[Type the document title] CITY ENGINEERING & PUBLIC WORKS DEPARTMENT Engr. Benjamin L. Acedera City Engineer The City Engineering and Public Works Department shall be in-charge of the infrastructure development and public works in general of the local government unit to include the administration, coordination, supervision and control of construction, maintenance, improvement and repair of roads, bridges and other engineering and public works projects. From survey works to planning and programming down to monitoring of these infrastructure projects are among the tasks that were performed by the whole department in order to complete the projects. The projects were categorized into City Projects by Contract, City Project by Administration, road concreting, farm to market roads, construction of administration’s major projects, installation of streetlights, installation of water system and maintenance services. The department prepares program of works for barangay projects upon request. There are 145 finished projects, 11 ongoing projects, and six (6) bidded projects while there are 153 finished barangay projects as per record. All projects being accomplished are as follows. CITY PROJECT BY ADMINISTRATION LOCATION NAME OF PROJECTS DESCRIPTION PROJECT COSTS STATUS Assessor’s Office, CGC Fabrication of Shelves Fabrication of shelves: 1 unit-1.50m x 2.45m, 1 unit-3.27m x 7.60m, including painting and 1 unit fabricated stainless ladder. 98,000.00 Finished CGC Guinobatan Rehabilitation of City College Building Repair of school building: works included: dismantling of damaged ceiling panels, carpentry works, door and window 73,350.00 Finished UPDD, CGC Renovation of Pantry Renovation of pantry including fabrication and installation of cabinet 27,300.00 Finished Legislative Bldg., Guinobatan Improvement of SP Secretary’s Office Works included: fabrication & installation of cabinets and backdrop, installation of glass partition, electrical works and painting works. 150,000.00 Finished Guinobatan Improvement of Stage Improvement of 62.90 sq .m. stage ( roofings and stage back wall) 98,420.00 Finished City Hall Compound, Guinobatan Repainting of Basketball/Volleybal l Court Repainting of 21 m x 28m basketball court and 9.0m x18.0m volleyball court 4,050.00 Finished Canubing I Elem. School, Canubing I Rehabilitation of Stage Rehabilitation of existing 8.86m x 6.0m stage roofing and ceiling including paintings. 50,187.50 Finished

Upload: others

Post on 11-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • [Type the document title]

    CITY ENGINEERING & PUBLIC WORKS DEPARTMENT

    Engr. Benjamin L. AcederaCity Engineer

    The City Engineering and Public Works Department shall be in-charge of theinfrastructure development and public works in general of the local government unit to includethe administration, coordination, supervision and control of construction, maintenance,improvement and repair of roads, bridges and other engineering and public works projects. Fromsurvey works to planning and programming down to monitoring of these infrastructure projectsare among the tasks that were performed by the whole department in order to complete theprojects. The projects were categorized into City Projects by Contract, City Project byAdministration, road concreting, farm to market roads, construction of administration’s majorprojects, installation of streetlights, installation of water system and maintenance services. Thedepartment prepares program of works for barangay projects upon request. There are 145finished projects, 11 ongoing projects, and six (6) bidded projects while there are 153 finishedbarangay projects as per record.

    All projects being accomplished are as follows.

    CITY PROJECT BY ADMINISTRATION

    LOCATION NAME OF PROJECTS DESCRIPTION PROJECTCOSTS STATUS

    Assessor’sOffice, CGC

    Fabrication ofShelves

    Fabrication of shelves: 1 unit-1.50m x 2.45m,1 unit-3.27m x 7.60m, including painting and1 unit fabricated stainless ladder.

    98,000.00 Finished

    CGCGuinobatan

    Rehabilitation ofCity College Building

    Repair of school building: works included:dismantling of damaged ceiling panels,carpentry works, door and window

    73,350.00 Finished

    UPDD, CGC Renovation ofPantryRenovation of pantry including fabricationand installation of cabinet 27,300.00 Finished

    LegislativeBldg.,

    Guinobatan

    Improvement of SPSecretary’s Office

    Works included: fabrication & installation ofcabinets and backdrop, installation of glasspartition, electrical works and painting works.

    150,000.00 Finished

    Guinobatan Improvement ofStageImprovement of 62.90 sq .m. stage ( roofingsand stage back wall) 98,420.00 Finished

    City HallCompound,Guinobatan

    Repainting ofBasketball/Volleybal

    l Court

    Repainting of 21 m x 28m basketball courtand 9.0m x18.0m volleyball court 4,050.00 Finished

    Canubing IElem. School,Canubing I

    Rehabilitation ofStage

    Rehabilitation of existing 8.86m x 6.0m stageroofing and ceiling including paintings. 50,187.50 Finished

  • [Type the document title]

    Old City Hall,Ibaba East

    Rehabilitation ofWaterline

    Rehabilitation of Waterline at Old City HallBuilding

    31,900.00 Finished

    FSRECCompound,

    Biga

    Rehab of Facilitiesof FSREC

    Replacement of damaged window and ceiling,including painting due to typhoon “Nona” 54,900.00 Finished

    OldCemetery,

    Lalud

    Clearing of OldCemetery

    Labor for clearing of 40,000 sq.m. oldcemetery including trimming/cutting of smalltrees.

    52,000.00 Finished

    City Proper Fabrication of NoParking SignageFabrication of parking signage: 36 units – 24”x 18’ x 6” 99,700.00 Finished

    City PublicMarket

    Improvement ofPublic Market

    Repair of handrail including steps for steelstair and steel gate for cistern tank

    94,500.00 Finished

    AdriaticoMem. School

    Installation of SteelGrills

    Installation of 24.91 lm perimeter grills forcorridor, 1 m high and 2m x 2m steel doorand 4.2m x 2.2m grills for stair handrail

    93,300.00 Finished

    City PublicMarket Repair of Escalator Repair of two units escalator 690,900.00 Finished

    LegislativeBldg.,

    Guinobatan

    Repainting of ABCPresident’s Office

    Repainting of ABC President’s Office with anarea of 210 sq. m. 7,750.00 Finished

    BonifacioSt.Ibaba East

    DrainageConstruction-

    Additional Work

    Construction of 4.40Lm x 0.60m coveredcanal w/ manhole, inlets and catch basin andconstruction of 4.40Lm curbs and gutterincluding 10.70m x 0.70m canal cover

    50,000.00 Finished

    City Proper Installation ofWooden Frame

    Supply of materials for installation 3-units 10'x 12' wooden for the promotion of activitiesfor City Fiesta 2016

    8,700.00 Finished

    LegislativeBldg.Guinoba

    tan

    Repainting of SPInformation Office

    Repainting of SP Information Office w/an areaof 249.93sq.m 19,400.00 Finished

    LegislativeBldg.Guinoba

    tan

    Improvement ofVice Mayor's Office

    Improvement of office, works included:installation of glass partition, repair of ceiling,cr, pantry, installation of backdrop and supplyof fabricated furnitures.

    350,000.00 Finished

    LegislativeBldg.Guinoba

    tan

    Improvement ofCity Councilor's

    Office

    Improvement of office, works included: repairof cr(flooring), ceiling, fabrication ofcabinet,partition w/glass and office tablew/drawer, chair including painting at Coun.Flores’ Office.

    68,600.00 Finished

    Coun.BrucalOffice,

    LegislativeBldg.Guinoba

    tan

    Improvement ofCity Councilor's

    Office

    Improvement of office, works included:fabrication of drop ceiling, counter topcabinet, partition w/ glass, sliding door glassand painting

    86,100.00 Finished

    Slaughter Fabricated Fabricated 4ft wide x 10ft long x 35" height 30,000.00 Finished

  • [Type the document title]

    House, Tibag Inspection Table stainless table

    Baruyan Fabrication ofDetachable TentFabrication of 1 unit 6.0m x 9.0m detachabletent w/ paintings 47,000.00 Finished

    City College Fabrication ofSignages w/ Plan 1 unit 1.53mx2.13m signage with paintings 9,000.00 Finished

    CGC Fabrication of FloatSupply of materials and labor for thefabrication of float for the Search of Mutya ngLungsod 2016

    96,000.00 Finished

    OMNHS Fabrication andInstallation of Stage

    Supply of materials and labor for thefabrication and installation of stage for theSeacrh of Mutya ng Lungsod 2016

    63,900.00 Finished

    BigaRehabilitation ofFacilities of FSREC

    Compound

    Works included: Replacement of windows ofScience Research Bldg. Extension & Ceiling.Repair of roof for Nursery Bldg. includingpainting due to typhoon Nona

    142,300.00 Finished

    New City HallCompound,

    Brgy.Guinobatan,Calapan City

    Additional Worksfor Rehab of City

    College

    Supply & installation of electrical for faculty,Research & Library Room & replacements of2-units doors & windows and anay treatment

    for door jamb at City Youth Office

    50,600.00 Finished

    City Plaza,Ibaba East

    Repainting ofVolleyball Court Repainting of 9m x 18m volleyball court 9,700.00 Finished

    BBRIS MainCanal, Naujan

    Desilting of Baco-Bucayao River

    Irrigation SystemBBRIS

    Rental of equipment for the immediatedesilting of BBRIS Main Canal for theprovision of irrigation to Calapan City Farmersaffected by Typhoon Nona partnership withinthe National Irrigation Administration

    280,000.00 Finished

    Old City HallBuilding,Ibaba East

    Rehabilitation ofRoof & Gutter

    Rehabilitation of roofing and gutter at secondfloor Old City Hall Building 88,400.00 Finished

    New City HallCompound,Guinobatan

    Rehabilitation ofExecutive Building

    Repair of executive building work in includeddismantling of damage roofing panels ceilingcarpentry works and concrete gutter

    191,900.00 Finished

    New City HallCompund,Guinobatan

    Rehabilitation ofCity College Building Repair of school building works included 350,300.00 Finished

    Brgy.Canubing I,Calapan City

    Construction ofIrrigation System

    Facility

    Construction of 4mx4m plump house w/ steelperimeter wall 1 unit of 3.4x3.4 mtr. stillingpool w/ water proofing 8 units of 20x20concrete brace for pipes.

    500,000.00 Finished

    FMO, Old CityHall, Ibaba

    East, CalapanCity

    Proposed Partitionfor Stockroom

    Proposed partition for stockroom: 1.32m x2.32m 13,300.00 Finished

    City Proper Ditching andClearing of Canal

    Clearing and ditching of drainage canal;Osmeña St., Mabini St., San AgustinSt.,Malaluan St.,J.Luna St., Gonzales St., andA.Bonifacio St.(Loob), Ilaya

    50,000.00 Finished

  • [Type the document title]

    Nag-Iba II Construction ofFootbridgeConstruction of temporary woodenfootbridge; coco lumber 83,800.00 Finished

    Sta.Isabel Repair of PoliceCommunity PrecintSupply of construction materials for therepair of Sta. Isabel Police Community Precint 19,600.00 Finished

    Lazareto Construction ofRoofing of BleacherConstruction of roofing of bleacher 2.53m x26.0m 160,139.00 Finished

    Lazareto Repair of BantayDagat Guard House

    Supply for construction materials for therepair of Bantay Dagat Guard House located@ Brgy.Lazareto

    30,812.00 Finished

    LaludCementery

    Construction ofTombs

    Construction of 0.8m x 0.75m x 2.2m - 120tombs 715,400.00 Finished

    Old City HallBuilding,Ibaba East

    Rehabilitation ofWaterline Rehab. of waterline @Old City Hall 31,900.00 Finished

    SPBldg.Guinoba

    tan

    Repainting ofOffices (Coun.Rafael

    Panaligan Jr.)Repainting of 3.80m x 6.41m office 11,000.00 Finished

    New City Hall,Guinobatan Painting of Gutter

    Supply of Materials for the painting of gutter@ City Government Compound 8,500.00 Finished

    Old City HallBuilding,Ibaba East

    Renovation of CityLibrary

    Rehab. of City Library, works included;dismantling of damage wooden ceiling andwall partition, installation of new partitionwall and ceiling; including painting work forinside and outside of City Library

    466,700.00 Finished

    FSRECComp.Biga

    Rehabilitation ofFacilities of FSREC

    Compound

    Works included: Replacement of damagedwindows ceiling including painting due totyphoon Nona

    54,900.00 Finished

    VariousBarangays

    Fabrication ofEmergency Hotline

    Board

    Fabrication of emergency hotline steel board-20 units (4'x5') including painting works

    96,300.00 Finished

    Ciriaco AbesMemorial

    School Mahalna Pangalan

    Construction offence Construction of fence , 4.0lm x 2.4m H

    15,000.00 Finished

    BJMP OfficeBldg., Ilaya Siphoning of Sludge

    Siphoning of septic tank (5.0m x 3.0m x 1.8depth) for BJMP Office 16,500.00 Finished

    LegislativeBldg.Guinoba

    tanSiphoning of Sludge

    Siphoning of septic tank (2.0m x 4.0m x 2.0depth) located at the left side of theLegislative Bldg.

    11,000.00 Finished

    Calapan Zoo,Bulusan

    Improvement ofPlayground Facilities

    Improvement of facilities, works included:repair of steel play pen, construction ofwooden play pen, fabrication of seesaw,installation of fiberglass slide, wooden bench,tire bench and painting.

    170,100.00 On-going

    Improvementof FSREC

    Improvement ofImprovement of FSREC compound, worksincluded; construction of pedestal for On-going

  • [Type the document title]

    Compound Playground Facilities fabrication of nipa hut and barbeque pit 146,400.00

    VariousBarangays

    Regravelling of Road Repair of existing different barangay roads 79,200.00 Finished

    Pamana ngLungsod ,Sitio Bulalo,

    Balite

    Regravelling of Road Repair of existing barangay roads,1200.0Lm(average of 4.0m W)

    140,100.00 Finished

    Canubing-IIPainting of HealthCenter/Daycare

    Center

    Painting of 15.0m x 6.0m daycarecenter/health center 20,000.00 Finished

    BuhuanMaterials for Cluster

    Meet 2016

    Materials for cluster meet includes;embankment of 28m x37m x 0.2m schoolground, 20 bags of cement and 10 pcs.marine plywood

    89,800.00 Finished

    Nag-Iba IIConst. of Concrete

    PavementConst. of 100m x 0.8m x 3” concretepavement at Sitio Villaluna

    31,200.00 Finished

    BBRIS MainCanal. Naujan

    Desilting of Baco-Bucayao River

    Irrigation

    Declogging/desilting of BBRIS Main Barrel(3units)

    30,000.00 Finished

    City CollegeProposed

    Information DeskFabrication of wooden counter and cabinets,works include: Carpentry and varnish paint. 31,900.00 On-going

    Parang Nat'lH/S, PARANG

    Rehab. Of ExistingBldg.(ACP Type)

    Rehab of existing two-storey 28.3mx9.19school bldg. including paintings

    370.000.00 On-going

    City ProperInstallation ofWooden Frame

    Supply of materials for installation of 3-units10’ x 12’ wooden frame 8,700.00 Finished

    BungahanE/S, Sta. Rita

    Demolition ofExisting Building

    Demolition of 3 CL (Marcos Type) building18m x 7.50m including disposal 34,875.00 Finished

    SilonayMangrove

    Conservationand Ecopark,

    Silonay

    Renovation of Sari-Sari Store

    renovation of sari-sari store includes:extension of 6.52sq.m from the mainbuilding, up built of guest comfort room (1)and sink and purchase of bamboo poles andbamboo stakes and installation of doors

    100,000.00 Finished

    TOTAL PROJECT COST Php 6,688,283.50

  • [Type the document title]

    Name of Project:WATER SYSTEM

    LOCATION DESCRIPTION PROJECTCOSTS STATUS

    Canubing-II Installation of two(2) units free flowing using 2” dia. G.i. pipe sch.40 (28 pcs.) at Sitio Aliso 112,900.00 Finished

    Pamana ngLungsod,Balite

    Installation of one(1) unit free flowing using 2” dia. G.i. pipe sch.40(18 pcs.) 72,600.00 Finished

    Baruyan Installation of one(1) unit free flowing using 2” dia g.i. pipe sch.40(21 pcs.) at Sitio Hulo. 42,000.00 Finished

    Canubing-IIRehabilitation of 10 units free flowing deepwell at Sitio Bayog (2units), Sitio Perlas (2 units), Sitio Layugan (2 units), Sitio Centro (2units)

    70,000.00 Finished

    Baruyan Installation of one unit free flowing using 2” dia. G.i. pipe sch.40(18 pcs.) at Sitio Manggahan. 36,100.00 Finished

    Managpi Materials for the water system @ Sitio Bibihan 3,000.00 FinishedBrgy.

    Malamig,Calapan City

    Labor for the installation of one (1) unit free flowing using 2" dia.G.I pipe sch 40mx22m at Sitio Silangan 44,000.00 Finished

    Brgy.Canubing I,Calapan City

    Labor for the installation of one unit free flowing deepwell using 2"dia. G.I pipe sch. 40 (10 pcs) at Sitio Aliso 20,000.00 Finished

    Bondoc Installation of 1 unit cylinder pump using 2" dia GI post sch 40(8pcs), fitting and accessories @ Sitio Ibaba 55,800.00 Finished

    Tawiran Installation of 1 unit free flowing using 2"dia GI post sch 40(12pcs.) @ Sitio Irrigation 48,500.00 Finished

    Managpi Installation of 1 unit jetmatic pump using 2"dia GI post sch 40(18pcs) @ Sitio Ilaya Cuenca

    75,900.00 Finished

    Malad Materials for the water system@ Sitio Purok VI 39,000.00 Finished

    Canubing-II Installation of one unit free flowing deepwell using 2” dia g.i. pipesch. 40(12 pcs.) at Sitio Bangaya. 45,000.00 Finished

    Canubing-II Installation of one unit free flowing deepwell using 2” dia g.i. pipesch. 40(12 pcs.) at Sitio Ibaba. 45,000.00 Finished

    Malad Installation of one unit free flowing deepwell using 2” dia. G.i.pipe sch. 40 (20 pcs.) 75,000.00 Finished

    Canubing IInstallation of 1 unit free flowing deep well using 2" dia GI pipesch.40 (22pcs) @ Sitio Proper(rental of welding machine includedin labor).

    102,540.00 Finished

    Core Housing,Bulalo, Balite, Construction of 33.0Lm x 0.40m outer width open canal 29,900.00 Finished

    Balingayan labor for the rehab of 7 units free flowing @ Sitio Common,Greenhills, San Juan, Ilaya, Barutbutan, San Isidro and Sunrise 42,000.00 Finished

    Canubing II Labor for the installation of one unit free flowing deepwell using 2"dia. G.I pipe sch 40 (10 pcs) at Sitio Bayog 20,000.00 Finished

    TOTAL PROJECT COSTS PHp 979,240.00

  • [Type the document title]

    Name of Project: INSTALLATION/REHAB OF STREETLIGHTS

    LOCATION DESCRIPTION PROJECTCOSTS

    DATESTARTED/

    DATEFINISHED

    Suqui Installation of 16 units streetlights CFL Lighting Fixture(KronoType Big) with 60 watts spiral at Sitio Sunrise and Villa Arce 4,800.00 Finished

    San VicenteNorth

    Installation of 14 units streetlights High Power LED 18 watts andfabrication of 14 units g.i. post for streetlight pole 2” x 1-1/2” x4.5mtrs. ht. along Aurora Blvd.

    136,900.00 Finished

    LegislativeBldg.Guinobatan

    supplies of materials for the rehabilitation of electrical facilitiesin various offices in Legislative Bldg. 70,900.00 Finished

    Baliteinstallation of open secondary line extension using 5 unitsservice pole @ Brgy.Balite 213,960.00 Finished

    Nag-Iba I installation of 15 units CFl lighting Fixture w/ maiximizer CFL 22watts (2 1/2 x 2 x 4.5mtrs Ht GI Post @ Sitio Ibaba 30-35m span

    119,400.00 Finished

    Camilmil Installation of 16 units st.lights using # 3" s.40 GI pipe w/ CFLfixture w/ GE Spiral Eco Bulbs 60w, tap to existing st.lights 191,500.00 Finished

    Ibaba East installation of 15 units streetlights roadlights fixture HPS 150watts (see item VII and VIII), 6 units - Bonifacio St., 4 units -Osmeña St., 5 units - J.P. Rizal St

    387,471.00 Finished

    TOTAL PROJECT COSTS Php 1,124,931.00

    Name of Project: CONSTRUCTION OF SOLAR DRYER

    Name ofBarangay Description Project Costs

    STATUS

    Canubing-II Construction of 16m x25m solar dryer 165,000.00 Finished

    Gulod Construction of 20m x 22m Solar Dryer at Sitio Silayan 224,460.00 Finished

    Gutad Construction of 15m x10m solar dryer with 0.20 m x 0.1mcolumn stiffener spaced at every 3m span. 167,700.00 Finished

    TOTAL PROJECT COSTS Php 557,160.00

    CITY PROJECTS(BY CONTRACT)

    LOCATION NAME OF PROJECTS DESCRIPTION PROJECTCOSTS STATUS

    Ibaba East Const. of Seawall Const. of 120m seawall with nosing, shoeand 6 stairs. 1,263,283.73 Finished

    AdriaticoMem.School

    Rehab of GabaldonBuilding

    Rehab of Gabaldon Bldg. which includesinstallation of tiles, wooden partition,stainless handrail, wooden capiz, electricalworks.

    986,090.50 Finished

    City Proposed 3-Storey Construction of 43 x 12 mtrs. Proposed 3- 4,882,408.90 On-going

  • [Type the document title]

    College,Guinobatan

    City CollegeBldg.(Phase-III)

    Storey City College Bldg.(Phase-II):including 2nd floor slab with steel deck,SOF, CHB laying and plastering, tiles andceiling works, doors

    Old CityHall

    Compound,Ibaba East

    City Disaster RiskReduction & Mngt.Operation Center

    Const. of Two-Storey Bldg. withRoofdeck.Tile and ceiling works, doors andwindows, electrical and plumbing,waterproofing. Const. of 16 lm slopeprotection with steel sheet pile.

    4,228,720.74 On-going

    City PublicMarket

    Repainting of PublicMarket

    Repainting of Calapan City Public Marketincluding steel railings 1,460,920.17 Finished

    City HallCompound,Guinobatan

    Const. of ChildCare(Phase-II)

    Const. of 16.0m x 12.0m Child CareCenter(phase-II) 1,495,278.52 On-going

    BigaConst. of LGUOrganic TradingPost(Phase-I)

    Const. of 10.0m x 7.50m LGU OrganicTrading Post(Phase-I) 997,028.00 Finished

    Sitio Dalig,Batino

    Const. of Category IISanitary Landfill Cell

    Proposed const. of 1 hectare category IIsanitary landfill cell. 2,318,041.13 On-going

    Pamana ngLungsodRelocationSite, Bulalo,

    Balite

    Baclfilling ofRelocation

    Site(Phase-IV)

    Clearing of 6000.00 sq. m. area, includingembankment for 4599.0 cum x .80mdepth.

    2,491,987.98 Finished

    LibisProposed Additionand Alteration of

    Brgy. Hall

    Const. of 8.5 x 10m 2-Storey Brgy. Hallwhich includes concrete works up to roofbeam, chb laying, plastering, tile works,roof and g.i. roof sheets, ceiling for groundfloor, doors for CR, 1 unit septic tank andelectrical works

    986,382.42 On-going

    City HallCompound,Guinobatan

    Rehab of HRMBuilding

    Rehab and repainting of HRM Building(197.76 sq. m.), works included:clearing,scaffolding, dismantling, carpentry works,installation of glass partition, repainting,rehab of conc. gutter & roof, plumbing,electrical works & installation of canopyroofing.

    389,680.47 Finished

    CanubingNHS,

    Canubing-I

    Proposed CoveredCourt

    Const. of 16m x 10.4 m covered court(Phase-II) 1,598,556.50 on-going

    Canubing-I Rehab of NIA RoadLateral A-6Rehabilitation of 4.0m x 150 lm NIA roadlateral A-6 (0.75 m ave. embankment) 349,855.00 Bidded

    CalapanRiver,

    Camilmil toLalud

    Dredging ofCalapan River

    Dredging of Calapan River with totallength of 750.00 lm 998,410.12 Bidded

    Libis Proposed Additionand Alteration ofCompletion of 8.5 m x 10 m 2-Storey Brgy.Hall which includes ceiling for 2nd floor, 432,450.58 Bidded

  • [Type the document title]

    Brgy. Hall windows, doors, plumbing works,paintings, stainless railings for balcony andperimeter grills and gate

    San VicenteNorth

    Improvement/Rehabilitation of CityRural Health Unit

    North

    Rehab of City Rural Health Unit:Demolition, repair of roof & gutter pebble,SS railings, window grills, scrub sink andwater pump, const. of placenta pit and SVpainting works.

    889,552.02 on-going

    TOTAL PROJECT COSTS Php 25,768,646.78

    Name of Project: CONCRETING OF ROAD

    LOCATION DESCRIPTION PROJECTCOSTS STATUS

    Sitio Greenhills & Proper,San Antonio

    Concreting of 156 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side(sta. 0 + 000-sta. 0 + 156)

    997,640.00 Finished

    Sitio Oliva, Bayanan-I

    Concreting of 200 lm x 4.0m x 3.0 m x 0.15mthick concrete pavement with aggregateshoulder on both side and installation of .60 mdia RCPC ( 4-units)

    979,143.44 Finished

    Sapul-Puting Tubig

    concreting of 110 Lm x 5.0m x 0.20 thickconcrete pavement w/ aggregate shoulder onboth side (sta.0+147.70 - sta.0+257.70) andinstallation of 0.60m dia RCPC x 6Lm w/riprap

    997,334.56 Finished

    Balite-Tibag Pamayanan

    concreting of 90.50Lm x 5.0m x 0.20 thickconcrete pavement w/ aggregate shoulder onboth side (sta.0+000 - sta.0+90.50) andconcreting of 45.20Lm x 4.0m x 0.115m thickconcrete pavement w/ 0.50m aggregateshoulder on both side (sta.0+90.50-sta.0+135.70)and installation of 0.30m dia RCPC x 12Lmw/riprap

    997,061.51 Finished

    Balite-Bulalo

    concreting of 140Lm x 5.0m x 0.20 thick concretepavement w/ aggregate shoulder on both side(sta.0+240.40 - sta.0+38.40) and installation of0.60m dia RCPC x 5Lm w/riprap

    996,747.47 Finished

    Bagong Silang, Baruyanconcreting of 160Lm x 4.0m x 0.15m thickconcrete pavement w/ aggregate shoulder onboth side

    997,481.50 Finished

    Ibaba, Baruyanconcreting of 160Lm x 4.0m x 0.15m thickconcrete pavement w/ aggregate shoulder onboth side

    997,709.87 Finished

    Sitio B3, Camansihan

    Concreting of 130.3 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side and installation of .60 m dia RCPC x 10lm with riprap

    997,061.51 Finished

  • [Type the document title]

    Puting-Tubig to Gulodconcreting of 120Lm x 5.0m x 0.15m thickconcrete pavemnet w/aggregate shoulder onboth side (sta. 0+000-sta 0+120)

    997,400.00 Finished

    Sta. Cruz

    Concreting of 160 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side and installation of .30 m dia RCPC x 6lm with riprap

    997,140.77 Finished

    Bagong Pook, Nag-Iba IConcreting of 165 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side(sta. 0 + 000-sta. 0 + 170)

    996,643.67 Finished

    Sitio Islander, Personasconcreting of 160Lm x 4.0m x 0.15 thick concretepavement w/ aggregate shoulder on both side(sta.0+000 - sta.0+160)

    997,922.23 Finished

    Sitio Putol, Sta. Isabel

    Concreting of 141 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side(sta. 0 + 201.70-sta. 0 + 342.7) andinstallation of 0.60 m dia RCPC x 10 lm, withriprap.

    996,526.20 Finished

    Sitio Bibihan, ManagpiConcreting of 165 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side(sta. 0 + 799.60-sta. 0 + 964.60)

    997,643.67 Finished

    Sitio San Gabriel, Malamig

    Concreting of 160 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side(sta. 0 + 000-sta. 0 + 160) andinstallation of 0.60 m dia RCPC x 5 lm, withriprap.

    998,279.08 Finished

    Sto. Niño, Nag-Iba IIconcreting of 180Lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side

    997,843.60 Finished

    Sitio Sunrise, SuquiConcreting of 170 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side(sta. 0 + 017.15-sta. 0 + 187.15)

    997,434.77 Finished

    Cherry St., Lalud Concreting of 114.0 lm x 4.0m x 0.15m thickconcrete pavement with shoulder on both side 574,352.13 Finished

    Sitio Aliso, Canubing-IIConcreting of 110 lm x 5.0m x 0.20m thickconcrete pavement with aggregate shoulder onboth side.

    997,854.60 Finished

    Sitio Core Housing, Sta.Isabel

    Concreting of 210 lm x 3.0m x 0.15m thickconcrete pavement and 13 lm x 4.0m x 0.15mthick concrete pavement with aggregateshoulder on both side and installation of RCPC0.20 m dia x 9 lm.

    997,571.86 Finished

    Ubas St., Lalud Rehabilitation of 185 lm x 6 m x 0.23 m thickconcrete pavement 1,997,928.96 Finished

    Biga-Comunal Rehabilitation of 120 lm x 5m x 0.20 m thickconcrete pavement. 997,968.42 Finished

    St. Benedict Road Extn.,Lalud

    Concreting of 170 lm x 4.0m x 0.15m thickconcrete pavement with shoulder on both side 996,919.23 Finished

  • [Type the document title]

    Pachoca Cathecist Lane,Pachoca

    Concreting of 160 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side(sta. 0 + 000-sta. 0 + 120 & sta. 126-sta.0+166 and installation of 0.30m dia RCPC x 10 lmwith riprap

    997,781.37 Finished

    Gutad, Caguisikan

    Concreting of 100 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side and installation of 1.20m dia RCPC x 6lm & 0.90m dia RCPC with slope masonry.

    997,673.05 Finished

    Batino Dumpsite Road Concreting of 160 lm x 4.0m x 0.15m thickconcrete pavement with shoulder on both side 998,278.34 Finished

    Holgado St. Camilmil

    Concreting of 48.80 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side and installation of 44 lm x 0.45 m diaRCPC with manhole.

    479,188.81 Finished

    Sitio Centro, Canubing II

    concreting of 80Lm x 4.0m x 0.15m thickpavement w/ aggregate shoulder on both sidesincluding installation of 6Lm x 0.45m RCPC w/stone masonry headwall

    300,000.00 Finished

    Malad Concreting of 160 lm. X 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth sides.

    997,507.23 Finished

    TOTAL PROJECT COSTS Php 28,270,037.85

    Name of Project: OPENING OF FARM TO MARKET ROAD

    LOCATION DESCRIPTION PROJECT COSTS STATUS

    Sitio Celis, Bayanan-IWorks included: Embankment for roadopening, 6.0m width x 140.0m , installationof 1.2m RCPC x 18.0 lm( 3 lanes), const. ofriprap, headwall and apron, lean concrete

    997,379.77 Finished

    Sitio Highlander, Canubing-I Opening of 3.0m x 88 lm farm to marketroad(1.0m ave. embankment) 347,448.03 Finished

    Sitio Bagong Silang, Biga

    Works included: Embankment for roadopening, 6.0m width x 291.0m andinstallation of 1.2m RCPC x 18.0 lm(3 lanes),const. of riprap, headwall, apron and leanconcrete

    1,470,753.42 Finished

    TOTAL PROJECT COSTS Php 2,815,581.22

    Name of Project: CONSTRUCTION OF EVACUATION CENTER

    Location DESCRIPTION PROJECTCOSTSDATE STARTED/DATE FINISHED

    Tawiran Construction of 8.5 x 9.5m 2-storey 987,150.60 Finished

  • [Type the document title]

    Evacuation Center Phase 1; civil works w/cincludes suspended slab of 1st & 2nd floor,footings & columns up to elev. ± 4.70mtrs.

    Tawiran

    Const. of 149.75 sq.m. two-storey evacuationcenter phase-II includes; columns & beams of2nd floor, masonry works, plaster (interiorwalls), roof framing, G.I. roof sheet, plumbingfittings and electrical rough-ins.

    983,458.47 Finished

    Camilmil

    Installation of perimeter steel louver, 1 unitof roof truss, 1 span of c-purlins and G.I. roofsheet; concreting of flooring withembankment plastering and electrical works.

    2,918,880.15 Finished

    Camilmil

    installation of perimeter steel louver, 1 unitof roof truss, 1 span of C-purlins and GI roofsheet, concreting of flooring w/ embankmentplastering and electrical works(Phase-III)

    2,500,000.00 Bidded

    Sta. Cruz

    Completion of 149.75 sq.m. plastering(2faces), tiles, wall cladding, balcony & stairhandrails, ramp, roofing works, ceiling, doors& windows, painting works, plumbing worksand electrical works.

    1,767,394.71 Finished

    Gutad

    Const. of 149.75 sq.m. two-storey evacuationcenter phase-III includes; plastering(2 faces),tiles, wall cladding, balcony & stair handrails,roofing, ceiling, doors & windows, paintingworks, plumbing works and electrical works.

    1,593,291.00 Finished

    Camansihan

    Const. of 6m x 18 m (1 span @ 6.0m)evacuation center with steel roof framing; ribtype roof sheet; concrete footing, columnsand beams; steel louver on perimeter wall.

    931,864.71 Finished

    TOTAL PROJECT COSTS Php 11,682,039.64

    Name of Project: CONST. OF MULTI-PURPOSE HALL

    Location DESCRIPTION PROJECTCOSTS STATUS

    PalhiConst. of 16m x 26.5 m multi-purpose hallwith steel columns and trusses and rib-typeg.i. roof sheet

    2,950,166.60 Finished

    Sta. Ma. Village

    Const. of Multi-Purpose Hall Phase-II :Bleacher (24 lm) with roofing, concretefloor slab(19.2 cum), fabricated basketballboard, goal and stand and painting works.

    974,302.18 Finished

    MINSCAT, Masipit Const. of 18.0m x 11.0m 2-Storey Bldg.; 2,959,873.50 Finished

  • [Type the document title]

    foundation, column, floor beams, suspendedslab, CHB laying and plastering for groundfloor, electrical and plumbing rough-ins.

    TOTAL PROJECT COSTS Php 6,884,342.28

    Name of Project: CONST. OF COMMUNAL IRRIGATION SYTEM

    Location DESCRIPTION PROJECTCOSTS STATUS

    Sitio Mansanas, Buhuan Construction of 130 lm. X 0.60m open canal 725,485.26 Finished

    Panggalaan Construction of 113 lm. X 0.60m open canal 772,010.91 Finished

    Pajo,Canubing-I-BaruyanConst. of 43 lm. X 0.60m open canal andinstallation of water system with water pumphouse

    998,525.90 Finished

    TOTAL PROJECT COSTS Php 2,496,022.07

    Name of Project: DRAINAGE CANAL

    LOCATION DESCRIPTION PROJECTCOSTS STATUS

    Bataan St., San VicenteWest

    Construction of 144Lm x 0.45m open canalincluding concreting of driveway 487,529.20

    Finished

    Avocado St., Lalud

    Const. of 124 lm x 0.60 m covered canal withmanhole, inlets and catch basin, const. of 124lm curbs and gutter, & conc. Of 124 lm x 1.0m ave. width x 0.15m thick shoulder

    938,123.91 Finished

    Bonifacio St., Ibaba East

    Const. of 127 lm x 0.60m covered canal, 9 lmx 0.60m box culvert with manhole, inlets andcatch basin, and const. of 80 lm curbs andgutter

    997,681.69 Finished

    Caimito St., Lalud

    Const. of 260 lm x 0.60 m covered canal withmanhole, inlets and catch basin, const. of 260lm curbs and gutter, & conc. Of 260 lm x 1.59m ave. width shoulder

    2,373,785.85 Finished

    Sampaguita St.,Lumangbayan

    Const. of 156 lm x 0.60 m covered canal withmanhole, inlets and catch basin, const. of 156lm curbs and gutter, & conc. of 156 lm x .74m ave. width shoulder

    1,198,063.96 Finished

    Bataan St., San VicenteWest

    construction of 71Lm x 0.45m covered canal,concrete covering of 100Lm open canal w/manhole, inlets and catch basin, const. of210Lm curbs and gutter and const.of 210Lm x0.33m average w/ shoulder

    842,566.15 Finished

    Suqui Const. of 135 lm x 0.60m open canalincluding concreting of driveway and 699,539.75 Finished

  • [Type the document title]

    installation of 6 lm 0.60 dia RCPC withheadwall.

    Sto. Niño construction of 196Lm x 0.45m open canalincluding concreting of driveway 649,996.05 On-going

    Relocation Site, Sitio Bulalo,Balite

    construction of 175Lm x 0.45m and 14Lm x0.30m open canal including concreting ofdriveway and installation of 16Lm x 0.45m Øand 6Lm x 0.30mØ RCPC

    772,997.67 On-going

    TOTAL PROJECT COSTS Php 8,960,284.23

    CITY PROJECTS BENEFICIARIES(2016)LOCATION TOTAL PROJECT COST LOCATION TOTAL PROJECT COST

    San Vicente South 1,079,390.50 Lalud 766,400.00Balingayan 42,000.00 Lazareto 160,139.00Balite 5,715,354.63 Libis 1,418,833.00Baruyan 3,118,817.27 Lumangbayan 1,198,063.96Batino 3,316,319.47 Malad 1,144,507.23Bayanan-I 66,200.00 Managpi 1,076,543.67Bayanan-II 2,644,077.44 Mahal na Pangalan 15,000.00Biga 3,662,949.84 Masipit 2,959,873.50Buhuan 815,285.26 Nag-Iba-I 1,116,043.67Bulusan Park 170,100.00 Nag-Iba-II 1,112,843.60Bondoc 55,800.00 Palhi 2,950,166.60Bucayao 310,000.00 Parang 370.000.00Calapan River 998,410.12 Panggalaan 772,010.91CGC Complex 9,444,593.75 Personas 997,922.23Camansihan 1,928,926.22 Puting-Tubig 997,400.00Camilmil 7,087,979.08 San Antonio 997,640.00Canubing-I 3,967,112.93 San Vicente West 1,330,095.4Canubing-II 1,775,754.60 San Vicente North 1,026,452.02City College 5,397,558.90 Silonay 100,000.00City Proper 167,100.00 Sta. Isabel 2,013,698.06City Public Market 2,246,320.17 Sta. Ma. Village 974,302.18Comunal 997,968.42 Sta. Rita 34,875.00Ibaba East 2,260,965.42 Sta. Cruz 2,764,535.48Ilaya 16,500.00 Sto. Niño 649,996.05Guinobatan 98,420.00 Suqui 1,002,234.77Gulod 224,460.00 Tawiran 2,019,109.07Gutad 2,758,664.05 Various Barangay 175,500.00Lalud 7,879,520.20

  • [Type the document title]

  • [Type the document title]

    PROPOSED ADDITION & ALTERATIONOF BRGY. HALL @ Libis

    CONST. OF CATEGORY II SANITARYLANDFILL CELLBatino, Calapan City

    CONSTRUCTION OF EVACUATIONCENTER Sta. Cruz, Calapan City

    CONSTRUCTION OF SEAWALLIbaba East, Calapan City REHABILITATION OF ROAD

    Ubas St., Calapan CityCONCRETING OF ROAD

    PROPOSED 3-STOREY CITYCOLLEGE BUILDING(PHASE-III)

    CONSTRUCTION OF CHILD CARE CENTERUbas St., Calapan City

  • [Type the document title]

    BARANGAY PROJECTSLOCATION NAME OF

    PROJECTSDESCRIPTION PROJECT

    COSTSSTATUS

    San Antonio Const. of ConcreteFence with

    Concrete Bleacher

    Const. of concrete fence with concretepavement at Sitio Proper

    140,000.00 Finished

    Wawa Improvement ofPlayground Facilities

    improvement of playground facilities, worksincluded; concreting 2-units x 0.60m x 40.0mpathway, repair of playground equipment andsteel gate, painting works and clearing area

    76,200.00 Finished

    Wawa Fabrication ofMotorized Banca

    fabrication of 1.0m width by 11.0m longmotorized wooden banca

    38,400.00 Finished

    Tawagan Installation ofPaging System

    installation of paging system including 1unit public address amplifier w/ USB inputand 2 GB USB Drive , 4 units horm 20" w/driven unit and matching transformer and

    speaker wire

    44,200.00 Finished

    San VicenteSouth

    Repainting ofGovernmentFacilities

    repainting of facilities, works included:clearing and scrapping of old paints andrepainting of Health Center, Day Care

    Center @ Brgy.Hall

    27,500.00 Finished

    CoveredCourt,

    Guinobatan

    Construction ofBleacher

    construction of 1.50m x 12.50m bleacherand repair of damage cyclone wire fence.

    120,999.00 Finished

    Balite Installation of RCPC Installation of 6 units 0.60mm diameterRCPC at Sitio Bulalo, total length of 6.0Lm

    25,800.00 Finished

    HealthCenter,Malamig

    Fabrication andInstallation of Grills

    and Paintings

    fab.and installation of door and windowgrills w/ paintings

    34,300.00 Finished

    SitioCentro,Masip

    it

    Installation ofManhole Cover

    installation of manhole: (9) 0.40mx0.40m,(8)0.50mx0.40m, (4)0.35mx0.50m,

    (6)0.60m x0.60m

    20,300.00 Finished

    San VicenteCentral

    Repair of Road repair of 22.5 Lm x 4.0mtr wide roadlocated @ Ramirez ST.

    99,300.00 Finished

    San Antonio Construction ofPVC Pipe Drainage

    Construction of 130Lm PVC pipe drainagew/ 10 units 0.75 x 0.75 x 0.20 catch basin

    39,880.00 Finished

    San VicenteNorth

    Fabrication of Grills Fabrication of 9 units 2.4x1.4mtrs, 1 unit1.8x1.4mtr window grills and 1 unit of 9.9 x2.65mtr perimeter enclosure grills using 1:

    GI pipe and 12mm square bar.

    24,000.00 Finished

    Calero Fabrication ofMovable Stage

    Fabrication of 3.6mtrs x 6.0mtrs movablestage w/ 3/4' marine plywood for flooring

    and GI pipes for frame

    60,000.00 Finished

    Bucayao Construction of Construction of 1m x 48Lm fence (steel) @ 70,000.00 Finished

  • [Type the document title]

    Elem. School School Fence Bucayao Elem.SchoolLumangbayan Improvement of

    Covered CourtImprovement of covered court included:

    dismantling of damaged portion of wall androof, installation of roof extension , gutter

    and perimeter steel matting

    243,100.00 Finished

    Day CareCenter,

    Canubing II

    Installation of Tilesand Grills

    Installation of tiles and door grills @7.32mx 5.70m day care center

    45,000.00 Finished

    Brgy.HallComp., Suqui

    Construction ofWaiting Area

    Construction of 4.78m x sq.m. waiting area 45,875.00 Finished

    Suqui Construction ofBarangay HallExtension

    Const. of Brgy.Hall Extension 4.0 m x 20.60m

    169,999.00 Finished

    San VicenteEast

    Trimming of TreeBranches

    Trimming of tree branches along ZamoraSt: 100Lm

    20,000.00 Finished

    Silonay Installation ofDecorative Lights

    Installation of 12 units decoratice lights @Center Island (Sitio Centro)

    57,600.00 Finished

    Sitio Bulalo,Balite,

    Opening ofBarangay Road

    Supply of backfilling materials for openingof 6.0m w x 85.50m barangay road

    99,800.00 Finished

    HealthCenter, Biga,

    Installation ofWooden Partition

    Installation of Wooden Partition 2-units -3.0m x 3.0 sq.m. , including fabrication of2-units 0.70m x 1.0m table and painting

    36,000.00 Finished

    SitioBarutbutan,Balingayan,

    Construction ofFoot Bridge

    Construction of 16.00m x x1.30m footbridge

    90,000.00 Finished

    Balingayan Regravelling regravelling of 326Lmx4mx0.05m thickroad; materials only

    30,000.00 Finished

    Bulusan SitioProper II

    Installation ofRiprap

    installation of 6.0Lm x 3.5m riprap w/average thickness of 0.60mtr.

    55,895.00 Finished

    Day CareCenter

    Canubing II

    Installation of tiles installation of tiles @ 7.32m x 5.70m daycare center

    35,000.00 Finished

    Salong Fabrication ofGarbage Bin

    Fabrication of Garbage Bin 76,090.40 Finished

    Guinobatan Regravelling regravelling of 1800 Lm x 3.0m x 0.15barangay road

    47,701.00 Finished

    Guinobatan Repair of DaycareCenter

    Repair of Daycare Center, replacement ofceiling and ceiling joist 100%, painting of

    61,722.00 Finished

  • [Type the document title]

    ceiling and repainting of wallsCentro,

    PanggalaanRehabilitation ofMulti-Purpose Hall

    Repair of roofing, ceiling, doors andwindows including paintings.

    47,575.00 Finished

    Canubing II Fabrication andInstallation of Grills

    Fabrication and Installation of Grills andpainting of Health Center, door and

    window grills with painting

    35,000.00 Finished

    Sta. Ma.Village

    Repainting ofBasketball Court

    Repainting of Basketball Court, 450.00sq.m.

    9,300.00 Finished

    Masipit Repainting ofBarangay Hall &Basketball Court

    Repainting of 239.28 sq.m. Barangay Halland 15x30 basketball court

    40,030.00 Finished

    Bayanan-I Repainting ofBasketball Court

    Repainting of 15mx 30m basketball court 58,000.00 Finished

    San VicenteCentral

    Repair of CCTV Repair of existing analog CCTV system 49,290.00 Finished

    Panggalaan Painting ofBasketball Court

    Repainting of 450.00 sq. m. basketballcourt

    18,400.00 Finished

    Camansihan Const. of OverheadWater Tank

    Const. of Overhead Water Tank using G.I.pipe 3” dia sch. 40

    10,350.00 Finished

    Camansihan Installation of Tiles Installation of tiles at Brgy. Hall 9,900.00 Finished

    San Antonio Painting of Multi-Purpose Bldg.

    Painting of entire multi-purpose livelihoodbuilding

    57,150.00 Finished

    Suqui Repainting ofplaygroundfacilities

    Repainting of all playground facilities 18,000.00 Finished

    TOTAL PROJECT COSTS Php 2,287,656.40

    Name of Project: WATER SYSTEM

    Name ofBarangay DESCRIPTION

    ProjectCosts

    STATUS

    Canubing-II Labor for the istallation of two (2) units free flowing at SitioAsilo (C/O Domingo Marasigan)

    48,000.00 Finished

    Canubing-I Additional 4 pcs. 2" dia sch 40 GI pipe for the installation offree flowing @ Sitio Lagunlong

    48,000.00 Finished

    Gutad

    Installation of 1 unit pressurized water tank 21 gal.(stainless )w/ electric motor pump 1 HP (complete set ) concretepedestal .80m x .80m x 1.60m, distribution pipeline ( PVC bluepipe 1/2 ), faucet and fittings at daycare center ( Caguisican )

    26,000.00 Finished

    Canubing-I Installation of one unit free flowing 29,660.00 FinishedMalamig Installation of water system at Sitio Silangan 76,230.00 Finished

    Canubing IInstallation of one(1) unit free flowing deep well using 2"diaG.I pipe sch 40 (20pcs) at Sitio Bayabas (rental of weldingmachine included on labor)

    83,000.00 Finished

    Sta. Isabel Construction of 1 unit 2.0m x 2.50m artesian well roofing 14,000.00 Finished

  • [Type the document title]

    Canubing IInstallation of 1 unit free flowing deep well using 2" dia GI pipesch.40 (22pcs) @ Sitio Proper(rental of welding machineincluded in labor).

    82,000.00 Finished

    Masipit Installation of 2 units Jetmatic pump using 2"dia GI pipe sch 40(28pcs) @ Sitio Batasan and Irrigation 119,400.00 Finished

    Canubing II Rehab of 1 unit free flowing @ Sitio Centro 7,000.00 Finished

    Canubing II Labor for rehabilitation of one unit free flowing deepwell atSitio Aliso (C/O Domingo Marasigan) 7,000.00 Finished

    Tawagan Rehabilitation of one unit free flowing @ Sitio Looban 7,000.00 FinishedCamansihan Labor for water system at Sitio Anilao 6,000.00 Finished

    TOTAL PROJECT COST Php 553,290.00

    Name of Project: INSTALLATION/REPAIR OF STREETLIGHTS & COURTLIGHTS

    Name ofBarangay Description Project Costs

    STATUS

    Canubing IInstallation of 7 units streetlights CFL lighting fixture(FIAMMA Singe) w/ LED bulb 14 watts and fabrication of 2x2-1/2x 4.5mtrs height GI post for streetlight pole @ SitioLagunlong

    48,950.00 Finished

    Panggalaan Rehabilitation of existing brgy.streetlights @ Sitio Highway 10,000.00 Finished

    TawaganInstallation of 30 units CFL lighting fixture (FIAMMA Single)w/ 22 watts & 2x2-1/2x4.5mtrs Ht GI post for streetlight pole@ Sitio Ilaya-2 units, Centro-2units and Hulo--26 units

    243,600.00 Finished

    Puting-Tubig

    Installation of 4 units stand alone solar streetlights w 20wattssolar panel mono crystal line 5 watts cobra headlight chargercontroller 12v 2AH deep cycle battery cables battery box andaccessories

    57,900.00 Finished

    Sta. IsabelInstallation of 15 units streetlights CFl lighting fixture KronoType Big and fabrication of 3x3x6.0m GI post w/ plate5/8"x10"x10" and bracket 1-1/4 x 1.0m at Sitio Proper

    288,700.00 Finished

    Sta. IsabelInstallation of 9 units CFL lighting fixture (FIAMMA Single) w/CFL 22 watts & 2x2-1/2x4.5mtrs Ht GI post for streetlightspole @ Sitio Manahan

    72,800.00 Finished

    Sta. Isabel Repair of existing barangay streetlights @ various sitios(damage by typhoon Nona)

    49,900.00 Finished

    San VicenteWest

    Installation of six (6) units streetlights CFL Lighting Fixture w/22 watts CFL maximizer and fabrication of 2 x 2 - 1/2 x 4.5mG.I post for streetlight pole along aurora blvd.

    57,100.00 Finished

    Tawiran Repair of existing brgy. streetlights@ Sitio Irrigation 28,500 .00 Finished

    Personas installation of 13 units streetlights FALCON-High Power LED18 watts & GI post 1-1/2 x 2x4.5mtrs Ht @ Sitio School 230,500.00 Finished

    Nag-Iba II Repair of existing barangay streetlights along Provincial Road(damage by Typhoon Nona) 29,700.00 Finished

    Tibaginstallation of 20 units CFL lighting fixture (FIAMMA Single)w/ CFL 22 watts and 2x2-1/2x4.5mtrs.Ht GI post forstreetlights pole @ Lopez, Macasaet and Aroma St.

    152,700.00 Finished

  • [Type the document title]

    Guinobataninstallation of 10 units streetlights Globe Type Half Clear /Half White 12" dia w/ essential bulb18 watts and2x2x4.5mtrs Ht (tap to residential houses)

    50,000.00 Finished

    Bayanan I repair of existing barangay streetlights along National High-way (Damage by Typhoon Nona) 54,300.00 Finished

    Canubing IIinstallation of 17 units streetlights CFL lighting fixture(FIAMMA Single) w/ maximizer CFL 22 watts and 2 x2-1/2 x4.5mtrs Ht GI post @ Sitio Centro

    123,700.00 Finished

    Gutadinstallation of 15 units streetlights CFl lighting fixtureFIAMMA Single w/ 22 watts and 2 x 2-1/2 x 4.5m Ht GI postfor streetlight pole at Sitio Hacienda

    93,900.00 Finished

    Nag-Iba IIinstallation of 10 units (Mercury Reflector) w/ LED bulb, 10watts and 3x3x6 mtrs.ht GI post w/ bracket 1-1/4" x 1.0m @Sitio Labasan

    99,900.00 Finished

    Panggalaan repair of existing barangay streetlights @ Sitio Natulo(damage by typhoon Nona) 112,900.00 Finished

    Panggalaan Repair of existing barangay streetlights @ Sitio Centro 38,400.00 Finished

    Canubing Irehab of 9 units streetlights and installation of 3 unitsstreetlights CFL lighting Fixture w/2-1/2 x 2 x 4.5 mtrs ht GIpost sch 40 @ Sitio Highlander

    80,000.00 Finished

    Suqui Repair of existing barangay streetlights along Provincial Road(damage by Typhoon Nona) 76,500.00 Finished

    Canubing I rehabilitation of 5 units streelights @ Sitio Bagong Silang,National Highway 35,500.00 Finished

    Balingayan installation of 22 units CFL lighting fixture (FIAMMA Single)w/ 22 watts and 2x2-1/2x4.5mtrs.Ht GI post for streelightpole @ Sitio San Isidro

    169,200.00 Finished

    Bucayao repair / rehab of 25 units globe type streetlights along Nat'lHighway (damage by Typhoon Nona) 53,200.00 Finished

    Tawiraninstallation of 40 units CFL lighting fixture (FIAMMA Single)w/ maximizer CFL 22 watts and 2x2-1/2x4.5mtr Ht GI post @

    Ilang-ilang ,Gumamela, Camia and Rosal St.320,600.00 Finished

    Ilaya

    installation of 6 units stand alone solar streetlights w/20watts soalr panel monocrystal line, 5 watts cobra headlight

    charger controller 12v 12AH Deep cycle battery cablesbattery box and accessories @ Kalaw St.

    112,800.00 Finished

    Sitio HighwayWest,

    Bayanan II

    installation of 5 units CFL lighting fixture Krono type big andfabrication of 84 3x3x6.0m GI post w/plate 5/8"x10"x10" and

    bracket 1-1/4x1m99,100.00 Finished

    Malamiginstallation of 6 units streetlights CFL lighting fixture

    w/22watts CFL maximizer and fab.of 2x2-1/2x4.5mtrs GI postfor the streetlight pole @ Sitio Silangan

    57,750.00 Finished

    Canubing II installation of 4 units floodlights metal halide 400 watts atcovered court (installation of basketball courtlights) 108,700.00 Finished

    Baliteinstallation of 12 units CFL lighting Fixture (FIAMMA Single)

    w/ CFL 22 watts and 2x2-1/2x4.5mtrs Ht.GI post forstreetlights pole @ Sitio Bulalo

    99,000.00 Finished

    Canubing I rehab of 9 units streetlights and installation of 3 units 80,000.00 Finished

  • [Type the document title]

    streetlights CFL lighting Fixture w/2-1/2 x 2 x 4.5 mtrs ht GIpost sch 40 @ Sitio Highlander

    Wawainstallation of seven(7) units streetlights CFL lighting Fixture(FIAMMA Single) w/ CFL 22 watts and fabrication of 2 x2-1/2x4.5 Ht GI pipe for steel light pole @ Sitio Core Housing

    58,400.00 Finished

    Salonginstallation of 8 units streetlight using 2"dia G.I pipe sch40 15ft ht w/ weather proof lighting fixture (IXE27) w/essential bulb 23 watts lighting @ SitioUpper Ville I

    69,000.00 Finished

    Lumangbayan Installation of 10 units streetlights using 2"dia GI pipe sch 4015ft Ht. w/ umbrella type gooseneck bracket lighting fixturew/essential bulb 23 watts @ Sitio Centro and Villa

    52,100.00 Finished

    Malamig Repair of existing streetlights at Sitio Riverside (Damage byTyphoon Nona) 17,200.00 Finished

    Canubing II,Installation of 18 units streetlight using # 2"S.40 G.I pipe, 15ft.ht. w/ Weatherproof Lighting Fixture (1 X E27) w/ Ess"IBulbs 23 watts at Sitio Layugan to Brgy. Hall

    120,000.00 Finished

    San VicenteWest

    installation of 6 units streetlights CFL lighting fixture(FIAMMA Single) w/22watts CFL maximizer and fab.of 2x2-1/2x4.5mtrs GI post for the streetlight pole @Bataan St.

    49,500.00 Finished

    SMVinstallation /rehab of 6 units metal halide flood light 400watts @ covered court ( note: 4 units metal halide available@ site)

    49,000.00 Finished

    Guinobatan Labor for the repair of basketball courtlight @ Sitio CoreHousing 12,450.00 Finished

    Guinobataninstallation of 10 units streetlights Globe Type Half Clear /Half White 12" dia w/ essential bulb18 watts and2x2x4.5mtrs Ht (tap to residential houses)

    50,000.00 Finished

    Bayanan-I repair of existing barangay streetlightrs along National High-way (Damage by Typhoon Nona)54,300.00 Finished

    TawaganInstallation of 1 unit streetlights using 2"dia GI pipe sch 4015ft Ht. w/ umbrella type gooseneck bracket lighting fixturew/essential bulb 23 watts

    10,000.00 Finished

    Masipit Repair/Rehabilitation of existing barangay streetlights atVarious Sitio (damage br Typhoon Nona) 37,400.00 Finished

    Tibag Installation of Basketball courtlights 12,450.00 FinishedIbaba West repair of existing barangay streetlights 39,900.00 FinishedSta. Isabel Rehab and installation of basketball courtlights 27,300.00 Finished

    TOTAL PROJECT COST PhP 3,835,300.00

  • [Type the document title]

    Name of Project: IMPROVEMENT OF BRGY. FACILITES (BRGY. HALL, MULTI-PURPOSE HALL, HEALTH CENTER)

    Name ofBarangay Description Project Costs

    STATUS

    Guinobatan

    improvement of barangay hall: installation of partitionwall(2.7m x 5.0m), installation of 40cm x40cm Glazed tile@kitchen center (4.0m x 0.60m), and flooring (4.0m x1.10m),replacement of ceiling and ceiling joist (100%) andconstruction of 5.0m x 0.75m storage room, replacement of2 panel doors and repainting of entire bldg.

    156,378.00 Finished

    Nag-Iba II improvement of 7m x 9m brgy.hall: installation of venetianblinds and window grills 46,926.25 Finished

    Puting-Tubig Propose building roofing and gutter 72,900.00 Finished

    Masipit improvement of barangay health center includes: roof gutter,replacement of window glass (9.41sq.ft.) and front door(1unit),roofing of kitchen including plaster of exterior wall

    47,900.00 Finished

    Bucayao Repair of ceiling, roofing, doors, windows including paintingof Health Center 49,960.00 Finished

    Masipit improvement of barangay hall includes: partition wall w/painting works and de-clogging and siphoning of septic tank 15,900.00 Finished

    Suqui Improvement of entire multi-purpose hall 224,994.00 FinishedTOTAL PROJECT COST PhP 614,958.25

    Name of Project: INSTALLATION OF CCTV

    Name ofBarangay Description Project Costs

    STATUS

    Sta. Rita supply of materials for the installation of CCTV Camera @barangay hall 37,300.00 Finished

    San Antonioinstallation of 4 units CCTV Camera, Centralized powersupply, hybrid video recorder, monitor 19" LED TV, 2TB

    Surveillance AV Drive and accessories56,600.00 Finished

    San VicenteEast

    installation of 4 units additional CCTV camera , centralizedpower supply, video balun booster and RG6 siamese cable 39,200.00 Finished

    TOTAL PROJECT COST PhP 133,100.00

    Name of Project: DRAINAGE CANAL(CONSTRUCTION/REPAIR)

    Name ofBarangay DESCRIPTION Project Costs STATUS

    Ilaya

    Const. of 52Lm drainage system using 6" diameter PVCpipe and 10 units of 40x40xcatch basin, const. of 20Lmopen canal w/ removable cover, const of 1 unit 0.90 x 0.90mtr.manhole w/cover

    100,000.00 Finished

    Sitio ProperIII,Bulusan

    Const. of 45mtr x 0.40 x 0.30 mtr (inner width) open canalw/croos beam every 3mtrs 75,500.00 Finished

    Along Covered Construction of 0.60m outer width x 26m covered canal 91,000.00 Finished

  • [Type the document title]

    Court,SMV and removal of existing earth fillcor.

    G.Morente St.Paras Comp.,

    SVS

    Installation of 0.30m RCPC for drainage canal w/totallength of 40.70Lm

    94,600.00 Finished

    SitioCentro,Masipit Repair of 13Lm x 0.4m x0.40m drainage canal 27,500.00 Finished

    Molave St.,Sto. Nino

    Const. of 10 m. x 0.6 x 0.65m. (inner width) open canal w/column and cross beam @ every 3m. 30,000.00 Finished

    Tangile St. Sto.Niño

    Construction of 70x0.40x0.50mtr (inner width) open canalw/ cross beam and post every 3.0mtrs. 150,000.00 Finished

    along Blk 4 ,SMV

    Rehab of existing drainage canal, 0.60m x 301.80Lm ,including construction of manhole inlets 188,600.00 Finished

    Silonay Construction of 50Lm x 0.90m wide open drainage canalw/ 6.0Lm RCPC 0.60m diameter 199,960.00 Finished

    Guinobatan Construction of drainage canal along National Highway 35,150.00 Finished

    Gozar St.Libis Construction of 76mtr x 0.60 x 0.5 mtr (inner width)covered canal w/ 0.40 x 0.40 manhole @ every 3 meters 220,000.00 Finished

    Salong Construction of 9.0m x 0.40m x 0.60m covered canal 19,160.00 FinishedLazareto Construction of drainage canal at Sitio Cadre 38,475.00 Finished

    Ibaba West Construction of drainage canal at Zone I, II & III 106,000.00 FinishedTOTAL PROJECT COST PhP 1,375,945.00

    Name of Project: CONCRETING/REHAB OF PATHWAY , PAVEMENT

    Name ofBarangay Description Project Costs STATUS

    Bulusan concreting of 38Lm x 2.0 x 0.15mtr existing brgy.road atSitio Wireless 54,832.00 Finished

    Bulusan concreting of 18Lm x 2.0 x 0.10mtr existing brgy road @Sitio Proper 1 14,890.00 Finished

    San Antonio concreting of 115.0Lmx1.20mx0.127m thick pathway @Sitio Crossing83,980.00 Finished

    Sitio PNB,Lumangbayan concreting of 1.0mx49.30mx0.075m thick pathway 16,400.00 Finished

    Sitio Mataas naKahoy, Masipit concreting of 46Lm x 0.50m x0.075m pathway 9,600.00 Finished

    San VicenteSouth

    concreting of 105Lm x0.075m thick x 1.10m widthpathway and construction of 0.40m x 10.5m outer widthcanal w/ movable cover

    14,100.00 Finished

    San Antonio concreting of 15.0m x 30.0m x0.075m multi-purposepavement 203,940.00 Finished

    Sitio ChurchSite, Masipit

    construction of concrete pavement w/ an area of 81.31sq.m and 6"thick 53,800.00 Finished

    Gutad construction of 6.0mx7.0m concrete pavement in front ofday care center 9,985.00 Finished

    TOTAL PROJECT COST PhP 461,527.00

  • [Type the document title]

    Name of Project: REHABILITATION OF BARANGAY FACILITIES

    Name ofBarangay Description Project Costs STATUS

    Sitio Centro,Puting-tubig Rehab of barangay outpost ( 4.26mx 5.0m) 20,000.00 Finished

    Balingayan Repair of ceiling windows, steel railings gutter includingpaintings of Brgy. Hall/Day Care Center 97,300.00 Finished

    Lumangbayan repair of roofing of waiting shed (6.8sq.m), includingpainting works 22,325.00 Finished

    Bondoc

    Rehabilitation of 10.0m x 6.0m Brgy. Hall (100%replacement of roof & roof trusses, additional of 0.50mheight of wall, replacement of doors, and installation ofwater closet and tiles and repainting of entire building

    311,000.00 Finished

    Sitio Bulalo,Brgy. Balite,

    works included: removal of damaged roofing structure,installation of new frame & panels (portion) 17064sq.m 10,000.00 Finished

    MaladRepair works included: dismantling and installation ofportion of ceiling, repair of roofing, flashing, installation ofoutlet and painting of Daycare Center

    33,000.00 Finished

    Canubing-I Rehabilitation of 2.0m x 4.30m HNP extension andinstallation of 2.0m x 0.60m kitchen sink 40,000.00 Finished

    SilonayRehab of HNP ( replacement of water closet,installation of C.R. tile, repair of ceiling, repaintingand replacement of damage light bulb)

    9,998.00 Finished

    TOTAL PROJECT COST PhP 543,623.00

    Name of Project: CLEARING OF ROADSIDES, RIVERSIDE, DRAINAGE, PATHWAY

    Name ofBarangay DESCRIPTION Project Costs

    STATUS

    San VicenteEast clearing and ditching of 2500 mtrs drainage canal 20,000.00 Finished

    Libis Clearing and ditching of 4000mtr drainage canal 25,000.00 FinishedIlaya clearing and ditching of 2000 meters drainage canal 125,000.00 Finished

    Guinobatan Clearing of 7500 sq.m roadside and ditching of drainagecanal 25,000.00 Finished

    San VicenteWest clearing and ditching of 2000 meters drainage canal 10,000.00 Finished

    Guinobatan Clearing of 7500 sq.m roadside and ditching of drainagecanal 25,000.00 Finished

    Balingayan Cleaning and ditching of 10.70Lm x 5.0m river/waterways 20,000.00 FinishedIbaba East clearing and ditching of 2000 meters drainage canal 10,000.00 Finished

    Libis Clearing and ditching of 4000mtr drainage canal 25,000.00 FinishedSan Vicente

    South Clearing and ditching of drainage canal 10,000.00 Finished

    Ilaya clearing and ditching of 2000 meters drainage canal 25,000.00 FinishedSan Vicente clearing and ditching of 2000 meters drainage canal 10,000.00 Finished

  • [Type the document title]

    WestTOTAL PROJECT COST Php 330,000.00

    BARANGAY PROJECTS BENEFICIARIES

    LOCATION TOTAL PROJECTCOST LOCATIONTOTALPROJECTCOST

    LOCATION TOTAL PROJECTCOST

    Balingayan 318,500.00 Ibaba East 25,000.00 San Vicente East 79,200.00Balite 234,600.00 Ilaya 362,800.00 San Vicente North 24,000.00Bayanan-II 99,100.00 Lazareto 38,475.00 San Vicente South 37,500.00Bayanan-I 148,630.00 Libis 270,000.00 San Vicente West 126,600.00Biga 36,000.00 Lumangbayan 333,925.00 Sta Isabel 452,700.00Bondoc 311,000.00 Malad 33,000.00 Sta. Ma. Village 337,900.00Bucayao 173,160.00 Malamig 185,480.00 Sta. Rita 37,300.00Bulusan 201,117.00 Masipit 371,830.00 Sto Niño 180,000.00Calero 60,000.00 Panggalaan 227,275.00 Silonay 267,558.00Camansihan 26,250.00 Personas 230,500.00 Suqui 489,493.00Canubing-I 117,660.00 Puting-Tubig 130,800.00 Tawagan 304,800.00Canubing-II 48,000.00 Salong 88,160.00 Tawiran 320,600.00Guinobatan 541,400.00 San Antonio 581,550.00 Tibag 165,150.00Gutad 129,885.00 San Vicente Central 99,300.00 Wawa 173,000.00Ibaba West 145,900.00

  • [Type the document title]

    CONSTRUCTION OF DRAINAGECANAL @ Sto. Niño, Calapan City

    INSTALLATION OF STREETLIGHT@ Canubing II

    INSTALLATION OF WATERSYSTEM(FREE FLOWING)

    Sitio Silangan, Malamig, Calapan City