THURSDAY, FEBRUARY 21 (OPEN MEETING FOR NMMM)
1.0 OPENING COMMENTS - OPEN
Call to Order / Quorum Check
The Non Metallic Materials Manufacturing (NMMM) Task Group was called to order at 10:30 a.m., 21-Feb-13.
A quorum was established with the following representatives in attendance:
Subscriber Members/Participants Present (* Indicates Voting Member)
NAME COMPANY NAME
* Peter Atwell Airbus S.A.S. Secretary* Mike Bemis Goodrich (UTAS) Ping Chen COMAC Lucia Cutillo Alenia Aeronautica* Kevin Dowling Spirit AeroSystems Patrick Dunleavy SAFRAN Group* Brett Hemingway BAE Systems (MAI)* Mark Jackson Triumph Group, Inc.* Mike Kahler Ball Aerospace & Technologies* John Key Bell Helicopter Chairperson John Knie The Boeing Company* Betty Kocsis Honeywell Aerospace* Lance Loeks The Boeing Company* Andreas Mastorakis GE Aviation Larry Olsen Northrop Grumman* Keith Panuska Lockheed Martin Vice Chairperson* Jeremy Phillips Cessna Aircraft Co. Robert Reynolds The Boeing Company* Sally Spindor Triumph Group, Inc.* Anne Stanley Bombardier, Inc. Colin Stuart Rolls-Royce Group* Yuan Yuhui COMAC
Other Members/Participants Present (* Indicates Voting Member)
NAME COMPANY NAME
Poitou Benoit CETIM Bill DeLaurier IMR Test Labs Chris Dowdy Toray CFA Ken Gish 3M Gerald Harvey Triumph Group Deborah LeMire 3M
1
NON METALLIC MATERIALS MANUFACTURINGFEBRUARY 2013
CONFIRMED MINUTES Sherri Li Exova Opeyemi Moyegun Hexcel Corporation Paul Poropatic PRI Auditor Don Russell Toray Composites America* Colleen Saunders Toray Composites* Steve Schrameyer Cytec Engineered Materials Vitorio Stana Avcorp Industries Inc.* Nancy Vancil Toray Carbon Fibers America, Inc.
PRI Staff Present
Rebekah BraunMike GrahamRoger Stirling
The Code of Ethics and Conflict of Interest Policy was presented for all Nadcap attendees. The new PRI Compliance video was shown to all Nadcap attendees. Note: This information is also available in the Nadcap Attendees Guide on Page 7.
The following member has been approved by the AC7124 Non Metallic Materials Manufacturing Task Group to be added as Alternate Supplier Voting Members
– Don Russell – Toray Composites America, Inc. (TCA) – Tacoma, WA
1.1 Approval of Previous Meeting Minutes – OPEN
The meeting minutes from October 2012 were approved as written.
1.2 Agenda Review – OPEN
John Key reviewed the agenda.
2.0 STAFF REPORT – OPEN
The Staff Report was presented by Roger Stirling. The above embedded presentation is also posted on eAuditNet under Resources - Documents - Public Documents – Composites – Meeting Presentations
ACTION ITEM: PRI to include AC7122/R NCR data if this can be determined. (Due date: 3-Jun-13)
ACTION ITEM: PRI to show NCR paragraph questions together with NCR data. (Due Date: 3-Jun-13)
3.0 METRICS – OPEN
2
NON METALLIC MATERIALS MANUFACTURINGFEBRUARY 2013
CONFIRMED MINUTESRoger Stirling presented the Composites Task Group Metrics for Suppliers, Staff Engineer and Task Group Initial and Reaccreditation Cycle Time, Supplier Merit and Subscribing Member Balloting.
4.0 PROCEDURE REVIEW – OPEN
5.0 ACTION ITEM REPORT-OUT – OPEN
Roger Stirling reviewed the action item list – All of the actions have been closed from the October 2012 Nadcap Meeting in Pittsburgh, PA, USA
ACTION ITEM: PRI to continue to review checklist questions to determine where” NAs” or “If Required” should be considered. (Due Date: 3-Jun-13)
ACTION ITEM: PRI to add an explanation at the front of the checklist on the applicability of “NA” in the checklist questions. (Due Date: 3-Jun-13)
ACTION ITEM: Sub-team to collate list of questions to determine if prefix ‘’if required’’ and NA is required. (Sub-team members include Paul Poropatic, Lance Loeks, Betty Kocsis, Nancy Vancil, Pete Atwell and Ken Gish) (Due Date: 3-Jun-13)
6.0 AC7124 BALLOT COMMENTS RESOLUTION – OPEN
Ballot comments resolved and incorporated for AC 7124/2
The comments for the draft AC7124/4 were also reviewed
ACTION ITEM: PRI to incorporate Sub-Team’s (Lance Loeks & Team) proposals for Dipping and Cure to AC7124/4 prior to pilot audit and return to Lance Loeks & team to agree content. (Due Date: 3-Jun-13)
ACTION ITEM: PRI to incorporate editorial changes through the checklist (Due Date: 3-Jun-13)
7.0 ADDITION OF FIBERS INTO AC7124 – OPEN
3
NON METALLIC MATERIALS MANUFACTURINGFEBRUARY 2013
CONFIRMED MINUTES
ACTION ITEM: PRI to send draft of AC7124/5 to task group. (Due Date: 3-Jun-13)
ACTION ITEM: Task Group to review and comment on draft AC7124/5. (Due Date: 3-Jun-13)
ACTION ITEM: Fiber Team to set up conference call comment resolution. (Due Date: 3-Jun-13)
ACTION ITEM: Subscribers to notify their qualified fiber suppliers regarding the addition of fiber to AC7124/5. (Copy PRI) (Due Date: 3-Jun-13)
8.0 AUDIT GRADING CRITERIA FOR AC7124 / AC7122/R– OPEN
Sub-Team (Lance Loeks) presented the AC 7124 / AC 7122/R proposed audit grading criteria.
The review focused on an audit capability approach to determine audit length.
ACTION ITEM: John Key to review previous audit data with reference to the proposed audit grading concept. (Due Date: 3-Jun-13)
9.0 REVIEW OF FAILURE CRITERIA – OPEN
Motion made to postpone setting the Mode “B” failure criteria for 12 months to allow more data.Motion Passed 14:1 waive
10.0 OPEN DISCUSSION – OPEN
Roger Stirling showed to the TG the merit eligibility questionnaire and NOP-006 criteria
Pilot Audit for the AC 7124/4 checklist is scheduled for April 29 – 30 2013 at Eurocomposites, Luxemburg
ACTION ITEM: PRI to incorporate team’s suggestions into checklist before the pilot audit (AC7124/4). (Due Date: 3-Jun-13)
ACTION ITEM: PRI to send revised AC7124/4 to the Team for verification prior to pilot audit for use at pilot audit. (Due Date: 3-Jun-13)
ACTION ITEM: PRI to ensure proposed AMS 2750/1 is also coordinated with raw material manufacturers. (Due Date: 3-Jun-13)
4
NON METALLIC MATERIALS MANUFACTURINGFEBRUARY 2013
CONFIRMED MINUTES
ACTION ITEM: Primes to notify their carbon fiber manufacturers of the proposed AMS 2750/1 requirements if applicable. (Due Date: 3-Jun-13)
11.0 MEETING CLOSE-OUT – OPEN
Review Action Items
Agenda Topics for the June 2013 meeting in Paris, France• Open Discussion
ADJOURNMENT – 21-Feb-13– Meeting was adjourned at 4:30 p.m.
Minutes Prepared by: Peter Atwell: [email protected]
RAIL:
AC7124
***** For PRI Staff use only: ******
Are procedural/form changes required based on changes/actions approved during this meeting? (select one)
YES* NO
*If yes, the following information is required:
Documents requiring revision:
Who is responsible: Due date:
AC7124/2 PRI
AC7124/4 PRI
DRAFT AMS 2750/1 PRI
5