Windward Community College ARLISS/USLI PresentationFall 2009KCC, Ohi’a Room 118November 21, 2009
Premo Ames II Todd EspositoJoleen Iwaniec Patrick LancasterJasmine Maru
ARLISS 2009
Thank You!
University Student Launch Initiative
Team MembersTodd Esposito
Patrick Lancaster
Joleen Iwaniec Premo Ames II
Jazmine Maru
Utah Conference 2009
Advanced Rocketry Workshop
Bonneville Salt Flats
Level 1 Certification flight
Todd Esposito
Bonneville Salt Flats, Utah
Level 1 Certification Attempt
Before
AfterBlack Rock, Nevada
Certification Launches
LEVEL 1 LEVEL 2
Black Rock, Nevada
Level 2 Certification Complete
Educational Outreach
USLI is education outreach oriented
Minimum 2 outreach events
Community Support
This Is A Competition!
Preliminary Design Review 100 Critical Design Review 150 Flight Readiness Review 150 Education Engagement
100 Website 50 Successful flight and Recovery 200 Altitude 150 Final Report 100 Total:
1000
CHARACTERISTICS,CONSTRUCTION,
&RECOVERY
Initial design criteria
5,280 ft Carry a student payload
National CanSat program No bigger than a 12 fl oz soda can Mass no greater than 1 kg USLI requires a dual deployment recovery
Characteristics
Electronics in nose cone Air brake system Three fin design
Construction
G10 fiberglass Motor
K560W by Aerotech 2,560 Newton seconds (thrust)x(burn time) 120 lbs of thrust 4.5 seconds of burn time
Flight Profile
5 phases Boost phase Coast phase Deployment of drogue chute at apogee Initial decent rate
Approximately 60 ft/sec Deployment of main chute at 500 ft
Slows approximately to less than 20 ft/sec Close and intact recovery
WEB PRESENCE
The team shall have a web presence maintained/updated throughout the period of performance that will be judged at random times throughout the year.
No set guidelines for web presence in USLI rules book
NASA MSFC will receive the required documents through website
SCORING
Website (5%)
Website updated PDRFar Exceeds Expectations 5
Website updated CDRFar Exceeds Expectations 5
Website updated FRRFar Exceeds Expectations 5
Total (15) 15 Points (50):
% of Website total 100 50
WCC CAE WEBSITE
Currently hosted on Laulima
Limited capability using Laulima editing tool.
New website under construction
Gantt Plot
Any Questions?