Q CHECKLIST WELL CONSTRUCTION PERMIT X PUMP INSTALLATION PERMIT WELL NAME or LOCATION: Mauna Lani Irrigation ________ __ WELL NUMBER: ___ ________________ Tax Map Key:_6_-_8_-_01_:_5_2 ________ _ OWNER/OPERATOR: . Firm Name Mauna Lani Resort, Inc. Contact Person Bill Spitz Addr e s s p . ° . Box - -4 r7 9 .... S"'7'9.--=---H .... C""R"""'Z..--------- Koha1a Coast, Hawaii 96743 LANDOWNER: Firm Name same ----------------------- Contact Person ________________ _ Address ________________________ _ Phone 885-6677 Phone __________________________ __ D t l ' t' 'd 18 November 1991 a e app lca lon recelve ................ •.• .... ________________ __ Date acknowledged receipt/request more info ..... ________________ __ Date application accepted ....................... ________________ __ Suspense date (90 days) ............ ........ •... ________________ __ Date filing fee deposited ..•.• ......... ........ ________________ __ Application sent to following: Dept. of Hawn Home Lands Dept. of Health Office of Hawn. Affairs State Hist Pres Div Dept/Bd of Water Supply Sierra Club L. D. F. Koolauloa NB #28 (Oahu) Dept.Pub. Wrks (Hawaii) Date sent Additional List (Molokai} ________ __ Comments received Date agenda due ................................. ________________ __ Date submittal due .............................. ________________ __ Date submittal sent to applicant ................ ________________ __ Date application approved or __ disapproved ... ------------------ Date applicant notIfied of decision ............. ________________ __ REMARKS: ? V\ \1\--.:> I')V" ..(, b

Upload: others

Post on 25-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

Q

CHECKLIST

WELL CONSTRUCTION PERMIT X PUMP INSTALLATION PERMIT

WELL NAME or LOCATION: Mauna Lani Irrigation ISLAND:~H=a~w~a~i=i ________ __

WELL NUMBER: ___ 56~5_1_-~O_1 ________________ Tax Map Key:_6_-_8_-_01_:_5_2 ________ _

OWNER/OPERATOR: . Firm Name Mauna Lani Resort, Inc. Contact Person Bill Spitz Addr e s s p . ° . Box - -4r79 .... S"'7'9.--=---H .... C""R"""'Z..---------

Koha1a Coast, Hawaii 96743

LANDOWNER: Firm Name same -----------------------Contact Person ________________ _ Address ________________________ _

Phone 885-6677 Phone __________________________ __

D t l ' t' 'd 18 November 1991 a e app lca lon recelve ................•.•.... ________________ __ Date acknowledged receipt/request more info ..... ________________ __ Date application accepted ....................... ________________ __ Suspense date (90 days) ............•........•... ________________ __ Date filing fee deposited ..•.•.........•........ ________________ __

Application sent to following:

Dept. of Hawn Home Lands Dept. of Health Office of Hawn. Affairs State Hist Pres Div Dept/Bd of Water Supply Sierra Club L. D. F. Koolauloa NB #28 (Oahu) Dept.Pub. Wrks (Hawaii)

Date sent

Additional List (Molokai} ________ __

Comments received

Date agenda due ................................. ________________ __ Date submittal due .............................. ________________ __ Date submittal sent to applicant ................ ________________ __

Date application approved or __ disapproved ... ------------------Date applicant notIfied of decision ............. ________________ __

REMARKS: ? V\ \1\--.:> I')V" ..(, b

Page 2: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

.. -r, JAIl 31 '00 12:33 FROM:TNWRE . . . ( I:) +808-538-7757 T-766 P.OI/OS F-350

1'1 !' ., ! "I, !I"! ' I' f I -I' ~ . Ie 'I '""," " ~ ,tI' -II" :,- ''t! "' .... '.~~l'"tl" ... ~·~M:-~_ •.• ".'.,.,,"

Tom Nance Water &aii .... ~ Resouroe Engineering

TO:~ ___ ~_--=J+W..Or----=~-:,-~C_W_t..\A _____ _ 0tipaa1 0 1IrI1I Ii} willlllll be mailed ID YQII.

'Tom Itfanu F~ ______________ J~~ __________________ __

Facsimile Header

Fa No.: ----::::::::--_6 ___ --_ DaP!: ~. "::;"~ No. or PapS: ~ (mcludiaa ~)

Subjecr.:_~~=-.;~ISeI....:..LoP1&~ ... ~W..;;;,.'"Jl1L~~~ ____ ~~~....::....:...-+-________ _

(I) Cofj !If ~ 'i>i# )A~"f~ '1- ~t.hW1' Crr- '2- {) ('2.' ~~ ~~') 1 ?~~~ ~ YY1>U.t,,:rcl (If' G-GJ)

.-. • - • - •• __ •• _ ••••••• _ R • _._ ••• _. __ , ". _ • "'" •••• _. ______ • ___ •• ________ • ______ •• ________ ._. __ • _________ • _____ _

Page 3: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

, ~AN 31 '00 12:33 FROU:TNWRE +808-538-1157 T-7&& P.OZ/09 F-350 • ~ .' 11 0 V. I.. UHi J 1 U: lllUl 0. '1Uft Jll llSUlSJ ~44 -tlJMM .0 11 D. ~4U'1 1'. Uy

MEl10llANDUK or tnmEJ.STAHDIHG BETWEQ MAUNA J(U PROPUTXf;S I INC.. MAUNA LAllI: usoaT, I.e.,

BANSAY HAWAlX, nc. AND WAnOLOA LAND COHPAft ON COOPERATIVE REGIONAL WATE1 DIVILOPH!IT

Mission Statement

To work Jointly and cooperatively in developing and implementinl a reSional water plan which b •• t serves the collective water needa of the parties and others within the

- .. - - --- -- -- uureaion- ina manner- ae-eeptable---to--relevant--govenuaent'al- - ____ ·_u _____ __ authoS'1t1es.

Objeotives . . . The parties to this Heaa~andua of Uod.r.tandioa

(collectively referred to as "South Kobala Water Study Group" or "Ct"OUph) acknowledae and agree tb&t it ia in their lona-te~ best intereltl to achieve the Mission set forth above in the fol1owina .. nn.~;

o

o

o

a.aCh a6~~At OP a ~ecion&l plan fo~ the developaant of aourceS and distribution 87stems for potable. non-potable wat~~ and effluent reuse,

Fo~ aud e.tabliah. &. equity participant •• a pJOi.v .. te. ~&loul wa.t~~ ccmap&D7 03: Gu.p&'Qie. for the development. productioD, distribution aDd 8.1. of pot.blc. fton·potabl. &n4 .fflQ~t reuse reSOUTceS serviuS the partie. and others within the region;

1eacb bilateral and multilateral aar .... nta aChi_vinI the Itased t.plementatiOD of the relional water plan;

Publicly suppo~ and cOD8ide~ tha eoamitaent to the coaditional. partial fuudina of the County of Hawaii Depar~.nt of Wate~·Supp17'. (DW&) development of its plannad Worth ~Dhala Pipeline;

Develop a Water Commitment folicy, whiCh 1 • incorporated harein by reference, containing a~ideltaes and requireaents for each Group Mambar a.curiu. • sufficient lupply of watel' for actual use in accordance w1th • realistic timetable:

Page 4: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

, JAR 31 '00 12:33 FROM:TNWRE •. "V" c.. '''''''''oJ lV. ,,,na

o

o

O. 'IViI '11 \UUU/ "''tot U";J;'

+808-538-7757 .,.Q T-766 P.03/0S F-350 IIII. "'lUI r. J/:J

Coordinate the activit1e. of the Wate~ Study Group with all relevant State of Haw.it autho~iti.8. including but not limite4 to its Water commission. in & manner which promote. and preserves the Group'. ability to deal with regional wate~ iSlue. OD a collective basis,

Communicate, where appropriate, with other interested partiel within the rftsion;

•• .-. -. --.-- .-- .--... ---.. - .... -.~ .u E'nter'-'1rito---sul)sequen'f--Yiiint·-aateetaents-l.QT'eM.a---- -.--to implement the objectives adopted herein.

Governance

The activities of the Group shall be coverned and coo~ina~ed throUlh aft Executive Co~it~ee co.priGed of 4 de.ianatad representative of each signatory to this Meaor~ua of Undarataftding.

the Group E~ecut!ve Coaaitt •• shall:

D

• o

D

o

Approve all pol1~ift.t •• ~.e.en~8 and expenditure. JUde on behalf of the 'Group; provided. t~t it ~h. r.p~.8eut.~tve of any Group aeaber specificall, dilapprov.. of an~ such aspend:1.tur •• that Grol.Jl) ... ber ,ball be eXCQsed froa ita pro rata share of .uab expenditure;

Approve the inclUSion of aaditional meabers to and approve, except member in que.t1.on. for the exclusion of existins members froa the Water Stud, Group; ,

Approve public state.euts and te.tiaony reaardina Wate~ Stud1 Croup activitiaB;

Develop and approve an annual oper&tina budget, project budaata aDd the indivtdual party's obliaationl to fund the operatioD& and the development of thes. planned proje~t.;

Be k.pt informed of all aareement£ entarad into between Water Study Croup mambers affectins the Group'. Hl.aioft and Objec~tve.;

CoorGi~to &11 contact reg.~ns the .ctLvit~e9 of the Water Study Group with governmantal agenciea;

-2-

Page 5: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

.. JAIl 31 'DO 12:33 FROM:llIWRE

.noy. t.. l:f:1J, lU:lJ.... wQ,un III ,lDUO) :lH-OJ:f:f,. +808-538-7157

. ··9 T-766 P.D4/09 F-35D

... r !to. l4U ' ..... ( ..... 41 L . __ ~

o

o

Direct and approve the act1vitie& of all consultants reca1ned by the Water Study Group relatina to its stated Mission and Objective ••

All daci.io~ of the Group ahall be by the aaJortcl ot the members of the Executive Coaaaittee ex:cept fo," "key decisions" which raqulra unani.aus approval. ~e7 declalon include approval of the annual operatins budset and individual member. obllaation to fund

. -..... operation. or make- ·contributionl-to-the-- -- ---.-.-----­development of planned projetl. exp.nditures which are outside of the appraved budset in eXCe5& of $5,000 in any single cale o~ $25.000 in the &Igregate and the addition of any new -' member to the Executive Co.-ittee.

Dispute Resolution

IC :LI &cmowladaad that froa time to till., disputes apd di ... reements •• 7 aris. between the parties to this M.mo~andum of UndarltandiDc resard1na raaional water issues and chac It 11 in their IOD8-te~ collective baat inte~est8 that 8~Cb disputes be resolved without resort to lovarnmantal O~ judicial :Lnvolv ... nt.

The parties asra. that they shall use tbeir iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the event De8otiatioDS fail to ~ •• ult ~ &ccept~ble aare •• ent or r •• olut~aD. they .ay voluntarily aubmit out.tanding 18sue(a) to binclina O'l' naQbindiQ8 a~bit~ation pursuant to t.~ &.~.ed to by the partias.

Korth Kohala Pipeline

Tba partie. aare. to SUPPDrt the concept of a North X4bal& pipeline t~4n$po~iQ8 potable water to &outh Kob&la be1nl pursued b7 the Depart.ant of Water Supply. CountJ of Hawaii.

In the event that the parties are reaaonably satiefied that the North Kohala pipeline will ba bu~lt, but no later than tbe .tA~t: of c:cm8t+ucti.on. individual lignato~1e. to thi$ aareemant shall coaait, OD a fa1r and e~~1table b.sis, to th. pa~tial fun4ing of said pipeline under acceptable teras and conditions to be negotiated.

-3-

Page 6: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

, . , ' JAN 31 '00 12:34 FRt*:TNWRE ,-""Y" & .. ,,,;'oJ 'U. 'oJ~ '0 IV .. U, \UUUI ,,'t. U..I;';'

+808-538-TT57

.0 T-766 P.05/0S F-350

au, uu, r,:U ~

Termlnatlon/~ithd[!w&l

A .ajority of the members of the Group ma~ te~1nat. the Group and Joint obligations contained in this Hemo1'andua of Under.tand1ns. Indi"idual Croup members may withdraw f~om the South Kohala W.te~ Study G~oup upon written notice to other memberBi provided, that members shall re •• 1n liable tor their or ita pro-rata share of cos~s of operations per tha approved budget Or aaeudaantl theretD, incurr.d during their IH1Ibership or prior tD Withdrawal, aa the caBe .. ,. be.

nlL This M.aora~,.. of Underst:anciiaa i. antered into this .,~ clay of ~ • 1991l-, MAUNA EEA r10PERTIES, IWe. H.ANSAY HAWAII, DlC.

11' C)ukh~. -:I~t-.~~~~~~------------- ~ IJ.L;~lt-j

!1AW.4 LAllI llESOJlT. 'IJlJe.

By -':-:--Its c--f----wlll!~~G.~~~ _-

-4-

tV

Page 7: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

.. ,JAN 31 '00 12:34 FROM:TlWRE +808-538-1751 T-166 P.OS/O! F-350 'I1VI. I.. '.:1.:1101 'U. '1oI1la 0 \,11'" '" \uUUJ , . ··0 ~ .. ""''''tUI &. UI'~

'pO I " ., .'''' I . I' ,~ ". - ... - --..-.".. ' ... -....

DRAFT Water Commitmeat Pollet. and Pruc:edUfII

.rIM So.tta ICahaIa W ... r Ususl Group

RcYisccl: (FebrUa., 4,1"3) March 9, 1993

~-. - - -- - -- - _. -.- - - .. -- ---- _ .. _-.----- --. -----_ .. ------------------------------ . -- ------ ----

The South Kohala WAW' U~el"$ Croup ('Group'1 r~e5 the need to develop a coherent set of policies and pIoced\Ue5 for the development of groundwater to ensure maximum beneficial use of this limited resource, avoid conflicts among USel"S, and facilitate the tinlely dev~lopment of water tied to actual use. The parties to this docwnent agree to abide by the policies and procedures it contains and encourage the State Commission on Water Resource Managen\ent ("Commission-) to eValuate all drilling and pump installation permits received £rOUl othet Willer users in the basitl by the same aiteria.

POUCIES

1.

-1.

2.

3.

TIl@ lJ'9yp rec9lmzes that aD parties need assurance of IA~ availability of ---waterlor their develo.pments· The Iroup furdw:.reasnJr,es that such

ilS5UJilDW san occur only if. iCasmd to la pl1 pgtiet. -~~

All drilling, well modification, and punlp installation permits will be fonnulOlled to conform to theintel\t of the then CQn'ent version of the Group's approved South Kohala Water [Master] ResoUIc~ Plan.

All drillingl well11'\odificatio~ iiU\d pump installation Permits will be su\)mitted to the Group for irs approval prior to submittal to the Commission. The Group's approval shaU be based on the applicant's conformance with these })CUd!S, anel the proadutes listed below. The Group's approval shan not be unreasonably withheld if such confolJl'\ance is demonstrated.

To mlninuze excessive use of groundwater, all eifl",cnt from sewage treatment plants shall be reused for irrigation unless it can be ~onclU5ively demonstrated to be physically and I or economically impractical for the d.valoper of the il-risation supply or the ultimate user of the water.

Page 8: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o o

Page 9: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

· . JAIl 31 'DO 12:34 FROU:TNWRE +808-538-1751 T-166 P.01/D9 F-35D "i ...... ~ .v ........

,...,. I"

\U"U, "'-''1 U\I-.J'"

, . ."0

4. All new landscaping, including golf COU1'Se turfgrass, will be designed and implemented to n,lninuzt irrigation use, EHotts towaTd this md shall include thoosing appropriate plant materials, use of proper soil types and thickness, and avoiding excessive tudgtus areas. Any new 18 -hole golf ,ourse shall not use Jl\ore tllan 0.15 MGD on year-round average nor more than 1.00 MCD over any 5e"'en-day period.

S. Allllew hotel, residentiaL couunetdaL and industrial development shall be designed to minfmize water use and shall indude appropriate water saving devices.

6~ --- Mine permits should be supl'2rtedif cONisteot with-tbe-WateJ.;-- -- ----.-----­Resource Plan as they provide mucb needed information about this resion's 'mPler. ~ . ..

7. [Drilling and] PUU1P mitallation pernlits shall not be sought mO~ than two yean in advance of actual need [to avoid aeating false Shortages 01 5upply and inappl'Oprlate positioning for the resource, potentially denying othel's tbeir lair and equitable use].

8.

9.

Members of the Croup agree to devise water use standards for consumption of potable aJ'\d irrigation water use in order to impleznent fuele polideg.

It is {fcognized tbat agreenlents between two 0[ more parties maybe y~~ necessary to facilitate respective water developmenl [Such agreements .~;, shall be consistent with the5e poUcie!l and procedum.] ~

PROCEDURES

1. AD applications for drilling, weD modification, and pump installation peDllits, including extensions of these pemuts, wiD be submiltecl for review and approval by the Group to ensure confonnance with the Intent of the Group's pollaes and [ul",ster] water resowq plan prior to submittal to the COJlUllission.

2. . To initiate the Gl'OUp'S rmew, application will be submitted with the follOwing SUPP01'ting imotnlation:

a. Quantity [and tim~g] of potable and I or non-potable supply • requirenl~nt5, including the basis for these projections (\mit cO'Qnts, acreage, etc.).

Page 10: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o

Page 11: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

"

, JAN 31 'DO 12:35 FROM:TNWRE ; ';UY, C.,I:!:lJ lU,I't1\. O··vn Ul \OUOI J't't OJ:!:!

+808-538-1757 T-766 P.OB/OS F-350

b.

c.

d.

rJ au, L'tU,

Measures taken to avoid excessive potable andl or non-potable w.tel"U5e. Exact location of the water uses, including land us. plans, TMKs, et<:. Approved State land use designation; County Genetal Plan designation; County zoning; use peXl\lit lor district use; I%ld the prospectiVe land use approvals, lndudtng 5ubdivDion, needed to achieve the desired land use.

e. The project's site specific water master plan for potable and not potable water shall be submitted.

.. -"'- - --- -- .... f. Exact 10000tion, dimensions, and pump capadty of the well (or t . -'.- . -. -- _. wei15) -tob'e-developidtomeeTthesis-upplfreqwremenl$-:-- -- ---- '---[g. A development schedule indicating the date of aC:Nal water use.) " •

3. The GfOUp'S review and response to the "ppliCAtion shad] ~ completed within 45 days, Th2 response shall judge the application's conformance with Jbese poliCies~ and willl the South Kohala Water (Master] It • Plan, [the appropriateness of the timing of the application,] and the ~. [Unless there are compelling reasons otherwise, the timing of au application shaD be deemed Inappropriate unless all land use ilppwvali through and including County zoning have bee11 ,'eclived and the actual use of water, based on a finn schedule, is to begin within two years.) Listed below are speQfie criteriA of the Gro~p" review 01 applications.

a. U ,ontonnance with these polides and procedures is demonstrated [and the timing of the appUcatiol\ is appropriate,) the GtollP'S approval shall not be unreasonably withbeld.

b, If the application falls [0 Bleet the standards for acceptability set out herein, no submittal of tbe application to the Commission shaD be ",ade until revisions satisfactory to the Croup are nlade.

[c~ The Group's approval for iI pump installation permit shall be given only after tentative subdivision appl'Oval tor the project to be served has been given.]

(d. U a proven wa.ter ~OUTce is a cOlldition of County zoning or llSI permit IIpprovals, the Group's approval oi a well construction pemllt shall be given only if evidence of the a'NI) water use within two yeaxs is provided-)

Page 12: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

'- ,.. ,JAIl 31 '00 12:35 FROM:TNWRE .• ; ........ , ... ", ." .. .,.- ,0,,,·· .. · \UllU/ """ 1101".1

+BOB-538-TT57 /0 T-766 P.09/09 F-350

nu. L'tU I &. iJl iJ

Thne WatQr CommItment Policies and Procedures are entered into this day pi I 1993 .

. MauM I<ca lJftpertlll, 11K.

By: -'1'~-------------------

~r- _________________________ __

Itt

~una Lam Rtsort, Inc;. WaikoloA Land Company By: ___________ _

By Its

Page 13: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

. '.

+808-538-7157 T-583 P,02/02 F-561 AUG 19 '99 09:57 FROM:TNWRE o o

• R. M. TOWILL CORPORATIO~

Ma Saohiko Muraao MIWII Lani llaort 61-1310,.,....... J...ni DriYe, Sua 101 ~ Coac. Hawaii 96743-9104

Dear MI. Muruo:

IlUUGAnON WELLS CUTmCADON MAUNA. J.ANI RUOIlT

IJNC, l'~O

AI WUkoloa. South KoMIa, bland of'Hawai~ Hawaii

...

...... • - ... lMItIIt

a ......... s.w. Ph ••• .....,

SuMPIII ConIDu&:Iian ....,."._

._-- -----~---. -- -- ----- ----

The uodecsiped hereby ~cs dill. field ILII'Yey was performed to esfIblish elcYlriooa oq the listed irria-tioa ...,.u, at Mauna Lui Retort with &be tbllowlna rosults:

I. Nonh Well, Well No. 5749--01: •. Elevatiotl of "+" cut Oft wnctete pad i5 92.56 feet.

2. ' Fife Swion WeD, Well No. S7SC)..OJ· .. Efevati04 of fl+" out Oft IteeI p. is ",41 r..

1. Cwvert We1~ W.lI No. s650-0:Z: a. Elevation of "+" cut on caacretc pad is 123.77 feet. b. ElevatioQ of top ofbuc .,a-t. is 121.92'" ... -.

4. BI1tcaIKle Well. Well No. S6SO-Ol: a BleYiUan of ........ an oa c:oncrctc pad is 136.64 feet. b. Elevation of fOp ofbaM pille i, 1)6.11 ...

H.iebway Well. Well No 54;51...01: L E1CVIIion 01"+" cut 011 concnM peel is 120.96 tect. b. BIevationof topof_p"'~ 121.12..".

The elCYItiOlll are nicmId to MCIII Sea I..ewd (MIL) and __ upon ICawaibR HIrbor TIdal Deneb Mart 1 with In eleYlltiaa at 7.23 fcIc:r. MSL. •

.~"IlA1.L ltobeJt &. Y. Lee ~ ~ioael Surveyor Ccftitlcate ~ SC17S

- .~ ...

...

Page 14: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

Mr. Keith W. Ahue Chairperson Commission on Water Resource Management Post Office Box 621 Honolulu, ill 96809

Re: Pump Installation Permits

Dear Mr. Ahue: .

Cn~ :b. ;;-;0 r--;r".:

c..... c:: r---;:;:.:~; f1'1,,- --. ____

s;::~., - c..n .,_c·

== r"l',-:~i ),,. v~:.... .:b

IT[€tf ~ Enclosed please find the following executed original Pump InstanatT6n Permits:

v") Cl::)

1. Mauna Lani Resort Irrigation Well No. 5650-01; 2. MaUna Lani Resort Irrigation Well No. 5650-02 3. Mauna Lani Resort Irrigation Well No. 5651-01; and 4. Mauna Lani Resort Irrigation Well No. 5749-01;

We have retained copies for our files.

Please contact me should you have any questions.

Sincerely,

MAUNA LANI RESORT, INC.

'~~~~~

:yt

Enclosures

P.O. Box 4959, HCR2· KohaIa Coast· Island of Hawaii 96743-4959 Telephone: (808) 885-6677 • Facsimile: (808) 885-6375

Morikuni Sasakura President

'"11 -.­.... rr:

Page 15: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

--

JOHNWAIHEE GOVERNOR OF HAWAII

c F.B : 0 S

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

P.O. BOX 621

HONOlULU, HAWAII 96809

PUMP INSTALLATION PERMIT

for

Mauna Lani Resort Irrigation Well Well No. 5651-01

South Kohala. Hawaii

KEITH W. AHUE CHAIRPERSON

JOHN C. LEWIN, M.D. ROBERT S. NAKATA

J. DOUGLAS lNG, ESQ. ROBERT G. GIRALD

DAVID NOBRIGA

RAE M. LOUI, P.E. OEPUlY

TO: Mauna Lani Resort, Inc. P.O. Box 4959-HCR 2 Kohala Coast, HI 96743

In accordance with the Department of Land and Natural Resources Administrative Rules, Section 13-168, entitled "Water Use, Wells, and Stream Diversion Works", your application to install a 425 gallons per minute pump in Mauna Lani Resort Irrigation Well (Well No. 5651-01), is approved subject to the following conditions:

1. The Commission on Water Resource Management (Commission), P.O. Box 621, Honolulu, HI 96809, shall be notified, in writing, before any work covered by this permit commences.

2. The permit shall be for installation of a 425 gpm capacity, or less, pump in the well. A means to accurately measure water levels, acceptable to the Commission, shall be provided.

3. The proposed use shall not adversely affect existing or future legal uses of water in the area, including any surface water or established instream flow standards. This permit or the authorization to pump water from the well shall not constitute a determination of correlative water rights. The permittee is notified and by this provision understands that the quantity of water taken from the well could be reduced by the Commission in the future. This permit is not a commitment that the pump capacity permitted here or even some lesser amount is guaranteed in the future.

4. The applicant shall comply with all applicable laws, rules, and ordinances.

5. The applicant shall provide and maintain an approved meter or other appropriate device or means for measuring and reporting total water usage. Water usage and salinity shall be measured on a monthly basis and reported to the Commission.

Page 16: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o PUMP INSTALLATION PERMIT Well No. 5651-01

o Page 2

6. This pennit may be revoked if work is not started within six (6) months of the date of issuance or if work is suspended or abandoned for six months. The work proposed in the pennit application shall be completed within two years from the date of pennit approval.

7. An as-built sectional drawing of the pump installation shall be submitted to the Commission within thirty (30) days after completion of work.

8. The pennit application and staff submittal approved by the Commission at its meeting on June 15, 1994 shall be incorporated herein by reference.

JUL -1 \994

Date of Issuance

I have read the conditions and terms of this pennit and understand them. I accept and agree to meet these conditions as a prerequisite and underlying condition of my ability to proceed.

Applicant's Signature: ""-""' ... :/4--.: ~/~ Date: 7-11 - i~ Printed Name: ____ M_o_ri_kun __ i _Sa_s_a_ku_ra ___________ _

Firm or Title: ____ P_r_e_s_id_e_n_t ______________ _

Please sign and return one copy of this pennit to the Commission and retain a copy for your record.

cc: USGS Department of Health

Safe Drinking Water Branch Ground Water Protection Program Wastewater Branch

Hawaii Department of Water Supply Tom Nance Water Resource Engineering

Page 17: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

Tom Nance Water Resource Engineering

Mr. Edwin T. Sakoda Acting Deputy Director

o

Commission on Water Resource Management Department of Land and Natural Resources State of Hawaii P. O. Box 621 Honolulu, Hawaii 96809

Dear Mr. Sakoda:

Q

As-Built Well Sections for Mauna Lani Resort Irrigation Well Nos. 5651-01. 5650-01. 5650-02. and 5749-01

June 7, 1999 99/313 (99-39)

In response to your June 2, 1999 letter to Mr. Hajime Yoshida at Mauna Lani Resort, we are

enclosing as-built well sections, pump installation drawings, and other relevant data for the four wells

cited in your letter. For clarity, their names and numbers are slightly different than cited in your

letter. In sequence from south to north, they are as follows:

Resort Resort State Number Name Number

4/ Highway I 5651-017 5 <' Entrance' 5650-01 / 6 / I

5650-02) Culvert ''c''

.1 North ./ 5749-01 / 7

Please let me know if there are any other outstanding issues in the processing of the Resort's

applications for Wells 8 and 9 (State Nos. 5849-02 and -03). Thank you for your attention to this

matter.

cc: Sachiko Murano Hajime Yoshida

Enclosures

Sincerely,

Tom Nance

680 Ala Moana Boulevard, Suite 406 • Honolulu, Hawaii 96813-5411 • Phone: (808) 537-1141 • Fax: (808) 538-7757· E-mail: [email protected]

Page 18: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

e o

" I

Page 19: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

)

-PEERLESS PUMP 0". """,.-

SuRFACE GI$CHARGE

.1

7 <t TO FACE OF fLANGE

~ 40 A /i7?7~ M F R. 4!:.~~<!.- TV P E

H. R G¥; vet=fS

I ~t1JO R. P. M. -PH=- ~E

I I' BASE TO t OF 01 SCHARGE

+-+--!::~~~~:-.I DISCHARGE COfv!PANION FLA NGE FO R

I "

l'r'f·~

f..?t>'.blJ( ,:v~ DISCHARGE HEAD

I ~ ~ 0 D. TOP COL. FLANGE ~

1/

I

,'2' . I. D.' OF' WELL

.• ' ~/ OD. OF 7 hCOUPUNG

b" COLUMN .,

I SHAFT

'L I' . II'~ TUBE

UNIT:

ASSEMBLY

e:, STAGE

PUMP RATING

G.P.M. 4 'lcr . ,

FT. FIELD H O.lo/'oZ I

/LJ:!;. ~~~ ;11 Y·"'".A,;J

"?/.,-;.,

I ~I.OI ~blklLl~-{ 'I -1/ ,.

~ Ii;; O. D. Of. BOWLS

~ __ iI .... J~ SUCTION ...., r-J/~ PIPE"

STRAINER:

I

-+141 DIA. HOLES

SQ. CONDUIT I ~ =---=====::r -tt:::*~--1'"

TOP YIEW

TIll PEERLESS PUMP')·

ORDER NO.

USER: I

ITEM NO. PUMP IDENTifiCATION:

;'~IS CERTifiED PRINT

CJ rOR_~.pP.~OY.<\.~.,

·BY·· . .oj.. T E __ _ . • ('1. = t

c::r'~r'crA~! tttNS T RUJ;.I.J.O.N .-----W-j H.TDRODTNA"«" 0 ..... 0 •. •

• '- Aapl .. aI, c..ut.. 1A4.Iaaa.=po=U.-='8 . .:1D:cl. ___ ~ __ ~ ___ ~e~y~= ... ;:_._:: .. =i::. ~{>~A~T~E===~ "",,C __ H __ K~'D-=-By.-.:_A-____ ·DATE: ? /1 "y . DRN. BY: hr-

PlJMP t-J{)

Page 20: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

IttfllJ6 t 1}' 0\;\.­

~u., e,V,.\"'I Gt

ibf c~ fo!r!l ~'1". WS-l4.- $UtL"! a . ..:.\·o

~Ol\.\ of 8: i~'f. '#< 's-w ~L-.~(--)q.[)

+

o

N

~b~ bf ~\"1. W~ _e:-V (:) \".

If

o

:. ~ fUr~l"r 6u.:r~; 'IT!"-G ~~C~C \;)12- S~.A u...

'otxuf1 t'{l...~\ S-rp.. .. n.c..- l-CP!\t.""""- L..2)j~ ~ 'S6-\ ~M L9f ,!;:nn1.Ap ~v:v ~'A-r-o-

I \ "

k c..C~Q t~Gv1.

!J. ~"'O or St\"lf..'V";C, "r~L~~ ~;~V~L.L ~ -sET / I ktotvt:- ~Ci(C M Ci-" 4/',l\oi..P '?;~ L-

9lPS \ -0 \ "------

l1'\nult~ L-t\'N \ IW/4.M\()o.. -Srf,'feWt \U.H~~ (..) ~ "U:fftlfl~,

Page 21: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

I~H

o 4 0 [Y\~~ u;1\ ~ N-<21 (~c..w.v6.'f) ~ t-lo. SGC;I-.O\

::n>~' 6), (C9~t1) ~-\?\,\t L;r INru... ~OOOJ.

-------z---------~; .~

5Cf2.te:N iD'

..,

//¥.A.~,-. I •

( Q..,() (

, ,

_-I ..... , · . " · . " .. . "

) .. ) .. · .

. ~

~ ~

. --.. - .

--...

-

--

", I •

I • , . . ~ ___ '.1-' __ _

i

.IIf

Page 22: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o o

Page 23: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o

Highway #4

State No. 5651-01

o

-- -- -------------- --------- --------

Page 24: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

State of HawaII A COMMISSION ON WATER RESOURC ANAGEMENT Department of Land and Natural Resources

WELL COMPLETION REPORT 9-25-92

839-0901 Inatructlons: Please print or type and submit oompleted raport within 30 days aner well completion to the Connission on Water Resource Management. P.O. Box 821. Honolulu. Hawaii 96809. An as-built drawing 01 the well and c:hen'kal analysis should also be 8Ubmitted. For assistance call the Commission Regulation Branch at 587-0225.

1. 2. 3. 4. 5. 6. 7.

STATE WELL NO. 5651-01 WELL NAME Highway Well (tlo. 4-) ISLAND Hawa i i LOCATION: Address Mauna Lani Resort Tax Map Key 6-8-01: 52 DRIWNG OR PUMP INSTALlATION CONTRACTOR Big Is 1 a nd Dr i 11 i ng CONTRACTOR'S C-57 UCENSE NUMBER C-11456 NAME OF DRILLER WHO PERFORMED WO=-R=-K-:-----nP-a u-'l---nB-e r-g--s"7t -e d"l'Ot""'--

TYPE OF RIG/CONSTRUCTION Cabl e-Too I DATE OF WELL DRIWNG COMP-L-ET-IO-N---'O<-e-c-em""h-e-r-"-lg""a""ar----(NOTE: ~eport must be submitted 'NIthln JO ~ys after this aam;-

8. GROUND E:LEVATION (msl) 121 ft. Top of DrHling Platform (msl) ___ -- ft.

Height of Drilling Platform above Ground surface --:-:::-_-:--__ ft. Bench Mark and Method Used to Determine Ground Elevation ______ ft.

9. DRILLER'S LOG: Wat.r Lev.1 Depth (ft.) Rock Deacriptlon. Remark •. Dat.. (ft.) Depth (ft.) Rock Deacriptlon. Remark •. Dat ••

__ 10 ____ .,..,..,..:--_____ __ to __________ _ __ 10 ____ .uN....,/A:>..-_____ __ to __________ _ __ 10 __ _________ __ 10 __________ _ __ to__ _________ __ 10 __________ _ __ 10__ _________ __ 10 __________ _

__ 10 _________ ~~ to (N more apeoa ia nHded, CiiiiiiiiUe on back.)

10. TOTAL DEPTH OF WELL BELOW GROUND __ ;;..;13;...:O __ ft. 11. HOLE SIZE: 16 inch dia. from ° ft. to _-,1:..:3",,0 __ ft. below ground

_____ inch dia. from ft. to ft. below ground ~::--___ inch dia. from ft. to ft. below ground

12. CASING INSTALLED: 12 in. 1.0. x 0.3125 in. wall solid section to 120 ft. below ground 12 in. 1.0. x 0.3125 in. wall perforated section to 130 ft. below ground

Type c:A Perforation 60 sq. in,/LF 13. ANNULUS: Groufed from ° ft. below ground to _....;3::..::0:....-_ft. below ground

Gravel packed from ft. below ground to ft. below ground

Water Level (It.)

14. INITIAL WATER lEVEL 119 ft. below ground. Date and time of measurement _~N~/-,A~ __ _ 15. INITIAL CHLORIDE ppm Date and time c:A sampling _______ _ 16. INITIAL TEMPERATURE OF Date and time c:A sampling _______ _ 17. DATE OF PUMP INSTALlATION 18. PUMP INSTALLATION: Pump I-ns""t,.-a .... ' ... '-at.,-' ..... ·o-n---...Pe-rmit Pending - Submitted 11-14-91

Pump Type, Make, Serial No. Capacity ___ gpm Motor type, H.P., Voltage, rpm Depth of Pump Intake Setting ____ ft. below ____ " which elevation Is _____ ft. Depth c:A bottom of airline ft. below , which elevation Is ft. Pumping Head Is ft.

19. PUMPING TESTS: ----R::-ef-=-er-e-nce Point (R.P.) used: ____ ' which elevation Is ____ It.

Date 11-11-88 Date ~,--,,.---:--Start water level __ 1_1_8_.6_7_11. below R.P. Stllrt water level _____ ft. below R.P. End water level _____ ft. below R.P. End water level ft. below R.P. Depth c:A well _____ ft. baow R.P. Depth of well ft. b910w R.P.

Contractor (print)

Signature

Draw- a- femll. Ba:-ed down

O (II.) IPP"') • F Time ~;

~.

(gpm)

=r:::mr:: -- to --Lli -- to -- ---~ .,---

4.58 __ --to== == -.IWlli. ...2DJL __ __ to ____ _

(H more..,_ ill Meded, conOrua on back.)

Big Island Drill ing Title

Date

Job No I IFor ornalll Use: LDngrtude

Dr_- 0- T."',I0· down (IL) (ppm) • F

W"No. I Lalilude

Page 25: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

CIl (\)

~ +> en

~

r.. o .... +> (\) (\)

r... .S '0

CIS (\)

::r: t;! .... o

E-<

thc...:r; III 4 4--:. 'C ~ I ~ 'Y

eMAN.. fiiu ••• " .. 0. .".,.ClaNCY .. U .... ..

iii •• rOLLOW. POINT. OF • .,,, .. .

. 'H1+ t Lower .1 J.l J.1o H ,.. . . '\ 2

. :$ Ai·" ri:J 1ii C;.l ~ .\..... itrr t1L j:

- i"IV Q) .H ~t .• ~ 1..1--LH ~~'-: ---'--IMff ~ -t- ;, .!.d: T' IlHi ;~.ii

fi) i-i ':?:~r -, tt~~ .~F7.N~O'!'T~£:"A-"-Y"C-H'''''-''''.-'''-=E~''''F''IC'''I''''"'''CY~ -,";": ~ ttr: ;~~: "~-:i ~ H-H ",. ... a:CT8 EITHER THE H ..... D 0"

J.IO r-. r t ~j-t ~T!--r~t~fIt"-:;'1 HORSI ~OW •• CO.RU~O"DI""L" -=-------tf'tft± 9:! r' " .:w:::rW.~tr~r ,~ __ , ~';--::-1i ;+1' +,r. l!ll '.

+> ·:titl+:;-';I:p-:t'~ 1+': i!i. ,Tt !'tl;tq !~:il :{;dd -""1'1~~ Q) -'.~ t~ 1':~ .. , .. ~,-'- :~.~~ .~.. +t-+- ~_ - 1.::_ 1.1 1-;- t n: (\) "''-, ,., .. ·,·:·;:ir· n7 'f~.~cH •. tt l J·tf 1.11'11111, 1'1>0 ~ .~ ~i-!: ; .. ! Ft, :p.l! ~ __ ·tl~ I+!~. III ,;'i .;, ,t d ++p tt]~t ,::: !.'±' T tffi :;:r.H flirt II.:: ,ill .. t;, ~ +1' ~:t- :~~', ~;.: ::~+;. BJ ~- :l~ CIS + '1 cti-j _ ,~ oJ" l·t ff~ ... j .: I 1.!Sf) (\) t- :=:J+ -I ",' H- L:: :r -'---f~+:xl ,. : til t '%11

ru ~ , 11: ~; 1# 1 ..:1 1+ ct~l' ltJ f-t I~ff . '.'. Iii: ' ' ':Rl ,-H'. :..;~ I ~.!~ r "!t+ -1 - -' 'It-,· i:::

C/o t:-~'H T +H~ [':r!

:ii~ ffi~' H ,. . f~;'

-;1 f:"[~ =S- +1

:r in :u ~[t J. . .. ':It Q)

cl. i -it-a rE I:! .~ "l../_ :j:±±:t± . +> tI \17

ii~\ktt. ~ <. rEm tti.c1 ~ .1 !:t 1-' ~mll{fJ' 0 '4.,1 H liiTtffi ~'n~:{~ ~ t 1-z..4

'Po !: . "itT . ..1-; J-j}li:!:t Il'it rr!!± II t ~ -fH' -I+l+tt-H . ~I~ H . IW 'fp'J IT ~. I-p:J~ :-ri- . ....-. •.• 0 tHtHfl±H

. . 1· • itt I i+ 1+h-rH-t+ 't!. ~ ,:i:ti rl . 0. 2..J ,::.lt14 II~'Fi+ if 1: Lt,H t8 ,TIt i L:·l;::r~:r:;: '1-'--; :.;:; ±H- ~l:':. ~ I

Ii+-! f£ nl, tt~: +rft ~t H, rtf! illi [F ,I tIfr~1# 3f+ l#Ht" '~'l~ ~:;I 8 ~·t~.;. -Itt H ·;11. ~ ." .-t-.L t-~ ~_:. ~-:: +·I~~·"- I !; .. = #!+.!+PI+H

:::. tlT~ } 1 f!itO::JtttJLu~rHll' t . ~ f!T:,m'f'frn~'; ~.j: i!ll.h .. f· • I-tt ,-:. ~ '11~tl::1IU! ~ ... , LO':::. rt ttl iL! ~H i ~:L It': iIll tftn J:r~!H ~~ . ,1 i : ; .. :.;;J ~.~f ~! 1m ~n~~ti-II ~ll >~~."h+' -- ;·H Ii nl-itr. 1 r. --, .•. ,.,- - • ..,. I:tH .• I+t

CURVE IMPELLER IMPELLER TAKEN ,n-JA,</ "..., to ~ r.. l(" / HYDRAUUC PERFORMANCE NO. NO. DIA. FROM Customer: '.r' _'

WARRANTY

Guaranteed at designated point T-84323 UNDERCU~tY~6~' THE WA'r 32825 Item No: ;;t/hAc" d' 4-

CIl (\)

~ .... [f)

oS

r.. .2 r..

Ul CD o M' o· o !-' If>. o

o

~O 0. (\) Ul r.. o ::r: <:

t:rl !:t! 0-3 >-< o ~ only. and contingent on: T 84323 STANDARD FILING 27497 __ .:..... ____ ..L _________________ _

2 - 6 1116" Peerless Ref. No: Proper !low to pump suction

Proper submergence 3 T-84323 61'16" 31374 Laboratory Perlormance BOWL T-84321-E Fluid free of gas, air" abraslvesl--=-_.\-.:..---=-:..:.::=-l~---.:..:......:.::.----+::.-:..:.::....:.. ... ...;;;.;;.;;.;;.;.;;.;;.;.~....;~~;.;;,;.;.;~~--_r-----_______ ..... Proper lateral setting of Impeller 4 o;lZE 9 LA I RPM 1760 CURVE 2842909 _I i

0-3.

~ ~

PUMP DESCRIPTION: Driver ov-€,rJ,. .jO//c~1C<:.- £,v~/A.Je.. ; Head ~)<&1<Iz..f>

GUARANTEED FIELD PERFORMANCE: Capacity 4-z..r gpm; Head I q ~ ft; Eff ~ I Column G::. +' --:-----%; BHP 'Z- (eo

--~--

I'd

~ I'd Ul

Page 26: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

I ' '

o o october 8, 1992

MEMORANDUM FOR THE RECORD

FROM: Bill Rozeboom

SUBJECT: MAUl LANI RESORT: WELL PERMIT VIOLATIONS?

Maui Lani Resort, Inc. presently uses water from four active wells, according to water use reports being submitted by them to us. However, three of the four wells may be lacking the required permits.

Well No. 5750-01: "P#ko" No problems with permit requirements on this well. It was constructed in 1960 and a registration/ declaration of use form was filed for it in 1989.

~ Well No. 5651-01: "Highway" Well may be in service without a pump installation permit. A construction permit for this well was issued in March 1989. A well completion report is ~~ed in the master log as having been ];,-9cQiv ed, but the form is not in the well file. According to water use reports, the well was placed into operational service and withdrawals of water began in July 1990. An application for a pump installation permit was received in November 1991 but there is no indication that this application was ever acted on.

Well No. 5750-03: "Fire station" Well may be in service without a pump installation permit. A construction permit for this well was issued in March 1989. There is no evidence that a well completion report or application for a pump installation permit was ever received for this well. According to water use reports, the well was placed into operational service an withdrawals of water began in July 1990.

Well No. 5750-04: "STP" Well may have been constructed without a construction permit and placed in service without a pump installation permit. I could not a find a file for this well, and it is not listed in the well permit application database. It is, however, marked on our working map showing all assigned well numbers, so some one must know something about it? According to water use reports, the well was placed into operational service an withdrawals of water began in July 1990.

/

l

I < !

I -. ' . -'

Page 27: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o State of HawaII COMMISSION ON WATER RESOURCE MANAGEMENT Department of Land and Natural Resources

WELL COMPLETION REPORT 9-25-92

839-0.901 InstrucUona: Please print or type and submit completed repon within 30 days after well completion to the Corrrnlssion on Water Resource Management, P.O. Box 621, Honolulu, Hawaii 96809. An as-buib drawing of the well and chemical analysis should also be submitted. For assistance call the CollYTlisslon Regulation Branch at 587-0225.

STATE WEll NO. 5651-01 WEll NAME Highway Well ISLAND Hawa i i ~6:---~8--=0~1--:: 5"""2--

1. 2. 3. 4. 5. 6. 7.

LOCATION: Address Mauna Lani Resort Tax Map Key DRILUNG OR PUMP INSTALlATION CONTRACTOR Big Island Drill ing ------CONTRACTOR'S C-57 UCENSE NUMBER C-1T14ii'15~6-"':'------=---------NAME OF DRIlleR WHO PERFORMED WORK Paul Bergstedt TYPE OF RIG/CONSTRUCTION Cab 1 e-Too I DATE OF WELL DRILUNG COMP--L ...... ET ..... , ...... O-N---..-Oe-c--e--m'T"b-er---:rl-'O;:9?:":88~---(NOTE: Report must be submitted within 30 days alter this dam;-

8. GROUND ELEVATION (msl) 121 ft. Top of Drilling Platform (msl) ft. Height of Drilling Platform above Ground surface ft. Bench Mark and Method Used to Determine Ground Elevation ft.

9. DRIlleR'S LOG: Water Level Water Lavel Depth (ft.) Rock Detcrlptlon, Remark., Date. (ft.) Depth (ft.) Rock Description, Remark., Dates (ft.)

__ to__ __ to __________ _ __ to ____ ..L1NLJ/A~_____ __ to __________ _ __ to__ _________ __ to __________ _ __ to__ _________ __ to __________ _ __ to__ _________ __ to __________ _

to to -- -- (If more space ia needed, continue on back.)

10. TOTAL DEPTH OF WEll BELOW GROUND 130 ft. 11. HOLE SIZE: 16 Inch dla. from 0 ft. to __ 1;;..;3...;,0 __ ft. below ground

_____ 'nch dla. from _____ ft. to _____ ft. below ground

----- Inch dla. from ft. to ft. below ground 12. CASING INSTAlLED:

12 In. 1.0. x 0.3125 In.waJlsoildsectlonto 120 ft. below ground 12 In. 1.0. x 0.3125 In. wall perforated section to 130 ft. below ground

Type of Perforation 60 s9. in ./LF 13. ANNULUS: Groured from 0 ft. beiow ground to 30 ft. below ground

-""";;";'---

Gravel packed from ft. below ground to ft. below ground

14. INITIAL WATER LEVEL 119 ft. below ground. Date and time of measurement __ N~/_A~ __ _ 15. INITIAL CHLORIDE ppm Date and time of sampling _______ _ 16. INITIAL TEMPERATURE • F Date and time of sampling _______ _

17. DATE OF PUMP INSTALlATION ---.,.~...--:".....----=_ 18. PUMP INSTALlATION: Pump Installation Permit Pending - Submitted 11-14-91

Pump Type, Make, Serial No. ____________ Capacity ___ gpm

Motor type, H.P., Voltage, rpm Depth of Pump Intake Setting ____ ft. below ____ , which elevation Is _____ ft. Depth of bottom of airline _____ ft. below _____ ,' which elevation Is ft. Pumping Head Is _____ ft.

19. PUMPING TESTS: Reference Point (R.P.) used: ____ ,. which etevation Is ____ ft. Date 11-11-88 Date

-~:----:--

Start water level _~1~18.;;....;...;.6...;..7_rt. below R.P. Start water level End water level _____ ft. below R.P. End water level Depth of well _____ ft. boaIow R.P. Depth of well

8.0Nd nme (hou~)

12:0710 1:z;]Z to iZill 12:12 to 1L:AO f'2"':'Zffi to rz:zr7 l."f:47 to T:T5 J:I5: toIJ1

~

(gPQ")

225 ~§e 475 600+

Draw­down (ft.) o 1.08

§:~~ 4.58 8.08

CI- Tem~. 8a;Md \PPfl1) 0 F nme (hou~;

~

~ .. (gpm)

==to== __ _ __ to ____ _ __ 110 ____ _ __ to __

760 __ to ____ _

(H more space is needed, continue on beck.)

_____ ft. below R.P. ft. below R.P.

. ft. b-3Iow R.P. -----Draw­

down (ft.) CI­

(ppm) Terr.~.

OF

Rem8rkS: _____________ ~~~~~~~~~~~~-----------------------(If more space Is needed, conllnue on beck.)

Contractor (print)

Signature

Big Island Drilling

I~:'_use_: ____ Job No. ___ I T~e ______________________ __

Date

For OffIcial Use:o , II WeM No. 56 5 I - 0 I Longitude 155 51 05 latitude 19 0 56' 08"

Page 28: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

9.(confd) DRILLER'S LOG (confd):

Depth (ft.) to to to to to to

Rock DMcrIptIon, Remarlc., Date.

19. (cont'd) PUMPING TESTS (oont'd):

Elapsed Time (hours)

to to to

Rate (gpm)

to __ _

10 to

Draw- CI-down (ft.) (ppm)

----- ------

Water Level (ft.)

T.",. 'f

Depth (ft.) to to to to to to

s.peed TIme (hours)

to to to to to

Rock DelCrlptlon, R.mark., Dat ••

Rata (gpm)

Draw- 0-down (tt) (ppm)

__ to ____ _

Wat.r Level (ft.)

T.",. 'f

Remarks(contd): ________________________________ _

....... ~ o

Page 29: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o Transmittal o TOM NANCE WATER RESOURCES ENGINEERING

Job No: _____ _

680 Ala Moana Blvd .. Suite 100. Honolulu. Hawaii 96813 Phone: (808)521-5361. FAX: (808)538-7819

DATE: September 24, 1992

c-:j' ,....~ TO: Department of Land and Natural Resources

Commission on Water Resource Management P.O. Box 373

f4l ;a -0

Honolulu, Hawaii 96809 '" 0>

):II

CD ATTENTION: Ed Sakoda .-

SUBJECT: c,.)

Mauna Lani Resort - Irrigation Well Completion Reports for Well No. 5750-03 and 5651-01.

We herewith transmit the following:

1 9/25/92

1 9/25/92

Remarks:

Mauna Lani Resort - Well Completion Report for Fire Station Well, State Well No. 5750-03.

Mauna Lani Resort - Well Completion Report for Highway Well, State Well No. 5651-01.

We herewith transmit the above reports for your files. We filled out these reports with infonnation we have in our files and left blank items where we did not receive any data from the driller. Also, we did not sign either report for the driller.

Please feel free to call the undersigned if there are any questions regarding this matter.

Sincerely, Tom Nance Water Resources Engineering

~gkW..d Greg Fukumitsu, P.E.

cc: Billy Spitz, Mauna Lani Resort

. .." .:'"') . t~ ." . . ,~

rn ;:J:

Page 30: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

JOHN WAIHEE

GOVERNOR OF HAWAII

82 JAN 6

c ED

All : 28 STATE OF HAWAII

DEPARTMENT OF LAND AND NATURAL RESOURCES STATE HISTORIC PRESERVATION DIVISION

33 SOUTH KING STREET, 6TH FLOOR

HONOLULU, HAWAII 96813

January 3,

WILLIAM W. PATY, CHAIRPERSON

BOARD OF LAND AND NATURAL RESOURCES

DEPUTIES

KEITH W. AHUE MANABU TAGOMORI

DAN T. KOCHI

AQUACULTURE DEVELOPMENT PROGRAM

AQUATIC RESOURCES CONSERVATION AND

ENVIRONMENTAL AFFAIRS CONSERVATION AND

RESOURCES ENFORCEMENT CONVEYANCES FORESTRY AND WILDLIFE HISTORIC PRESERVATION

PROGRAM LAND MANAGEMENT STATE PARKS WATER RESOURCE MANAGEMENT

LOG NO: 4377 MEMORANDUM DOC NO: 0041X

TO: Manabu Taqomori, Deputy Director Commission on Water Resource Manaqement

FROM:

SUBJECT:

Don Hibbard, Administrator State Historic Preservation Division

State of Hawaii--Pump Installation Permit Application (Well No. 5651-01), Mauna Lani Waikoloa, South Kohala, Island of Hawaii TMK: 6-8-01: 52

HISTORIC PRESERVATION PROGRAM CONCERNS:

Archaeoloqical surveys as recent as 1986 recorded siqnificant historic sites in areas just west of the subject parcel, with similar type of terrain, and oceanside of Queen Kaahumanu Hiqhway. These historic sites include cave shelters, quarries, and foot trails a few of which are slated for preservation. We have no records of any siqnificant historic sites in the subject parcel but we have no reason to believe that this area will be different from the areas cited above to contain significant historic sites. Therefore, we recommend that the pump installation site and access roads be surveyed archaeoloqically to determine if siqnificant historic sites are present. The results of the survey should be submitted to us for review in report format. We request that your office take no action on this application until we have received and reviewed the above-recommended archaeoloqical survey report.

If you have any further questions, please contact Kanalei Shun at 587-0047.

KS:jle

---------------_. __ .. _--------------------

Page 31: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the
Page 32: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o o JOHN WAIHEE JOHN C. LEWIN, M.D.

GOVERNOR OF HAWAII DIRECTOR OF HEALTH

91 0 E C 23 A 8: 54 STATE OF HAWAII

:...f. i,"',!,;: -':. n::r{ PEPARTMENT OF HEALTH '. - , . , - •. ,-" P. O. BOX 3378

U,;~J ;;~ u:ji'~'iENT HONOLULU, HAWAII 96801

December 11, 1991

Mr. Manabu Tagomori, Deputy Director Commission on Water Resource Management Department of Land and Natural Resources State of Hawaii P.O. Box 621 Honolulu, Hawaii 96809

Dear Mr. Tagomori:

SUBJECT: PUMP INSTALLATION PERMIT APPLICATION MAUNA LANI IRRIGATION WELL STATE WELL NO. 5651-01 MAUNA LANI RESORT, HAWAII

In reply, please refer to:

EMO / SOWB

Thank you for the opportunity to review and comment on the subject document. We have examined the application and have the following comments to offer:

1. The application indicates that the proposed well will be used for golf course and landscape irrigation. Thus, Hawaii Administrative Rules, Title 11, Chapter 20, Potable Water Systems, will not be applicable. However, in the event that the proposed use of the well were to Change, the Safe Drinking Water Branch must be notified.

2. The proposed well is situated above the Underground Injection Control (UIC) line. Land areas above the UIC line are considered to contain underground sources of drinking water. Thus, it is essential that the well be designed and constructed to prevent the possibility of groundwater contamination. For example, the well should have a concrete well pad and full grouting to prevent seepage or floodwaters from migrating down the well shaft.

3. The operation of the well should not be allowed to adversely affect the water quality of nearby water wells. The map accompanying the application indicates that the proposed well will be located within 4,000 feet of the state well nos. 5650-01 and -02.

Page 33: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

I ./ o Lorraine R. Inouye

Mayor

Bruce C. McClure Chief Engineer

Laurence E. Capell as Deputy Chief Engineer

County of Hawaii • 25 Aupuni Street, Room 2'!] r w~oCHrgaii .ac}'(f~ . ~i) 961-8321 • Fax (808) 969-7138

December 13, 1991

MR MANABU TAGOMORI DEPUTY DIRECTOR DEPARTMENT OF LAND AND NATURAL RESOURCES COMMISSION ON WATER RESOURCE MANAGEMENT POBOX 621 HONOLULU HI 96809

SUBJECT: WELL CONSTRUCTION PERMIT APPLICATION

We have reviewed the subject permit application and have no objections to the proposed well being constructed.

1. Kealakehe-DWS, Well No. 4057-04 TMK: 7-4-3: por. 5

2. Honokohau-DWS, Well No. 4158-02 TMK: 7-4-5: 2

3. Mauna Lani Irrigation, Well No. 5651-01 TMK: 6-8-01: 52

IROB~~BU. DiVision Chief iEngi neert~~A~~ vi si on

GR:byf

Page 34: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o JOHN WAIHEE

WILLIAM W. PATY GOVERNOR OF HAWAII

CHAIRPERSON

JOHN C. LEWIN. M.D.

STATE OF HAWAII MICHAEL J. CHUN. Ph.D.

DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

REF:WRM-FC

Mr. Clayton H. W. Hee Chairman & Trustee At Large Office of Hawaiian Affairs 1600 Kapiolani Blvd., Suite 1500 Honolulu, Hawaii 96814

P. O. BOX 621

HONOLULU. HAWAII 96809

DEC 5 1991

Attn: Ms. Linda Delaney, Land & Natural Resources Division

Dear Mr. Hee:

Well Construction and Pump Installation Permit ApplicationCs) •

Transmitted for your review and comment is a copy of the following permit application(s) :

Island Well Name Well No. Application Type

Hawaii Kealakehe-DWS 4057-04 Well Construction Hawaii Honokohau-DWS 4158-02 Pump Installaion Hawaii Mauna Lani Irrigation 5651-01 Pump Installation

ROBERT S. NAKATA

RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, ten (10) working days from date of this letter.

Should you have any questions, please contact Manabu Tagomori, Deputy Director at 587-0214.

Very truly yours,

Enc.

Page 35: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o o JOHN WAIHEE

GOVERNOR OF HAWAII

WILLIAM W. PATY

CHAIRPERSON

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. Bill Spitz Mauna Lani Resort, Inc. P.O. Box 4959 - HCR 2 Kohala Coast, Hawaii 96743

Dear Mr. Spitz:

P. O. BOX 621

HONOLULU. HAWAII 96809

DEC - A 1991

JOHN C. LEWIN. M.D. MICHAEL J. CHUN. Ph.D.

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

We have received your application and filing fee for a permit to install a pump in a well (Well No. 5651~01) at Waikoloa, Hawaii, (TMK 6-8-01:52). We are reviewing the application for completeness.

Should you have questions, please call the Division of Water Resource Management at 587-0225.

erelY~

ABU T~""'~-I _______ '"'1

NF:fc

Page 36: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

JOHN WAIHEE

GOVERNOR OF HAWAII

o o WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN. M.D.

STATE OF HAWAII MICHAEL J. CHUN. Ph.D.

DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. William Sewake, Manager Department of Water Supply County of Hawaii 25 Aupuni Street Hilo, Hawaii 96720

Dear Mr. Sewake:

P. O. BOX 621

HONOLULU. HAWAII 96809

DEC - 4 1991

Well Construction and Pump Installation Permit ApplicationCs)

Transmitted for your review and comment is a copy of the following permit application(s) :

Island

v1-1awaii

Well Name

Mauna Lani Irrigation

Well No. Application Type

5651-01 Pump Installation

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, ten (10) working days from date of this letter.

Should you have any questions, please contact the Division of Water Resource Management at 587-0225.

NF:fc Enc.

UT~~------_f. Director

Page 37: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o o JOHN WAIHEE WILLIAM W. PATY

GOVERNOR OF HAWAII CHAIRPERSON

JOHN C. LEWIN. M.D.

MICHAEL J. CHUN. Ph.D.

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. Thomas Arizumi, Chief Environmental Management Division State Department of Health Five Waterfront Plaza 500 Ala Moana Blvd., Suite 250 Honolulu, Hawaii 96813

Attn: Mr. William Wong

Dear Mr. Arizumi:

P. O. BOX 621

HONOLULU. HAWAII 96809

DEC - 4 1991

Well Construction and Pump Installation Permit ApplicationCs)

Transmitted for your review and comment is a copy of the following permit application(s) :

Island Well Name Well No. Application Type

Hawaii Kealakehe-DWS 4057-04 Well Construction Hawaii Honokohau-DWS 4158-02 Pump Installaion Hawaii Mauna Lani Irrigation 5651-01 Pump Installation

ROBERT S. NAKATA

RICHARD H. COX GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, ten (10) working days from date of this letter.

Should you have any questions, please contact the Division of Water Resource Management at 587-0225.

NF:fc Enc.

rL~~ ___ .. UTA~ Direc~?MOfI

Page 38: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

JOHN WAIHEE

GOVERNOR OF HAWAII

o o

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. Bruce C. McClure Chief Engineer Department of Public Works County of Hawaii 25 Aupuni Street Hilo, Hawaii 96720

Dear Mr. McClure:

P. O. BOX 621

HONOLULU. HAWAII 96809

DEC - 4 1991

Well Construction and Pump Installation Permit Application(s)

Transmitted for your review and comment is a copy of the following permit applicationCs) :

Island Well Name Well No. Application Type

Hawaii Kealakehe-DWS 4057-04 Well Construction Hawaii Honokohau-DWS 4158-02 Pump Installaion Hawaii Mauna Lani Irrigation 5651-01 Pump Installation

WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN. M.D. MICHAEL J. CHUN. Ph.D.

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Please review the applicationCs) pursuant to your area of concern and submit your comments to us, orally or in writing, ten (10) working days from date of this letter.

Should you have any questions, please contact the Division of Water Resource Management at 587-0225.

NF:fc Ene.

" -----'"

Page 39: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

JOHN WAIHEE

GOVERNOR OF HAWAII

o o

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Ms. Marjorie Ziegler Sierra Club Legal Defense Fund, Inc. 212 Merchant Street, Room 202 Honolulu, Hawaii 96813

Dear Ms. Ziegler:

P. O. BOX 621

HONOLULU, HAWAII 96809

DEC - 4 1991

Well Construction and Pump Installation Permit Application(s)

WILLIAM w. PATY

CHAIRPERSON

JOHN C. LEWIN, M.D. MICHAEL J. CHUN, Ph.D.

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Transmitted for your information are copies of recent well permit application(s):

Island Well Name Well No. Application Type

Hawaii Kealakehe-DWS 4057-04 Well Construction Hawaii Honokohau-DWS 4158-02 Pump Installaion Hawaii Mauna Lani Irrigation 5651-01 Pump Installation

Should you have questions, please contact the Division of Water Resource Management at 587-0225.

NF:fc Enc.

------, A

Page 40: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o o State of Hawaii

DEPARTMENT OF LAND AND NATURAL RESOURCES Division of Water Resource Management

Honolulu, Hawaii

DEC - 4 1991

MEMORANDUM

TO:

FROM:

SUBJECT:

Don Hibbard, Director Historic Preservation Program

Manabu Tagomori, Deputy Director Commission on Water Resource Manage

Well Construction and Pump Installation Pe 't Application(s)

Transmitted for your review and comment is a copy of the following permit application(s) :

Island Well Name Well No. Application Type

Hawaii Kealakehe-DWS 4057-04 Well Construction Hawaii Honokohau-DWS 4158-02 Pump Installaion Hawaii Mauna Lani Irrigation 5651-01 Pump Installation

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, ten (10) working days from date of this memo.

Should you have any questions, please contact the Division of Water Resource Management at 587-0225.

NF:fc Ene.

Page 41: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

JOHN WAIHEE

GOVERNOR OF HAWAII

c o WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN. M.D. MICHAEL J. CHUN. Ph.D.

STATE OF HAWAII

REF:WRM-FC

DEPARTMENT OF LAND AND NATURAL RESOURCES •

COMMISSION ON WATER RESOURCE MANAGEMENT

Honorable Hoaliku L. Drake Director

P. O. BOX 621

HONOLULU. HAWAII 96809

DEC A 1991

Department of Hawaiian Home Lands State of Hawaii P.O. Box 1879 Honolulu, Hawaii 96805

Dear Mrs. Drake:

Well Construction and Pump Installation Permit ApplicationCs)

Transmitted for your review and comment is a copy of the following permit application(s) :

Island Well Name Well No. Application Type

Hawaii Kealakehe-DWS 4057-04 Well Construction Hawaii Honokohau-DWS 4158-02 Pump Installaion Hawaii Mauna Lani Irrigation 5651-01 Pump Installation

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, ten (10) working days from date of this letter.

Should you have any questions, please contact Manabu Tagomori, Deputy Director at 587-0214.

Ene.

Page 42: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

-r o

State of Hawaii o COMMISSION ON WATER RESOURCE MANAGEMENT 1'1 W9artment of Land and Natural Resources

Division of Water Resource Management

,t,".) t".~,'" '.1 18 A '1' U": U 7 31 . 'T r APPLICATION FOR

11-6-91 154-11

INSTRucTIONS: Plelle print or type and send completed application with anachment. to the DiVisIon or Water and Land Development. P.O. Box 373. Honolulu. Hawall 1S80'. Application must be accompanied by a non-retundable filing tee of $25.00 pAyable to the Department of Land and Natural RelOurcn. (FUIng fee walved for government agendes.) If necessary. phone 548-7543. HydrololQ"Ceology Section (or .. slltance.

1. WELL LOCATION

Island Hawa i i

Address

Tax Map Key 6-8-01: 52

Mauna Lani Resort State Well No. 5651-01 --------------------------------------------------------------------------------------------------

(Attach a USGS map (scale 1"=2000') and property tax map showing well location referenced to established property boundaries.)

2 . WELL OWNER LANDOWNER

Firm Name Mauna Lani Resort, Inc. Firm Name Mauna Lani Resort, Inc.

Contact Person Bill Spitz Contact Person Bill Spitz -----------~-----------------------Address P.O. Box 4959 - HCR 2 Address P.O. Box 4959 - HCR 2

Kohala Coast, Hawaii 96743 Kohala Coast, Hawaii 96743

Phone ------------------885-6677 Phone __ 8_8_5-_6_6_7_7 ___ _

3. PROPOSED CONTRACTOR FOR: DWell Drilling .Pump Installation

Name Roscoe Moss Hawaii, Inc.

Address 830 Ahua Street

Honolulu, Hawaii 96819

4. PROPOSED WORK

Phone 839-6888

Contractor's License No. 16437

o Drill New Well 0 Deepen 0 Redrill n Alter D Seal D Abandon • Install New Pump CJ Replace Pump 0 Modify Pump

(B riefly describe the proposed work and fill in the diagram on the back of this form.)

5. PROPOSED USE

OMunicipal (including hotels, stores, etc.) CJMilitary CJDomestic (individual, noncommercial water systems) CJ Industrial .Irrigation (specify) Golf Course and Other LandscapDOther (specify) ___ _

6. PROPOSED AMOUNT OF WITHDRAWAL 610,000 gallons per day

7. PROPOSED PUMP INFORMATION

Pump Type: .Vertical Turbine o Submersible OCentrlfugal Motor: ODiesel OGas .Electric: __ 2_0 __________ Rated Horsepower Rated Pump Capacity 425' gallons per minute (gpm)

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • * • * 4.T1( /<.6>0/<.7;",

Well Owner ,y/ /<Ii:solil: 1tK.

_1t!!~2i'!!f!~~=:':"; Landowner (print)

Fer' Official

Fie ld Checked By _________ _ Lati tude ____ _ Hydro logic Unit _____________ _

rate ---------------------------------

wngi tude ____ _ State Welt No. 8- s~s;/-o / ,

Page 43: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

Briefly describe the proposed work:

A new pump will be installed in the well. It is to be used for golf course .

and other landscape irrigation.

Elevation at top of casing 121 ft. t msl.~

Cement Grout 30 ft. ---+---41 ....

Hole Dia. 17 in. ----1-..111

Total Depth ~ ft.-~

Rock Packing None ft.

PROPOSED SECTION OF WELL

Ground Elev. 121 ft. t msl· --~~~~~~--------

Solid Casing: Steel Material

Length 120 ft.

Diameter 12 in.

Wall thickness 0.3125 in.

I IScreen

VCaSing: I IPerforated

I Material Stee 1 --------------------. Length ____ 1_0 _____ ft.

I Diameter 12 in. I 0.3125 in. Wall thickness

sq. in. / L . F. ----60

10 feet

Diameter ___ 1_2 ______ in.

• Approximate elevation at time of filing application. Final elevation (msl) by a surveyor licensed by the State must be submitted at start of construction.

c o

Page 44: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

./ .// / . .';

/ /

KALAE

ISLAND OF HAWAII o~ SCALf IN MIL!

----s/- __

----_ /

Mauna Lani Irr. Well

(Well No. 5651-01) I

/~

Page 45: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o ~ . ..- ~

r '· fR- ~ \ ... \.- V i!o"

".,-,~"""" !O

Mr. William Paty Commission on Water Resource Management Department of Land & Natural Resources State of Hawaii P. O. Box 621 Honolulu, Hawaii 96809

Dear Mr. Paty:

Pump Installation Permit Application for Mauna Lani Resort South Kohala, Hawaii

o [: Q li 'November 14, 1991

91TN-134 (154-11)

The enclosed permit application and $25 filing fee are submitted on behalf of Mauna Lani Resort. The pump would be installed in completed well (No. 5651-01) to augment the supply capability of Mauna Lani's private, non-potable water system. This system is used to irrigate its two golf courses and roadway landscaping.

If any questions arise during your review of this application, please call Bill Spitz at Mauna Lani Resort (885-6677) or me. Thank you for your attention to this matter:

Sincerely,

Tom Nance

cc: Bill Spitz

Enclosures

680 Ala Moana Boulevard, Suite 200 • Honolulu, Hawaii 96813 • Phone: (808) 521-5361 • Fax: (808) 538-7819

A Belt Collins & Associates Company

Page 46: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

HONOLULU, HI 96813 161 SOUTH KING STREET HONOLULU. HAWAII 96813

November 14, 19~

TO THE

ORDER OF

Department of Land and Natural Resources

BELT COLLINS AND ASSOCIATES

JANCE) LTD"

I DATE

DETACH AND RETAIN THIS STATEMENT THE ATTACHED CHECK IS IN PAYMENT OF ITEMS DESCRIBED BELOW. IF NOT CORRECT PLEASE NOTIFY US PROMPTLY. NO RECEIPT DESIRED.

DELUXE FORM WVC-3 Y-2

DESCRIPTION

11-14-91 Filing Fee: Pump Installation Permit Application for Mauna Lani Resort (Job No. 154-11)

We,// #0, S-bS/-O /

0237

59-101 1213

AMOUNT

$25.00

i I

I

'f.:j'

Page 47: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

,.,

Page 48: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

Form 8810-1

o o

STATE OF HAWAII COMMISSION ON WATER RESOURCE MANAGEME~J'\ Y J'10 jl LJ; I 7

DEPARTMENT OF LAND AND NATURAL RESOURCES .J v II'

\ ' "~

DIVISION OF WATER RESOURCE MANAGEMENT

11 1'1 I: I "I r. 'lOr-I) " • r "'. , t ., (. ~ \ fi~

REGISTRATION OF WELL L'·'···U' "/''''-''T !-\! iU :_ i lu)1 'i' Itl~ AND

DECLARATION OF WATER USE

INSTRucnoN8: Please Iype or prlnl. H Inlonnallon Is nol available or nol appUcable. Indlcale 81 N1A. All out as completely 81 possible. sign, and llie lorm wtth the DMsion 01 Water Resource Management. P.O. Box 373. Honolulu. Hawaii 96809. Phone 5-4&-~ or 548-7543 lor assillance.

BATTERY OF WELLS: For a banery 01 wells. on the surface, In a tunnel, or In a shaft, submit a registration lorm lor each well together with a single map or plot plan showing layout 01 wells; - '

STATE WELL NO.: 5651-01

WELL NAME OR DESIGNATION: ___ ' _f_./o_n_e __ (-"' ....... ).\'O';;·.,'i-,'-t--',·I""".\1A.....,:I&J+--________ _ .. '-i.-'

ISLAND: __ H_a_I,,_a _i ,_. __

SOURCE OR STATION NAME (For a banery 01 wens): ________________ _

A. WELL OPERATOR B. OWNER OF WELL SITE Firm name: ~1auna Lani Resort, Inc. Firm name: ~1auna Lan; Resort, Inc.

Contact person: f1i ke Gomes Contact person: Tom Yamamoto Address: P. O. Box 4959 - HCR 2 Address: P.O. Box 4959 - HCR 2

Kohala Coast, Hawaii Kohala Coast, Hawaii Zip: 96743 Phone: 885-6677 Zip: 96743 Phone: 885-6677

C. WELL LOCATION Tax Map Key: 6-8-22: 32 Town, Place,' District: South Koha 1 a, Ha\'1a;;

Attach USGS "Quad" map (scale 1 :24,000), tax map, or other map showing the well location.

D. WELL DATA For Drilled Well •. submft "as-bulft" drawing, driller's log, and pump test results, and complete Items below.

For Tunnels and Shafts, submit construction drawings, plo! plan, or sketch map.

Ground elevation (Mean sea level): 121 ft. Reference point (Used to measure depth to water):

Elevation: 122 ft. Description: Top of Cas; n9

Depth to water (Below reference point): 120 ft. Maximum recorded chloride: ppm Minimum recorded chloride: ppm Maximum chloride in 1987: ppm

E. INSTALLED PUMP DATA

Year drilled or constructed: 1988 Well contractor: Big Is 1 a nd Dr; 11 i ng

Casing diameter: __ ---:1:.;:2=---__ --:;-;:;;:;-_ in. Solid caSing depth (Below grolXld): 120 ft. Perforated casing depth (Below ground): 130 ft. Total depth of well: 130 ft. Chlorides in initial pump test: 820 MGL. Minimum chloride in 1987: ______ ppm

Pump type: 0 Vertical shaft D Submersible D Centrifugal D Other (specify): -----­Power: D Diesel, __ HP D Gas, __ HP 0 Electric. __ HP D Other (spedy): ----Pump capacity: gallons per minute Pump installation contractor: tlo pump; not in us e yet"

... (continued over)

For Official Use Only: Date received: ___ Date accepted: __ _ Field checked by: ____ Date: Latitude: ____ _ Hydrologic Unit: ___ _

Comments: ____________ Longitude: ____ _ State Well No.: ___ _

References: Hawaii Revised Statutes, Chapter 174C. Hawaii Administrative Rules, Chapters 13·167 to 13-171.

Page 49: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o o

1.\1arch 20, 1989

Mauna Lani Resort, Inc. nCR-2, P.O. Box 4959 (Kohala Coast) Kamuela, Hawaii 96743

,..,.--Gentlemen:

/~ I am pleased to inform you that the Commission on Wnter Resource t1anagement approved your request for two \VeIl construction permits at its l\~arch 15 t 1989 meeting.

--_. Attached are your permits as well es the following forms that are required under the conditions of the permits:

Application for Pump Installation Permit Well Completion Report

If you have any questions, please contnct rJr. Dan Lum at 548-7643.

\ ~incercly , \ , /

ES:ko Enc.

i~; },:L . ~~~:!of-' ' De uty Director

Page 50: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

JOHN WAIHEE

GOVERNOR OF HAWAII

o o WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN. M.D. MICHAel J. CHUN. Ph.D.

STATE OF HAWAII ROBERT S. NAKATA RICHARD H. COX. P.E.

DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT GUY K. FUJIMURA

P. O. BOX 621

HONOLULU. HAWAII 96809

MANABU TAGOMORI. P.E.

WELL CONSTRUCTION PERMIT

for

Mauna Lani Resort Well State Well No. 5651-01

Waikoloa, South Kohala, Hawaii

TO: Mauna Lani Resort, Inc. HCR-2, P.O. Box 4959 (Kohala Coast) Kamuela, Hawaii 96743

In accordance with the Department of Land and Natural Resources Administrative Rules, Section 13-168, entitled "Water Use, Wells, and Stream Diversion Works", your application to construct and test State Well No. 5651-01 for golf course irrigtion use within Tax Map Key: 6-8-22:32 is approved subject to the following conditions:

1. The Division of Water and Land Development (DOWALD), Geology-Hydrology Section, shall be notified at 548-7619, before any work covered by this permit commences.

2. The permit shall be for construction and testing only. No permanent pump may be installed and no water used from the well without the necessary pump installation permit from the Commission. Prior to any planned use, the well shall be pump tested to determine the safe yield and any potential impact on surrounding wells. A step drawdown test and a sustained rate pumping test of at least 72 hours shall be conducted for each well.

3. The following shall be submitted to DOWALD, P.O. Box 373, Honolulu, Hawaii 96809 within 30 days after completion of the well:

a. Well Completion Report.

DEPUTY

Page 51: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o WELL CONSTRUCTION PERMIT State Well No. 5651-01

o

Ground elevation (referenced to mean sea level) determined by survey by a Hawaii-licensed surveyor. Static water level shall be measured by the driller using the survey data as reference.

c.

d.

e.

As-built sectional drawing of the well.

Plot plan and map showing the exact location of the well.

Complete pumping test record; including time, pumping rate, drawdown, chloride content, and water quality data.

4. The applicant shall comply with all applicable laws, rules, and ordinances.

5. This permit may be revoked if work is not started within six months of date of issuance or if work is suspended or abandoned for six months. The work shall be completed within two years of the date of issuance.

MAR 23 1989

Date of Issuance

cc: USGS Department of Health,

Drinking Water Program Ground Water Protection Program

Maui Department of Water Supply Belt Collins & Associates

Page 2

Page 52: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o State of Hawaii

COl\1MISSION ON WATER RESOURCE MANAGEMENT Department of Land and Natural Resources

Honolulu, Hawaii

March 15, 1989

Chairperson and Members Commission on Water Resource Management State of Hawaii Honolulu, Hawaii

Gentlemen:

Mauna Lani Resort, Inc. Application for Well Construction Permits

Mauna Lani Irrigation Wells, Waikoloa, South Kohala, Hawaii

Applicant: Mauna Lani Resort, Inc. HCR-2, P.O. Box 4959 Kohala Coast, Hawaii 96743

Action Requested: Permission to construct and test two 12-inch diameter, exploratory wells (State Well Nos. 5651-01 and 5750-03) for golf course irrigation.

Well Location: The proposed well sites are in Waikoloa, South Kohala, Hawaii, at Tax Map Keys: 6-8-22:32 and 6-8-01:52 (see attached map).

Proposed Use of Well: To construct and test for two new sources of water for golf course irrigation.

Well Description: Well 5651-01 Well 5750-03

Ground elevation: 125± ft. 90± ft. Casing diameter: 12-inch 1. D. 12-inch 1.D. Solid casing depth: 123± ft. 88± ft. Screen casing depth: 10 ft. 10 ft. Open hole: 2 ft. 2 ft. Open hole diameter: 10 inches 10 inches Total depth: 133 ft. 100 ft. Grouted annulus: 0-100 ft. 0-80 ft. Proposed pump capacities: 700 gpm 700 gpm

Agenc~ Review: The application has been sent to the State Department o Health (DOH), the Hawaii Department of Water Supply (DWS), and the County Department of Public Works (DPW) for review. DWS and DPW had no objections. DOH expressed concern that portions of the golf course irrigated by the proposed wells appear to be situated above the Underground Injection Control (UIC) line and various golf course-associated activities should not be allowed to contaminate groundwater. The applicant has informed staff that no portion of the golfcourse is situated above the UIC line. DOH also noted that Well 5651-01 is located above the UIC line and should be designed and constructed to prevent the possibility of groundwater contamination.

Analysis: The wells are expected to encounter a thin (3± ft.), brackish basal lens.

The closest well to Well 5651-01 is approximately two miles southwest along the coastline and is used for irrigation of the Waikoloa Beach Resort golf course.

ITEM 2

Page 53: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the
Page 54: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o o Chairperson and Members COMMISSION ON WATER RESOURCE MANAGEMENT March 15, 1989

There are three existing wells within a mile and a half north of Well 5750-03. The closest (2,300 ft. away) is unused. Another (3,100 ft. _away) is used intermittently for nursery irrigation, and the third (a mile and a half away) is used for golf course irrigation. All three wells are owned by Mauna Lani Resort, Inc.

There are two wells mauka of Well 5750-03. The closest (2 miles away) is unused. The other (3 miles away) is used for irrigation of the Waikoloa Village golf course.

RECOMMENDATION

That the Commission approve the issuance of a well construction permit for construction and testing of Mauna Lani Irrigation Wells, subject to the following conditions:

(1) The Division of Water and Land Development (DOWALD) shall be notified before work commences.

(2) The permit shall be for construction and testing only. No permanent pumps may be installed and no water used from the wells without the necessary pump installation permits. Prior to any planned use, the wells shall be pump tested to determine the safe yield and any potential impact on surrounding wells. A step draw down test and a sustained rate pumping test of at least 72 hours shall be conducted for each well.

(3) The following shall be submitted to DOWALD within 30 days after completion of the wells:

a. Driller's Well Completion Report.

b. Ground elevations (referenced to mean sea level) determined by survey by a Hawaii-licensed surveyor. Static water levels shall be measured by the driller using the survey data as reference.

c. As-built sectional drawings of the wells.

d. Plot plans and map showing the exact locations of the wells.

e. Complete pumping test record; including time, pumping rate, draw down , chloride content, and water quality data.

(4) The applicant shall comply with all applicable laws, rules, and ordinances.

(5) The permit may be revoked if work is not started within six months of date of issuance or if work is suspended or abandoned for six months. The work shall be completed within two years of the date of issuance.

Attach.

SUBMITTAL:

WILL

-2-

~(lr-

BU TA OMORI Y Director

-,

Page 55: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

....... '<.: . . ~ "

/

..... ~ .. ~ .=--..-::. r--

I

'-. (

'-) r'~"::> I

"- ,.. .. ~~." . . ~;i·o·· \.., , ... ;.:~~ (----.-;......... ~-

I.. , .. / .... ~\.::.\

1/ '­ ,

/

(

~ IC~I III "11..1

. . . ISLAND OF HAWAII

Page 56: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

KAPOHO

KALA[

~ ISLAND OF HAWAII

. . . IC .... ' ... III'"

Page 57: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

I()(~

JOHN WAIHEE GOVERNOR OF HAWAII ", " F C L' r" i

v;:; L i; L.-; 39 FEB27 JOHN C. LEWIN. M.D.

A 7: 57 STATE OF HAWAII

:; . I c" . , ,_" i ;;') DEPARTMENT OF HEALTH '-" J';;~ ! U:',.; . ,:: ,;' I \l1"f"'~~ P. O. BOX 3378

r'~:~ ','--:.,; ~\~~v'i.Ji'\Jt~ .) I j,i 1 E ul- tiA WAJJ HONOLULU. HAWAII 96801

February 17, 1989

A Ill: 29 DIRECTOR OF HEALTH

fJ/V. OE ty.4 TER & LAND DE VtLOPMENT

In reply. please refer to: EPHSD

The Honorable William W. Paty, Chairperson Commission on Water Resource Management Department of Land and Natural Resources State of Hawaii P.O. Box 621 Honolulu, Hawaii 96809

Dear Mr. Paty:

SUBJECT: WELL CONSTRUCTION PERMIT APPLICATION MAUNA LANI IRRIGATION WELLS STATE WELL NOS. 5651-01 AND 5750-03 KOHALA COAST, HAWAII

Thank you for the opportunity to review the subject document. We have reviewed the application and have the following comments to offer:

1.

2.

The Department's Administrative Rules, Title 11, Chapter 20, "Potable'Water Systems," are not applicable because the proposed wells are intended to be used only for irrigation.

Portions of the project site appear to be situated above the Underground Injection Control (UIC) line. Land areas above the I(

urc line are considered to contain underground sources of drinking water. Various activities associated with golf courses should not be allowed to contaminate groundwater. Activities of concern include:

a. Application of biocides and fertilizers b. Storage of vehicles c. Maintenance of vehicles and equipment (cleaning,

refueling, lubrication, etc.) d. Wastewater disposal

3. Since one of the proposed wells is located in above the urc line, (State Well No. 5651-01) it is essential that it be designed and constructed to prevent the possibility of groundwater contamination. For example, the well should have a concrete well pad to prevent seepage or floodwaters from migrating down the well shaft.

Page 58: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o The Honorable William W. Paty Page 2 February 17, 1989

o

4. Wastewater disposal activities must comply with all applicable rules and regulations in the event that the project does not connect to an existing, approved wastewater treatment works.

If you should have any questions, please contact the Drinking Water Program at 548-2235.

Very truly yours,

if'$ JOHN C. LEWIN, M.D. Director of Health

Page 59: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

".'\~, ~

\, \ -c

\\\\ \

\

\\ \ 1/

'\ f .... :i'~: p 1'·

I 1/ ", iI , II "-

1/ ' Ii

" \ 1/ 1/ ' // '

// \ ~, " . .,:"

Page 60: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

c o

Page 61: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

III Ii.

/'

i i ( I

~ l ~ ~'J -\YIY\ (, \ it,: (

U./V LA.

~ If/O H N. of (;") //"

2jM.;H N. J (',3

[.\i ~', ! ,/ I . I f'

,-f)

i't i' r"'.)

Page 62: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the
Page 63: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

I

.1'"" ,

BeA B~LT COLLINS & ASSOCIATES Engineering • Planning Landscape Architecture

Memorandum

Date: Job No.:

From: ~ tJ. ~ Subject: wdk """ ~ JVlz:.u\;\.,-~ ~~~ko(oz..

1: ~~ ~~ S1SD-O( ~ -0'2, Vt-<Ja.I~~ 1C4 q~ l-,~ C-byy~ M£ ~ 9...oC/~·i,v, 2At-.(/ )1Z.~~~) ~+ ~~ £)( ;3.~.

680 Ala Moana Blvd., Suite 200, Honolulu, Hawaii 96813, Phone: (808) 521-5361, Telex: BELTH 7430474, Fax: (808) 538-7819

Page 64: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o 0 DEPARTMENT OF PUBLIC WORKS COUNTY OF HAWAII - 25 AUPUNI STREET - HILO. HAWAII 96720 - TELEPHONE 18081 961-8321

January 31, 1989

MR MANABU TAGOMORI DEPUTY DIRECTOR DEPARTMENT OF LAND AND NATURAL RESOURCES COMMISSION ON WATER RESOURCE MANAGEMENT P 0 .BOX 621 HONOLULU HI 96809

SUBJECT: WELL CONSTRUCTION PERMIT APPLICATIONS Mauna Lani Irrigation Wells State Well Nos. 5651-01 and 5750-03 South Kohala, Hawaii

"-1 ""'1

": ::0

s;~

.: ~"

We have reviewed the permit application for the subject project and have no objections to it.

fH~~P.L C~YEngineer STT:aa

BERNARD K. AKANA Mayor

HUGH Y. ONO ChIeI~

BRUCE c. Mc:CUIIE Deputy ChIeI~

Page 65: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o o DEPARTMENT OF WATER SUPPLY. COUNTY OF HAWAII

'J '\!;, In 25 AUPUNI S~EEi 'II; '1IILO. HAWAII 96720

January 30, 1989

Mr. Manabu Tagomori, Deputy Director State of Hawaii Department of Land and Natural Resources Commission on Water Resource Management P.O. Box 621 Honolulu, HI 96809

WELL CONSTRUCTION PERMIT APPLICATIONS MAUNA LANI IRRIGATION WELLS

,-:,IFRR. , ____ • !"aH

STATE WELL NOS. 5651-01 AND 5750-03, KOHALA COAST \ We have no objections to the two (2) permit applications for irrigation wells.

~f#~~ <;{jv H. Wi ew 0" Manager

GK

. .. Wale,. t,.inf/:J progre66 ...

Page 66: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

JOHN WAIHEE __ OF HAWAII

co WILLIAM w. PATY

CHAIRPE..-

JOHN C. LEWIN. M.O. MICHAEL J. CHUN. Ph.D.

DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Honorable lohn C. Lewin Director of Health Department of Health Honolulu, Hawaii

P. O. BOX 1121

HONOLULU. HAWAII 96809

JAN 26 1989

ATIENTION: Mr. Tom Arizumi, Drinking Water Program

Dear Dr. Lewin:

Well Construction Permit· Applications

In accordance with the Department of Land and Natural Resources Administrative Rules, Section 13-168-12(c), enclosed are the following well construction permit applications with maps for your review and comments:

(1) Barbers Point-Kalaeloa Wells, State Well Nos. 1805-04, 05

(2) Kaneohe MCAS Monitor Test Holes, State Well Nos. 2644-01M to 08M, 2645-01M

(3) Mauna Lani Irrigation Wells, State Well Nos. 5651-01 and 5750-03 (Kohala Coast)

(4) Koloa Well E, State Well No. 5427-03 (Koloa, Kauai)

(5) Bellows AFS Monitor Test Holes, State Well Nos. 2143-01M to 04M

Please submit any comments to us, orally or in writing, within three weeks from the date of this letter. If you have any questions, please contact Manabu Tagomori at 548-7533.

Enc.

ROBERT S. NAKATA RICHARD H. COX GUY K. FUJIMURA

MANABU TAGOMORI DEPUTY

Page 67: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

JOHN WAIHEE

GOVERNOR OF HAWAII

o o WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN. M.D. MICHAEL J. CHUN. Ph.D.

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. William Sewake Manager and Chief Engineer Department of Water Supply County of Hawaii 25 Aupuni Street Hilo, Hawaii 96720

Dear Mr. Sewake:

P. O. BOX 621

HONOLULU. HAWAII 96809

January 23, 1989

Well Construction Permit Applications Mauna Lani Irrigation Wells

State Well Nos. 5651-01 and 5750-03, Kohala Coast

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Enclosed are copies of two well construction permit applications submitted by Mauna Lani Resort, Inc.

Please review the applications and submit your comments to us, orally or in writing, at your earliest convenience. We would appreciate your comments within three weeks from the date of this letter.

If you have any questions, please contact Dan Lum at 548-7643.

Ene.

Page 68: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

JOHN WAIHEE

GOVERNOR OF HAWAII

c o WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN. M.D. MICHAEL J. CHUN. Ph.D.

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. Hugh Y. Ono Chief Engineer

P. O. BOX 621

HONOLULU. HAWAII 96809

January 23, 1989

Department of Public Works County of Hawaii 25 Aupuni Street Hilo, Hawaii 96720

Dear Mr. Ono:

Well Construction Permit Applications Mauna Lani Irrigation Wells

State Well Nos. 5651-01 and 5750-03, Kohala Coast

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Enclosed are copies of two well construction permit applications submitted by Mauna Lani Resort, Inc.

Please review the applications and submit your comments to us, orally or in writing, at your earliest convenience. We would appreciate your comments within three weeks from the date of this letter.

If you have any questions, please contact Dan Lum at 548-7643.

~ .0

~~ M ABU TAGOM Dep 'ty Director

Ene.

Page 69: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

January 16, 1989

r,launa Lani Resort, Inc. HCR-2, P.O. Box 4959 Kohaia Coast .'Ha •• vaH 96743

Attention: r,'r. Thomas H. Yamamoto

Gentlemen:

This is to acknowledge receipt of two well construction permit 8.pplications and accompanying $25.00 filing fees for r/iauna Leni "lells 5651-01 ane 5750-03. Kohaia Coast, BewaiL

My staff is processing the applications and will contact you should there be any questions.

\Sincerely,

ES:ko cc: Belt Collins @>; Associates

Page 70: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

BELT COLLINS & ASSOCIATES Engineering • Planning Landscape Architecture

Mr. William Paty

o

Division of Water Resource Management Department of Land & Natural Resources P. o. Box 373 Honolulu, Hawaii 96809

Dear Mr. Paty:

AlQ: ,-. i ~J

o 680 Ala Moana Blvd., Suite 200, Honolulu, Hawaii 96813

;PlilsJne: (808) 521-5361, Telex: BELTH 7430474, Fax: (808) 538-7819 L " Hawaii· Singapore· Australia· Hong Kong· Saipan iL

December 6, 1988 88-2145

Well Construction Permits for Future Irrigation Wells at Mauna Lani Resort

Enclosed for your review and approval are two well construction permits for future irrigation wells located at Mauna Lani Resort, North Kohala, Hawaii. Should you have any questions regarding these permits, please do not hesitate to call us.

Sincerely yours,

~0 (j.J=,...,:-k.J cJr'T om Nance

GF:gk

Enclosures

Page 71: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

O 0 State of Hawaii

COMMISSION ON WATER RESOURCE MANAGEMENT- ." <-"

Department of Land and Natural Resources../" .~ l) Division of Water Resource Manag~~e~t

,'v >L;~ 9 A 9: 5 3 APPLICATION FOR

X WELL CONSTRUCTION PERMIT

PUMP INSTALLATION PERMIT

IN'STROCTIORs: Plene print or type and send completed application with attachment. to the DIVision or Water snd Land Development. P.O. Box 373. Honolulu. Hawall '180'. Application must be accompani.d by a non-refund.ble CUln, fee of US.OO p~y.ble to the Department of Land and Natural R.aourc... (FlIinr fee walv.d for government a,.ncl ... ) If nece .. ary. phone 548-7543. Hydrology/GaolOf}' Section for a .. tstance. I

1. WELL LOCATION

Island Hawaii Tax Map Key 6-8-22: 32

Address Within Mauna Lani Resort; 0ill be Well No. 5651-01 (see attached map)

(Attach a USGS map (scale 1"=2000') and property tax map showing well location referenced to established property boundaries.)

2 • WELL OWNER LANDOWNER

Firm Name MAUNA LANI RESORT, INC.

Contact Person THOMAS H. YAMAMOTO

Address HCR-2, P.o. BOX 4959

KOHALA COAST, HAWAII 96743

Phone 885-6677

Firm Name MAUNA LANI RESORT, INC.

Contact Person THOMAS H. YAMAMOTO

Address HCR-2, P.o. BOX 4959

KOHALA COAST, HAWAII 96743

Phone 885-6677

3. PROPOSED CONTRACTOR FOR: .Well Drilling DPump Installation

Name Big Island Drilling -----------------------------------------------------------------

Phone 882-7080

Address p~ ;'0:;, Box: 229]1" Contractor's License No. C 11456 Kona, Hawaii) 96745

4. PROPOSED WORK

• Drill New Well o Alter

o Deepen CJ Seal

o Redrill o Abandon

o Install New Pump o Replace Pump o Modify Pump

(B riefly describe the proposed work and fill in the diagram on the back of this form.)

5. PROPOSED USE

OMunicipal (including hotels, stores, etc.) o Military ODomestic (individual, noncommercial water systems) OIndustrial .Irrigation (specify) Golf Course OOther (specify) ___ _

6. PROPOSED AMOUNT OF WITHDRAWAL 700,000 gallons per day

7. PROPOSED PUMP INFORMATION

Pump Type: .Vertical Turbine o Submersible o Centrifugal Motor: ODiesel OGas OElectric: 40 Rated Horsepower Rated Pump Capacity 700' gallons per minute (gpm)

• • * • • * • • • • • • • * * * * • • • • • * * • * • • • * * * * * * * * • * * * * * * * * * * * * Well Owner rint) MAUNA LANI RESORT, INC.

Signature 4:i-, L .... __ ~ Date NOVE~M~B~E~R~3~O~,~1~98~8~~---------~~----

F'c,!' Offiaia l Use On ly:

Field Checked By ---------- Latitude ----- Hydrologia Unit ------Longitude ----- State Well No. S-6 5/- D I tate

----------------------------

___ ,_"""*_ .. _____ .I __ * ____ ""'iJ_I. ______ ----·,...,-M-.. --~'~~,

Page 72: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

Briefly describe the proposed work:

PROPOSED SECTION OF WELL

Ground Elev. 125 ft., msl"

Solid· Casing: Steel ASTt1 A-53 Material

Cement Grout 100 ft. ---+---t~.I

Length 123 ft. Hole Diameter 12 in. Dia. 16 in. ----t_. ..

Wall thickness 0.3125 in.

Total Depth ~ ft.--...t

Rock Packing Noneft.

VCaSing: IX I Perforated I IScreen

I Material Steel ASTr1 A-53

. Length 10 ft.

I Diameter 12 in. I Wall thickness 0.3125 in.

Openings 60 sq. in./L.F.

~open Hole: ----

Length 2

Diameter 10 in. -------------------

"Approximate elevation at time of filing application. Final elevation (msl) by a surveyor licensed by the State must be submitted at start of construction.

Page 73: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o.

57 57'30"

56·

l-----.----300--t-__ -

-. ,

/ "/C"4~

/ -

/I 1/ II

It· 1/

1/

" " It II " . II

" II .,' 1/

N \.

c

Page 74: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

(Y) 1-

C'I _t~ .. ,,-0<: 'j

! cr C" ) li-

fo-~.-.

, '--'"

Page 75: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

/' /'

KAPOt10

KALAE

~ ISLAND OF HAWAII . .. . " ,.

ICAl.I: IN MIL(

." _ ........................ __ ...... _ ... _-------------

Page 76: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

KAPOHO

o

KALAE

~ ISLAND OF HAWAII • •• • It

SC ...... E IN MILE

Page 77: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o

KALAE

~ ISLAND OF HAWAII

. . SCALE: IN MILE

Page 78: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

o

Keohole Pt.

Upolu Pt.

o

PROJECT AREA

o Mouno Loo

KALAE

ISLAND OF HAWAII

KAPOHO

~ NORTH

• 4 0 • 16 2'

SCALE IN MILE

Page 79: University of Hawaii€¦ · iDdi:v1dual and collective beat efforts to resolve any aml all outataDdin& niasues covered by this tta.o~prJ.... "rbe partiel further aarae that in the

Keahole Pt.

o

Upolu Pt.

Mauna () Kea

--- PROJECT AREA

OMauna Loa

HONAUNAU

MILOLII

KALAE

ISLAND OF HAWAII

o

KAPOHO

~ NORTH

e 4 0 e 16 24