two thirds of the earths surface is water… the rest we can process!

14
Two thirds of the earth’s surface is water… The rest we can process! Two thirds of the earths surface is water… The rest we can process!

Upload: talib

Post on 22-Feb-2016

42 views

Category:

Documents


0 download

DESCRIPTION

Two thirds of the earths surface is water… The rest we can process!. MDM ENGINEERING IS…. A process engineering and project management company with a 22-year track record Staffed by skilled professionals with experience in some 16 countries Africa Focused - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process!

Two thirds of the earths surface is water…The rest we can process!

Page 2: Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process!

MDM ENGINEERING IS…

o A process engineering and project management company with a 22-year track record

o Staffed by skilled professionals with experience in some 16 countries

o Africa Focused

o Listed on the London Stock Exchange (AIM)

Page 3: Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process!

MDM’S COMMITMENT TO HEALTH & SAFETY

oTotal commitment to safety

o“ZERO TOLERANCE” to fatalities, LTI’s and recordable incidents

oManaging H,S & E is a critical business activity

o6,747,138 fatality free hours in 3 years

o5 lost time injuries in 3 years

Page 4: Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process!

WHAT WE’VE DONE

o The MDM team has over 22 years of operational experience and have been responsible for:

• 54 Bankable feasibility studies completed → Over 96% of BFS went on to receive third party financing

• Constructed 52 metallurgical plants→ All producing above design capacity

• Executed projects in 16 countries worldwide→ African focused

• Worked with a cross section of minerals

Page 5: Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process!

WHAT DO WE DO

o Project Evaluation through• Scoping Studies• Pre-Feasibility Studies• Bankable Feasibility Studies

o Design - Metallurgical process development and specialised process engineering and design of metallurgical plants

o Construction - Construction and commissioning of plants and associated infrastructure

o Project Management - Total Project Execution

Page 6: Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process!

o Manage medium to large size mining projects on an international basis

o Focused on• Gold• Uranium• Base Metals – including copper, nickel, zinc and tin• Ferro Metals – including manganese and ferrochrome• Platinum• Industrial Minerals• Coal• Diamonds

Page 7: Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process!

HOW WE DO ITo Interactive in-house design, costing and planning with client

input

o Focused on technical innovation, lateral thinking and attention to detail - creating economic value for our clients

o Maintain a close working relationship with clients

o Transparent and open book contracting (EPCM) with agreed:• Capital Cost• Contingencies • Fees• Cost-Plus Structure• Savings shared on an agreed basis

Page 8: Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process!

MDM – FAST TRACK APPROACHo MDM works closely with clients to develop schedules by:

• incorporating initial design phase period• starting construction whilst design continues – this will result in some minimal equipment changes due to a ‘fast track’ approach

o Built 200K TPM gold & 100TPM uranium plant in 23 months (including design) May 2007 – April 2009

o Built 650K & 1.3M TPM gold and uranium tailings retreatment plant in 21 months (including design) April 2008 – January 2010

Page 9: Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process!

EZULWINI PLANT – BEFORE & AFTER

The Beginning

Commissioned – 23 months

12 months

Page 10: Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process!

WHAT WE DO IT WITH - INTELLECTUAL CAPITAL

o Over 150 staff comprising:• Process• Design• Drawing Office• Project Management• Construction• Commissioning• Commercial

o 22 years of technical and financial database on past projects

Page 11: Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process!

PROJECT FOCUS – OVER LAST 3 YEARS

o Built 2.4M TPA gold planto Built 1.2M TPA uranium hard rock planto Built 650K TPM gold tailings treatment planto Built 1.3M TPM uranium tailings treatment plant

Flotation

Page 12: Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process!

FEASIBILITY STUDIES – OVER LAST 3 YEARS

o 2 copper and copper/cobalt studies (BFS & DFS)o 7 uranium studies (PFS & BFS/DFS)o 3 gold studies (BFS)o 2 manganese studies (PFS & BFS)o 2 coal studies (PFS & DFS)o 1 platinum study (BFS)

High grade material in core

Page 13: Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process!

WHY MDM ENGINEERING

o Significant experience and track record within team

o Lessons learnt in challenging logistical environments

o Team internationally recognisedfor well engineered and technically superior plants

o Sound financial position

o MDM Engineering will deliver on time and on budget

Page 14: Two thirds of the earths surface is water… The rest we can process!

Two thirds of the earth’s surface is water… The rest we can process!

Thank You

MDM staff induction artwork

The MDM team