Muhammad Umar Shaheen Born March 09, 1990 – Pakistan Passport #: UB5147721 Contact #:+974 3378 4884; Skype ID: umarshaheen07 Email: [email protected] LinkedIn: qa.linkedin.com/pub/umar-shaheen/6a/6b8/795/ Postal Correspondence: P.O. Box 23364 Doha, Qatar A meticulous, self-driven, motivated Planning Engineer with a ‘can do’ attitude, undertakes complex assignments, meets tight deadlines and performs efficiently under minimum supervision. Applies training & knowledge of “Chemical Engineering” for planning the maintenance activities in shutdowns and turnarounds of process industry. Fluent in English. The core competencies include: Primavera P6 v8.2, MS Project Manager, MS Excel 2013, MS Visio, Aspen Hysys v 8, ChemCAD 2006, Matlab r2014a, AutoCAD 2013, Resource estimation, Project Costing, Progress monitoring, Project reporting internal & external Experience +3 Years Descon Engineering Qatar May 2012 - Present An engineering services & manufacturing giant, in the business of delivering client-specific solutions, for projects related to Energy, Infrastructure and Process industry across Pakistan and Middle East. The integrated package of services encompasses engineering, procurement, manufacturing, construction, commissioning and maintenance. Planning Engineer The responsibilities as a planning engineer are as under: Scope management & control D efinition of work breakdown (WBS) structures Activity Definition for Level IV schedule Estimation of resource time & cost Schedule preparation in Primavera P6 or MS Project Material requisition plan (MRP) Proposals Engineer The responsibilities as a proposals engineer are as under: Preliminary study of the enquiry to understand client’s requirements Visit of the job site for comprehensive understanding and resource estimation Detailed study of tender documents like Technical specifications, scope of supply, exclusions, P&ID’s, plot plans, terms and conditions Floating enquiries to Commercial department and subcontracting department for getting quotations of material, rental equipment, manpower supply and other subcontracts Services requirement plan (SRP) for subcontractors Project monitoring on Primavera P6 & MS Excel Identification of Critical path Issuance of Latest Forecast Plan Progress reporting internal & external Man-hours estimation for each job using site experience and company’s standard-man hours Preparation of bid package for the review and comments of Proposal manager after complete estimation of costs. Preparation of method statements, Execution plan and deployment plans of resources. Identification of risks and putting in necessary safeguards in the bid Preparation & submission of complete technical and commercial bid as per client requirements.

Upload: umar-shaheen

Post on 07-Aug-2015

85 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Umar Shaheen Planning & Proposals Engr, Chemical Engr

Muhammad Umar Shaheen Born March 09, 1990 – Pakistan

Passport #: UB5147721 Contact #:+974 3378 4884; Skype ID: umarshaheen07 Email: [email protected] LinkedIn: qa.linkedin.com/pub/umar-shaheen/6a/6b8/795/ Postal Correspondence: P.O. Box 23364 Doha, Qatar

A meticulous, self-driven, motivated Planning Engineer with a ‘can do’ attitude, undertakes complex assignments, meets

tight deadlines and performs efficiently under minimum supervision. Applies training & knowledge of “Chemical

Engineering” for planning the maintenance activities in shutdowns and turnarounds of process industry. Fluent in

English. The core competencies include:

Primavera P6 v8.2, MS Project Manager, MS Excel 2013, MS Visio, Aspen Hysys v 8, ChemCAD 2006, Matlab r2014a, AutoCAD 2013, Resource estimation, Project Costing, Progress monitoring, Project reporting internal & external

Experience +3 Years

Descon Engineering Qatar May 2012 - Present An engineering services & manufacturing giant, in the business of delivering client-specific solutions, for projects related to Energy, Infrastructure and Process industry across Pakistan and Middle East. The integrated package of services encompasses engineering, procurement, manufacturing, construction, commissioning and maintenance.

Planning Engineer

The responsibilities as a planning engineer are as under:

Scope management & control

D efinition of work breakdown (WBS) structures

Activity Definition for Level IV schedule

Estimation of resource time & cost

Schedule preparation in Primavera P6 or MS Project

Material requisition plan (MRP)

Proposals Engineer

The responsibilities as a proposals engineer are as under:

Preliminary study of the enquiry to understand client’s

requirements

Visit of the job site for comprehensive

understanding and resource estimation

Detailed study of tender documents like Technical

specifications, scope of supply, exclusions, P&ID’s,

plot plans, terms and conditions

Floating enquiries to Commercial department and

subcontracting department for getting quotations of

material, rental equipment, manpower supply and other

subcontracts

Services requirement plan (SRP) for subcontractors

Project monitoring on Primavera P6 & MS Excel

Identification of Critical path

Issuance of Latest Forecast Plan

Progress reporting internal & external

Man-hours estimation for each job using site

experience and company’s standard-man

hours

Preparation of bid package for the review and

comments of Proposal manager after

complete estimation of costs.

Preparation of method statements, Execution

plan and deployment plans of resources.

Identification of risks and putting in necessary

safeguards in the bid

Preparation & submission of complete technical

and commercial bid as per client requirements.

Page 2: Umar Shaheen Planning & Proposals Engr, Chemical Engr

Projects Installation of New OXY Reactor at Qatar Vinyl Company June–August-2014

Position: Proposals Engineer. The scope of work is as under: 1. Transportation and Erection of new OXY Reactor at QVC. Net mass 319 Ton. 2. Installation of process piping and steam tracing.

Qatar Petroleum NGL-3 Sour Gas Compressor April–May-2014

Position: Proposals Engineer for EPIC project “Installation of Sour Gas Compressor at NGL-3”, the Scope is as under: 1. Detailed Engineering and process design for new

facility. 2. Installation of new sour gas compressor 10~26MMScfd

capacity 3. Installation of auxiliaries i.e. lube oil cooler, control

systems.

4. Installation of 3 m3 knock out drum. 5. Installation of sour gas cooler i.e. Fin fan heat

exchanger. 6. Installation of 25ton EOT crane.

Ras Laffan Olefins Company, RLOC March–May 2014

Position: Proposals Engineer, the scope of work is as under: 1. Detailed Engineering and design of drain system for process raw water tank. 2. Installation of new pumps, piping and control systems.

Qatar Petrochemical Company GSD 2014 Feb–May 2014

Position: Planning Engineer at LDPE-1, LDPE-2 and LLDPE. 1. Maintenance of 170 equipment in Low density poly ethylene area that included Heat Exchangers, Vessels, Columns. 2. Replacement of synchronous motor, 105 Tons, Low density poly ethylene area

Qatar Fertilizers 2 Company GSD 2013 Sep–Nov 2013

Position: Planning and Field Engineer for the following jobs 1. Maintenance of Primary reformer at Ammonia-2 plant. Reformer tubes, catalyst and header replacement 2. Maintenance of Heat Exchangers. Shell & tube type 3. Maintenance of Absorber and Regenerator at Ammonia-2 plant. Internals replacement (Demister, Distributor & packing) and

installation of reinforcements. 4. Maintenance of piping, 1600 Dia-inches (Plant process & utilities piping prefabrication and field installation)

Qatar Fertilizers 4 Company GSD 2013 Aug–Sep 2013

Position: Planning and Field Engineer for the following jobs 1. Maintenance of Ammonia Converter (Design of UDHE ThyssenKrupp) 2. Maintenance of Primary reformer (Design of UDHE ThyssenKrupp) 3. Maintenance of control valves at Ammonia-4. 4. Maintenance of piping 600 Dia-inch (plant process/utilities piping prefabrication and field installation)

Seef Ltd Emergency Shutdown Aug–Sep 2013

Position: Planning & Proposals Engineer for the following jobs 1. Preparation and submission of bid for the emergency shutdown of PACOL reactor at SEEF Ltd.

Qatar Petroleum Refinery 1 & 2 and Utilities Shutdown 2013 Apr–June 2013

Position: Planning Engineer for the following jobs 1. Prefabrication of IAT (Inspection Advised Ticket 7000 Dia inches process piping jobs) 2. Prefabrication of PCR (Plant change request 9,000 Dia inches process piping jobs) 3. RFCC (Unit 41); Replacement of Catalyst cooler (4101CA) 4. RFCC (Unit 41); Maintenance of RFCC Reactor, Stripper Section, Regenerator Section and Combustor Section

Page 3: Umar Shaheen Planning & Proposals Engr, Chemical Engr

5. RFCC Product Treatment Section (Unit 45); Maintenance of Shell & tube Heat Exchangers, pigging and repair of Heaters and Maintenance of packed Columns

6. RFCC Product Treatment Section (Unit 46); Maintenance & replacement of Heat Exchangers, air coolers and maintenance of a tray Column

7. Sulfur-treatment facility (Unit 48); Maintenance of a Tray Column

Qatar Fertilizers 1 Company GSD 2012 Aug–Sep 2012

Position: Planning Engineer for the following jobs 1. Maintenance of Absorber and Regenerator (Packed Columns) 2. Primary Reformer Tubes Replacement (Piping Job 200 Dia Inches) 3. Over hauling of control valves from Urea 1 & Ammonia 1 Section (101 valves)

4. Maintenance of shell and tube heat exchangers at Ammonia-1

Qatar Gas Company Train 2 GSD 2012 Sep–Oct 2012

Position: Field Engineer for the following jobs at Qatar Gas train 5 and Inlet Reception areas: 1. Heat Exchanger maintenance at inlet reception area (12 shell and tube heat Exchangers) 2. Maintenance of Air Coolers at inlet reception (Fin fan cooler bank maintenance) 3. Maintenance and repair of Vessels and pits at sulfur recovery unit (17 in total) 4. Replacement of Plate & frame Heat Exchangers at sea water inlet facility.

k-Axis Group, Pakistan Sep 2011~May 2012 K-Axis Engineering in joint venture with Welkin is a progressive company dealing in alternate and efficient power

solutions for process industry.

Process Design Engineer

The responsibilities as a process design engineer are as under:

Design and fabrication of fixed bed updraft coal gasifiers

Design of Fluidized bed coal gas plant.

Installation of Fixed Bed coal Gas plants at Shalimar Steel mills, Ittehad Chemicals, Batala Steel, Sitara Textiles and Mughal Steel.

Education Bachelor of Science in Chemical Engineering

University of Engineering & Technology Lahore, Pakistan (Class of 2007 ~ 2011)

H2S Breathing Apparatus from Enertech Qatar.

Primavera P6, Scheduling and Reporting

Trainings Plant Safety inductions by Qatar Gas, Qatar Petroleum,

Qatar Fertilizers, Qatar Petrochemicals, Qatar Aluminum,

Descon’s Graduate Engineer Training Program GETP-26 NGL, and Qatar Steel

University - Academic Projects Distillation Column Design (Plate & Packed type)

Heat Exchanger Design (Shell & Tube, Plate & Frame) Modeling & Simulation of storage vessels

Dimethyl Ether manufacturing by coal gasification

Technical Skills Proficient in Microsoft Excel Suite 2013: Advanced Excel, Power point, Word

Process Modeling & simulation: Aspen HYSYS v8.0, ChemCAD 2006, Matlab r2010b

Planning & Scheduling: Primavera P6 v8.2, Microsoft Project manager 2010

Engineering & Design: AutoCAD2013, Microsoft Visio 2013