Title
Instruction # 1
Instruction # 2
Instruction # 3
Instruction # 4
Instruction # 5
Instruction # 6
Instruction # 7
Instruction # 8
Instruction # 9
Instruction # 10
Instruction # 11
Instruction # 12
Instruction # 13
User Advisory - This Excel Worksheet or Workbook "Tool" is locked and password protected. The user may only enter date in the "yellow" cells. Other cells on this "Tool" includes locked "cells" that contain complex math formulas. Care should be taken to learn where these cells are and if the streadsheet is ever unlocked that the cells with the formulas are not disturbed. Disturbing or altering these cells may render the "Tool" unable to function properly.
Title
- This Excel Worksheet or Workbook "Tool" is locked and password protected. The user may only enter date in the "yellow" cells. Other cells on this "Tool" includes locked "cells" that contain complex math formulas. Care should be taken to learn where these cells are and if the streadsheet is ever unlocked that the cells with the formulas are not disturbed. Disturbing or altering these cells may render the "Tool" unable to
document.xls
Page 3 of 23
PROJECT KICKOFF 1
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Client and Company PM jointly set time, place and
agenda for Kickoff meeting
Joint Company and Client Project Kick-Off meetings
Arrange for project
number and space, office & computersEngr Mngr
Selected
Discipline Leads
assigned
Piping Material
Engineering
Piping Design Group
Piping Material Control
Pipe Stress Engineering
Piping Engineering Lead (PEL)
Piping Lead assigned
Piping Lead meets with Piping Department
Manager to address Preliminary Staff
assignments
Attend all project meetings and collect all project data relevant to Piping
document.xls
Page 4 of 23
PROJECT KICKOFF
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Piping Material
Engineering
Piping Design Group
Piping Material Control
Pipe Stress Engineering
Piping Engineering Lead (PEL)
Preliminary Engineering 2
PFD & Line Data available
Piping Line Class Specs
Input to overall Project Execution Plan
Input to project Document Distribution Matrix
Start job planning and Instructions
Attend all Meetings, Visit Jobsite, Collect Client Specs and keep Piping Manager informed
PME assigned (Latest)
Piping Design
Supervisor assigned (latest)
Determine availability of Group Leads
document.xls
Page 5 of 23
PROJECT KICKOFF
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Piping Material
Engineering
Piping Design Group
Piping Material Control
Pipe Stress Engineering
Piping Engineering Lead (PEL)
Preliminary Engineering 3
P&IDs IFA P&IDs IFD
Piping Line Class Specs
P&ID Reviews
Line Number and "Spec" P&IDs
Initiate Line List
Develop Plot Plan
Develop Piping Design and Layout Specification
Develop Piping Standard Details
P&ID Reviews
P&ID Reviews
PMC Supervisor available as required
P&ID Reviews
PSE Supervisor available as required
P&ID Reviews
Monitor, Control and Report
Plot Plan Issued for In-house review
Resolve comments
Plot Plan IFA
Piping Material Control Supvr
assigned (not Staffed)
All PMC Staffed
Lead Pipe Stress Eng assigned &
avail as required
document.xls
Page 6 of 23
PROJECT KICKOFF
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Piping Material
Engineering
Piping Design Group
Piping Material Control
Pipe Stress Engineering
Piping Engineering Lead (PEL)
Scope, Estimate & Schedule 4
Util P&IDs
1 st Vendor Drawings
Ln. Cl. Specs Complete
Prepare other Specs (Insulation, Paint, Hydrotest, etc)
Prepare "Specialty" Item List and Specifications
Build 3D Data Base for Model
Update Line List for Utility
Create 3D Model Partitions
Perform "Valve" MTO as P&IDs become available
Review and finalize Shop Fab Spec. Develop Pipe Fab Shop Bidders List
Develop SOW Develop Estimate
Monitor, Control and Report
Scope of Work, Labor Hour Estimate & input to Piping Control Level Schedule
Preliminary MTO by sketch and other methods as appropriate
Scope of Work, Labor Hour Estimate & input to Piping Control Level Schedule
Prepare Shop Tonnage Estimate
Scope of Work, Labor Hour Estimate & input to Piping Control Level Schedule
Scope of Work, Labor Hour Estimate & input to Piping Control Level Schedule
Review w/ Piping Mngr
Review w/ Project Mngr
Review w/ Piping & Proj
Mngr
Review w/ Project Mngr
document.xls
Page 7 of 23
PROJECT KICKOFF
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Piping Material
Engineering
Piping Design Group
Piping Material Control
Pipe Stress Engineering
Piping Engineering Lead (PEL)
Detailed Engineering and Design 5
Vess Orient Review
Build Commodity Code Catalog
Detailed Vessel Orientation Vessel Orientation Review
Detailed Piping Layout all Areas
Prepare RFQ for all Piping material
Initiate Pipe Fab Shop Request For Quote
Monitor, Control and Report
Review w/ Piping Mngr
Review w/ Project MngrDevelop Control Level
Schedule
document.xls
Page 8 of 23
PROJECT KICKOFF
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Piping Material
Engineering
Piping Design Group
Piping Material Control
Pipe Stress Engineering
Piping Engineering Lead (PEL)
Detailed Engineering and Design 6
Detail Piping Layout all Areas
Pipe Mat'l Bids Due
Support Piping Layout as required
Shop Fab Bids Due
Monitor, Control and Report
De-staff PME Staff as needed
In-house Model
Review
Update as Required
Client Model Review
Update as required
Download all Piping
Material
Finalize all Stress related Engineered Items (Spring
Hangers, Expansion Joints, etc.)
document.xls
Page 9 of 23
PROJECT KICKOFF
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Piping Material
Engineering
Piping Design Group
Piping Material Control
Pipe Stress Engineering
Piping Engineering Lead (PEL)
Production Engineering 7
Answer questions as required during Iso Check and Issue
Lead Piping Material Engineer available as required
Process "Heat Tracing" Isometrics as required.
Prepare Bill of Material (BOM) for Isometrics as Issued
Support Isometric Checking and Issue as required
Finalize Pipe Fab Shop Purchase Order
Monitor, Control and Report
Extract all Isometrics, Check, make corrections as required. Initiate QA/QC Check of all Critical Lines in accordance with approved project plan.
Update quantities, Prepare and issue all Purchase Orders
Issue all Purchase Orders for Stress related Engineered Items
document.xls
Page 10 of 23
PROJECT KICKOFF
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Piping Material
Engineering
Piping Design Group
Piping Material Control
Pipe Stress Engineering
Piping Engineering Lead (PEL)
Project Completion (Home Office) 8
Lead Piping Material Engineer available as required
Check, Correct and Issue all Isometrics
Prepare Bill of Material (BOM) for Isometrics as Issued
Support Isometric Checking and Issue as required
Monitor, Control and Report
Prepare input to Piping Final Job Report
De-staff non-essential
staff
MTO Final Isometrics Update final
material quantities and Check
for Shortages
De-staff Pipe Stress Staff
Prepare input to Piping Final Job Report
Issue Final Iso to Shop
Fab
document.xls
Page 11 of 23
PROJECT KICKOFF
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Piping Material
Engineering
Piping Design Group
Piping Material Control
Pipe Stress Engineering
Piping Engineering Lead (PEL)
Fabrication & Delivery 9
Lead Piping Material Engineer available as required
Field follow-up as required
Prepare input to Piping Final Job Report
Process Final Supplement data
Prepare input to Piping Final Job Report
Prepare Piping Home Office Final Job Report
Monitor, Control and Report
De-staff PME Lead
De-staff last PDG Staff
and Supervisor
De-staff all PMC staff
except Supervisor
Evaluate Shortages and Issue Supplements as required.
document.xls
Page 12 of 23
PROJECT KICKOFF
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Piping Material
Engineering
Piping Design Group
Piping Material Control
Pipe Stress Engineering
Piping Engineering Lead (PEL)
Construction 10
De-staff PMC Supervisor
Monitor, Control and Report
Collect Data on all surplus Piping material and with Client resolve "Keep or Return" guidelines
De-staff Piping
Engineering Lead
document.xls
Page 13 of 23
Milestones Total Project joint kick-off meeting
document.xls
Page 14 of 23
Milestones PFDs and some Design data available
Process initiates work on P&IDs
document.xls
Page 15 of 23
MilestonesIn-house P&ID Review
P&IDs IFA P&IDs IFD
document.xls
Page 16 of 23
Milestones1 st Vendor Drawings
Util P&IDs
document.xls
Page 17 of 23
MilestonesVess Orientation Review
document.xls
Page 18 of 23
Milestones Field Move In
Model Review
Client Model Review
document.xls
Page 19 of 23
Milestones 1st Iso to Shop
1 st Spools ship to Site
document.xls
Page 20 of 23
Milestones Last Iso to Shop
document.xls
Page 21 of 23
Milestones Last Spools fm Shop
document.xls
Page 22 of 23
Milestones
document.xls
Page 23 of 23
Piping Training - Part - 6Process Plant Project Secquence Chart, Piping
Notes:
Instructions:
This Piping, Process Plant Project Sequence "Chart" is a broad generalization of the major project activities by the different Piping groups and is not intended to be an absolutely detailed match for every project. It was prepared specifically for use as a guide in this Training Program for Piping Leads.
To use the Chart on screen go to the first page of the Chart, Place the courser in "Cell" C-1 and then go to "Windows (in the tool bar above) and click on "Split" This will freeze the left-hand "B" column. Then you can scroll right to any page and you will still see the discipline designations in the "B" column. On print-Out Column "B" will be repeted on each page.
The major Piping Engineering and Design sub-groups stretch across the pages horizontally. Their individual activities and tasks remain in their individual horizontal bar. Joint activities are shown grouped vertically.
The vertical fields are not intended nor should they be interpretive as implying any unit of time such as Hours, Days, Weeks, Months or Years. They are only there for the presentation of the data.
These "Notes and Instructions" along with the attached "Chart" are "Locked" and Password protected. To make any changes you must "Unlock" the individual document first. After the changes have been completed you should relock the document. The "password" for both documents is located in "Cell" CO-1 of the Chart file.