Objectives
Understand what constitutes a suitable Helitorch Operations site
Successfully hook-up a Helitorch to the Helicopter
Demonstrate how to test Helitorch with aircraft power
![Page 3: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/3.jpg)
Objectives
Demonstrate procedures for filling a Helitorch from mixing systems
Perform final Helitorch systems check, finalize Go / No Go checklist
Demonstrate the mixing procedures for mixing systems
![Page 4: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/4.jpg)
Helitorch Base
![Page 5: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/5.jpg)
Helitorch Site Locations Helitorch site large enough to safely
accommodate all necessary equipment Establish clear approach and departure
paths, over flight of personnel, vehicle traffic, and property not allowed
Maintain safety circle Close proximity to burn site desired Consider impacts from smoke/embers
![Page 6: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/6.jpg)
![Page 7: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/7.jpg)
Helitorch Site Locations (cont’)
Authorized personnel only Establish alternate landing area Separate Helitorch base from wildland
fire helibase Establish escape routes for personnel
& equipment in event of escaped fire Consider dust abatement needs
![Page 8: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/8.jpg)
![Page 9: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/9.jpg)
Helitorch
Installation
Procedures
![Page 10: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/10.jpg)
Helitorch Installation to the Helicopter Remove pilots door Complete the helitorch check list Place helitorch in front of ship with nozzle to the
pilots side Make sure switches are in off position Layout suspension system under helicopter
between skids Assure suspension system attachment point is
configured for cargo hook, DO NOT hook up suspension system until test completed
![Page 11: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/11.jpg)
![Page 12: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/12.jpg)
Connect the 9 pin plug
![Page 13: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/13.jpg)
![Page 14: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/14.jpg)
Installation (cont’)
Install a propane bottle (if applicable) and adjust pressure (5-10 psi)
Have pilot active helicopter electrical power to helitorch
Test electrical ignition system Test pump Do a manual and electrical test of cargo hook
release Attach suspension system to helicopter cargo hook
![Page 15: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/15.jpg)
Helicopter-Helitorch Test
![Page 16: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/16.jpg)
Helicopter-Helitorch Test
![Page 17: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/17.jpg)
Mixing Systems Safety Standards
Mixing Area
![Page 18: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/18.jpg)
![Page 19: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/19.jpg)
![Page 20: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/20.jpg)
Mixing Area Located outside of the helicopter safety
circle During the mixing operation fire protection
will be staffed and ready Restricted to Helitorch personnel only No smoking within 50 feet of any operation
on the Helitorch base, including the vapor removal discharge hose outlets
![Page 21: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/21.jpg)
Mixing Area (cont’)
Precautions must be taken to eliminate sources of ignition
Use approved gelling agent dispenser NO PLASTIC of any kind should be used
in the mixing operation
![Page 22: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/22.jpg)
![Page 23: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/23.jpg)
Bonding Sequence
![Page 24: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/24.jpg)
Bonding Mixing Systems, Helitorch & Bulk Fuel Source
Connect bonding cable from bulk fuel nozzle to the mixing system or a common bonding point
Connect vapor removal hose Open fueling port and begin fueling When fueled remove nozzle, close port Remove bonding cable Note: The goal is to provide continuity
![Page 25: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/25.jpg)
Bonding from the mixing system to the Helitorch drum for gel loading
![Page 26: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/26.jpg)
Connect vapor removal hose Use a fuel transfer hose with wire
helix and a dry-break connector and connect into the Helitorch dry-break
When done disconnect dry-brake Remove vapor hose
![Page 27: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/27.jpg)
Commercial Gelling Agent
Use only commercial gelling agents that come with an MSDS
Maintain proper mix ratio Gelling agent should be dry and free of
contaminants Break up any lumps before adding to fuel
![Page 28: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/28.jpg)
Gelling Agent (cont’)
Gelling agent added to partially gelled fuel will not dissolve
More than 5 to 10 percent residual gel left can cause severe clumping
Add gelling agent to agitated fuel at a moderate rate
![Page 29: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/29.jpg)
Fuel Gasoline or a gasoline (70%) / diesel (30%)
combination is preferred Use clean fuels, avoid contaminants Warmer fuels will gel more quickly Fuel additives used for formulating
oxygenated fuel have had a negative effect on maintaining gel cohesion
![Page 30: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/30.jpg)
Mixing Systems
![Page 31: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/31.jpg)
Mixing Systems
![Page 32: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/32.jpg)
Mixing Systems Personnel required:
• Mixmaster • Mixing crew• Fuel truck driver
Mixing system should be as empty as possible of residual gel
Bond to bulk fuel source Hook up vapor removal hose (50 ft. minimum),
layout and post “no-smoking”signs
![Page 33: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/33.jpg)
![Page 34: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/34.jpg)
![Page 35: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/35.jpg)
Mixing Systems
Fill mixing system with desired amount of fuel
Begin fuel agitating/re-circulation and check Dispense gelling agent into fuel at a moderate
rate Continue re-circulation for 2 minutes for 55
gallon drums and 5 minutes for larger quantities, then shut off system and wait
Gelling should be complete in 5-20 minutes
![Page 36: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/36.jpg)
![Page 37: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/37.jpg)
Mixing Systems Check for proper gel consistency with a
wooden or aluminum paddle. The gel should envelope around the paddle
when inserted into the gel (batch mixer) When removed from the gel there should be
no liquid dripping and gel should roll right off paddle and not stick to it
![Page 38: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/38.jpg)
![Page 39: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/39.jpg)
Filling the Helitorch Personnel required:
• Parking Tender• Mixmaster• Mixing crew member (s)
Parking Tender marshals helicopter then assures switches are turned off
Parking Tender than signals mix personnel that they can start torch filling operation
![Page 40: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/40.jpg)
![Page 41: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/41.jpg)
PAY ATTENTION
![Page 42: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/42.jpg)
Filling the Helitorch Parking Tender then staffs fire extinguisher
for duration of all operations Mix Master ensures that switches are off
then hooks up vapor removal hose Hooks up fuel transfer hose and signals
pump operator to begin fuel transfer Watches through sight glass to monitor fuel
level
![Page 43: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/43.jpg)
![Page 44: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/44.jpg)
![Page 45: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/45.jpg)
![Page 46: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/46.jpg)
![Page 47: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/47.jpg)
![Page 48: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/48.jpg)
Filling the Helitorch Signals pump operator (give pump operator
enough notice) when full, gel to bottom of sight glass and shuts off dry brake
Unhooks vapor hose then fuel hose and replaces clay bailey 2” cam lock
![Page 49: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/49.jpg)
Helitorch Test - First Load With helicopter not running, and switches
in off position, signal to pilot to turn on power to Helitorch
Place a bucket under the nozzle and turn on the pump switch until gel comes out, test helitorch for fuel flow, ensure nozzle valve is not leaking
Assure both switches are off
![Page 50: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/50.jpg)
Final Helitorch Systems Check
Inspection should be done by the Helitorch Manager with the Parking Tender and Mixmaster present
During helicopter fuel cycles, re-inspect the helitorch
![Page 51: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/51.jpg)
Inspection Items Suspension system Cam lock caps secured Visual of Drum straps Propane pressure between 5 to 10 p.s.i.
(Simplex) Dry break valve open (Isolair/Simplex) Fuel flow valve open Ignition component properly adjusted & cleaned
![Page 52: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/52.jpg)
Launch Mix master or designee turns switches on Parking tender ensures switches are
activated and informs pilot the system is ready
Parking Tender marshals takeoff and advises pilot of any unsafe conditions
![Page 53: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/53.jpg)
![Page 54: Unit 6 Helitorch Operations/Exercises](https://reader035.vdocuments.mx/reader035/viewer/2022081421/5681555e550346895dc32859/html5/thumbnails/54.jpg)