Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Undulator Vacuum System/Mechanical

ByDean R WaltersAdvanced Photon SourceArgonne National Laboratory

Page 2: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

 

Talk Outline Undulator Chamber & Bellows Vacuum System Beamline Diagnostics Schedule Highlights

Undulator Vacuum System/Mechanical

Page 3: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Undulator Chamber & Bellows Chamber Design

Bellows Design

Status of the Prototype

Undulator Vacuum System

Page 4: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Undulator Moves In & Out

Undulator

Vacuum Chamber with Supports

Vacuum Chamber & Bellows Design

Page 5: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Supports

Chamber Strongback

Tubular Chamber

6 mm OD X 5 mm ID

Vacuum Chamber & Bellows Prototype Design

Page 6: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Chamber DrawingsVacuum Chamber & Bellows

Page 7: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Vacuum Chamber & Bellows Bellows Design

Drawn by SH Lee

Page 8: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Vacuum Chamber & Bellows

Drawn by SH Lee

Bellows Design (Expanded View)

Page 9: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Status of Prototype Chamber

Drawings Complete Outside shops have completed all quotations All orders have been issued ANL shop work orders are in place Fabrication to complete in December 2004

Bellows Assembly and parts design complete Need to draft assembly and part drawings

Undulator Vacuum Chamber

Page 10: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Vacuum System System Layout Short Break Section Long Break Section Vacuum Pressure within the System

Undulator Vacuum System

Page 11: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

System LayoutVacuum System

Page 12: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Vacuum System

Page 13: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Short Break Section Schematic

Vacuum System

Page 14: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Vacuum System

Drawn by SH Lee

Page 15: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Long Break Section SchematicVacuum System

Page 16: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Vacuum System

Drawn by SH Lee

Page 17: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Vacuum Pressure within the System

Red is at Tube Mid-Point

Blue is Average

Vacuum System

1 10 100 1 1031 10 8

1 10 7

1 10 6

1 10 5

1 10 4

2.191 10 5

1.378 10 8

PR

PRa

1201 Timehours

Torr

(Thermal Desorption only)

Page 18: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Vacuum SystemVacuum Pressure within the System(includes Thermal Desorption plus Photon Stimulated Desorption)

Red is at Tube Mid-Point

Blue is Average

Torr

hours1 10 100 1 1031 10 8

1 10 7

1 10 6

1 10 5

1 10 4

2.203 10 5

9.347 10 8

PRPe

PRPa

1201 Time

Page 19: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Undulator Vacuum System/Mechanical

Beamline Diagnostics RFBPM

Different type under considerationHighlights of Schedule

Vacuum Testing of Diagnostics ComponentsWhat drives this issueStatus of Testing

Page 20: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Beamline DiagnosticsC-Band RFBPM now being considered instead of X-Band

C-Band has the possibility of using industry supplied electronics

According to published literature resolution ~30 nm

Page 21: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Highlights of the ScheduleDesign work to start March 2005Timing of Design work based of funding during Continuing ResolutionUse intervening time to research C-Band RFBPM (ANL)Goal is to have BPM mechanical design by June 2005Goal is to have (3) test BPMs by September 2005Currently this schedule is undergoing a review

Beamline Diagnostics

Page 22: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Beamline DiagnosticsVacuum Testing of Diagnostics Components

What drives this issue

The Diagnostics Station is considering the use of motion components in the vacuum section where we do not have a lot of experience.

Slides and Stages

Motors

The initial concept was to put the motion components in the vacuum for reasons of positional accuracy.

The design is at a point where changes are possible to move things in and out of vacuum

The intention is to subject components to residual gas analysis and outgassing measurement to qualify them for use.

Page 23: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Beamline Diagnostics

Sample Chamber

ColdCathodegauge

ResidualGas

Analyzer

ManualValve

ManualGateValve

Turbo Pump

IonGauge

Page 24: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Beamline DiagnosticsStatus of Testing

A draft test procedure has been written that covers both residual gas analysis and outgassing measurement.The Test Set-up is assembled The Set-up has completed a troubleshoot/ clean-up processThe Set-up is in the process of establishing a base performance profile Suppliers are being contacted for test samples

Page 25: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Schedule

Diagnostics

Vacuum System

Description Early FinishComplete Fabrication of Wire Scanner Prototype 29-Apr-05Complete Fabrication of OTR Prototype 29-Apr-05Design of Diagnostics Test Station Compl 31-May-05Prototype RFBPM Design Complete 31-May-05Prototype RFBPM Fabrication Complete 29-Aug-05Diagnostics Prototype Testing Complete 23-Mar-06OTR Final Production Design Complete 18-Apr-06Prototype RFBPM Testing Complete 17-Feb-06

Prototype Bellows Fabrication Complete 31-May-05Vacuum Chamber Prototype Testing Complete 29-Jul-05Prototype Bellows Testing Complete 29-Aug-05Production Chamber Design Complete 28-Sep-05Bellows Final Design Complete 27-Oct-05

Page 26: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Conclusions: Prototype Chamber construction progressing The prototype Bellows has been modeled and after

issuing drawings it will enter the fabrication phase.The order of the Beamline Components is still

undergoing some adjustments but it is firming to allow design of the cradle assembly

A new direction for the RFBPM is being considered and work on it is schedule for March 2005

Motion components vacuum testing has just entered the first stage of testing.

Questions

Undulator Vacuum System / Chamber Design

Page 27: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

END

Page 28: Undulator Vacuum System/Mechanical

Dean R Walters

Undulator Vacuum System [email protected]

October 12-13, 2004Facility Advisory Committee

Resulting of Outgassing CalculationsAPPENDIX

q2c 8.771 10 10 q12c 1.222 10 10 q24c 4.852 10 12 q120c 8.261 10 13

Outgassing

Calculation of Outgassing rates using a time rate of change formula

Copper Outgassing that is mechanically polished

For the t<12 hours For the t> 12 hoursc 1.1 qc 1.88 10 9 c 1.1 qgc 1.6 10 10

qtc t( )qc

t( )c qTc t( )

qgc

t( )c

t is in seconds t is in seconds

Stainless Steel Outgassing

s .5 qs 1.7 10 9 s .7 qgs 4.6 10 10For the t<12 hours For the t> 12 hours

qts t( )qs

t( )s qTs t( )

qgs

t( )s

q2s 1.046 10 9 q12s 2.986 10 10 q24s 4.973 10 11 q120s 1.612 10 11