tyresoil retaining wall (adopting a low cost landslide mitigation method)
DESCRIPTION
A low cost landslide method for mitigating landslide risk, in an urban community. Initiative operationalized through a Framework Agreement between the National Disaster Office of Jamaica the General Counsel of Martinique.TRANSCRIPT
![Page 1: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/1.jpg)
8th Caribbean
Conference on
Comprehensive
Disaster
Management
Presenter: Christopher Gayle
ODPEM
![Page 2: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/2.jpg)
Initiative came out of a framework
partnership agreement between Martinique
General Counsel and Jamaica (ODPEM)
Knowledge transfer from Martinique to
Jamaica (Technical Agencies, Melbrook
CDRM Group)
Implementation by partnership with Local
DRR partners (MGD,NSWMA,NWA)
Implementation under existing World Bank
Community Based Landslide Risk Reduction
project
![Page 3: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/3.jpg)
Framework partnership agreement
to implement five projects : 1) Knowledge Transfer-Tyresoil Retaining Wall Technique 2) Earthquake Resistant retrofitting of buildings, 3) Cliff protection through dynamic screening, 4) Multi risks simulator, 5) Sharing of experience on communities’ evacuation techniques
+
![Page 4: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/4.jpg)
Fact : Society produces waste in the form of tyres ((it is estimated that 35 Million in
France, 290Million in USA)
History : Tyresoil system developed by the Professor NGUYEN THANH LONG of the LCPC
(French research institute)
- 1978 : Beginning of the research and pilot projects
- 1993 : in 15 years >250 tyresoil works completed in several different countries (France, Algeria, USA, Switzerland, Brazil, Indonesia …)
- 1996 : First project completed by the Martinican General Council on Department Road 28 with PR3+500.
- After 1996 : Numerous works in Martinique, many of them completed by private individuals. No negative side effects known to this day.
Advantages : - Waste recycling
- Economical (tyresoil cost = 50% less than a traditional retaining method)
- Materials for this technique are easy to obtain : used tires are readily available
worldwide
- Multiple uses within different domains of civil engineering: retaining wall, light
backfill, energy absorber, pressure distributer, slope and bank protector…
![Page 5: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/5.jpg)
TYRESOIL = the association of 2 elements : Tyre and the soil
•Tyre = 2 sides + 1 tread band
2 types of tyres :
* Trucks = Exterior diameter :1.10 m to 1.20 m
Interior diameter : 0.50 m to 0.60 m
Thickness : 0,26 m to 0,33 m
Mass : 40 to 70 Kg
* Cars = Exterior diameter : 0.60 m
Interior diameter : 0.30 m
Thickness : 0.12 m to 0.16m
* Soil = large range of soils, ideally pulverulent (= sandy) containing elements which must not be bigger
than 5 cm (to allow for efficient compacting)
Sides
Tread band
![Page 6: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/6.jpg)
Type 1 = Light backfill and energy absorbers.
-Preserve empty space to reduce backfill mass
-Allow for Deformation for energy absorption
-Applicable for variety of infrastructure applications
Type 2 = Retaining tyresoil :
-Construct the densest wall possible, which will withstand upward and
downward pressure
-Internal resistance is obtained through layers of linked tyres.
-The top side of the tyre is cut out to allow for quick filling.
![Page 7: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/7.jpg)
MELBROOK HEIGHTS JAMAICA
(Informal community with Regularized status)
![Page 8: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/8.jpg)
![Page 9: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/9.jpg)
•Coastal Limestone
•Variable poor alluvial
deposits such as sand, silt
and clays.
•Subject to rotational
failures •Slope stability is dependent
on soil strength particularly
cohesion
•Slope gradients ranging
from 0- 40°.
•Moderately steep slopes
(21-30°) accounting for
approximately 60% of the
community.
![Page 10: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/10.jpg)
• Widespread
cutting into slopes
• Major landslides
• Houses threatened
• Rapid rate of
development
• Poor Construction
practices
![Page 11: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/11.jpg)
![Page 12: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/12.jpg)
![Page 13: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/13.jpg)
![Page 14: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/14.jpg)
![Page 15: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/15.jpg)
![Page 16: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/16.jpg)
Wall A (Road Protection)
•Dimension - 2.5mX2mX20m.
•Location: Scarp of Slide
•Estimated Tyres Required 990
Wall B (Slope Stabilization)
•Dimension 3mX4mX26m.
•Location: at the toe (base of landslide)
•Number of Rows: 21
•Estimated tyres required: 3360
•Contract Period: 20 working days
WALL A WALL B
![Page 17: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/17.jpg)
![Page 18: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/18.jpg)
Community Engagement/ Mobilization
-Encourage Ownership
-Encourage Sweat Equity
-Testing Community Skills Bank
Delivery of Tyres
-Sorted and delivered by National
Solid Waste Management Authority
-Unlimited supply
![Page 19: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/19.jpg)
Uniform Laying out of Tyres
Tyre size: R14/ R15
Cutting of Rope
-Polyproplene Rope used (non
biodegradable)
-New method of cutting devised
![Page 20: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/20.jpg)
Linkage of tyres
-Rope affixed to link layers
vertically and horizontally
-Special tie used to ensure
stability of wall
Compaction of Fill
-Fill compacted to achieve maximum
homogeneity of each layer
-Fill compacted using water to allow
for greater cohesion of particles
![Page 21: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/21.jpg)
WALL B
WALL A
![Page 22: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/22.jpg)
Number of walls built - 2
Total budget approximately 3 Million JAD
dollars
- Estimates for conventional Wall 15Million
JAD
Total Number of tyres used – 4600
Number of community members trained-
>20
![Page 23: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/23.jpg)
ALGERIA FRANCE
![Page 24: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/24.jpg)
Excellent case of Knowledge Transfer and Regional cooperation in DRR
Low cost mitigation interventions pay/ reduces risk exposure of vulnerable communities
Reinforces the importance of partnership in DRR
Provides platform for sharing DRR experiences with regional and international DM community.
Capacity of vulnerable communities strengthened
Technique to be packaged as part of ODPEM’s training suite.
Multiple opportunities for replication
- Member of Parliament/ Councillors
- NSWMA
- Parish Councils
- NGO’s
![Page 25: Tyresoil Retaining Wall (Adopting a low cost Landslide Mitigation Method)](https://reader034.vdocuments.mx/reader034/viewer/2022042715/5595d65e1a28abb1138b457d/html5/thumbnails/25.jpg)