Page 2: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

Project Management

Building Consultancy

Cost Consultancy

Building Engineering Services

Interior Design

The assignments which the Project Management & Consultancy team have

across the UK capture the imagination. We are

proud to work across all sectors and property

types, adding value at each stage of property

life cycle. Our innovative and comprehensive

solutions transform the way our clients work,

shop and live.

cushmanwakefield.com / 32 / CUSHMAN & WAKEFIELD

Page 3: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

200PROFESSIONALS

COVERING PROJECT MANAGEMENT,

BUILDING CONSULTANCY,

BUILDING ENGINEERING

SERVICES, COST CONSULTANCY AND INTERIOR

DESIGN

10OPERATING FROM

OFFICES IN 9 CITIES

ACROSS THE COUNTRY

£322MTOTAL VALUE OF PROJECTS

DELIVERED IN 2015

93Msq ft

DUE DILIGENCE OR MONITORING

IN 2015

4.2MFIT OUT

ACROSS ALL SECTORS IN

2015

sq ft

Cushman & Wakefield UK & Ireland Offices

GLASGOW

BELFAST*

DUBLIN*

CORK*

LIMERICK*

GALWAY*

EDINBURGH

NEWCASTLE

LEEDS

MANCHESTER

BIRMINGHAM

BRISTOLCARDIFF LONDON

WEST END

THE CITY

* Affiliates

cushmanwakefield.com / 54 / CUSHMAN & WAKEFIELD

Page 4: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

AC

QU

ISIT

ION

/RED

EV

ELOPMENT

LEASE

EV

EN

TS

DISPOSAL

RE

FU

RBI

SH

MENT

If you are redeveloping your property, either through refurbishment or new build, we provide a full Project Management, Design, Programme Management and Contract Administration service from project inception to completion. Our Building Consultancy team provides freehold acquisition advice and life cycle services including dilapidations assessments and negotiations at lease termination.

• Project management

• Redevelopment strategy

• Strategic procurement advice

• Contract administration

• Cost consultancy

• Development management

• Health and safety advice

• Interior design

• Building engineering services

• Programme management

• Service charge expenditure

• Statutory applications/compliance

• Sustainability advice

• Targeted works to improve Energy Performance (EPC) ratings

• Approval of tenant’s alterations

• Interim dilapidations and negotiations

• Terminal dilapidations, negotiations and reinstatement works

• Insurance reinstatement cost assessments

• Planned preventative maintenance

• Repair and maintenance works

• Technical due diligence surveys

• Development/construction monitoring

• Dilapidations advice

• Energy Performance Certificates (EPCs) and advice

• Feasibility studies

• Insurance reinstatement cost assessments

• Front of house/common parts upgrade

• Service charge reconciliation

• Vendor surveys

NEW BUILD/CATEGORY A/IMPROVEMENTS /REFURBISHMENTS

LEASE EVENTS

ACQUISITION DISPOSAL/EXIT STRATEGY

INVESTOR SERVICES

cushmanwakefield.com / 76 / CUSHMAN & WAKEFIELD

Page 5: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

For your occupational requirements, we will provide technical input into your property search and a full Project Management and Design service; in addition our Programme Management team can coordinate projects across a number of locations. Our Building Consultancy team provides leasehold acquisition advice and development monitoring. We also provide dilapidations assessments and negotiations at lease termination.

LEASE

EV

EN

TS

DISPOSAL/EXIT

A

CQ

UIS

ITIO

N

• Project management• Interior design• Workplace strategy• Space audit, test fits and space planning• Cost consultancy• Building engineering services• Change management • Consolidation/rationalisation• Employment mapping • Base build development/construction

monitoring• Due diligence surveys and negotiating

landlord contributions• Feasibility studies• Programme management• Furniture selection and procurement• Relocation management• Post occupancy reviews

• Alterations, approvals and restacks

• Building insurance review

• Dilapidations assessment for accounting provisions

• Interim dilapidations advice

• Planned preventative maintenance

• Repair and maintenance works

• Service charge assessments

• Depreciated Replacement Cost valuations for accounting purposes

• Project management

• Architectural and interior design

• Contract administration

• Cost consultancy

• Health and safety advice /  CDM related services

• License for alterations

• Building engineering services

• Statutory approvals

• Cost consultancy

• Sustainability advice

• Restacks

• Break clause advice

• Dilapidations and exit strategy

• Dilapidations negotiations

• Reinstatement works

• Handover protocols

• Mitigating accrued liabilities

• Sale and leaseback surveys

ACQUISITION/EXPANSION/FIT OUT

OCCUPATION/LEASE EVENTS

IMPROVEMENTS/REFURBISHMENT DISPOSAL

OCCUPIER SERVICES

cushmanwakefield.com / 98 / CUSHMAN & WAKEFIELD

Page 6: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

ST MODWEN

CLIENTSt. Modwen

LOCATION27 premises valued ranging from £1.5m to £225m

SECTORRetail/Occupier

SQ FT10 million

SERVICESReinstatement Cost Assessment

PROJECT REINSTATEMENT COST ASSESSMENT PORTFOLIO

DURATION60 weeks

cushmanwakefield.com / 1110 / CUSHMAN & WAKEFIELD

Page 7: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

AVIVA INVESTORS

CLIENTAviva Investors

LOCATIONLondon and UK regions

SECTORInvestor

SQ FT11 Million, over 200 properties assessed across 58 UK sites

SERVICESReinstatement Cost Assessments (RCA)

PROJECT REINSTATEMENT COST ASSESSMENTS

DURATION16 Weeks

cushmanwakefield.com / 1312 / CUSHMAN & WAKEFIELD

Page 8: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

CLYDESDALE AND YORKSHIRE BANK

CLIENTClydesdale and Yorkshire Bank

LOCATIONUK

SECTORBanking

SQ FT1.8 million

SERVICESProgramme Management Office

Project Management

Cost Consultancy

PROJECT DELIVERY OF CAPITAL PROJECTS ACROSS BRANCH AND OFFICE PORTFOLIO

DURATION20 weeks

© Graven Images cushmanwakefield.com / 1514 / CUSHMAN & WAKEFIELD

Page 9: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

WM MORRISONS

CLIENTWM Morrison

LOCATIONUK

SECTOROccupier/Retail

SQ FT3 million

SERVICESBuilding Consultancy

Technical Due Dilligence

PROJECT NATIONAL MULTI SITE BUILDING SURVEYS

DURATION4 months

cushmanwakefield.com / 1716 / CUSHMAN & WAKEFIELD

Page 10: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

HEATHROW APPROACH

PROJECT CATEGORY A REFURBISHMENT

CLIENTSampension KP

International A/S

LOCATION470 London Road, Slough

DURATION35 weeks

SECTORLandlord/Investor

SQ FT83,000

SERVICESProject Management

Interior Design

Cost Consultancy

Dilapidations

cushmanwakefield.com / 1918 / CUSHMAN & WAKEFIELD

Page 11: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

FOX WILLIAMS

PROJECT CATEGORY B FIT OUT

CLIENTFox Williams LLP

LOCATION10 Finsbury Square, London

DURATION16 weeks

SECTORLegal

SQ FT25,000

SERVICESProject Management

Workplace Strategy

Interior Design

Cost Consultancy

Due Diligence

Dilapidations

cushmanwakefield.com / 2120 / CUSHMAN & WAKEFIELD

Page 12: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

LINKEDIN

PROJECT CATEGORY B FIT OUT

CLIENTLinkedIn

LOCATIONNew Oxford Street, London

DURATION12 weeks

SECTORMedia & Technology

SQ FT60,000

SERVICESProject Management

Contract Administration

cushmanwakefield.com / 2322 / CUSHMAN & WAKEFIELD

Page 13: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

THE FORUM HEMEL HEMPSTEAD

PROJECT DEVELOPMENT

CLIENTDacorum Borough Council

LOCATIONHemel Hempstead, Hertfordshire

DURATION70 weeks

SECTORPublic Sector

SQ FT70,000

SERVICESProject Consultancy

Cost Consultancy

Building Engineering Services

Development Advice

cushmanwakefield.com / 2524 / CUSHMAN & WAKEFIELD

Page 14: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

BRITISH AIRWAYS

CLIENTBritish Airways

LOCATIONHeathrow, London

SECTOROccupier/Investor

SQ FT5.5 million

SERVICESReinstatement

Cost Assessments (RCA)

PROJECT REINSTATEMENT COST ASSESSMENTS

DURATION8 Weeks

cushmanwakefield.com / 2726 / CUSHMAN & WAKEFIELD

Page 15: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

E.ON

CLIENTE.ON

LOCATIONNottingham

SECTOROccupier/Energy

SQ FT126,000

SERVICESProject Management

Interior Design

Building Engineering Services

PROJECT CATEGORY A & B OFFICE FIT OUT

DURATION24 month

cushmanwakefield.com / 2928 / CUSHMAN & WAKEFIELD

Page 16: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

THREE SNOWHILL

CLIENTM&G Real Estate

LOCATIONBirmingham

SECTORInvestor/Offices

SQ FT640,000

SERVICESDevelopment Monitoring

PROJECT DEVELOPMENT MONITORING OF CITY CENTER DEVELOPMENT

DURATION144 weeks

cushmanwakefield.com / 3130 / CUSHMAN & WAKEFIELD

Page 17: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

JULIAN HODGE BANK LIMITED

CLIENTJulian Hodge Bank Limited

LOCATIONCardiff

SECTORBanking

SQ FT16,500

SERVICESProject Management

Cost Consultancy

Architectural Services

Mechanical and Electrical Consultancy

Principal Designer

PROJECT CATEGORY B OFFICE FIT OUT

DURATION11 weeks

cushmanwakefield.com / 3332 / CUSHMAN & WAKEFIELD

Page 18: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

AVOX

CLIENTAvox

LOCATIONRedwither Tower, Wrexham

SECTOROccupier/ Media & Technology

SQ FT30,000

SERVICESProject Management

Interior Design

Building Engineering Services

PROJECT CATEGORY A & B OFFICE FIT OUT

DURATION20 weeks

cushmanwakefield.com / 3534 / CUSHMAN & WAKEFIELD

Page 19: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

730 AZTEC WEST

CLIENTAEW UK Core Property Fund

LOCATIONBristol

SECTORInvestor/Office

SQ FT40,000

SERVICESContract Administration Principal Designer Cost Consultancy Dilapidations advice and negotiations

PROJECT CATEGORY A REFURBISHMENT

DURATION30 weeks

cushmanwakefield.com / 3736 / CUSHMAN & WAKEFIELD

Page 20: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

LEEDS BECKETT UNIVERSITY

CLIENTLeeds Beckett University

LOCATIONLeeds

SECTORPublic/Education

SQ FT70,000

SERVICESProject Management

Building Design

Contract Administration

PROJECT CALVERLEY BUILDING REFURBISHMENT

DURATION12 months

cushmanwakefield.com / 3938 / CUSHMAN & WAKEFIELD

Page 21: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

NORTHUMBRIA HEALTHCARE NHS FOUNDATION TRUST

CLIENTNorthumbria Healthcare, NHS

LOCATIONNewcastle-upon-Tyne

SECTORPublic/Health

SQ FT1.5 million

SERVICESDepreciated

Replacement Cost (DRC) Valuation

Asset Life Assessment

PROJECT DEPRECIATED REPLACEMENT COST VALUATION

DURATION3 months

cushmanwakefield.com / 4140 / CUSHMAN & WAKEFIELD

Page 22: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

REGISTERS OF SCOTLAND

CLIENTRegisters of Scotland

LOCATIONGlasgow

SECTORPublic

SQ FT17,250

SERVICESProject Management

Cost Consultancy

Contract Administration

PROJECT CATEGORY B FIT OUT

DURATION12 weeks

© Graven Images

Copyrighted to Graven Images

cushmanwakefield.com / 4342 / CUSHMAN & WAKEFIELD

Page 23: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

UNIVERSITY OF GLASGOW

CLIENTUniversity of Glasgow

LOCATIONGlasgow

SECTORPublic/ Education

SQ FT4m across 14 sites and 300 buildings

SERVICESProject Management

Contract Administration

Principle Design

Cost Consultancy

Building Consultancy

PROJECT BUILDING CONSULTANCY FRAMEWORK

DURATION24 weeks

© Graven Images cushmanwakefield.com / 4544 / CUSHMAN & WAKEFIELD

Page 24: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

ASSOCIATION OF CHARTERED CERTIFIED ACCOUNTANTS

CLIENTAssociation of Chartered Certified Accountants

LOCATIONGlasgow

SECTOROccupier/Professional Services

SQ FT60,000

SERVICESProject Management

Contract Administration

Interior Design

Building Engineering Services

Cost Consultancy

Dilapidations

PROJECT CATEGORY B FIT OUT

DURATION18 weeks

© Graven Images cushmanwakefield.com / 4746 / CUSHMAN & WAKEFIELD

Page 25: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

CRAIGHOUSE LTD

CLIENTCraighouse Ltd

LOCATIONEdinburgh

SECTORInvestor/Residential

SQ FT150,000

SERVICESTechnical Advisor

Project Monitor

PROJECT RESIDENTIAL REDEVELOPMENT

DURATION2015-2019

© Graven Images cushmanwakefield.com / 4948 / CUSHMAN & WAKEFIELD

Page 26: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

“Cushman & Wakefield has been one of our most credible, reliable and trusted building consultancy advisors over the past 4 years. Cushman & Wakefield understands what SEGRO is about and anticipate our needs, appreciate our end goals and help us in achieving them. More specifically, we consider their dilapidations and project management services best in class, they have aligned with our working practices and are tenacious in their delivery. We look forward to working with Cushman & Wakefield in the future.”Barry Thomas, SEGRO

“Cushman & Wakefield provided a strong and effective project management service for what was a challenging high value project for the Bank. They worked with our project team and internal stakeholders to devise and implement a phased solution to a complex refurbishment and restack project whilst ensuring the Bank continued its “business as usual”. They demonstrated a very professional and supportive approach which made an important contribution to the successful outcome of the project. We, and our staff, are delighted by the end result.”Marcus Allen, Rabobank

“Cushman & Wakefield demonstrated depth and breadth of experience.”Steve Barnes, British Airways

cushmanwakefield.com / 5150 / CUSHMAN & WAKEFIELD

Page 27: UK Project Management & Consultancy Brochure/media/reports/uk/UK_PM_Consultancy... · the Project Management & Consultancy team have across the UK capture the imagination. We are

CONTACT DETAILS

Philip WebbChair UK Project Management & Consultancy UK & Ireland +44 (0) 7747 [email protected]

Chris Hutchinson Project Management & Consultancy Glasgow +44 (0) 7738 [email protected]

Donald ReidProject Management & Consultancy Edinburgh+44 (0) 7887 [email protected]

David WilsonProject Management & Consultancy Newcastle+44 (0) 07747 [email protected]

Steve ClarkeProject Management & Consultancy Leeds+44 (0) 7715 [email protected]

Gareth Collin-JonesProject Management & Consultancy Manchester+44 (0) 7793 [email protected]

Andy IrvineProject Management & Consultancy Birmingham+44 (0) 7771 [email protected]

Steve Puddicombe Project Management & Consultancy Bristol+44 (0) 1179 [email protected]

Paul LoveProject Management & Consultancy Cardiff+44 (0) 7736 [email protected]

Philip NyeChair EMEA Project Management & Consultancy +44 (0) 7805 [email protected]

Nic WilkinsonHead of Project Management & Consultancy London +44 (0) 7793 [email protected]

Robert BeaumontLondon Project Management+44 (0) 7767 890859 [email protected]

Kate MasonLondon Interior Design +44 (0) 7721 [email protected]

Alex CharlesworthLondon Building Consultancy+44 (0) 7801 [email protected]

Jon ThornLondon Cost Consultancy+44 (0) 7747 [email protected]

Tony ComberLondon Building Engineering Services+44 (0) 7834 [email protected]

Copyright © 2016 Cushman & Wakefield. All rights reserved. CUS100473 09/16