![Page 1: Uni Modular Construction (Green Precast)greenprecastsystems.com/media/Modular_Construction-Green...Box 2655 ABU DHABI - UAE PHONE: +971 2 666 6332 FAX: +971 2 666 2292 GREEN PRECAST](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f4d907268593756d475d588/html5/thumbnails/1.jpg)
Student AccommodationModular Options
Joss Constructions/Ecotec - NSW Australia
10/03/2010
![Page 2: Uni Modular Construction (Green Precast)greenprecastsystems.com/media/Modular_Construction-Green...Box 2655 ABU DHABI - UAE PHONE: +971 2 666 6332 FAX: +971 2 666 2292 GREEN PRECAST](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f4d907268593756d475d588/html5/thumbnails/2.jpg)
Student AccommodationModular Options
Joss Constructions/Ecotec - NSW Australia
10/03/2010
Individual 4-sided bedroommodules manufactured o!-site
Modules are monolithicallycast - no construction jointsbetween walls
Excellent acousticproperties betweenadjacent rooms
Greatly compressedconstruction timeframe
as the majority of structuremanufactured concurrently
to site preparation etc.
Replication: modulesmanufactured
precisely tospeci"cation each pour
![Page 3: Uni Modular Construction (Green Precast)greenprecastsystems.com/media/Modular_Construction-Green...Box 2655 ABU DHABI - UAE PHONE: +971 2 666 6332 FAX: +971 2 666 2292 GREEN PRECAST](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f4d907268593756d475d588/html5/thumbnails/3.jpg)
Student AccommodationModular Options
Joss Constructions/Ecotec - NSW Australia
10/03/2010
Industry standardlifting gear installed
in each module
Cast-in steeldoorframes
All power, co-ax, ethernetetc. can be cast-in
even plumbing and hydronicheating in slabs
Timber framingcast-in to modulesto assist in !xingwindows etc.
Light !ttingscast-in