umts training - part vi - umts planning with atoll

Upload: brzata-ptica

Post on 06-Apr-2018

279 views

Category:

Documents


5 download

TRANSCRIPT

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    1/100

    Part VI

    UMTS Planning with Atoll

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    2/100

    Planning workflowBH trial configuration

    UMTS project in Atoll

    Propagation models

    Equipment / Antennas

    Sites / Transmitters / Cells

    Prediction - Coverage by transmitter / Pilot signal level

    Neighbours / Scrambling codes automatic allocationBH trial services definition

    Atoll UMTS service parameters

    Monte-Carlo simulation

    Predictions - Ec/Io; Eb/No; Handoff status; Pilot pollution; SC Interference

    Predictions - HSDPA / HSUPA

    Point analysis tool

    ACP Tool - Capesso

    Contents

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    3/100

    Planning Workflow

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    4/100

    BH Trial Configuration

    Planning only for Contorno region

    Band = 2.1GHz

    Bandwidth = 5MHz (1 Channel)

    Orthogonality Factor: 0.6

    Antenna = 18dBi / 65 Beamwidth / 4 Tilt (+ variable additional electrical downtilt)

    Height: 30m

    35 three-sectored sites (0 120 240)

    Cable Loss: 2dB

    Node B Noise Figure: 2dB

    Node B Maximum Output Power: 43dBm

    Pilot Power = 33dBm

    SCH Power = 21dBm

    Other CCH Power = 30dBm

    Active Set Threshold: 5dB

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    5/100

    Menu FileNew/ Project templates (UMTS HSPA)

    Starting a Project

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    6/100

    Define projection (e.g. WGS 84 / UTM zone 23S)

    Define display coordinate system (e.g. Long/Lat - WGS 84) - depends on the map

    Define power and length units (e.g. dBi, dBd / W, dBm / m, km)

    Menu ToolsOptions

    Projection / Units

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    7/100

    Import clutter classes, DTM (Digital Terrain Model), vector data, etc

    Menu File Import

    Import Geographic Data Files

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    8/100

    Clutter classes:

    Import Geographic Data Files

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    9/100

    Clutter classes:

    Import Geographic Data Files

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    10/100

    Heights (DTM = Digital Terrain Model):

    Import Geographic Data Files

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    11/100

    Import Geographic Data Files

    Heights (DTM = Digital Terrain Model):

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    12/100

    Vectors:

    Import Geographic Data Files

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    13/100

    Vectors:

    Import Geographic Data Files

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    14/100

    Clutter Classes + DTM + Vectors

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    15/100

    Focus Zone Polygon

    Explorer window

    Geo tab

    Zones

    Focus Zone

    Draw (or Import)

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    16/100

    Computation Zone Polygon

    Explorer window

    Geo tab

    Zones

    Computation Zone

    Draw (or Import)

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    17/100

    Explorer window

    Geo tab

    Clutter Classes

    Properties

    Clutter Properties

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    18/100

    Explorer window

    Geo tab

    Clutter Classes

    Properties

    Clutter Properties

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    19/100

    Explorer window

    Modules tab

    Propagation Models

    Propagation Models

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    20/100

    Standard Propagation Model

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    21/100

    Propagation Model Calibration

    Import CW Measurements

    Explorer windowData tabCW MeasurementsNew

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    22/100

    Propagation Model Calibration

    Displaying CW Measurements route

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    23/100

    Propagation Model Calibration

    Explorer windowModules tabPropagation ModelsStandard Propagation ModelAutomatic Calibration

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    24/100

    Cost-Hata Model

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    25/100

    Explorer windowData tabSitesEquipmentOpen Table

    Site Equipment

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    26/100

    Explorer windowData tabSitesEquipmentChannel Element Consumption

    Channel Element Consumption

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    27/100

    Site Creation

    Explorer windowData tabSitesNew

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    28/100

    Explorer windowData tabSitesOpen Table

    Sites Table

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    29/100

    Sites + Vectors + Focus Zone

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    30/100

    Explorer windowData tabAntennas

    Antennas

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    31/100

    Antennas

    Explorer windowData tabAntennas (any antenna) Properties

    A

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    32/100

    Antennas

    Explorer windowData tabAntennas (any antenna) Properties

    F B d

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    33/100

    Explorer windowData tabFrequency Bands

    Frequency Bands

    T itt E i t

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    34/100

    Explorer windowData tabTransmittersEquipment

    Transmitter Equipment

    BTS

    TMA

    Feeder

    T itt C ti

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    35/100

    Explorer windowData tabTransmittersNew

    Transmitter Creation

    T itt T bl

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    36/100

    Explorer windowData tabTransmittersOpen Table

    Transmitters Table

    C ll C ti

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    37/100

    Cell Creation

    Explorer windowData tabTransmitters (any transmitter) Properties

    C ll T bl

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    38/100

    Cells Table

    Explorer windowData tabTransmittersCellsOpen Table

    P di ti

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    39/100

    Explorer windowData tabPredictionsNew

    Predictions

    Dont need Monte-CarloSimulation (cell loads)

    Need Monte-Carlo

    Simulation (cell loads)

    P di ti C b T itt

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    40/100

    Explorer windowData tabPredictionsNewCoverage by Transmitter

    Prediction - Coverage by Transmitter

    P di ti Pil t Si l L l

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    41/100

    Explorer windowData tabPredictionsNewCoverage by Signal Level

    Prediction - Pilot Signal Level

    Prediction Pilot Signal Le el

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    42/100

    Prediction - Pilot Signal Level

    Prediction Pilot Signal Level

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    43/100

    Prediction - Pilot Signal Level

    02.95.88.6

    11.514.417.320.2

    2325.928.831.734.6

    37.440.343.246.1

    49

    -100

    -99

    -98

    -97

    -96

    -95

    -94

    -93

    -92

    -91

    -90

    -89

    -88

    -87

    -86

    -85

    -84

    -83

    -82

    -81

    -80

    -79

    -78

    -77

    -76

    -75

    -74

    -73

    -72

    -71

    -70

    -69

    -68

    -67

    -66

    %

    Best Signal Level (dBm)

    06

    1217232935

    404652586369758186

    9298

    -100

    -99

    -98

    -97

    -96

    -95

    -94

    -93

    -92

    -91

    -90

    -89

    -88

    -87

    -86

    -85

    -84

    -83

    -82

    -81

    -80

    -79

    -78

    -77

    -76

    -75

    -74

    -73

    -72

    -71

    -70

    -69

    -68

    -67

    -66

    -65

    %

    Best Signal Level (dBm)

    CDF

    Histogram

    Explorer windowData tabPredictions (Coverage by Signal Level) Histogram

    Neighbours Automatic Allocation

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    44/100

    Explorer windowData tabTransmittersCellsNeighboursAutomatic Allocation

    Neighbours Automatic Allocation

    Neighbours Automatic Allocation

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    45/100

    Neighbours Automatic Allocation

    Scrambling Codes Automatic Allocation

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    46/100

    Scrambling Codes Automatic Allocation

    Explorer windowData tabTransmittersCells

    Primary Scrambling CodesAutomatic Allocation

    BH Trial Services Definition

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    47/100

    BH Trial Services Definition

    Voice: 12.2kbps

    Video: 64kbps

    HSDPA:

    DL: 1Mbps (average)

    UL: 256kbps (average)

    HSUPA:

    DL: 256kbps (average)

    UL: 1Mbps (average)

    BH Trial Services Definition

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    48/100

    BH Trial Services Definition

    UE Antenna Gain: 0dBi

    UE Height: 1.5m

    UE Noise Figure: 7dB

    Body Loss = 3dB (for voice service only)

    Active Set Size = 3

    Ec/Io min = -14dB

    UL DLVoice 12.2kbps 5dB 7dB

    Video 64kbps 3dB 5dB

    Required Eb/NoRAB

    UL 12.2 21 1

    DL 12.2 30 1

    UL 64 21 4

    DL 64 30 4

    Maximum Power (dBm)RAB Data rate (kbps)

    Video 64kbps

    Required CE

    Voice 12.2kbps

    R99 Radio Bearers

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    49/100

    Explorer windowData tabUMTS ParametersServicesR99 Radio Bearers

    R99 Radio Bearers

    Services

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    50/100

    Explorer windowData tabUMTS ParametersServices

    Services

    Services

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    51/100

    Explorer windowData tabUMTS ParametersServices

    Services

    Mobility Types

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    52/100

    Explorer windowData tabUMTS ParametersMobility Types

    Mobility Types

    Eb/No per R99 Radio Bearer

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    53/100

    Explorer windowData tabUMTS ParametersServices

    R99 Radio Bearers (any radio bearer) Record Properties

    Eb/No per R99 Radio Bearer

    Terminals

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    54/100

    Explorer windowData tabUMTS ParametersTerminals

    Terminals

    Voice / Video

    Terminals

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    55/100

    Explorer windowData tabUMTS ParametersTerminals

    Terminals

    HSDPA

    Terminals

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    56/100

    Explorer windowData tabUMTS ParametersTerminals

    Terminals

    HSUPA

    User Profiles

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    57/100

    Explorer windowData tabUMTS ParametersUser Profiles

    User Profiles

    Environments

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    58/100

    Explorer windowData tabUMTS ParametersEnvironments

    Environments

    Traffic Map

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    59/100

    Explorer windowGeo tabTrafficNew MapCreate Map

    (Map Bases On Environments - Raster)

    Traffic Map

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    60/100

    UMTS Simulations (Monte-Carlo)

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    61/100

    UMTS Simulations (Monte Carlo)

    UMTS Simulations (Monte-Carlo)

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    62/100

    UMTS Simulations (Monte Carlo)R99 Portion:

    1) Best server determination: The best server is determined for each mobile using Ec/Io criterion. The

    mobile is rejected if the Ec/Io condition is not satisfied or the uplink load factor is higher than the specified

    limit (Ec/Io pilot < Ec/Io min pilot; Admission rejected)

    2) Active set determination: The active set is determined for each mobile.

    3) Uplink power control: The mobile transmit power is calculated. It corresponds to the power requiredto satisfy the uplink Eb/Nt requirement. The mobile is rejected if the calculated required transmit power is

    higher than the maximum mobile transmit power (Pmob >Pmob max)

    4) Downlink power control: The transmitter traffic channel power is calculated. It corresponds to the

    power required to satisfy the downlink Eb/Nt requirement. The mobile is rejected if the calculated traffic

    channel power is higher than the maximum traffic channel power allowed (Ptch > Ptch max)

    5) Uplink and downlink interference update: The uplink load factor and total downlink transmit power are

    updated with these results.

    6) Congestion and radio resource control: Mobiles are rejected if any of the following situations occur:

    - Uplink load factor higher than the specified limit

    (UL load saturation)- Total downlink power higher than the maximum total downlink power (DL load saturation)

    - Number of OVSF codes insufficient (Code saturation)

    - Number of channel elements available insufficient (Channel element saturation)

    7) Convergence study: The previous iterations are repeated until the simulation converges, i.e. either

    the maximum number of iterations is reached or both, uplink and downlink, criteria are verified.

    Users Distribution

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    63/100

    Users Distribution

    UMTS Simulation Results

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    64/100

    Explorer window Data tab UMTS Simulations (any simulation) Properties

    UMTS Simulation Results

    UMTS Simulation Results

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    65/100

    UMTS Simulation Results

    Average Simulation

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    66/100

    Explorer window Data tab UMTS Simulations (any simulation) Average Simulation

    Average Simulation

    Average Simulation

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    67/100

    Average Simulation

    Sites

    - Max No. of DL and UL CEs

    - No. of DL and UL CEs Used

    - No. of DL and UL CEs Due to SHO Overhead

    - Carrier Selection- Downlink and Uplink Overhead CEs/Cell

    - AS Restricted to Neighbours

    - Rake Factor

    - MUD Factor

    - Compressed Mode- Instantaneous HSDPA Rate (kbps)

    - Instantaneous HSDPA MAC Throughput (kbps)

    - HSUPA Rate (kbps)

    - DL and UL Throughput for Each Service

    Average Simulation

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    68/100

    Average Simulation

    Cells

    - Max Power (dBm)

    - Pilot Power (dBm)

    - SCH power (dBm)

    - Other CCH power (dBm)

    - Available HSDPA Power (dBm)

    - AS Threshold (dB)- Gain (dBi)

    - Reception Loss (dB)

    - Transmission Loss (dB)

    - BTS Noise Figure (dB)

    - Total Transmitted R99 Power (dBm)- Total Transmitted Power (dBm)

    - UL Total Noise (dBm)

    - Max UL Load Factor (%)

    - Max DL Load (% Pmax)

    - UL Load Factor (%)

    - UL Load Factor due to HSUPA (%)

    - DL Load Factor (%)

    - UL and DL Noise Rise (dB)

    - DL R99 Load (% Pmax)

    - Reuse Factor (UL)

    - Reuse Efficiency Factor (UL)

    - Number of UL and DL Radio Links

    - Connection Success Rate (%)

    - HSDPA Application Throughput (kbps)

    - Min. HSDPA RLC Peak Rate (kbps)

    - Max HSDPA RLC Peak Rate (kbps)

    - Avg. Instantaneous HSDPA Throughput (kbps)

    - Instantaneous HSDPA Rate (kbps)

    - Instantaneous HSDPA MAC Throughput (kbps)

    - No. of Simultaneous HSDPA Users

    - No. of HSDPA Users

    - No. of HSUPA Users- HSUPA Application Throughput (kbps)

    - HSUPA UL Load Factor (%)

    - No. of Codes (512 Bits)

    - The types of handover as a percentage

    - R99 UL and DL Throughput (kbps)

    - R99 UL and DL Throughput Without HO (kbps)

    - Min TCH Pwr (dBm)

    - Max TCH Pwr (dBm)

    - Avg TCH Pwr

    - Rejected users

    Trial Simulation Results

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    69/100

    Trial Simulation Results

    Service Users DL Rate (R99) UL Rate (R99)

    Voice 12.2kbps 1,288.12 7.87 Mbps 7.87 Mbps

    Video 64kbps 130.23 8.33 Mbps 8.33 Mbps

    HSDPA 33.64 - 2.15 MbpsHSUPA 16.82 - -

    Request1468.81 users trying to connect

    Service Users DL Rate (R99) UL Rate (R99)

    Voice 12.2kbps 1277.16 (99.1%) 7.8 Mbps 7.8 Mbps

    Video 64kbps 127.95 (98.2%) 8.19 Mbps 8.19 Mbps

    HSDPA 31.26 (92.9%) - 2 Mbps

    HSUPA 15.57 (92.6%) - -

    Result

    1451.94 (98.9%) connected to a R99 RAB

    Service Rate

    HSDPA 56.86 Mbps

    HSUPA 11.39 Mbps

    HSDPA / HSUPA

    Trial Simulation Results

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    70/100

    a S u at o esu ts

    Pmob > PmobMax: 0Ptch > PtchMax: 3.99

    Ec/Io < (Ec/Io)min: 10.9

    UL Load Saturation: 0.01

    Ch. Elts saturation: 0DL Load Saturation: 0

    Multiple causes: 0

    Code saturation: 0

    Admission rejection: 1.96

    HSDPA Delayed: 10.9

    HSDPA Scheduler Saturation: 0

    HSUPA Scheduler Saturation: 0

    Reasons

    27.76 (1.9%) user rejected or delayed

    Result

    Predictions

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    71/100

    Need Monte-Carlo

    Simulation (cell loads)

    Prediction - Ec/Io - Voice

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    72/100

    Explorer windowData tabPredictionsNewPilot Reception Analysis (Ec/Io)

    Prediction - Eb/No (DL) - Voice

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    73/100

    ( )

    Explorer windowData tabPredictionsNewService Area (Eb/Nt) Downlink

    Prediction - Eb/No (UL) - Voice

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    74/100

    ( )

    Explorer windowData tabPredictionsNewService Area (Eb/Nt) Uplink

    Prediction - Effective Service Area - Voice

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    75/100

    Explorer windowData tabPredictionsNewEffective Service Area

    Prediction - Handoff Status - Voice

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    76/100

    Explorer windowData tabPredictionsNewHandoff Status

    No Handoff 67.8

    Softer 5.2

    Soft 18.4Softer-Softer 0

    Softer-Soft 4.2

    Soft-Soft 4.2

    % areaHandoff Status - Voice

    Prediction - Pilot Pollution - Voice

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    77/100

    Explorer windowData tabPredictionsNewPilot Pollution

    Prediction - SC Interference Zones

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    78/100

    Explorer windowData tabPredictionsNewScrambling Codes Interference Zones

    Prediction - HSDPA App Throughput

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    79/100

    pp g p

    Explorer windowData tabPredictionsNewHSDPA Coverage

    Prediction - HSUPA App Throughput

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    80/100

    pp g p

    Explorer windowData tabPredictionsNewHSUPA Coverage

    Point Analysis Tool

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    81/100

    y Profile Tab

    Point Analysis Tool

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    82/100

    Reception Tab

    Point Analysis Tool

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    83/100

    AS Analysis

    Transmitters of themobile active set(grey zone)65

    Best server thresholdto be part of theactive set (dependingon the mobility type)

    Lower limit of theactive set (best pilotquality - Active setthreshold)

    Pilot and serviceavailability in ULand DL

    Summary - Building a UMTS Project

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    84/100

    1) Define projection / import geographic data files

    2) Network design: sites / transmitters / cells

    3) Calibrate propagation model using CW measurements

    4) Pilot studies based only on signal reception

    5) Neighbour / scrambling codes allocation

    6) Traffic description (activity probabilities), traffic map design

    7) Simulations - realistic user distribution generation

    8) Coverage and point prediction studies

    Automatic Cell Planning Tool - Capesso

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    85/100

    Site Location

    Greenfield site deployment for new areas

    Vector + area deployment

    Site Location

    Greenfield site deployment for new areas

    Vector + area deployment

    Site Selection

    Site selection + RF configuration for UMTS overlay on GSM

    Automatic efficiency analysis

    Site Selection

    Site selection + RF configuration for UMTS overlay on GSM

    Automatic efficiency analysis

    Better Plans

    Parameter configurations to improve network designs, plans

    Highly efficient what if analysis

    Better Plans

    Parameter configurations to improve network designs, plans

    Highly efficient what if analysis

    Capesso - Greenfield

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    86/100

    Greenfield data in ATOLL Automatic site location in ATOLL

    Best site deployment: number of sites, location, az, tilt, etc.

    Very large areas in a few minutes (>350km2 in less than 10min)

    Both area deployment and vector deployment supported

    Full verification of results and further processing in ATOLL

    Best site deployment: number of sites, location, az, tilt, etc.

    Very large areas in a few minutes (>350km2 in less than 10min)Both area deployment and vector deployment supported

    Full verification of results and further processing in ATOLL

    Greenfield: Site location for all radio technologies

    Capesso - Greenfield

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    87/100

    Capesso - Greenfield

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    88/100

    Capesso - Greenfield

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    89/100

    Manual Planning (35 Sites) Capesso Greenfield (36 Sites)

    36 site(s) have been created in 76.672 sec (2.130 sec/site).

    976 location(s) have been analyzed in 76.672 sec (0.078557 sec/loc).

    Capesso - Greenfield

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    90/100

    Manual Planning (35 Sites) Capesso Greenfield (36 Sites)

    Capesso - Optimization

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    91/100

    Capesso - Parameter Ranges

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    92/100

    Capesso - Targets

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    93/100

    Capesso - Optimization Options

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    94/100

    Capesso

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    95/100

    Capesso

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    96/100

    Capesso - Analyzing Changes

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    97/100

    Capesso - Analyzing Results in Atoll

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    98/100

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    99/100

    Questions ?

  • 8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll

    100/100