unit 1 overview of environmental technology by rr
TRANSCRIPT
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
1/30
Click to edit Master subtitle style
4/19/12
Introduction to
Environmental Technology
Advanced Construction System
DCC 4133 EnvironmentalTechnology
By RozitaRazali
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
2/30
4/19/12
Syllabus
Advanced Construction System
DCC 4133 EnvironmentalTechnology
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
3/30
4/19/12
Assessment Scheme
Assessment Percentage
Assignment 10%
Project 30%
Test 1 10%
Test 2 10%
Final Exam 40%
Advanced Construction System
DCC 4133 EnvironmentalTechnology
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
4/30
Click to edit Master subtitle style
4/19/12
Unit 1Overview ofEnvironmental
Technology
Advanced Construction System
DCC 4133 EnvironmentalTechnology
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
5/30
4/19/12
Topic Outline
Advanced Construction System
DCC 4133 EnvironmentalTechnology
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
6/30
Click to edit Master subtitle style
4/19/12
Advanced Construction System
DCC 4133 EnvironmentalTechnology
1.1Environmental Problems atConstruction Site
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
7/30
4/19/12
Movement of Plant
Movement of plant such astruck, backhoe etc. cancause dust.
Pave and water haul roads
for access and egress atconstruction site to controldust.
Ensure there is no healthrisk or loss of amenity dueto emission of dust to theenvironment.
Movement of the truck
Advanced Construction System
DCC 4133 EnvironmentalTechnology
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
8/30
4/19/12
Contaminated Material andWaste
Unused brick
Rusty steel bar
Timber (formwork)
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
9/30
4/19/12
an s ur ance(Cut, Fill and Compacting
Activities)
Improper earthwork
Compaction activity
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
10/30
4/19/12
Land Disturbance(Soil Erosion)
Soil erosion
Advanced Construction System
DCC 4133 EnvironmentalTechnology
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
11/30
4/19/12
Waste from Labours
Advanced Construction System
DCC 4133 EnvironmentalTechnology
Waste from workers
Waste generated bylabours:
o Wastewater caused byimproper toilet
o Discarded food
o Domestic garbage
Contain contaminated
leachate and gases
Contaminated surfacerunoff
Can cause river pollution
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
12/30
Click to edit Master subtitle style
4/19/12 Advanced Construction System
DCC 4133 EnvironmentalTechnology
1.2Definition ofEnvironmentalTechnology
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
13/30
4/19/12
Environmental Technology
o Environmental technology(envirotech) or green technology(greentech) or clean technology(cleantech) is the application of theenvironmental science to conservethe natural environment andresources, and to curb the negativeimpacts of human involvement.
Source:Wikipedia
Advanced Construction System
DCC 4133 EnvironmentalTechnology
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
14/30
Click to edit Master subtitle style
4/19/12 Advanced Construction System
DCC 4133 EnvironmentalTechnology
1.3
Environmental Technology
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
15/30
4/19/12
Environmental Technology
o In the construction site, theenvironmental technologies to beconsidered are:
a) Reduce, reuse and recycle
b) Sewage treatment
c) Solid waste management
d) Air pollution control
e) Noise pollution control
Advanced Construction System
DCC 4133 EnvironmentalTechnology
) R d d
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
16/30
4/19/12
Three key factors when thinking about how to recycle The
3Rs:
Recycling is very important as waste has negative impacton the natural environment.
Harmful chemicals and greenhouse gasses are releasedfrom rubbish in landfill sites. Recycling helps to reducethe pollution caused by waste.
Habitat destruction and global warming are some theaffects caused by deforestation. Recycling reduces the
need for raw materials so that the rainforests can be
a) Reduce, reuse andrecycle
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
17/30
4/19/12
Recycle - Wood
Type of wood can currently be recycled:
Wood can often be reused to make other items,such as a bird table for your garden.
Wood can often be added to your compost heap,such as sawdust and wood shavings.
What happens to the wood collected?
Its sent to a merchant who sorts the material into
a) Reduce, reuse andrecycle
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
18/30
4/19/12
Sewage is characterized in terms of its physical, chemical
and biological composition. Sewage Physical Properties : Colour, Odor, Solids,
Temperature.
The sewage has to be treated before discharged into the
rivers. The constituents in the sewage could decrease theriver water quality.
Sediment, clogs the gills of fish, blocks light transmissionand increases ocean water temperature can harmingaquatic life and disturbing the food chain.
b) Sewage Treatment
Advanced Construction System
DCC 4133 EnvironmentalTechnology
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
19/30
4/19/12
b) Sewage Treatment
Advanced Construction System
DCC 4133 EnvironmentalTechnology
Sewage Treatment Plant
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
20/30
4/19/12
c) Solid Waste Management
Advanced Construction System
DCC 4133 EnvironmentalTechnology
Definition of Solid WasteAll waste arising from human and animal and animalactivities that are normally solid and that are discarded asuseless and unwanted. Improper management of solidwastes has direct adverse effects on health and theenvironment
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
21/30
4/19/12
c) Solid Waste Management
Advanced Construction System
DCC 4133 EnvironmentalTechnology
Sources of Solid Wastes:
Factors affecting waste generation:
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
22/30
4/19/12
Air pollution is the introduction of chemicals, particulate
matter, or biological materials that cause harm or discomfortto humans or other living organisms, or damages the naturalenvironment into the atmosphere.
The air quality in Malaysia is described in terms ofAirPollutant Index (API).
The API is an indicator of air quality and was developedbased on scientific assessment to indicate in an easilyunderstood manner, the presence of pollutants and itsimpact on health.Advanced Construction System
DCC 4133 EnvironmentalTechnology
d) Air Pollution Control
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
23/30
4/19/12
The API system of Malaysia closely follows the PollutantStandard Index (PSI) developed by the United StatesEnvironmental Protection Agency (US-EPA).
Advanced Construction System
DCC 4133 EnvironmentalTechnology
d) Air Pollution Control
API scale Air quality
0 50 Good
51 100 Moderate
101 200 Unhealthy
201 300 Very unhealthy301 and above Hazardous
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
24/30
4/19/12
Noise pollution (or environmental noise) isdispleasing human, animal or machine-created soundthat disrupts the activity or balance of human oranimal life. The word noise comes from the Latinword nausea meaning seasickness.
Section 23 under The Environmental Quality Act 1974stipulates that : No person shall, unless licensed,
emit or cause or permit to be emitted any noisegreater in volume, intensity or quality incontravention of the acceptable conditions specifiedunder section 21.
Advanced Construction System
DCC 4133 EnvironmentalTechnology
e) Noise Pollution Control
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
25/30
4/19/12
Maximum Permissible Sound Level By Receiving LandUse For Planning And New Development
Advanced Construction System
DCC 4133 EnvironmentalTechnology
e) Noise Pollution Control
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
26/30
4/19/12
e) Noise Pollution Control Piling works is common job for the
construction of multi-storey building,and bridge.
The noise pollution happen during thepiling works.
Some of the complaint of the pilingworks are neglected because of thenoise is not consistent.
The exposure to the piling works fordays at a long time could lead to the
hearing problems. Therefore the construction workers
have to make a proper piling schedulein order to control the noise pollution.
Advanced Construction System
DCC 4133 EnvironmentalTechnology
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
27/30
Click to edit Master subtitle style
4/19/12 Advanced Construction System
DCC 4133 EnvironmentalTechnology
1.4Construction Workers andEnvironmental Technologies
C t ti W k &
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
28/30
4/19/12
Construction workers spend most of their time atconstruction site. Therefore it is the job of theconstruction workers to ensure that they have a cleanenvironment.
Under direct supervision of a mentoring Field Technicianor Project Manager, construction workers assist in carryingout Site Management and/or Waste Management field-
related activities such as sampling, surveying, collectionand measuring etc. This involves collecting informationregarding the presence and effects of pollutants in air,water and soil of the construction site.
Advanced Construction System
DCC 4133 EnvironmentalTechnology
Construction Workers &Environmental technologies
C t ti W k &
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
29/30
4/19/12
q Specific duties of construction workers and environmental
technologies could include:A. Field sampling: air, water and soil
B. Solid, liquid and air treatment methods and waste minimization
C. Hazardous goods and waste handling methods
D. WHMIS (Workplace Hazardous Management Information Systems)implementation and compliance evaluation
E. Emergency planning and spill response methods
F. Recycling and waste minimization program design
G. Environmental issue analysis and environmental law and ethics
H. Developing and implementing air, water or soil quality measurement plans.
I. Taking inventory of and quantifying sources of locally-generated pollution
J. Using different laboratory techniques and instruments to prepare andanalyze samples.
K. Preparing reports of lab results for internal and external use.
Advanced Construction System
DCC 4133 EnvironmentalTechnology
Construction Workers &Environmental technologies
-
8/2/2019 Unit 1 Overview of Environmental Technology by RR
30/30
Click to edit Master subtitle style
4/19/12
Advanced Construction System
DCC 4133 EnvironmentalTechnology
End
Always bear in mind that your own resolution to succeedis more important than any other