Prevention of Flashover on a Double-circuit 220 kV
Line
Ivo Uglešić*, A. Xemard**, V. Milardić*, B. Filipović-Grčić*
*Faculty of Electrical Engineering and Computing
University of Zagreb, Croatia
**EDF R&D, Paris, France
EMTP-RV USER GROUP MEETING, DUBROVNIK, 30 APRIL 2009
![Page 2: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/2.jpg)
2
OUTLINE OF PRESENTATION
INTRODUCTION
SIMULATION OF LIGHTNING STROKES TO
TRANSMISSION LINE
MODELING PROCEDURE FOR TRANSIENT
SIMULATIONS
SIMULATION RESULTS
CONCLUSIONS
![Page 3: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/3.jpg)
3
INTRODUCTION
- The case study is related to the improvement of the lightning
performance of a 220 kV double-circuit overhead line, which connects
the thermo power plant to the rest of the power system.
- Several double-circuit outages provoked by lightning caused the
interruption of power supply of the power plant.
- To avoid back-flashovers due to lightning strokes to tower or
overhead shielding wires, the tower footing resistance should be as
low as possible.
- Installation of unbalanced insulation on a double-circuit line is one of
possible solution for suppression of double-circuit simultaneous
faults.
- Installation of line surge arresters (LSA).
![Page 4: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/4.jpg)
4
The goal of the simulation is to determine the distribution of lightning
current amplitudes which strike HV transmission line towers and shield
wires or the phase conductors directly.
The Monte Carlo method is used – reproducing numerically a
stochastic problem.
The log–normal distribution of lightning current amplitude:
SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE
P - probability of occurrence of lightning current amplitude
higher than I.
![Page 5: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/5.jpg)
5
The general expression for the striking distance:
SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE
R - striking distance,
I - lightning current amplitude,
a - constant [3.3 – 10.6],
b - constant [0.5 – 0.85].
In calculations is used a=7.2, b=0.65.
![Page 6: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/6.jpg)
6
SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE
4,5 m
6,5 m
5,0 m
6,7
m6,0
m6
,0 m
A
B
C
30,00m
27,30m
24,60m
22,00m
19,50m
17,10m
4,5 m
6,5 m
5,0 m
6,7
m6
,0 m
6,0
m
3D model of the part of the studied transmission line
![Page 7: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/7.jpg)
7
SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE
-Total number of simulations 37932,
-1000 simulations finished with phase conductor strikes,
-25635 ground strikes,
-11297 with shielding wire and tower strikes,
-shielding failure occurs in 8.85% cases.
According to statistical calculation, the following characteristics of
the crest values of the current for lightning striking phase conductors
are calculated:
- average value: 15.40 kA,
- variance: 98.36 kA,
- standard deviation: 9.92 kA,
- maximal phase conductor strike current: 42.80 kA,
- critical current: 47.30 kA.
![Page 8: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/8.jpg)
8
SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE
Distribution of lightning currents striking phase conductors
0
0,01
0,02
0,03
0,04
0,05
0,06
0,07
0,08
0,09
0,1
1-3 3-5 5-7 7-9 9-11 11-13 13-15 15-17 17-19 19-21 21-23 23-25 25-27 27-29 29-31 31-33 33-35 35-37 37-39 39-41 >41
Classes (kA)
Pro
bab
ilit
y
Distribution of lightning currents striking phase conductors
![Page 9: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/9.jpg)
9
SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE
Distribution of lightning currents striking top of towers or shielding wire
Distribution of lightning currents striking top of towers or shielding wire
0
0,05
0,1
0,15
0,2
0,25
1-1010-20
20-3030-40
40-5050-60
60-7070-80
80-90
90-100
100-110
110-120
120-130
130-140
140-150
150-160
160-170
170-180
180-190
Classes (kA)
Pro
bab
ilit
y
![Page 10: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/10.jpg)
10
MODELING PROCEDURE FOR TRANSIENT SIMULATIONS
The lightning stroke hitting a tower or a phase conductor can be
replaced by a surge current generator and a resistor (Norton
generator).
The CIGRE Lightning Current Waveform model can approximate well
the concave form of the lightning current front.
The transmission line, conductors and earth wire is represented by
several multi-phase untransposed distributed parameter line spans at
both sides of the point of the lightning stroke impact.
Tower surge impedances are calculated using equation:
![Page 11: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/11.jpg)
11
MODELING PROCEDURE FOR TRANSIENT SIMULATIONS
Phase voltages at the instant at which a lightning stroke impacts the
line must be included.
Insulators are represented using the area criterion that involves
determining the instant of breakdown using the formula:
DEdUU
t
T
k
0
0
U(τ) is the voltage applied at time t,
U0 is a minimum voltage to be exceeded before any breakdown
process can start or continue,
k and U0 and DE are constants corresponding to an air gap
configuration and overvoltage polarity,
T0 is the time from which U(τ) > U0.
![Page 12: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/12.jpg)
12
MODELING PROCEDURE FOR TRANSIENT SIMULATIONS
Tower footing resistances are modelled taking into account ionization:
R0 - footing resistance at low current and low frequency, i.e. 50 Hz,
I - stroke current through the resistance,
Ig - limiting current to initiate sufficient soil ionization.
ρ - soil resistivity m ;
E0 - soil ionization gradient, recommended value: 400 kV/m .
![Page 13: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/13.jpg)
13
MODELING PROCEDURE FOR TRANSIENT SIMULATIONS
EMTP-RV Model of footing resistance ionization
![Page 14: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/14.jpg)
14
MODELING PROCEDURE FOR TRANSIENT SIMULATIONS
The model of gapless type LSA includes non-linear and dynamic
behaviour of the arrester.
0
100
200
300
400
500
600
700
800
0,1 1 10 100
Current (kA)
Vo
ltag
e (
kV
)
U-I characteristic of surge arrester for the 220 kV line (Ur=210 kV)
![Page 15: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/15.jpg)
15
MODELING PROCEDURE FOR TRANSIENT SIMULATIONS
Model of 220 kV double-circuit line
8 9
Z=
13
9.3
Ω
Z=
13
9.3
Ω
Z=
13
5.2
Ω
6 7
Z=
13
9.3
Ω
5
Z=
13
9.3
Ω
4
Z=
13
9.3
Ω
3
Z=
13
5.2
Ω
2
Z=
13
9.3
Ω
1
Z=
13
9.3
Ω
upper
middle
lower
Tra
ns
mis
ion
lin
e
27
6 m
Tra
ns
mis
ion
lin
e
34
3 m
Tra
ns
mis
ion
lin
e
10
km
Tra
ns
mis
ion
lin
e
28
9 m
Tra
ns
mis
ion
lin
e
40
2 m
Tra
ns
mis
ion
lin
e
29
5 m
Tra
ns
mis
ion
lin
e
21
3 m
Tra
ns
mis
ion
lin
e
45
9 m
Tra
ns
mis
ion
lin
e
35
0 m
Shield wire
1000 Ω
31 kA, 72 kA,
96 kA, 138 kA
Stroke to tower
Tra
ns
mis
ion
lin
e
10
km
![Page 16: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/16.jpg)
16
SIMULATION RESULTS
When a lightning strikes the top of a 220 kV tower the occurrence of
the back-flashover depends on many parameters:
- peak current magnitude and maximal steepness,
- tower footing resistance,
- flashover voltage of insulation clearances,
- magnitude and phase angle of the voltage,
- atmospheric condition (rain, snow, pressure, temperature, humidity)
etc.
![Page 17: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/17.jpg)
17
SIMULATION RESULTS
Back-flashovers in relation to the lightning current magnitude and the
footing resistance of a tower
![Page 18: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/18.jpg)
18
SIMULATION RESULTS
Back-flashovers in relation to the lightning current magnitude and the
footing resistance of a tower (LSA in the upper phase)
![Page 19: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/19.jpg)
19
SIMULATION RESULTS
Back-flashovers in relation to the lightning current magnitude and the
footing resistance of a tower (LSA in the middle phase)
![Page 20: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/20.jpg)
20
SIMULATION RESULTS
Back-flashovers in relation to the lightning current magnitude and the
footing resistance of a tower (LSA in the lower phase)
![Page 21: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/21.jpg)
21
SIMULATION RESULTS
Back-flashovers in relation to the lightning current magnitude and the
footing resistance of a tower (LSAs in middle and lower phases)
![Page 22: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/22.jpg)
22
SIMULATION RESULTS
Back-flashover rate of one circuit of the 220 kV line: not protected by
LSAs, protected by LSA in middle phase (B), LSA in lower phase (C)
and LSAs in lower and middle phases (B and C)
0
1
2
3
4
5
6
7
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Tower resistance (Ohms)
Nu
mb
er
of
Bac
k-f
las
ho
ve
r R
ate
s (
an
nu
al, p
er
10
0k
m o
f li
ne
)
NO LSA
LSA in B
LSA in C
LSAs in B and C
![Page 23: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/23.jpg)
23
SIMULATION RESULTS
Total flashover rate (back and shield failure) of one circuit of the 220 kV
line: not protected by LSAs, protected by LSA in middle phase (B), LSA
in lower phase (C) and LSAs in lower and middle phases (B and C)
0
1
2
3
4
5
6
7
8
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Tower resistance (Ohms)
Nu
mb
er
of
Fla
sh
ov
er
Ra
tes
(an
nu
al,
per
10
0km
of
lin
e)
NO LSA
LSA in B
LSA in C
LSAs in B and C
![Page 24: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/24.jpg)
24
CONCLUSIONS
The following recommendations can be given for the purpose of
optimization of the number of LSAs:
-Improvement of footing resistances on towers if economically
justified.
-No LSA (tower footing resistance < 21 ).
-LSA in the lower phase (tower footing resistance > 21 and < 47 ).
-LSAs in the middle and lower phases (tower footing resistance > 47
< 150 ).
-Arresters installed in all 3 phases at selected towers with tower
footing resistance > 150 (the installation of three LSAs in one circuit
will only prevent back-flashover in that circuit on that tower and back-
flashovers could occur on neighboring towers).
![Page 25: Univ Of Zagreb Uglesic Prevention Of Flashover](https://reader034.vdocuments.mx/reader034/viewer/2022052618/5549ecabb4c9050d488b5011/html5/thumbnails/25.jpg)
25
Prevention of Flashover on a Double-circuit 220 kV
Line
Ivo Uglešić*, A. Xemard**, V. Milardić*, B. Filipović-Grčić*
*Faculty of Electrical Engineering and Computing
University of Zagreb, Croatia
**EDF R&D, Paris, France
EMTP-RV USER GROUP MEETING, DUBROVNIK, 30 APRIL 2009