The New Grid: Integrating Photovoltaics, Energy
Storage, and a Local Utility for Electric Transportation
www.cert.ucr.edu
www.scrise.ucr.edu
7
UCR Lot 15 EV
CE-CERT/Bourns, Inc.
BCOE WCH
Solar PV
3.5 MW UCR West Campus
0.5 MW CE-CERT
Battery Storage
1.08 MWh BCOE WCH
1.08 MWh CE-CERT/Bourns, Inc.
EV Chargers (green)
UC Riverside Solar, Battery Energy Storage and EV Charging System
UCR Lot 30 EV
UCR Lot 1 EV
UCR Lot 15 EV
UCR West
Campus
Battery Energy Storage• Commercial/Industry partners (Balqon, Winston Energy)
• 1.1 MWh installed on UCR campus
• 1.1 MWh installation underway at CE-CERT
11
Electric Trolley Bus
• Conversion of existing UCR trolley from diesel to electric
• Testing and performance evaluation
• Operate on existing route between UCR and Community
13
EV Demand / Building Peak Supplied by Battery Energy Storage
www.cert.ucr.edu
www.scrise.ucr.edu
14
Large HVAC systems are often overlooked as a large energy consumer
Lights use only 20% of US electric energy compared to 60 to 70% motors use.
UCR New Grid Research Goals
• Integrate utility scale renewable energy, energy storage,
and EV charging
• Demonstrate the functionality of Smart Grid protocols
• Provide EV charging demand without increased grid loads
• Provide real world Smart Grid test-bed platform
• Evaluate efficiency of energy storage
• Evaluate power quality issues
• Demonstrate battery electric bus transit operating in the
Riverside community