen Plant Lithuania Year: 2008 1 x GTG – SGT 32MWe 1 x HRSG - 40 t/h, 45 bara, 450degC

    ISTROENERGO GROUP a.s.

  • Korangi Power Station 225MWe CCPP (200MWe 1st Stage) Pakistan Year: 2008 4 x GTG – GE LM6000PC 45MWe 1 x HRSG – 91/31 t/h, 58/8 bara, 408/242degC 1 x STG – 25MWe

    ISTROENERGO GROUP a.s.

  • Toplofikacia Pleven 33MWe Co-gen Plant Bulgaria Year: 2007 1 x GTG – GE LM2500+G4 (new) 33MWe 1 x HRSG - 75 t/h, 45 bara, 450degC

    ISTROENERGO GROUP a.s.

  • ISTROENERGO GROUP a.s.

    ELM Wilton, Middlesborough 42MWe Co-gen Plant United Kingdom Year: 2008 1 x GTG – GE F6B 42MWe 1 x HRSG - 180 t/h, 98 bara, 385degC

  • ORAPA 90MWe SC Power plant Botswana Year: 2010 2 x GTG – GE LM6000PC 45MWe

    ISTROENERGO GROUP a.s.

  • DANTE SSE 50MWe SC Peaking Power Plant Slovakia Year: 2009 1 x GTG – GE LM6000PC 50MWe

    ISTROENERGO GROUP a.s.

  • GGE Power Station Povazska Bystrica 60MWe CCPP Slovakia Year: 2010 1 x GTG – GE LM6000PD 45MWe 1 x HRSG - 42/13 t/h; 55.5/6.4 bara, 426/252degC 1 x STG – 15MWe

    ISTROENERGO GROUP a.s.

  • Syzran Power Station 200MWe CCPP Russia Year: 2011 2 x GTG – GE F6FA 80MWe 2 x HRSG - 115/14 t/h; 80/6 bara, 544/210 degC 1 x STG – 40MWe

    ISTROENERGO GROUP a.s.

  • 1.) GUD ZEITZ CCPP 135 MW (Germany) (2xGTG + 2xHRSG + 1xSTG + ACC)

    ISTROENERGO GROUP a.s.

    Upcoming Projects

    GTG SGT 800 (Siemens) 46 MWe, el. eff. 37% HRSG HP: 56 bar, 60 t/h, 530 degC LP: 4.5 bar, 12.4 t/h, 270 degC STG SST 400 (Siemens) 40 MWe Condensing extraction type CCPP Power: 130 MWe (@ 15 degC) El. eff.: 53% (@ 15 degC)

  • 2.) Tashkent CCPP 370 MW (Uzbekistan) (1xGTG + 1xHRSG + 1xSTG)

    ISTROENERGO GROUP a.s.

    GTG Frame 9FA (GE) 256 MWe, el. eff. 37.5% HRSG HP: 128 bar, 258 t/h, 568 degC Reheat: 28 bar, 305 t/h, 561 degC LP: 4.8 bar, 35 t/h, 248 degC STG 135 MWe Condensing extraction type CCPP Power: 376 MWe (@ 16 degC) El. eff. : 57.5% (@ 16 degC) Hot water delivery: 420 GJ/h

  • 3.) Timashevsk CCPP 180MWe (Russia) (3xGTG + 3xHRSG + 1xSTG)

    ISTROENERGO GROUP a.s.

    GTG LM6000 PF SPRINT (GE) 48 MWe, el. eff. 41.2% HRSG HP: 55 bar, 45 t/h, 450 degC LP: 4 bar, 14 t/h, 250 degC DW heater: 700 kWth STG 42 MWe Condensing extraction type CCPP Power: 186 MWe (@ 11 degC) El. eff.: 53.4% (@ 11 degC) Process steam : 100 t/h (@ 18 bar)

  • ZEMPLIN CCPP 70 MW (SLOVAKIA) (1xGTG + 1xHRSG + 1xSTG)

    ISTROENERGO GROUP a.s.

    Project in tendering stage

    GTG SGT 800 (Siemens) 50 MWe, el. eff. 37.9% HRSG HP: 93 bar, 61 t/h, 535 degC LP: 5 bar, 16 t/h, 230 degC STG 22 MWe Condensing extraction type CCPP Power: 72 MWe (@ 15 degC) El. eff. : 54.4% (@ 15 degC) Process steam: 25t/h (@ 18bar)

  • THANK YOU VERY MUCH FOR ATTENTION

    Branislav DROZDIK

    Head of Development Department

    ISTROENERGO GROUP a.s.

    Rozmarinova 4, 934 01, LEVICE

    SLOVAKIA

    www.ieg.sk

    tel.: +421 36 6376 632

    fax: +421 36 6227 249

    cell: +421 905 535 781

    e-mail: [email protected]

    ISTROENERGO GROUP a.s.

    http://www.ieg.sk/