UK CCS update & Acorn CCS project Japan CCS Forum June 12 th 2019 Sam Gomersall - Commercial Director 16/05/2019 Pale Blue Dot Energy Limited

Upload: trinhnhu

Post on 21-Aug-2019

228 views

Category:

Documents


0 download

TRANSCRIPT

UK CCS update & Acorn CCS project Japan CCS Forum June 12th 2019Sam Gomersall - Commercial Director

16/05/2019

Pale Blue Dot Energy Limited

www.pale-blu.com03/06/2019

Pale Blue Dot Energy Limited

• Developing the UKs leading CCS and clean hydrogen project in Scotland; Acorn

• Providing an update today on CCS in the UK, on behalf of the UK Government

Pale Blue Dot Energy

www.pale-blu.com

CCUS Deployment Pathway: An Action Plan

3

• Published November 2018

• Commitment in the Clean Growth Strategy and Government’s response to the CCUS Cost Challenge Taskforce

Key Messages:1. UK’s vision is to become a global leader in CCUS, unlocking the potential of

CCUS and securing the added value CCUS can bring to our industrial centresand businesses across the UK

2. UK’s ambition is that the UK should have the option to deploy CCUS at scale during the 2030s, subject to the costs coming down sufficiently

3. UK’s Action Plan is designed to enable the establishment of the first CCUS facility in the UK, commissioning from the mid-2020s

UK

Polic

y

www.pale-blu.com

International Collaboration – a theme from the Action Plan

4

UK

Polic

y

We will work with other Governments to identify and address barriers to cross-border transport of carbon dioxide and promote ratification of the London

Protocol

• UK and Norway signed a Memorandum of Understanding (MOU) on collaboration on CCUS • UK and USA signed an Energy Implementing Agreement, including CCUS• UK co-leading CCUS Mission Innovation Challenge• UK co-leading CCUS CEM Initiative

Current and upcoming activity:

Ministers Claire Perry and Kjell-BørgeFreiberg signing the UK-Norway MOU onCCUS

“International collaboration is vital to the complex task of accelerating CCUS globally. Working with other governments and industry will be essential to driving cost reductions and shifting perceptions of CCUS"

www.pale-blu.com5

UK

Polic

y

Unprecedented level of engagement from Ministers, CEOs from across industry and senior executives from the financial sector

• The Summit underlined the importance of CCUS, the need for urgent action and for it to be mainstreamed in climate negotiations

• Participants recognised that progress has been made, highlighted that strengthened partnership will be critical for accelerating CCUS, together with clear policy direction and new business models

• IEA and UK Government will maintain this momentum throughout 2019

Minister of State for Energy and Clean Growth The Rt Hon Claire Perry MP andFatih Birol, Executive Director of the International Energy Agency with Summitattendees in Edinburgh, November 2018.

International Collaboration: Accelerating CCUS Summit

www.pale-blu.com03/06/2019

Pale Blue Dot Energy Limited

• 2007-2015 All about power• 2015 Disappointment• About Industry and Heat• Hydrogen agenda• Operational by mid 2020s• Ready for scale up in 2030s• CCS Essential not Optional

CCS in the UK

www.pale-blu.com03/06/2019

Pale Blue Dot Energy Limited

• Greta Thunberg • Extinction Rebellion • Committee on Climate Change

Sense of urgency is increasing

www.pale-blu.com03/06/2019

Pale Blue Dot Energy Limited

Enabling CCS in the UK

Initiating clean hydrogen

Decarbonising industry

www.pale-blu.com

Acorn: multi-project

03/06/2019

Pale Blue Dot Energy Limited

Acorn HydrogenHydrogen production from natural gas with CO2 capture at St Fergus, Scotland

Acorn CCSCapture, Transport and Storage of CO2 at St Fergus, Scotland

Acorn shippingTransfer of CO2 by ship to Peterhead for onpass to St Fergus for storage

www.pale-blu.com

TeessideHumbersideThamesSouth Wales

Norway

Netherlands

03/06/2019

Pale Blue Dot Energy Limited

Acorn Overview

www.pale-blu.com03/06/2019

Pale Blue Dot Energy Limited

• Low capital cost re-using existing pipelines

• Storage site appraised from oil and gas activity

• Built in oversizing to stimulate the market

• Strategic location enabling multiple options

• Takes stakeholders along and benefits whole UK

• Builds a real option for the UK in the 2030s

www.pale-blu.com03/06/2019

Pale Blue Dot Energy Limited

Acorn: St Fergus Gas Terminal

www.pale-blu.com

Acorn: St Fergus Location

03/06/2019

Pale Blue Dot Energy Limited

www.pale-blu.comwww.pale-blu.com

Goldeneye

CO2 Storage

Acorn CO2 Storage Site

03/06/2019

Pale Blue Dot Energy Limited

www.pale-blu.com

Peterhead CO2 ship import & transfer to St Fergus

03/06/2019

Pale Blue Dot Energy Limited

www.pale-blu.com

North Sea CO2 shipping

03/06/2019

Pale Blue Dot Energy Limited

www.pale-blu.com03/06/2019

Pale Blue Dot Energy Limited

Clean Hydrogen

www.pale-blu.com

Acorn Project Status

03/06/2019

Pale Blue Dot Energy Limited

www.pale-blu.com03/06/2019

Pale Blue Dot Energy Limited

Acorn Project Plan2018 2020 2022 2026

CCS

CCS Build

Feas. -CEF 1

Feasibility -ACT ERA-NET

Pre-FEED

Hydrogen

2024 2028

FID

First CO2 injection

Commercial Operations

Expand CCS

FEED

Hydrogen Build

Expand Hydrogen production

www.pale-blu.com

Acorn opportunity

• The first PCI funded project

• CO2 storage license in place

• Re-use of O&G infrastructure

Acorn Hydrogen enables;

• Hydrogen blending into the NTS

• Local hydrogen applications

• Early learning for other regions

Acorn CCS enables;

• Initiation of CCS in the UK

• Decarbonisation of multiple regions

• A CCS project by 2023

Acorn Summary

03/06/2019

Pale Blue Dot Energy Limited

www.pale-blu.com

You are never too small to make a difference

– Greta Thunberg