under graduate b-arch portfolio

15

Upload: roby-seby

Post on 30-Mar-2016

235 views

Category:

Documents


5 download

DESCRIPTION

under graduate portfolio from semester 2- semester 6,USD, mysore

TRANSCRIPT

Page 1: under graduate b-arch portfolio
Page 2: under graduate b-arch portfolio

ABOUT

Roby SebyDoha, Qatar , near Lulu Hypermarket09964098271EducationThe University school of Design| Mysore| The University school of Design| Mysore| India.B.Arch (2009 - Present)M.E.S Indian School, Doha9th and 12th grade (2007 - 2009)The Indian School, Bahrain1st to 9th grade (1997 - 2007)Personal InformationPersonal InformationDate of Birth - 21 December 1990Place of Birth - Thrichur(Kerala)Nationality - IndianSex - Male

Software skills

Photoshop CS5.5Illustrator CS5.5InDesign CS5.5After Effects CS5.5Microsoft Office 2010Autocad 2012Autocad 2012Sketchup 8.0Revit Architecture 2012Processing

Other Skills

Model making(Sunboard, Foam Board, (Sunboard, Foam Board, Cardboard,Paper,Gypsum plaster, Metal)Drafting(Pen and ink, Pencil)Sketching(Conceptual, Finale)LanguageLanguage(English, Hindi, Malayalam, Kannada)

CV

Page 3: under graduate b-arch portfolio

Performing Art Centre That PerformsStudio Project| Sem 4 Year 2| 2011|Mangalore(School/ Museum/ Cultural centre/ Riverfront/ Dynamic Architecture/Theatre/ Music/ Dance Studios)FACULTY- Ar. Srinivasa 01

SchoolSchoolStudio Project| Sem 3 Year 2| 2010| Mysore(High School/ Kindergarten/ Natural System/Golden Ratio/Voronoi Division/ L-System) FACULTY-Ar.Vivek 03

River Front Development ProjectStudio project| Sem 6 Year 3|2012| AhmedabadStudio project| Sem 6 Year 3|2012| Ahmedabad(Riverfront development/ Urban Restructure/ Public Squares/Street/Bazaars/ Library / Theatre/Food Court) FACULTY-Ar. Anand Krishnamurthy 05

HousingStudio Project| Sem 5 Year 3| 2011| Bellary(Bellary/ Bank Employees/ Clubhouse/ Biomimicry/ Units) FACULTY-Ar.Anand Prakash 08 FACULTY-Ar.Anand Prakash 08

Time Problem: Metro RoofscapeStudio Project| Sem 6 Year 3| 2012| FACULTY-Ar. Anand Krishnamurthy 11

Model Skills 12

6.

5.

1.

2.

3.

4.

Page 4: under graduate b-arch portfolio

1

Page 5: under graduate b-arch portfolio

1

WRITE UPS PERFORMING ARTS CENTRE, MANGALORE

purpose for spaces Purpose, Space cannot exist without time or purpose.In Architecture this Notion does not existsince Space exist even when its devoid of purposeor time. Breaking away from tradition and or time. Breaking away from tradition and bridgingthe notion of time and space was completedby bringing a sense of dynamism to space, to keepup with time and purpose.

SECION A-A’

SECTION C-C’

SECTION D-D’

site sections2

Page 6: under graduate b-arch portfolio

3

Page 7: under graduate b-arch portfolio

3 4

Page 8: under graduate b-arch portfolio

5

Page 9: under graduate b-arch portfolio

5

Page 10: under graduate b-arch portfolio

Emphasis onthe character of the un-built spaces.

Physical barriers deviate thevisual axis through the movementpath though the visualcontinuity is maintainedThe Winding movementThe Winding movementthrough a series of spaces createvaried mental conditioningas in the temple sequenceChoices of movement path allowthe individual freedom ofrelating in one’s own way.Movement as a critical featureMovement as a critical featureto induce kinetic perception ofspace

WRITE UPS RIVER FRONT DEVELOPEMENT PROJECT, AHMEDABAD

7

MODELThe 3d model shows that the building is raised and supported on massive col-umns.Thus providing a visual connection to the river

Page 11: under graduate b-arch portfolio

Emphasis onthe character of the un-built spaces.

Physical barriers deviate thevisual axis through the movementpath though the visualcontinuity is maintainedThe Winding movementThe Winding movementthrough a series of spaces createvaried mental conditioningas in the temple sequenceChoices of movement path allowthe individual freedom ofrelating in one’s own way.Movement as a critical featureMovement as a critical featureto induce kinetic perception ofspace

WRITE UPS RIVER FRONT DEVELOPEMENT PROJECT, AHMEDABAD

7

MODELThe 3d model shows that the building is raised and supported on massive col-umns.Thus providing a visual connection to the river

PROJECT: HOUSING, BELLARY

PLAN AT G+6, TOP FLOOR, SCALE 1:200

PLAN AT G+6, GROUND FLOOR, SCALE 1:200

“Architecture should serve the social condi-tion ofthe people rather than just for visual senses. Henceunderstanding the social behaviour of the re-gionalsociety and serving them becomes a primaryagenda, problems like climate, material and structureare pure technological depended hence theyare time based should be solved based on existingtechnology rather than working in Isolation. Sincetoday we have new theory ,new tool,new today we have new theory ,new tool,new productiontechniques for building construction.”

Walk up apartment for the ICICI Bank em-ployees20 units of 1BHK @90sqm40 units of 2BHK @110sqm20 units of 3BHK @140sqmMaximum coverage 50%Unit are excludes common corridors,stairs,car parking & resultantterraces and should be climate specific

REQUIREMENTS

8RADICAL AGENDA

PLAN AT G+4, SCALE 1:200

WRITE UPS

Page 12: under graduate b-arch portfolio

PLAN AT G+1, SCALE 1:200PLAN AT G+2, SCALE 1:200

WRITE UPS

PLAN AT GROUND LEVEL, G, SCALE 1:200

PLAN OF 3BHK, SCALE 1:100

Hot and dry climate demands a Structure which is less ventilated, smaller windowsand less heat gain and due to site restriction the massing has to bedense to fit the requirement. By looking at various examples of denseand porus structure we can find various examand porus structure we can find various exam-ples that is found in theNature

HousingClubhouseBlocks placed to avoid wind movementalong the peripheryBlocks placed in ‘L’ shape to funnel the air,to reduce heat gain and unwanted dry winds.Blocks placed in ‘H’ Shape to funnel theBlocks placed in ‘H’ Shape to funnel theair, and also provide large open space inthe centre.Cutout for light and ventilation of unitsbelow.Final massing with all Units ,Clubhouse and ParkingCell generated based on functional requireCell generated based on functional require-mentCells clustered based on offsets conditions.

massing developement: climate study

9conceptual developement

PROJECT: HOUSING, BELLARY

Page 13: under graduate b-arch portfolio

PLAN AT G+1, SCALE 1:200PLAN AT G+2, SCALE 1:200

WRITE UPS

PLAN AT GROUND LEVEL, G, SCALE 1:200

PLAN OF 3BHK, SCALE 1:100

Hot and dry climate demands a Structure which is less ventilated, smaller windowsand less heat gain and due to site restriction the massing has to bedense to fit the requirement. By looking at various examples of denseand porus structure we can find various examand porus structure we can find various exam-ples that is found in theNature

HousingClubhouseBlocks placed to avoid wind movementalong the peripheryBlocks placed in ‘L’ shape to funnel the air,to reduce heat gain and unwanted dry winds.Blocks placed in ‘H’ Shape to funnel theBlocks placed in ‘H’ Shape to funnel theair, and also provide large open space inthe centre.Cutout for light and ventilation of unitsbelow.Final massing with all Units ,Clubhouse and ParkingCell generated based on functional requireCell generated based on functional require-mentCells clustered based on offsets conditions.

massing developement: climate study

9conceptual developement

PROJECT: HOUSING, BELLARY

Page 14: under graduate b-arch portfolio

11

GLASS FACADE

METRO TRAIN

PLAN, SCALE 1:400

SECTION A-A”

SECTION B-B’

WRITE UPS TIME PROBLEM:METRO ROOFSCAPE

Page 15: under graduate b-arch portfolio

11

GLASS FACADE

METRO TRAIN

PLAN, SCALE 1:400

SECTION A-A”

SECTION B-B’

WRITE UPS TIME PROBLEM:METRO ROOFSCAPE