REOI - UNICEF Bangladesh, August 2019
1
UNITED NATIONS CHILDREN'S FUND (UNICEF)
REQUEST OF EXPRESSION OF INTEREST
FOR
“PREQUALIFICATION OF CONTRACTORS FOR CONSTRUCTION WORKS IN
BANGLADESH”
1. BACKGROUND
(a) UNICEF is a specialized agency of the United Nations with a mandate to advocate for the
protection of children's rights, to help meet their basic needs and to expand their opportunities
to reach their full potential.
(b) In support to its aid relief programmes and operations, UNICEF Bangladesh is planning to
engage qualified Contractors for the execution of civil works which may include the renovation,
rehabilitation or (re)construction of the followings facilities:
▪ Cold-chain rooms;
▪ Health Clinics;
▪ Primary Schools;
▪ Community centres;
▪ Water Sanitation and Hygiene (WASH);
▪ Warehouses;
▪ Office premises.
(c) Expressions of Interest (EOI) are invited from Contractors wishing to be prequalified to tender
for similar contracts and through the attached questionnaire establishing their capacities to
undertake such works.
2. SCOPE OF WORK
(a) The EOI is the first stage of a multi-stage procurement process. The objective of the EOI process
is to identify and prequalified Contractors that wish to be considered for selection for future
works with UNICEF and have suitable capacity, capability and experience.
(b) An Evaluation Committee comprising representatives of UNICEF will evaluate EOI applications
on the basis of the evaluation criteria set out in Section 4 of this Request for Expressions of
Interest (REOI).
(c) It is expected that prequalified Contractors will be invited to submit Invitations to Bid (ITBs) or
Request for Proposals (RFPs) when needs arise for project implementation purposes.
3. ELIGIBILITY REQUIREMENTS
(a) This REOI for Prequalification is open to all Contractors regularly registered and licensed to
operate in Bangladesh.
(b) To become eligible candidates shall demonstrate to have:
a. minimum of 5 (five) years of experience as a general contractor, and
b. successful completed at least 3 (three) contracts of a nature and complexity
comparable to the construction works required above (Section 1.b).
REOI - UNICEF Bangladesh, August 2019
2
(c) Companies doing business with the United Nations are required to register online with UN
Global Market (www.ungm.org) and accept and comply with the UN Contractor Code of
Conduct (https://www.ungm.org/Public/CodeOfConduct).
4. EVALUATION CRITERIA
(a) Prequalification will be based on meeting the minimum criteria regarding their general and
particular construction experience, financial position, personnel and equipment capabilities,
and other relevant information as demonstrated by the Contractor’s responses in the
Submission Forms attached to this REOI.
(b) Contractors must have cumulated a minimum score of 60% to be prequalified.
(c) Incomplete or inadequate responses, lack of response or misrepresentation in responding to
any questions will affect the evaluation.
(d) Submissions shall be evaluated in accordance with the following criteria:
Serial Criteria Form Weighting (%)
sub total
1 Valid company registration and licensed to operate in Bangladesh.
mandatory
2
Litigations: A consistent history of awards against the Contractor or any partner of a Joint Venture may result in disqualification of the Contractor.
mandatory
3 Evidence of minimum of 5 (five) years of experience as a general contractor.
mandatory
4
Completed at least 3 (three) contracts of a nature and complexity comparable to the works listed in Section 1.b of this REOI in the capacity of a general contractor.
mandatory
5 Evidence of the Contractor’s experience and performance on contracts of a similar nature in Bangladesh.
B 25
6
Evidence of a competitive management structure capable to make provision for suitably qualified personnel to fill the key positions.
C 15
7
The Contractor shall demonstrate to own, or have assured access to key items of equipment, in full working order, and that, based on commitments, they can be available for timely use in the future contracts.
D 10
8
The Contractor shall also demonstrate that it has adequate sources of finance to meet the cash flow requirements on works currently in progress and for future contract commitments.
E 20
REOI - UNICEF Bangladesh, August 2019
3
9 The Contractor shall demonstrate to have in place a sound Quality Management & Safety System
F 15
10 Client References (minimum 3 of the last 3 projects similar per nature to this REOI).
G 15
Total 100
5. DISQUALIFICATION OF PRE-QUALIFICATION SUBMISSION
(a) If a prequalification submission fails to comply in any respect with the requirements set out in
this REOI or is ambiguous, UNICEF shall be entitled at its absolute discretion, but shall not be
obliged to one of the following:
I. To reject the prequalification submission as non-compliant;
OR
II. Without prejudice to UNICEF’s right to reject the prequalification submission, to meet
with, raise issues and/or seek clarification from the Contractor in respect of the relevant
pre-qualification submission;
OR
III. Without prejudice to UNICEF’s right to reject the prequalification submission, to request
the Contractor to provide UNICEF with information or items which have not been
provided or have been provided in an incorrect form; and/or to waive a requirement
which, in the opinion of the UNICEF, is not material and/or is procedural.
(b) Any change in the Contractor after the Contractor has submitted its prequalification submission
may lead to disqualification of the Contractor unless notified to UNICEF in writing. UNICEF
reserves the right to withhold approval for any such changes and to disqualify the Contractor
concerned from any further participation in the during any future procurement process.
6. PREQUALIFICATION PROCEDURE
(a) The Submission Forms must be fully completed as per requirements stated in the annexures.
(b) Submission and acceptance of any Prequalification will not constitute a contract or part of a
contract between UNICEF and the Company;
(c) Any conflict of interest or potential conflict of interest either with UNICEF employees/ex-
employees or any other conflict of interest must be fully disclosed to UNICEF in this EoI or as
soon as such conflict or potential conflict becomes apparent. In the event of any conflict or
potential conflict of interest UNICEF shall, in its absolute discretion, decide on the appropriate
course of action. UNICEF reserves the right to evaluate individual or organizational conflict of
interest of the bidder vis-à-vis UNICEF it’s employees;
(d) The company by responding to this EoI agree to be bound by the decision of UNICEF;
(e) UNICEF reserves the following rights for this EoI:- i. To request any additional information, which is considered relevant for the evaluation; ii. Visit and inspect the company’s premises and its clients;
iii. Contact clients of the company/referees provided;
REOI - UNICEF Bangladesh, August 2019
4
iv. Request additional supporting or clarification or supplementary information or technical presentation;
v. Arrange interviews with the company’s management team or any other relevant staff as appropriate;
vi. Reject any all of the EoI or Accept any EoI in whole or in part; (f) Any costs related to the EoI submission will be borne by the company responding to this EoI;
7. METHOD OF SUBMISSION AND DEADLINE :
(a) DUE DATE OF SUBMISSION 19th August 2019, 14.00 hrs (DHAKA TIME)
(b) The EOI responses with accompanying documents can be either submitted by email OR can
be submitted in hard copies to the following address, between 0900 am to 14 pm
UNICEF Bangladesh Country Office
The Reception Desk
4th floor of BSL Office Complex,
1 Minto Road,
Dhaka-1000
(c) Sealed package should be marked as follows
“EOI for Prequalification of Contractors for Construction Works in Bangladesh”
(d) ELECTRONIC SUBMISSION OF EOI (by email)
• All e-mailed submissions must be sent to [email protected], the ONLY ACCEPTABLE E-MAIL ADDRESS for receipt of Proposals. No other recipient should be "Cc" or "Bcc" in the e-mail submission.
• All e-mail communication in relation to the submission must clearly indicate “EOI for Prequalification of Contractors for Construction Works in Bangladesh” in the "Subject" line of the e-mail.
• All responses to EoI by e-mail must be submitted as PDF (Portable Document Format) files. Email links (e.g. to documents to be downloaded from cloud based folders) are not acceptable unless otherwise specifically requested. Proposals submitted as a link or through a link will be invalidated.
8. ENQUIRIES
(a) Interested Companies are encouraged to contact UNICEF during the EOI stage should they have
any queries regarding any aspect of this EoI. Requests for clarification shall be in writing by
email and UNICEF will respond to the queries in writing by email.
(b) All enquiries in relation to this EoI submission must be sent by email to:
E-Mail: [email protected]
Subject: Enquiry: “EOI for Prequalification of Contractors for Construction Works in
Bangladesh” [Company Name], no later than 15 August 2019.
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
5
Submission Forms
In order to be considered as a potential Contractor, interested Contractors should return the following
forms as indicated in Section 6 of this REOI, including the Letter of Expression of Interest duly complete and
signed. Additional verification of any information submitted may be requested.
Note: The order and format of the items requested as presented in the forms here below must be
preserved.
No Items to be submitted Yes/No
1 Letter of Expression of Interest: duly completed and signed the form annexed to this REOI.
2 Company registration certification: Copy of company’s registration required by law
and issued by authorized agency. This document is mandatory for administrative
compliance and starting with technical evaluation of bids.
3 Litigation History : provide information regarding any litigation, current or during the last five years, in which the Contractor was/is involved, the parties concerned, and the disputed amounts and awards.
4 Form A - Contractor Profile: provide the requested information,
5 Form B – Experience of the Contractor: provide information about the experience
in similar projects experience in the past 5 years and other relevant projects
experience in the last 10 years.
6 Form C – Experience of each key personnel: provide the requested information,
including the organization chart showing the structure of the company.
7 Form D – Facilities, Machinery and Equipment: provide a list of various plant, machinery and equipment, tools, tackles, facilities etc., including testing lab equipment’s, if any. The Contractor should also specify if the listed items are owned, rented, or other.
8 Form E – Financial and Economic Standing: provide the requested information,
including the turnover in each of the last three (3) completed financial years and
attach Audit Financial Statements of the last 3 years.
9 Form F – Quality Management & Safety: provide the requested information,
10 Form G – References: Contractors shall seek Client References in respect of at least three (3) projects similar to the services required here. The References should be returned duly signed by the Clients.
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
6
Letter of Expression of Interest
[Letterhead paper of the Contractor including full postal address, and telephone, facsimile and electronic mail]
Date:
To:
1. Being duly authorized to represent and act on behalf of __________________ (hereinafter referred to
as “the Contractor”), and having reviewed and fully understood all of the prequalification requirements
and information provided, the undersigned hereby applies for prequalification to bid to construction
works undertaken by UNICEF Bangladesh.
2. Attached to this letter are copies of original documents defining:
a) Company’s registration certificate and license;
b) Authorized Signatory legal status
3. UNICEF and its authorized representatives are hereby authorized to conduct any inquiries or
investigations to verify the statements, documents, and information submitted in connection with this
application, and to seek clarification from our other Agencies and Clients regarding any financial and
technical aspects. This Letter of Expression of Interest will also serve as authorization to any individual or
authorized representative of any institution referred to in the supporting information to provide such
information deemed necessary and as requested by your selves to verify statements and information
provided in this application, such as the resources, experience, and competence of the Contractor.
4. UNICEF and its authorized representatives may contact the following persons for further information:
Contact 1 Address and communication facilities
Contact 2 Address and communication facilities
Contact 3 Address and communication facilities
5. This application is made with the full understanding that:
a) bids by prequalified Contractor will be subject to verification of all information submitted for
prequalification at the time of bidding;
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
7
b) UNICEF reserves the right to:
invite to bid only those Contractors who meet the prequalification requirements;
reject or accept any submission, cancel the prequalification process, and reject all
submissions.
c) UNICEF shall not be liable for any such actions under 5 (b) above.
6. The undersigned declare that the statements made and the information provided in the duly completed
application are complete, true, and correct in every detail.
Name of Contractor:
Address:
Date:
Undersigned by:
Designation of Undersigned:
Consortia Application (if applicable)
Group Members:
1)
2)
Etc....
Member 1:
Address:
Date:
Undersigned by:
Designation of Undersigned:
Member 2:
Address:
Date:
Undersigned by:
Designation of Undersigned:
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
8
FORM A - COMPANY PROFILE
1. Name of the Company:
2. Full Address:
3. Telephone: Fax: Email: Webpage:
4. Company’s registration No*: Expire Date: License Class/Category: *Attach registration certificate
5. Type of Company: Private Limited Company, Public Limited Company, other:
6. If limited company, state amount:
7. Authorized Signatory Name & Title:
8. Authorized Signatory Telephone: E-mail:
9. Does the Contractor satisfy the eligibility requirements contained in this REOI-Section.3? Yes No
10. If answered “No” provide details of eligibility requirements not satisfied.
11. Is the Contractor participating to this EOI as a consortium/joint venture? Yes No
12. Does the Contractor intend to use sub-consultants in the works? Yes No
13. Is the Contractor relying on the capacity or qualifications of a parent company? Yes No
14. Is the Contractor involved in any litigation, current or during the last five (5) years? Yes No
15. If answered “Yes” please provide information regarding the parties concerned, and the disputed amounts and awards.
Year Award for or Against the Contractor Name of Client, cause of litigation, and matter in dispute Disputed amount (in BDT)
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
9
FORM B - EXERIENCE OF THE CONTRACTOR Part 1: EXPERIENCE OF SIMILAR REOI PROJECTS (AS LISTED IN THIS REOI-SECTION 1) IN THE LAST 5 YEARS
Name of Project and
Geographic Location
Project Description (health clinics, schools, community centres, offices,.)
Building floor area (m2)
Contract Value (BDT)
Client Name Date started Completion Date
(Insert additional rows where needed) Part 2: EXPERIENCE OF OTHER RELEVANT PROJECTS IN THE LAST 10 YEARS
Name of Project and
Geographic Location Project Description
Building floor area (m2)
Contract Value (BDT)
Client Name Date started Completion Date
(Insert additional rows where needed)
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
10
FORM C - EXPERIENCE OF EACH KEY PERSONNEL (a separate form is to be completed for each key personnel)
Part 1: KEY STAFF IDENTIFICATION
Name of Key Personnel
Date Commenced with company
Position Title
Part 2: PROFESSIONAL EDUCATIONAL QUALIFICATIONS
Qualification Institution Date completed
Part 3: KEY PERSONEL EXPERIENCE & ROLE/POSITION IN SIMILAR CONTRACTS
Name of Project and Geographic Location
Project Description Role / Position Title
Building floor area (m2)
Contract Value (BDT)
Client Name Date
Part 4: KEY PERSONEL EXPERIENCE & ROLE/POSITION IN OTHER CONTRACTS
Name of Project and Geographic Location
Project Description Role / Position Title
Building floor area (m2)
Contract Value (BDT)
Client Name Date
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
11
Part 5:DETAIL OF THE COMPANY AVERAGE NUMBER OF PERSON EMPLOYED FOR THE LAST 3 FULL YEARS
Year Total Managerial Admin Architects Structural
Engineer
Planning
Engineer QC/QA
Site
Engineer Surveyor Other
1. Does the Contractor use external resources? Yes No
2. If yes, provide clarification:
3. Please provide the information here below and also attach the organization Chart showing the structure of the company.
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
12
FORM D - FACILITIES, MACHINERY AND EQUIPEMENTS
The Contractor shall provide list of various plant, machinery and equipment, tools, tackles, facilities etc., including testing lab equipment’s.
The Contractor should also specify if the listed items are owned, rented, if they belong to sub-contractors or other.
Machinery Type Model Size/Capacity Age Owner, Rental, other
1. Please provide information about any other relevant fixed assets
2. Does the Contractor has a Storage/Warehousing? Yes No
3. If yes, please provide the capacity (in m2):
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
13
FORM E - FINANCIAL AND ECONOMIC STANDING
1. The Contractor should state the annual turnover, for Civil Engineering Construction Work only, in terms of the amounts billed to clients for each year for
work in progress or completed at the end of the period reported. The annual periods should be the last three (3) completed financial years.
In case of Joint Venture this should be done for each member of the group.
Year Annual Turnover (BDT) (Civil Engineering Construction Work only)
2. Attach a copy of Audit Financial Statement of the last 3 years? Yes No
If not available, please provide a certified copy of your Income Tax Return. Failure to demonstrate the specified level of turnover averaged over the three
specified years may result in the Contractor being excluded from further consideration.
3. State the Contractor’s current outstanding workload value: BDT [total amount]
4. Contractor’s Bank Name :
5. Contractor’s Bank Address:
6. Contractor’s Bank account No:
7. Does the Contractor hold Professional Indemnity Insurance? Yes No If “Yes” please state value in BDT:
8. Does the Contractor hold Employers Liability Insurance? Yes No If “Yes” please state value in BDT:
9. Does the Contractor hold Public Liability Insurance? Yes No If “Yes” please state value in BDT:
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
14
FORM F - QUALITY MANAGEMENT & SAFETY
1. Indicate with which recognised Quality Control Systems Standards the Contractor is registered. (Please provide a copy of the certificate)
ISO9001 Environmental Management
Other Standard Internal Procedures
None
2. In case of “other standards” or “internal procedures”, please provide some details of the other standard below:
3. How does the Contractor ensure that the quality of its works are to a high standard?
4. Does the Contractor have a Safety Management System certified by a recognised independent authority? Yes No
If yes please provide a copy of the certificate.
5. How does the Contractor ensure the health and safety of its personnel both in the office and on site?
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
15
FORM G - REFERENCES Contractors shall seek Client References in respect of at least three (3) projects similar to the services
required here. The Contractor shall note that the non-provision of client references with original
signatures may result in the Contractor receiving a lower score for this section of EOI.
Project Title and Type
Client / Company Name:
Name and title of Referee:
Contact Details of Referee (phone &
email)
Project Value (Design & Construction) Design: Construction:
Design Tender / Final Account Amount Tender Final Acc
Design Completion Date: Contract /
Actual
Contract Actual
Yes No
Was any increase in the final account amount due to issues with Contractor performance?
Were any delays experienced due to issues with Contractor performance?
Was the work in compliance with the projects plans?
Was the works executed in a state-of-the art?
Did the Contractor provide continuous onsite supervision during the construction stage?
Did the Contractor provide design support during the construction stage?
Was the Contractor’s approach to health and safety in the site satisfactory?
Would you engage with the Contractor on another project?
Details of project and of the service provided by the Contractor:
Further Comments:
Client Signature and/or company
stamp
(Copy page for each reference)