understanding your bill - peninsula clean energy · energy surcharge $0.14 10/01/2016 10/22/2016 9...
TRANSCRIPT
MARY SMITH
94804
455 COUNTY CENTER, FOURTH FLOORREDWOOD CITY, CA 94063
SAMPLE BILL: PAGE ONE
1234 STREET AVENUESAN RAFAEL, CA 2
3
4
Your Account SummaryAmount Due on Previous Statement 82.85Payments Received Since Last Statement 82.85
Previous Unpaid Balance $0.00Current PG&E Electric Delivery Charges $44.97PCE Electric Generation Charges $30.33Current Gas Charges $27.20Total Amount Due $102.50
Total Amount Due $102.50
1234567890-110/01/201610/22/201610/01/201610/22/2016
PAT A CAN5905 FRESNO AVESAN MATEO, CA 94063
1
SAMPLE
UNDERSTANDING YOUR BILL
1 3
2 4
Account NumberThis is where you will find your existing PG&E account number.
PCE Electric ChargesThis is PCE’s charge for generating the cost of electricity that powers your home or business. This charge replaces what PG&E would otherwise charge. These charges are detailed on Page 4 of your Sample Bill.
PG&E Electric Delivery ChargesThis is PG&E’s charge for the delivery of electricity to your home or business. It includes transmission, distribution, and a variety of other fees explained in Point 6 (page 2 of your Sample Bill). It does NOT include generation charges if you’re a PCE customer.
This rate will not change if you’re a PCE customer.
Total Amount DueThe total amount due includes ALL of your fees for PG&E gas services and electric delivery, and PCE electric generation services. You should remit the total amount due on your bill to PG&E, as indicated.
1234567890-1
10/01/2016 – 11/01/2016 (31 billing days)
10/01/2016 – 11/01/2016
SAMPLE BILL: PAGE THREE
SAMPLE BILL: PAGE TWO
1234567890-1
Conservation Incentive -$22.36Transmission $7.46Distribution (note: includes NSGC) $37.75Public Purpose Programs $7.38Nuclear Decommissioning $0.25DWR Bond Charge $2.50Competition Transition Charges (CTC) $1.93Energy Cost Recovery Amount -$0.10PCIA $3.08Taxes and Other $0.29
Total Electric Charges $30.33
1234 STREET AVENUE
Tier 1 Allowance 362.70 kWh (31 days x 11.7 kWh/day)Tier 1 Usage 362.70 kWh @$0.13230Tier 2 Usage 108.81 kWh @$0.15040Tier 3 Usage 36.49 kWh @$0.31916Generation Credit -$40.05 Power Charge Indifference Adjustment $5.59 Franchise Fee Surcharge $0.32
Total PG&E Electric Delivery Charges $44.972016 Vintaged Power Charge Indifference Adjustment
Meter # 0000000000Current Meter Reading 1,508Prior Meter Reading 1,000Total Usage 508.000000 kWhBaseline Territory X
Service Agreement ID: 0123456789
Electric Usage This Period: 508.000000 kWh, 31 billing days
10/1 10/4 10/7 10/10 10/14 11/110/17 10/20 10/23 10/26 10/29
Your delivery and maintenance services from PG&E will remain unchanged.
10/01/201610/22/2016
10/01/201610/22/2016
5
6
7
8
SAMPLE
5 7
6 8
Your Electric Charge BreakdownThese are PG&E electric delivery charges and associated fees.
Total PG&E Electric Delivery ChargesThis is the sum of PG&E’s charges for electric delivery, which matches the charge on the summary page of your bill (page 1 on your Sample Bill).
Franchise Fee SurchargeThis fee is collected by PG&E to pay for the right to use public streets to run gas and electric service.
Power Charge Indifference AdjustmentThis fee is required by PG&E of all PCE customers. It is intended to ensure that customers who switch to PCE pay for energy that PG&E procured on their behalf, prior to their switch.
10/01/2016 – 11/01/2016 (31 billing days)SERVICE FOR: 1234 STREET AVENUEService Agreement ID: 0123456789 ESP Customer Number: 0123456789
10/01/2016 – 11/01/2016
Total Usage 508.000000 kWh
SAMPLE BILL: PAGE FOUR
1234567890-1
Rate Schedule: RES-1 508.000000 kWh @ $0.0100 $5.08 508.000000 kWh @ $0.09202 $46.75
Net charges $51.83
Energy Surcharge $0.14
10/01/201610/22/2016
9
11
10
12
ECOplus - TOTALECO100 - TOTAL
Total PCE Electric Generation Charges $30.33
PG&E no longer bills you for electric generation.
455 COUNTY CENTER, FOURTH FLOORPENINSULA CLEAN ENERGY
REDWOOD CITY, CA 94063
PG&E
SAMPLE
9 11
10 12
Rate ScheduleThis is your current rate schedule. More information on rates can be found at PeninsulaCleanEnergy.com/rates.
Energy SurchargeThis fee is collected on behalf of the California Energy Commission. It was previously included in PG&E’s fees.
ECO100If you’ve Opted Up to ECO100 100% renewable energy, you’ll see an additional $0.01 per kilowatt hour charge. It only applies to ECO100 customers.
Total PCE Electric Generation ChargesThis is the sum of all electric generation services from PCE.