ideal grid for all
UFD LV demo site
18/05/2016SLIDE 2 WWW.IDE4L.EU – IDE4L Symposium, Brescia
ASSETS:• 2 Secondary substations
• 10 LV feeders
• Loads/EV chargers
• DERs: PV panels, wind turbine, gas generator
CONTROLLABLE NODES:• 3 PV installations
USE CASES (LV):• RT monitoring
• Load and production
forecast
• State estimation
• Power flow control
ideal grid for all
UFD LV demo site
18/05/2016SLIDE 3 WWW.IDE4L.EU – IDE4L Symposium, Brescia
ideal grid for all
UFD selected topology (CIM model)
18/05/2016SLIDE 4 WWW.IDE4L.EU – IDE4L Symposium, Brescia
ideal grid for all
UFDPhysicalModel
18/05/2016SLIDE 5 WWW.IDE4L.EU – IDE4L Symposium, Brescia
•Receive data from SCADA and MDC
•Send set-points to SCADA
•Power by phase
•Accumulated energy by phase
•Voltage
•Current
•Active/Reactive power
•Temperature
•Wind speed
•Solar radiation
ideal grid for all
UFD implementation
18/05/2016SLIDE 6 WWW.IDE4L.EU – IDE4L Symposium, Brescia
SCADA
MDC:
Meter Data
Concentrator
SSAU
Data Base
Algorithms
• Load Forecast
• Production
Forecast
• State Estimator
• Power Control
Generators
PVs
Wind Turbine
Gas generator
EV Charging
post
Meteo station
Smart meters
DLMS/COS
EM
ModBus
IEC
61850
LV
Super
visor
DLMS/COS
EM
ideal grid for all
UFD – Use Case LV Monitoring
18/05/2016SLIDE 7 WWW.IDE4L.EU – IDE4L Symposium, Brescia
PV1 Installation (Wh) – Accumulated energy phA:• Hourly, daily and weekly mean values
11
/01
/20
16
21
/01
/20
16
31
/01
/20
16
10
/02
/20
16
20
/02
/20
16
01
/03
/20
16
11
/03
/20
16
21
/03
/20
16
31
/03
/20
16
10
/04
/20
16
800
700
600
500
400
300
200
100
0
Aggregated mean values (hourly) Aggregated mean values (daily) Aggregated mean values (weekly)
ideal grid for all
UFD – Use Case LV Monitoring
18/05/2016SLIDE 8 WWW.IDE4L.EU – IDE4L Symposium, Brescia
PV1 Installation (Wh) – Net energy phA:• Hourly, daily and weekly mean values
11
/01
/20
16
21
/01
/20
16
31
/01
/20
16
10
/02
/20
16
20
/02
/20
16
01
/03
/20
16
11
/03
/20
16
21
/03
/20
16
31
/03
/20
16
120
100
80
60
40
20
0
Mean values (hourly)
Mean values (daily)
Mean values (weekly)
ideal grid for all
UFD – Use Case LV Monitoring
18/05/2016SLIDE 9 WWW.IDE4L.EU – IDE4L Symposium, Brescia
PV1 Installation (W) – Power phA:• Hourly, daily and weekly mean values
11
/01
/20
16
21
/01
/20
16
31
/01
/20
16
10
/02
/20
16
20
/02
/20
16
01
/03
/20
16
11
/03
/20
16
21
/03
/20
16
31
/03
/20
16
10
/04
/20
16
3000
2500
2000
1500
1000
500
0
Mean values (hourly)
Mean values (daily)
Mean values (weekly)
ideal grid for all
UFD – Next steps
18/05/2016SLIDE 10 WWW.IDE4L.EU – IDE4L Symposium, Brescia
Use Case LV RT Monitoring:• Data model and algorithms
completed
• Analyzing results and calculating KPIs
Use Case L&P Forecast and State Estimation:• Installation completed
• Debugging software
• Analyzing results
Use Case Power Control:• In progress