Two New Bridges, One Project. The Louisville - Southern Indiana Ohio River Bridges Project (LSIORBP). 01-30-2014 Real Estate Economic Forecast. Area Map. The Bridges Project. Purpose and Need. Safety problems Traffic congestion Inefficient mobility Inadequate system linkage - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Two New Bridges, One Project

1

The Louisville - Southern Indiana Ohio River Bridges Project

(LSIORBP)

01-30-2014 Real Estate Economic Forecast

Two New Bridges, One Project

Page 2: Two New Bridges, One Project

2

Area Map

Two New Bridges, One Project

Page 3: Two New Bridges, One Project

3

The Bridges Project

Page 4: Two New Bridges, One Project

4

Bottom line: Improve cross-river mobility

• Safety problems• Traffic congestion• Inefficient mobility• Inadequate system

linkage• Planning consistency

Purpose and Need

Page 5: Two New Bridges, One Project

5

Downtown Crossing

Date (go to View, Header & Footer to edit) Two New Bridges, One Project

Page 6: Two New Bridges, One Project

6

Existing Kennedy Interchange

Page 7: Two New Bridges, One Project

7

Proposed Kennedy Interchange

Page 8: Two New Bridges, One Project

8

New I-65 Downtown Bridge

• Six lanes of NB I-65 traffic• Located East of the

Existing Kennedy Bridge• 99 Feet wide• 2,114 feet long with 3

towers• 71 feet above water

Page 9: Two New Bridges, One Project

9

• Deck ReconfigurationConvert to SB OnlyDeck Reconstruction•New SB Approach Spans

Sect

ion

2 –

Dow

ntow

n Br

idge

Existing JFK Bridge Rehab

Page 10: Two New Bridges, One Project

10

Downtown Crossing - Indiana

• Reconstructs I-65 to add additional lanes

• Reconstructs approaches to the Clark Memorial Bridge to permit more direct access to I-65

Two New Bridges, One Project

Page 11: Two New Bridges, One Project

11

East End Crossing 4B

• Kentucky Approach: reconstruction and new terrain road on KY 841

• Section 4A: from the southern limit of Section 4 to the northerly abutment of the proposed Harrods Creek/River Road bridge; this section includes the Drumanard Tunnel

• Section 4B: from the north end of Section 4A to the new East End Ohio River Bridge

4

4

A

B 4A

11

Page 12: Two New Bridges, One Project

12

East End Crossing

• East End Bridge: A new four-lane Ohio River bridge with a pedestrian walkway and bikeway, opening to traffic in late 2016(capable of being expanded to six lanes with only striping)

5

12

Page 13: Two New Bridges, One Project

13

East End Crossing

• Indiana Approach: Construction of a new roadway from the existing SR 265/SR62/Port Road Interchange to the new East End Bridge

New interchange at Salem Road

6

13

Page 14: Two New Bridges, One Project

14

Project Schedule

Downtown Crossing December 28, 2012 – Contract Awarded To WalshDecember 2016 – Construction Completion

East End CrossingDecember 27, 2012 – Commercial Close to the Walsh – Vinci – Bilfinger (WVB) TeamMarch 28, 2013 – Commercial CloseOctober 2016 – Construction Completion