Page 1: Two-Tier Firm Curtailment Overview

Two-Tier Firm CurtailmentOverview

August 16, 2011

Page 2: Two-Tier Firm Curtailment Overview

2 Free Template from www.brainybetty.com 2

Two-Tier Firm Curtailment Overview• Terminology • Transmission Loading Relief (TLR)• Two-Tier Curtailment Concept• First-to-Curtail/Last-to-Curtail • Examples

Page 3: Two-Tier Firm Curtailment Overview

3 Free Template from www.brainybetty.com 3

Terminology• Flowgate –

– A portion of the transmission system through which the Interchange Distribution Calculator (IDC) calculates the power flow from Interchange Transactions.

– A mathematical construct, comprised of one or more monitored transmission facilities and optionally one or more contingency facilities, used to analyze the impact of power flows upon the Bulk Electric System.

• Off-Path Flows – Flows that cannot be traced to the Transmission Service

Provider’s (TSP’s) transmission service because, by definition, off-path flows are flows from neighboring transmission systems that are not reserved on the TSP’s system.

– These are also referred to as Loop Flows, Off-the Path Flows, Unscheduled Flows, or Parallel Flows.

• On-Path Flows – Flows that can be traced back to existing transmission service

and their corresponding service priorities on the TSP that owns the flowgate.

– These are also referred to as Contract Path Flows, On-the-Path Flows or Scheduled Flows.

Page 4: Two-Tier Firm Curtailment Overview

4 Free Template from www.brainybetty.com 4

Terminology

• Interchange Distribution Calculator (IDC) – – The mechanism used by Reliability Coordinators in the Eastern

Interconnection to calculate the distribution of Interchange Transactions over specific flowgates. It includes a database of all Interchange Transactions and a matrix of the distribution factors for the Eastern Interconnection.

– Tool to calculate the impact of flows on a flowgate including the source of the flow (includes both scheduled and unscheduled flows on the flowgate)

• Book of Flowgates (BOF)– The master list of flowgates used by the IDC.– Flowgates are added by to the BOF at the Reliability Coordinators

request, in part to manage congestion in their footprint.

• Transmission Loading Relief (TLR)– A procedure used in the Eastern Interconnection to relieve

potential or actual loading on a Constrained Facility or Flowgate.– Reliability Coordinators submits a TLR Relief request to the IDC – IDC calculates relief obligations for those contributing to

congestion

Page 5: Two-Tier Firm Curtailment Overview

5 Free Template from www.brainybetty.com 5

Transmission Loading Relief (TLR) Levels• The TLR Process has a series of TLR levels from 0-6:

– Level 0 is lowest state (terminates a TLR event)– Level 6 is the highest level which can result in “shedding load”

• Two-tier firm curtailment is associated with Level 5 TLR events.

• Current environment - TLR Level 5 analysis shows that the following actions can prevent exceeding the System Operating Limit (SOL) or Interconnection Reliability Operating Limit (IROL):– Full curtailment of non-firm Interchange Transactions and

energy flows, and– Reconfiguration of the transmission system, if possible, and– Full or partial curtailment or reallocation of firm Interchange

Transactions and energy flows.

Page 6: Two-Tier Firm Curtailment Overview

6 Free Template from www.brainybetty.com 6

TLR Assigning Priorities

• The TLR priority of on-path transactions (from the perspective of the TSP experiencing congestion) are determined from the priority of the transmission service associated with the transaction.

• The priority of the off-path transactions are determined by the Weakest Link method whereby the TLR procedure assigns the priority of an off-path transaction as the lowest priority of all transmission service reservations associated with the transaction, from any TSP on the path of the transaction. (Off-path transactions don’t have associated transmission service on the TSP experiencing the congestion.)

Page 7: Two-Tier Firm Curtailment Overview

7 Free Template from www.brainybetty.com 7

Two-Tier Firm Curtailment Concept• The two-tier firm curtailment concept proposes to assign

two levels of firm curtailment priorities for the purpose of TLR (First-to-Curtail and Last-to-Curtail).

• If all segments on the contract path are firm and the TSP for any segment does not have a coordination agreement with the TSP experiencing congestion the entire transaction will be considered as First-to-Curtail.

• In all other cases where all segments on the contract path are firm the entire transaction will be considered as Last-to-Curtail.

• Intra-BA firm Point-to-Point, native and network transactions will follow the same rules recognizing that intra-BA transactions have only a single segment.

Page 8: Two-Tier Firm Curtailment Overview

8 Free Template from www.brainybetty.com 8

Two-Tier Firm Curtailment Concept (cont.)

• The Two-Tier Firm Curtailment concept provides a mechanism to address off-path firm flows on a flowgate prior to on-path flows.

• Two-tier curtailment applies to the Eastern Interconnection. The concept:– provides an optional process that allows a TSP to ensure

their flows remain in a last-to-curtail category provided coordination occurs with impacted neighbors, which may be beyond the adjacent neighbor,

– Provides a common approach for dealing with Parallel Flows in the Eastern Interconnection.

• IDC– The concept will require modifications to the IDC for

calculating firm relief assignments for Balancing Authorities when congestion occurs on a flowgate based on the analysis/evaluation that was done at the time service was sold/granted.

Page 9: Two-Tier Firm Curtailment Overview

9 Free Template from www.brainybetty.com 9

First-to-Curtail / Last-to-Curtail

• First-to-Curtail includes off-path (not reserved on the TSP’s system experiencing the congestion) firm service (Interchange Transactions, network and native load service) if any TSP providing transmission service on the contract path has not previously entered into Coordination Agreement with the TSP experiencing congestion.

• Last-to-Curtail includes on-path firm transactions with reservations that were procured and granted firm service on the TSP’s system experiencing the congestion. Off-path firm service (Interchange Transactions, network and native load service) will also be treated as Last-to-Curtail if all TSPs providing transmission service on the contract path have previously entered into Coordination Agreement(s) with the TSP experiencing congestion.

Page 10: Two-Tier Firm Curtailment Overview

10 Free Template from www.brainybetty.com 10

Examples

• Inter-BA Transmission Service– Current Curtailment

– Two-Tier Curtailment – No Coordination Agreement

– Two-Tier Curtailment – Coordination Agreement

• Intra-BA Transmission Service– Current Curtailment

– Two-Tier Curtailment – No Coordination Agreement

– Two-Tier Curtailment – Coordination Agreement

Page 11: Two-Tier Firm Curtailment Overview

11 Free Template from www.brainybetty.com 11

Current Curtailment (Inter-BA Transmission Service)

BA 2

BA 1

BA 3

- Firm Transmission Service sold/granted from BA-1 to BA-3 and from BA-2 to BA-3

- Congestion is occurring on Flowgate 223.

- Both Flows A and B are contributing to congestion on flowgate 223.

- Both flows used in calculating relief obligations on the same level (Flow A service was sold/granted in BA 2, Flow B was not)

Note: Parallel Flow impacts are subject to TLR curtailments only to the extent the impacts exceed the minimum IDC Threshold.

FG 102

FG 315

FG 223

Flow B

Flow A

Page 12: Two-Tier Firm Curtailment Overview

12 Free Template from www.brainybetty.com 12

Two-Tier Curtailments – No Coordination Agreement(Inter-BA Transmission Service)

BA 2

BA 1

BA 3

- Firm Transmission Service sold/granted from BA-1 to BA-3 and BA-2 to BA-3

- No Coordination Agreement exists

- Both Flows A & B are contributing to congestion on FG 223

- Flows A goes into Last-to-Curtail (Service sold/ granted in BA-2)

- Flow B goes into First-to-Curtail (Service not sold/ granted in BA-2)

Note: Parallel Flow impacts are subject to TLR curtailments only to the extent the impacts exceed the minimum IDC Threshold.

FG 102

FG 315

FG 223

Flow B

Flow A

Page 13: Two-Tier Firm Curtailment Overview

13 Free Template from www.brainybetty.com 13

Two-Tier Curtailments – Coordination Agreement(Inter-BA Transmission Service)

BA 2

BA 1

BA 3

- Firm Transmission Service sold/granted from BA-1 to BA-3 and BA-2 to BA-3

- Coordination Agreement exists between TSPs in BA-1 and BA-2

- TSPs in BA-1 and BA-2 analyzed impacts of Flows prior to selling /granting service

- Congestion is occurring on FG 223 both Flows A & B are contributing to

- Flows A and B goes into Last-to-Curtail

Note: Parallel Flow impacts are subject to TLR curtailments only to the extent the impacts exceed the minimum IDC Threshold.

FG 102

FG 315

FG 223

Flow B

Flow A

Page 14: Two-Tier Firm Curtailment Overview

14 Free Template from www.brainybetty.com 14

Current Curtailment (Intra-BA Transmission Service)

BA 2

BA 1

BA 3

- Firm Transmission Service sold/granted from BA-1 to BA-3 and within BA-2

- Congestion is occurring on FG 315 both Flows A & B are contributing to congestion

- Flows A is not subject to curtailment (not reported to the IDC)

- Flow B is used to determine curtailment relief obligation

Note: Parallel Flow impacts are subject to TLR curtailments only to the extent the impacts exceed the minimum IDC Threshold.

FG 102

FG 315

FG 223

Flow B

Flow A

Page 15: Two-Tier Firm Curtailment Overview

15 Free Template from www.brainybetty.com 15

Two-Tier Curtailments – No Coordination Agreement(Intra-BA Transmission Service)

BA 2

BA 1

BA 3

- Firm Transmission Service sold/granted from BA-1 to BA-3 and within BA-2

- No Coordination Agreement exists

- Congestion is occurring on FG 315 both Flows A & B are contributing to congestion

- Flows A goes into First-to-Curtail

- Flow B goes into Last-to-Curtail

Note: Parallel Flow impacts are subject to TLR curtailments only to the extent the impacts exceed the minimum IDC Threshold.

FG 102

FG 315

FG 223

Flow B

Flow A

Page 16: Two-Tier Firm Curtailment Overview

16 Free Template from www.brainybetty.com 16

Two-Tier Curtailments – Coordination Agreement(Intra-BA Transmission Service Example)

BA 2

BA 1

BA 3

- Firm Transmission Service sold/granted from BA-1 to BA-3 and within BA 2

- Coordination Agreement exists with TSPs in BA-1 and BA-3

- When selling/granting service TSP in BA-2 considered impact on BA-3

- Congestion is occurring on Flowgate 315 both Flows A & B are contribution to congestion

- Both Flows A & B go into Last-to-Curtail

Note: Parallel Flow impacts are subject to TLR curtailments only to the extent the impacts exceed the minimum IDC Threshold.

FG 102

FG 223

FG 315

Flow A

Page 17: Two-Tier Firm Curtailment Overview

17 Free Template from www.brainybetty.com 17

Summary

• Under the current process those entities that purchase firm transmission service on a particular path are subject to the same pro-rata curtailments as those who did not purchase firm transmission service on the path when congestion occurs on a particular flowgate and both flows are contributing to the congestion.

• Two-Tier Curtailments provides a set of standards for addressing parallel flows in the Eastern Interconnection.

• If an entity does not cause parallel flows that contribute congestion on another system there are no additional requirements. (There would be no need/incentive to enter into Coordination Agreements.)

Page 18: Two-Tier Firm Curtailment Overview

18 Free Template from www.brainybetty.com 18

Questions

?