unclassified data integration joint lessons learned information system and joint training...

11
Unclassified Unclassified Data Integration Joint Lessons Learned Information System and Joint Training Information Management System Unclassified Unclassified

Upload: rosalyn-dawson

Post on 31-Dec-2015

237 views

Category:

Documents


3 download

TRANSCRIPT

Unclassified

Unclassified

Data Integration

Joint Lessons Learned Information Systemand

Joint Training Information Management System

Unclassified

Unclassified

2

UNCLASSIFIED

UNCLASSIFIED

Data Integration Overview

• Purpose

• Phased approach - JLLIS design concept

- JTIMS design concept

3

UNCLASSIFIED

UNCLASSIFIED

Ms. Diane Lent-TuckerJoint Staff J7Joint Lessons Learned Branch

Systems Integration:Joint Lessons Learned Information

System(JLLIS)

4

UNCLASSIFIED

UNCLASSIFIED

Purpose of Integration

• To meet the requirements defined by the users

• Reduce duplication of effort

• Provide seamless sharing of data

• Increase the speed and accuracy of information sharing

5

UNCLASSIFIED

UNCLASSIFIED

JLLIS Design Concept for Integration

• Implement a phased approach for JLLIS and JTIMS Data Integration

• Phase one:

- JLLIS establish link to access other DoD systems (JTIMS, JDEIS)

• Determine JLLIS requirements for enhanced integration capabilities

6

UNCLASSIFIED

UNCLASSIFIED

LINKS

JTIMS

DRRS

JDEIS

LINKS

JTIMS http://64.124.158.32/jtims/welcome.do

JDEIS http://www.dtic.mil/doctrine/s_index.html

DRRS http://userguide.drrs.org/Introduction/DRRS%20Applications/index.html

Phase One of Integration:The Initial Link

8

UNCLASSIFIED

UNCLASSIFIED

LINKS

Arrangement of menu bar follows standard format (eg. ‘Home’ is always located at the upper left corner, ‘Email Us’ is always at the upper right corner, etc.)

Menu bar persists throughout JLLIS

Menu items possess drop-down capabilitywhere each link opens in a new window

JTIMS

DRRS

JDEIS

Phase One of Integration (cont’d):Modification

9

UNCLASSIFIED

UNCLASSIFIED

• Phase Two: JLLIS Import Capability

- JLLIS develop capability for manual import of JTIMS LL Initial Observation Data (XML File)

- Determine JLLIS requirements for enhanced integration capabilities (Web Services)

Phase Two of Integration:Importing Data from JTIMS

10

UNCLASSIFIED

UNCLASSIFIED

• Near ‘real-time’ data exchange

- Seamless data sharing/integration between JLLIS and JTIMS

- JTIMS LL Initial Observations, when approved, will automatically update the corresponding organization’s JLLIS with no manual effort

Long-Range Goaland Last Phase of Integration

Unclassified

Unclassified

Questions?

12

UNCLASSIFIED

UNCLASSIFIED

Systems Integration:Joint Training Information

Management System(JTIMS)

LCDR Steven JaureguizarJoint Staff J7Joint Training and Policy Branch