UN City of Greenwood, Arkansas Baltimore and West Denver Sanitary Sewer Improvements Tabulation of Bids Received on November 9, 2020, 7:00 p.m. HWEI Project No. 2020086 ltem# 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. 44. 45. 46. BALTIMORE AND WEST DENVER SANITARY SEWER IMPROVEMENTS Description Performance and Payment Bond Maintenance of Traffic and Traffic Control Construction Erosion Control Site Preparation R&D of Concrete Sidewalks/Driveways R&D of Concrete Curb & Gutter Relocate Portable Structure R&D of Building Structure Clearing and Grubbing Tree (8" to 12" Diameter) Clearing and Grubbing Tree (12" to 34" Diameter) Clearing and Grubbing Tree (34" Diameter and Larger) Trench or Excavation Safety System Select Backfill (Trenches) Granular Backfill (Trenches) Rock Excavation Sanitary Sewer Trenching & Backfilling (0'-4' Deep) Sanitary Sewer Trenching & Backfilling (4'-8' Deep) Sanitary Sewer Trenching & Backfilling (8'-12' Deep) Sanitary Sewer Trenching & Backfilling (12' & Deeper) Flowable Fill Seeding, Fertilizing, and Mulching Solid Sodding Surface Patch (ACHM) Deep Patch Curb & Gutter (Type A - Barrier) Curb & Gutter (Type B - Mountable) Concrete Driveway (6" Thickness) Post CCTV Sewer Main (8" Diameter) Sewer Pipe (8", PVC SDR 35) Sewer Service Line (4", PVC Sch. 40) Open Cut Sewer Service Wye (8" x 4") Sewer Service Clean-Out (4") Standard Depth Manhole (4' Diameter, 6' and Less) additional Depth for Manhole (4' Diameter) Connect Sewer Main Pipe to Existing Manhole Remove and Reinstall Sign Structure Move & Reconstruct Fence (up to 4' tall PVC Coated Chain Link) Move & Reconstruct Fence (up to 4' tail Chain Link) Move & Reconstruct Fence (5' to 6' tail Chain Link) Move & Reconstruct Fence (5' to 6' tall PVC Coated Chain Link) Move & Reconstruct Fence (5' to 6' tall Wood) Move & Reconstruct Fence (up to 4' tall Woven Wire) Move & Reconstruct Gate (up to 4' tail Chain Link) Move & Reconstruct Gate (5' to 6' tail Chain Link Move & Reconstruct Gate (5' to 6' tall Wood) Move & Reconstruct Gate (5' to 6' tall PVC Chain Link) TOTAL BID Qty/Unit 11 11 11 n 10| 551 5| 6| 91 14| 3| 11 2,723| 19| 100| 201 1,007| 1,265| 501 431 501 5551 58| 581 10| 451 10| 2,272| 2,272| 5401 361 361 5| 19| 8| 11 951 901| 3021 115| 174| 211 2| 2| 11 11 LS LS LS LS SY LF LF LF EA EA EA LS CY CY CY LF LF LF LF CY SY SY SY SY LF LF SY LF LF LF EA EA EA VF EA EA LF LF LF LF LF LF EA EA EA EA Engineer's Estimate Unit Cost $20,000.001 $8,000.001 $7,500.00| $40,000.001 $18.00| $10.00| $1,500.001 $5,000.001 $1,000.001 $1,500.001 $2,500.00| $25,000.001 $20.00| $40.00| $75.00| $11.00| $20.00| $35.00| $60.001 $130.00| $2.00| $10.00) $30.00| $45.00| $25.00| $25.00| $50.00| $6.00| $75.00| $35.00| $300.00| $350.001 $4,000.001 $225.001 $1,500.001 $500.001 $40.00| $25.00| $30.001 $50.00| $30.00| $30.00| $500.001 $600.001 $600.001 $800.001 Bid $20,000.00 $8,000.00 $7,500.00 $40,000.00 $180.00 $550.00 $7,500.00 $30,000.00 $9,000.00 $21,000.00 $7,500.00 $25,000.00 $54,460.00 $760.00 $7,500.00 $220.00 $20,140.00 $44,275.00 $3,000.00 $5,590.00 $100.00 $5,550.00 $1,740.00 $2,610.00 $250.00 $1,125.00 $500.00 $13,632.00 $170,400.00 $18,900.00 $10,800.00 $12,600.00 $20,000.00 $4,275.00 $12,000.00 $500.00 $3,800.00 $22,525.00 $9,060.00 $5,750.00 $5,220.00 $630.00 $1,000.00 $1,200.00 $600.00 $800.00 $637,742.00 Unit Cost $30,000.00 $7,000.00 $10,000.00 $45,000.00 $20.00 $15.00 $1,000.00 $800.00 $1,500.00 $2,700.00 $3,000.00 $45,000.00 $20.00 $40.00 $85.00 $15.00 $20.00 $35.00 $65.00 $130.00 $3.00 $8.00 $40.00 $65.00 $45.00 $45.00 $85.00 $12.00 $50.00 $35.00 $350.00 $300.00 $4,500.00 $300.00 $1,600.00 $800.00 $45.00 $35.00 $45.00 $50.00 $45.00 $55.00 $600.00 $800.00 $800.00 $875.00 Goodwin & Goodwin, Inc. Bid $30,000.001 $7,000.00| $10,000.001 $45,000.001 $200.00| $825.001 $5,000.001 $4,800.001 $13,500.001 $37,800.001 $9,000.001 $45,000.001 $54,466.001 $760.001 $8,500.001 $300.001 $20,140.001 $44,275.001 $3,250.00| $5,590.001 $150.00) $4,440.00| $2,320.001 $3,770.001 $450.001 $2,025.00| $850.00) $27,264.001 $113,600.00| $18,900.001 $12,600.001 $10,800.001 $22,500.001 $5,700.001 $12,800.001 $800.00| $4,275.00| $31,535.00) $13,590.001 $5,750.001 $7,830.00| $1,155.001 $1,200.001 $1,600.001 $800.001 $875.001 $652,985.001 Corrected Bid $54,460.00 $652,979.00 I hereby certify that this tabulation is a true and accurate representation of all bids received. Jeremy D/ Shores, F^E. Hawkins-Weir Engineers, Inc. Arkansas P.E. No. 12386 2020086\Bid Tabulation 110920.xlsx

Upload: others

Post on 16-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UN...Sewer Service Line (4", PVC Sch. 40) Open Cut Sewer Service Wye (8" x 4") Sewer Service Clean-Out (4") Standard Depth Manhole (4' Diameter, 6' and Less) additional Depth for …

UN City of Greenwood, Arkansas

Baltimore and West Denver Sanitary Sewer Improvements

Tabulation of Bids Received on November 9, 2020, 7:00 p.m.

HWEI Project No. 2020086

ltem#

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

41.

42.

43.

44.

45.

46.

BALTIMORE AND WEST DENVERSANITARY SEWER IMPROVEMENTSDescription

Performance and Payment BondMaintenance of Traffic and Traffic Control

Construction Erosion Control

Site PreparationR&D of Concrete Sidewalks/Driveways

R&D of Concrete Curb & Gutter

Relocate Portable StructureR&D of Building Structure

Clearing and Grubbing Tree (8" to 12" Diameter)Clearing and Grubbing Tree (12" to 34" Diameter)

Clearing and Grubbing Tree (34" Diameter and Larger)

Trench or Excavation Safety SystemSelect Backfill (Trenches)Granular Backfill (Trenches)

Rock Excavation

Sanitary Sewer Trenching & Backfilling (0'-4' Deep)

Sanitary Sewer Trenching & Backfilling (4'-8' Deep)Sanitary Sewer Trenching & Backfilling (8'-12' Deep)

Sanitary Sewer Trenching & Backfilling (12' & Deeper)Flowable Fill

Seeding, Fertilizing, and Mulching

Solid SoddingSurface Patch (ACHM)Deep Patch

Curb & Gutter (Type A - Barrier)

Curb & Gutter (Type B - Mountable)Concrete Driveway (6" Thickness)Post CCTV Sewer Main (8" Diameter)

Sewer Pipe (8", PVC SDR 35)

Sewer Service Line (4", PVC Sch. 40) Open CutSewer Service Wye (8" x 4")

Sewer Service Clean-Out (4")Standard Depth Manhole (4' Diameter, 6' and Less)

additional Depth for Manhole (4' Diameter)

Connect Sewer Main Pipe to Existing Manhole

Remove and Reinstall Sign Structure

Move & Reconstruct Fence (up to 4' tall PVC Coated Chain Link)Move & Reconstruct Fence (up to 4' tail Chain Link)

Move & Reconstruct Fence (5' to 6' tail Chain Link)

Move & Reconstruct Fence (5' to 6' tall PVC Coated Chain Link)

Move & Reconstruct Fence (5' to 6' tall Wood)

Move & Reconstruct Fence (up to 4' tall Woven Wire)

Move & Reconstruct Gate (up to 4' tail Chain Link)Move & Reconstruct Gate (5' to 6' tail Chain Link

Move & Reconstruct Gate (5' to 6' tall Wood)Move & Reconstruct Gate (5' to 6' tall PVC Chain Link)

TOTAL BID

Qty/Unit111111n

10|551

5|6|91

14|3|11

2,723|19|

100|201

1,007|1,265|

501431501

555158|58110|45110|

2,272|2,272|

5401361361

5|19|

8|11

951901|3021115|174|

2112|2|1111

LSLSLSLSSYLFLFLFEAEAEALSCYCYCYLFLFLFLFCYSYSYSYSYLFLFSYLFLFLFEAEAEAVFEAEALFLFLFLFLFLFEAEAEAEA

Engineer's

EstimateUnit Cost

$20,000.001

$8,000.001

$7,500.00|

$40,000.001

$18.00|$10.00|

$1,500.001

$5,000.001

$1,000.001

$1,500.001$2,500.00|

$25,000.001

$20.00|$40.00|$75.00|$11.00|$20.00|$35.00|$60.001

$130.00|$2.00|

$10.00)$30.00|$45.00|$25.00|$25.00|$50.00|

$6.00|$75.00|$35.00|

$300.00|$350.001

$4,000.001

$225.001$1,500.001

$500.001$40.00|$25.00|$30.001$50.00|$30.00|$30.00|

$500.001$600.001$600.001$800.001

Bid$20,000.00

$8,000.00

$7,500.00$40,000.00

$180.00$550.00

$7,500.00$30,000.00

$9,000.00$21,000.00

$7,500.00$25,000.00

$54,460.00$760.00

$7,500.00$220.00

$20,140.00

$44,275.00

$3,000.00

$5,590.00$100.00

$5,550.00

$1,740.00

$2,610.00$250.00

$1,125.00$500.00

$13,632.00$170,400.00

$18,900.00

$10,800.00

$12,600.00

$20,000.00

$4,275.00$12,000.00

$500.00

$3,800.00

$22,525.00

$9,060.00$5,750.00

$5,220.00$630.00

$1,000.00

$1,200.00$600.00

$800.00

$637,742.00

Unit Cost

$30,000.00

$7,000.00$10,000.00$45,000.00

$20.00

$15.00

$1,000.00$800.00

$1,500.00

$2,700.00

$3,000.00$45,000.00

$20.00

$40.00

$85.00

$15.00

$20.00

$35.00

$65.00$130.00

$3.00

$8.00$40.00

$65.00

$45.00$45.00

$85.00

$12.00

$50.00

$35.00$350.00

$300.00

$4,500.00$300.00

$1,600.00$800.00

$45.00

$35.00$45.00

$50.00$45.00

$55.00

$600.00

$800.00

$800.00$875.00

Goodwin &

Goodwin, Inc.

Bid$30,000.001

$7,000.00|

$10,000.001

$45,000.001

$200.00|$825.001

$5,000.001

$4,800.001$13,500.001

$37,800.001

$9,000.001$45,000.001

$54,466.001

$760.001$8,500.001

$300.001$20,140.001$44,275.001

$3,250.00|

$5,590.001

$150.00)$4,440.00|

$2,320.001

$3,770.001

$450.001$2,025.00|

$850.00)$27,264.001

$113,600.00|$18,900.001

$12,600.001

$10,800.001

$22,500.001

$5,700.001

$12,800.001

$800.00|$4,275.00|

$31,535.00)

$13,590.001

$5,750.001

$7,830.00|$1,155.001

$1,200.001

$1,600.001

$800.001$875.001

$652,985.001

Corrected Bid

$54,460.00

$652,979.00

I hereby certify that this tabulation is a true and

accurate representation of all bids received.

Jeremy D/ Shores, F^E.Hawkins-Weir Engineers, Inc.

Arkansas P.E. No. 12386

2020086\Bid Tabulation 110920.xlsx