twins residential presentation board
DESCRIPTION
The composition of graphics and perspectives on the delivery of the idea of the housing scheme, design and concept.TRANSCRIPT
ALTERNATIVE AFFORDABLE HOUSING BSC 07 HOUSING STUDIO DEPARTMENT OF ARCHITECTURE UITM SHAH ALAM ECO-RES DESIGN IDEAS COMPETITION 2011
TWINS RESIDENTIALAIDI AFFENDI BIN KUSIM . 2008215818
PUTRAJAYA HOLDINGSA PROPOSED HOUSING PROJECT FOR :
10,693 sqmPLOT AREA
PLOT GFA (MAX) 36,925.85 sqmPLOT RATIO3.45PARKING BAYS REQUIRED231 bays car
TOWER GFA10,800 sqm
MAXIMUM PLINTH AREA4775.99 sqm (44.66%)
MAXIMUM OPEN SPACE COVERAGE5917.01 sqm (55.34%)MINIMUM LANDSCAPE RESERVE40% open space
LANDUSE MIX50% commercial 50% residential
NO. OF RESIDENTIAL UNITS116
PLOT 3M4
PRECINT 3, PUTRAJAYA
SITE SETTINGTHE SITE IS STRATEGICALLY PLACED IN THE HEART OF PUTRAJAYA, PRECINT 3. IT IS AN ANCHOR POINT OF PUTRAJAYA DEVELOPMENT WHICH IS LOCATED AT THE CENTRE OF THE ISLAND. ‘CIVIC AND CULTURAL’ IS THE MAIN CHARACTERISTICS WHICH PRECINT 3 POTRAYS WITH THE DEVELOPMENT OF GOVERNMENT OFFICES WITHIN THE URBAN LAYOUT. EACH URBAN ENTITY HAS DISTINCT ARCHITECTURE CHARACTERISTIC AND CIVIC AURA. THE SITE IS LOCATED PARCEL 3M4 WHICH IS AT THE END OF PRECINT 3 AREA.
DILLEMAS AND POTENTIAL HYPHOTHESISPRECINT 3 HAS A HOMOGENOUS CHARACTERICTIC IN THE CONTEXT OF THE USERS. IT IS CAUSED BY THE ‘HO-MOGENOUS’ DEVELOPMENT WHICH CREATES LESS VIBRANT AND NON-LIVELY AREA. THE NEXT DEVELOPMENT SHOULD BECOME THE SUPPORTIVE URBAN FABRIC AND IT CAN EVEN BE THE MAIN URBAN ENTITY WHICH BRINGS VIBRANCY INTO PRECINT 3. THE SITE COULD BECOME THE URBAN BACKDROP WHICH FUNTIONALLY CONNECTED WITH THE EXISTING DEVELOPMENT. THE DISTINCT CHARACTERICTICS EXIST IN PRECINT 3 NEED TO BE MAINTAINED WITHOUT NEGLECTING CONTINUITY THROUGH OUT THE URBAN FABRIC.
THE HOUSING COMPLEX WILL CREATE A MULTI-FUNTIONAL CULTURAL EVENTS THAT WOULD BRING BACK THE DESIRED PUTRAJAYA LIFESTYLE. BEING IN THE MIDDLE OF PUTRAJAYA WILL BECOME THE CENTRALIZE AP-PROACH OF DIVERSE LIFESTYLES AND EVENTS FOR THE EXISTING AND FUTURE USERS IN PRECINT 3 AND FOR THE WHOLE PUTRAJAYA. IN THE LIVING COMPLEX, PEOPLE WHO LIVE IN THE COMMUNITY WILL ALSO GET THE OPPORTUNITY TO HAVE THE SAME EXCESS TO INDIVIDUALITY.
PRECINT 3
PARCEL 3M4 NEIGHBOURING PARCEL EXISTING PARKING GREEN NETWORKURBAN GRID SPORT FACILITIES ROAD NETWORKUNDERGROUND / UPPERGROUND MAIN AXIS
MAIN ACCESS ROUTE SERVICE ROUTE
URBAN NETWORK KEY PLANURBAN COMPONENTS PRECINT 3
PRIM
ARY R
OAD
ACCE
SSPEDESTRIAN ROUTE
PALA
CE O
F JUS
TICE 3M5
3M3
PRIM
ARY D
ROP-
OFF A
REA
SECO
NDAR
Y ROA
D AC
CESS
SECO
NDAR
Y DRO
P-OF
F ARE
A
SERVICE ROUTE
USERS
FUNTION AND PROGRAMES
ENERGY
TOURIST GOVERNMENT OFFICERS
RESIDENT PRIVATE OFFICERS
HOUSING UNIT STALL RESTAURANT PLAZA CLINIC PARKING CYCLING PATH
INJECTION
BOOKSTORE LIBRARY CONVENIANT STORE RETAILS LOITERING AREA DINING SHOPPING PRAYER ROOM PLAYGROUND SQUARE COURTYARD GREEN OFFICES
RAIN WATER HARVESTING
SOLAR ROOF PANEL
SOLAR WALL
UTILIZING UNUSED MATERIAL
CONSTRUCTION STRATEGYSITE PRECINT 3
LIMITATIONS
CHARACTERISTICS
DESIGN INTENTIONSA LIVELY AND MORE VIBRANT LIVING IN PRECINT 3
CONTINUITY IN CHARACTER AND IMAGE OF THE SITE
ENHANCE PERMEABILITY OF PEDESTRIAN MOVEMENT
ANCHOR POINT OF PRECINT 3 AND NEIGHBOURING PRECINT
ELIMINATE DEPENDENCY ON UNRENEWABLE ENERGY SOURCE
MAINTAINING INDIVIDUALISM WHILE INCREASING DENSITY OF INTERACTION WITHIN COMMUNITY
ENHANCE LIVING CULTURES AND EVENTS WITHIN HOMOGENOUS COMMUNITY
FUTURE
PRESENT
PARCEL 3M4
OPEN SPACE / URBAN POCKETS
GREEN POCKETS
VEHICULAR CIRCULATION
PEDESTRIAN CIRCULATION
EXISTING URBAN COMPONENTS
UNBUILT AREA
EXISTING CARPARKS
ALTERNATIVE AFFORDABLE HOUSING BSC 07 HOUSING STUDIO DEPARTMENT OF ARCHITECTURE UITM SHAH ALAM ECO-RES DESIGN IDEAS COMPETITION 2011
TWINS RESIDENTIALAIDI AFFENDI BIN KUSIM . 2008215818
PUTRAJAYA HOLDINGSA PROPOSED HOUSING PROJECT FOR :
3 MAIN PROGRAM GROUPS ARRANGED VERTICALLY
PARKINGCOMMERCIALHOUSING
PROGRAMS ARE TO BE PLACED ON SITE WITHIN SITE BOUNDARY
SEPERATED PROGRAMS ENSURE CLEAR FUNTIONAL CHARACTERISTICS OF SPACES
MAXIMUM VOLUME OF PROGRAMS ON SITE
PROGRAMS PLACED HORIZONTALLYIN RESPECT OF SKYLINE AND HEIGHT LIMITATION
VOLUMIZATION BASED ON FUNTIONS AND NEEDS ON SITE
PARKING ARE SUBMERGED UNDER-GROUND TO KEEP THE IMAGE OF FORMALITY ON SITE
COURTYARD FORM AS CONTINUITY OF PUTRAJAYA’S CHARACTERICTICS
SUBTRACTION TRANSFORMATIONTO CREATE MORE DYNAMIC FLOW IN PUBLIC CIRCULATION
FORM ARE PUSHED INWARDS TO CREATE SENSE OF WELCOME INTO THE SITE FROM NEIGHBOURING PARCELS
FRONTAL AND REAR APPROACH WITH WIDE OPEN SPACE
MULTIPLE PUNTURE ON THE GROUND LEVEL ENSURE HIGH DENSITY OF PEDESTRIAN MOVEMENT ON SITE
MULTI-LEVEL PUBLIC SPACE ATTACHED CREATES HIGHER DENSITY OF INTER-ACTION AMONG ALL USERSUSERSUSER
DESIGN APPROACH FORM DEVELOPMENT
HOUSING UNIT TYPOLOGY
+ =
+ =
+ =
+ =
+ =
+ =
+ =
+ =
+ =
+ =
+ =
+ =
CONCEPTTHE CONCEPT WAS TAKEN FROM THE IDEA OF CHILDREN’S WOODEN BLOCKS GAMES OR ALSO KNOWN AS JENGO, OTHER GAMES WHICH HAS THE SAME CONCEPT IS UNO STACKO. THE CONCEPT IS ABOUT INTERLOCKING IMAGES OF COMPONENTS. HOWEVER IT CREATES A SIMPLE GEOMETRY SHAPE OF RECTANGLE. THE HOUSING UNITS CONFIGURATION ARE VARIES IN ORDER TO CREATES HIGHER PERCENTAGE OF OPTIONS FOR THE BUYERS. IN ORDER TO MAXIMISE THE USAGE OF SPACE IN THE HOUSING BLOCK, THE INTERLOCKING UNITS FORMED A PERFECT
PARTITION SYSTEM
DISCOVERED IN 1914 IN SWEDEN : ADDING ALUMINUM POWDER +CEMENT, LIME, WATER,AND FINELY GROUND SAND CAUSED THE MIXTURE TO EXPAND DRAMATICALLY. “FOAMED” CONCRETE ARE TO BE HARDENED IN A MOLD, AND THEN CURED IT IN A PRESSURIZED STEAM CHAMBER--AN AUTOCLAVE. AUTOCLAVED AERATED CONCRETE (AAC, ALSO CALLED AUTOCLAVED CELLULAR CONCRETE--ACC) IS PRODUCED BY ABOUT 200 PLANTS IN 35 COUNTRIES AND IS USED EXTENSIVELY IN RESIDENTIAL, COMMERCIAL,AND INDUSTRIAL BUILDINGS. AT A DENSITY OF ROUGHLY ONE-FIFTH THAT OF CONVENTIONAL CONCRETE AND A COMPRESSIVE STRENGTH OF ABOUT ONE-TENTH, AAC IS USED IN PARTITION AND CURTAIN WALLS. THE MATERIAL IS ALSO FAIRLY FRIABLE AND MUST BE PROTECTED FROM WEATHER WITH STUCCO OR SIDING. ON THE POSITIVE SIDE, IT INSULATES MUCH BETTER THAN CONCRETE AND HAS VERY GOOD SOUND ABSORBING CHARACTERISTICS.
THE DOOR IS PRODUCED AND DE-SIGNED BY A COMPANY NAMED TRE PIÙ . IT IS A LEADING COMPANY IN THE DESIGN AND MANUFACTURE OF TOP QUALITY DOORS, SUPPORTED BY THE CONTINUOUS CREATIVE AND INNOVA-TIVE CONTRIBUTION OF RENOWNED NAMES IN ARCHITECTURE AND INDUS-TRIAL DESIGN. THE TRE PIÙ DOOR IS KNOWN FOR ITS HIGHLY ARCHITEC-TURAL QUALITY AND FORMAL ABILITY TO RE-DESIGN A SPACE. THE TRE PIÙ DOOR HAS BEEN CONCEIVED AND DE-SIGNED TO BECOME AN OBJECT WHOSE DISTINCTIVE AND ORIGINAL QUALITIES ENHANCE INTERIOR DESIGN.THE DOOR
AUTOCLAVED CELLULAR CONCRETE
POLYETHYLENE TEREPH-THALATE (PET) ROLLER
ULTRA-SLIM DOOR
AUTOCLAVED CELLULAR CONCRETE
WINDOW PANEL DETAILS
INITIALLY DEVELOPED FOR USE IN PUBLIC ART INSTALLATIONS, LIGHTBLOCKS ARE HIGH-STRENGTH, INTEGRAL-COLOR ACRYLIC AND POLYCARBONATE PANELS WHICH CAN BE USED IN INTERIOR AND EXTERIOR APPLICATIONS. LIGHTBLOCKS HAVE BEEN SHOWN TO WITHSTAND IMPACTS APPROXIMATELY THREE TIMES GREATER THAN LAMI-NATED SAFETY GLASS AND HAVE SIX TIMES GREATER IMPACT RESISTANCE THAN ORDINARY GLASS. MOREOVER, LIGHTBLOCKS ARE 50% LIGHTER THAN GLASS. LIGHTBLOCKS ARE AVAILABLE IN UNLIMITED TRANSLUCENT OR OPAQUE COLORS, AND HAVE BEEN PROVEN TO WITHSTAND WEATHER AND SUN EXPOSURE FOR LONGPERIODS WITHOUT ANY DETECTABLE DETERIORATION. THE MATERIAL CAN BE MOLDED, CURVED, SLUMPED, CUT, DRILLED, AND CARVED, AND SURFACES CAN BE SMOOTH, TEXTURED, GLOSSY OR MATTE.
PALE
COOL
BROW
N
PURE
MAG
ENTA
MEDI
UM CO
OL BR
OWN
DARK
MAG
ENTA
RED
LIGHT
VIOL
ET
PAST
EL CY
AN
PAST
EL YE
LLOW
PAST
EL G
REEN
PAST
EL BL
UE VI
OLET
LIGHT
WAR
M BR
OWN
BUYERS GET TO CHOOSE WINDO PANEL COLOUR BASED ON THEIR TASTE AND CHOICESLIGHTBLOCKS PANEL
UNIT : THU 1FLOOR AREA : 91 SQM / 980 SQFESTIMATED PRICE : RM 215,600
UNIT : THU 2FLOOR AREA : 104 SQM / 1120 SQFESTIMATED PRICE : RM 246,400
UNIT : THU 3FLOOR AREA : 104 SQM / 1120 SQFESTIMATED PRICE : RM 246,400
UNIT : THU 4FLOOR AREA : 104 SQM / 1120 SQFESTIMATED PRICE : RM 246,400
UNIT : THU 5FLOOR AREA : 104 M2 / 1120 SQFESTIMATED PRICE : RM 246,400
UNIT : THU 6FLOOR AREA : 104 SQM / 1120 SQFESTIMATED PRICE : RM 246,400
UNIT : THU 7FLOOR AREA : 78 SQM / 840 SQFESTIMATED PRICE : RM 184,800
UNIT : THU 8FLOOR AREA : 130 SQM / 1400 SQFESTIMATED PRICE : RM 308,000
UNIT : THU 9FLOOR AREA : 91 SQM / 980 SQFESTIMATED PRICE : RM 215,600.
UNIT : THU 10FLOOR AREA : 117 SQM / 1260 SQFESTIMATED PRICE : RM 277,200
UNIT : THU 11FLOOR AREA : 78 SQM / 840 SQFESTIMATED PRICE : RM 184,800
UNIT : THU 12FLOOR AREA : 130 SQM / 1400 SQFESTIMATED PRICE : RM 308,000
UNIT : THU 13FLOOR AREA : 91 SQM / 980 SQFESTIMATED PRICE : RM 215,600
UNIT : THU 14FLOOR AREA : 117 M2 / 1260 SQFESTIMATED PRICE : RM 277,200
UNIT : THU 15FLOOR AREA : 104 SQM / 1120 SQFESTIMATED PRICE : RM 246,400
UNIT : THU 16FLOOR AREA : 104 SQM / 1120 SQFESTIMATED PRICE : RM 246,400
UNIT : THU 17FLOOR AREA : 130 SQM / 1400 SQFESTIMATED PRICE : RM 308,00
UNIT : THU 18FLOOR AREA : 78 SQM / 840 SQFESTIMATED PRICE : RM 184,800
UNIT : THU 19FLOOR AREA : 104 SQM / 1120 SQFESTIMATED PRICE : RM 246,400
UNIT : THU 20FLOOR AREA : 104 SQM / 1120 SQFESTIMATED PRICE : RM 246,400
UNIT : THU 21FLOOR AREA : 104 SQM / 1120 SQFESTIMATED PRICE : RM 246,400
UNIT : THU 22FLOOR AREA : 104 SQM / 1120 SQFESTIMATED PRICE : RM 246,400
UNIT : THU 23FLOOR AREA : 52 SQM / 560 SQFESTIMATED PRICE : RM 123,200
UNIT : THU 24FLOOR AREA : 52 M2 / 560 SQFESTIMATED PRICE : RM 123,200
TYPOLOGY PLAN
SYMBOLIC AESTHETIC THE SYMBOLIC ADAPTATION OF THE SITE GEOMETRY IS APPLIED TO THE BALCONY DESIGN. SINCE THE HOUSING TYPOL-OGY UNITS WERE DESIGNBASED ON THE SQUARE GRID, THIS INJECTION OF DIFFERENT GEOMETRY FOR THE HOUSING UNIT WILL FURTHER ENHANCE THE UNIQUNESS AND AESTHETIC VALUE OF THE HOUSE AND ALSO THE WHOLE BUILDING FORM. IT ALSO BRINGS THE LOCAL LANGUAGE OF ARCHITECTURE INTO THE RESIDENTIAL DESIGN.
BALCONY DESIGN
EXISTING SITE BOUNDARY GEOMETRYAPPLICATION ON THE BALCONY DESIGN FORM
DIFFERENT DIMENSION OF BALCONY CREATES HIERARCHY IN SIZE AND LENGTH. THUS THIS WILL CREATE A MORE DYNAMIC ELEMENT ON BUILDING FORM.
CONTINUITY OF HORIZONTALITY IS APPLIED AND TAKEN FROM NEIGHBOURING BUILDINGS.
EXPERIENCE FROM NEIGHBOURING DESIGN IS BROUGHT INTO THE RESIDENTIAL AREA TO CREATE A DOMESTIC FEELINGS OF PUTRAJAYA.
USAGE OF PATTERN FOR FACADE IS IMMITATED WITH ADDITIONAL FUNTION OF PHOTOVOLTAIC CELL. THE PATTERN OF THE SUN SCREEN REFLECTS INTERNAL ARRANGMENTS OF HOUSING UNIT
DIFFERENT INLETS AND OUTLETS SIZES CREATE DIFFERENCE IN PRESSURE TO ENSURE EFFICIENT AND QUALITY FLOW OF NATURAL VENTILATION
FOLDABLE WINDOW WITH FULL OPENING
THE BALCONIES ACT AS A MULTIPURPOSE COMPONENTS, THEY ALSO BLOCK EXCESSIVE LIGHTS AND DECREASES THE HEAT INTENSITY FROM ENTERING THE UNITS
SKY GARDEN
SKY GARDEN
SMALL OPENING
GREEN ELEMENT IN THE SKY GARDEN PROMOTES A FRESHER AIR FLOW THROUGH OUT THE UNIT BY NATURAL VENTILATION AND ENHANCE THE INTERNAL ENVIRONMENT QUALITY
SKY GARDEN
BASIC
GRE
EN ST
RATE
RGIES
ALTERNATIVE AFFORDABLE HOUSING BSC 07 HOUSING STUDIO DEPARTMENT OF ARCHITECTURE UITM SHAH ALAM ECO-RES DESIGN IDEAS COMPETITION 2011
TWINS RESIDENTIALAIDI AFFENDI BIN KUSIM . 2008215818
PUTRAJAYA HOLDINGSA PROPOSED HOUSING PROJECT FOR :
+ =
TYPOLOGY PROGRAMMES PERSPECTIVE
BALC
ONY
WC /
SHOW
ER
SECO
NDAR
Y ROO
M
READ
ING
AREA
DINI
NG A
REA
KITC
HEN
LIVIN
G AR
EA
PRIM
ARY B
EDRO
OM
BALC
ONY
SECO
NDAR
Y ROO
M
LIVIN
G AR
EA
KITC
HEN DINI
NG A
REA
READ
ING
AREA
PRIM
ARY B
EDRO
OM
WC /
SHOW
ER
PRIVA
CY
CONCEPTUAL SECTION
HOUSING UNITS
HOUSING UNITS
HOUSING UNITS
HOUSING UNITS
HOUSING UNITS
HOUSING UNITS
RESIDENTIAL FACILITIES
COMMERCIAL
COMMERCIAL
COMMERCIAL
COMMERCIAL
HOUSING UNITS
HOUSING UNITS
HOUSING UNITS
HOUSING UNITS
HOUSING UNITS
HOUSING UNITS
RESIDENTIAL FACILITIES
COMMERCIAL
COMMERCIAL
COMMERCIAL
COMMERCIAL
BASEMENT PARKING 2
BASEMENT PARKING 1
GROUND FLOOR
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
FIFTH FLOOR
SIXTH FLOOR
SEVENTH FLOOR
EIGHTH FLOOR
NINTH FLOOR
TENTH FLOOR
SERVICES FLOOR
ROOF
UNDERGROUND CARPARK10,800 SQM27%
BASEMENT 1 : 150 CARPARKS, 4 LOADINGBAYS , STORAGE , GARBAGE COLLECTIONBASEMENT 2 : 135 CARPARKS, 4 DISABLED PARKING ,PARKING MANAG MENT OFFICE , MULTIPURPOSE STORAGE WATER TANK ,PUMP HOUSE, AHU ROOM, ELECTRICITY ROOM
MULTILEVEL BASEMENT CARPARK
GROUNDFLOOR1248 SQM3.1%
CAFES INFORMATION COUNTERRESTAURANTS KIOSKCOURTYARDSPUBLIC TOILETPARKING ACCESS
COMMERCIAL
FIRST FLOOR2028 SQM5.1%
RETAILS KIOSKPUBLIC TOILETS
COMMERCIAL
2231 SQM
SECOND FLOOR5.6%RETAILS KIOSKPUBLIC TOILETSOPEN PUBLIC SPACE
COMMERCIAL
THIRD FLOOR2028 SQM5.1%
RETAILSPUBLIC TOILETS
COMMERCIAL
FOURTH FLOOR2974 SQM7.4%
LIBRARYMULTIPURPOSE HALLMINI GYMPRAYERS ROOMLAUNDERETTEMANAGMENT OFFICE
PUBLIC FACILITIES
RESIDENTIAL BLOCK18,658 SQM46.7%
24 DIFFERENT HOUSING TYPOLOGY2 MAIN BLOCKS WITH 144 UNITSOPEN PUBLIC GARDEN
HOUSING
INDOOR LEISURE ROOMRESIDENTIAL SECURITY ROOMPUBLIC MEETING ROOMCOMPUTER ROOMCLINICDAYCARE CENTER
ALTERNATIVE AFFORDABLE HOUSING BSC 07 HOUSING STUDIO DEPARTMENT OF ARCHITECTURE UITM SHAH ALAM ECO-RES DESIGN IDEAS COMPETITION 2011
TWINS RESIDENTIALAIDI AFFENDI BIN KUSIM . 2008215818
PUTRAJAYA HOLDINGSA PROPOSED HOUSING PROJECT FOR :
TYPOLOGY FLEXIBILITY
ADDITIONAL MEMBER?
+
+
+
+
+
FLEXIBLE SPACE
SYSTEM
+
SINGLE
MARRIED
MARRIED WITH A CHILD
RETIRED MARRIED COUPLE
STUDENTS
COLLEAGUES
MARRIED + CHILDREN
MARRIED WITH A CHILD + MORE CHILDREN
RETIRED MARRIED COUPLE +A SON STAYING OVER (PERMANENTLY)
STUDENTS + MORE FRIENDS
COLLEAGUES + MORE FIRENDSUNITS ARE COMBINED TO FORM A COMPLETE RECTANGULAR SHAPE FORM OF MODULE. THIS MODULE CONSIST OF 2 UNITS EACH. THE SPACING SYSTEM ALLOWS THE MODIFICATION BETWEEN THESE TWO UNITS TO TRANSFORM INTO A BIGGER UNIT. THIS CONTRIBUTES INTO THE FLEXIBILITY FEATURES IN HOUSING SCHEME
INITIAL COMBINATION OF TWO UNITS IN ONE RECTANGULAR FRAME CONCRTE SYSTEM SEPARATED BY TWO LAYER (CAVITY) CONCRETE PAN-ELS FOR INSULATION AND SOUND PRIVACY. INDUSTRIALISED BUILDING SYSTEM ALLOWS MODIFICATION OF PRE-CAST COMPONENTS USED IN THIS BUILDING.
COMBINED UNITS CREATES OPPORTUNITY FOR FUTURE ADDITION OF FAMILY MEMBER AND FUTURE OCCUPANCY IN THE RESIDENTIAL UNITS.
ALL COMPONENTS ARE PRE-CASTED IN THE FACTORY TO ALLOW FAST CON-STRUCTION, THUS REDUCING CONSTRUCTION COST FOR THE DESIGN. IT ALSO GIVES AN ADVANTAGE OF FLEXIBLE SPACE CHANGES IN THE FUTURE.
USAGE OF PRE-CAST CONCRETE PARTITION FOR INTERNAL SPACE DIVISION ALLOWS HIGH FLEXIBILITY LEVEL FOR SPACE ADDITION AND DIVISION WITHIN THE UNIT.
THE DESIGN WILL ACHIEVE HIGH OCCUPANCY PERCENTAGE BY HAVING A FLEXIBLE SPACE MANAGMENT AND STRUCTURE.
PRECAST CONCRETE COLUMN
FOLDABLE GLASS WINDOW PANEL
PRECAST CONCRETE BEAM
PRE-FABRICATED OPEN WEB STEEL JOIST
PRECAST CONCRETE FLOOR PANEL
GLASS RAILINGCANTILEVERED PRE-FABRICATED OPEN WEB STEEL JOIST
PREFABRICATED WALL PANEL
PREFABRICATED CONCRETE BALCONY WITH STEEL FRAME GLASS RAILING
PREFABRICATED STEEL STAIRCASE
GLASS RAILING
VOIDS WITHIN BEAM STRUCTURE FOR SERVICES AND DUCTING
UNIT STRUCTURAL SYSTEM
CENTRALIZED CIRCULATION DISPERSION -2 MAIN LIFT AND STAIRCASE CORES
PRECAST COLUMN PLACED LINEARLY ACCORDING TO GRIDS
PRE-CAST SEMI-ENCLOSED LIFT STAIRCASE CORES WITH ADDITIONAL SPACE FOR DUCTING ,PLUMBING AND OTHER SERVICES DISTRIBUTION
SETS OF PRIMARY PRECAST BEAM INSTALLED TO CONNECT COLUMN AND DEFINING LEVELLING ON BLOCKS
ANOTHER SETS OF PRECAST BEAM INSTALLED TO CONNECTS COLUMN ROWS FORMING THE MAIN HORIZONTAL AND VERTICAL STRUCTURE
SECONDARY BEAM OF PRE-FABRICATED OPEN WEB STEEL JOIST CONNECTED TO PRIMARY BEAMS AND REFINE STRUCTURAL GRIDS FOR HOUSING UNITS
PRECAST CONCRETE FLOOR PANELS ARE PLACED BASED ON THE HOUSIING UNITS LAYOUT SUPPORTED BY THE PRE-FABRICATED OPEN WEB STEEL JOIST
WALL PANELS ARE ASSEMBLED AND CONNECTED WITH THE FLOOR ,PREFABRICATED FOLDABLE WINDOW PANELS ARE INSTALLED
SOLAR PANEL ROOF AND FACADE
STRUCTURAL STRATERGY
THE SOLARWALL SYSTEM IS BASED ON A METAL (ALUMINUM OR STEEL) CLADDING THAT IS INSTALLED ON THE WEST AND EAST-FACING WALL OF A BUILDING. THE SYSTEM OPERATES IN A VERY SIMPLE MANNER USING ECONOMICAL AND ENVIRONMENTALLY-BENIGN SOLAR ENERGY TO CREATE ELECTRICITY. AT NIGHT, A SOLARWALL ACTS TO REDUCE BUILDING HEAT LOSS. SOLARWALL PROVIDES SUMMER COOLING BY PREVENTING SOLAR RADIATION FROM STRIKING THE EAST AND WEST WALL OF A BUILDING. WARM AIR BETWEEN THE SOLARWALL AND THE BUILDING RISES AND IS VENTILATED THROUGH THE CLADDING. THIS REDUCES COOLING LOADS IN THE BUILDING. FRESH VENTILATION AIR IS DRAWN DIRECTLY INTO THE BUILDING VIA BYPASS DAMPERS.SOLARWALL HAS AN OPERATING EFFICIENCY OF UP TO 75% (RATED BY BOTH THE CANADIAN AND US GOVERNMENTS). THE COST OF A SOLARWALL SOLAR HEATING SYSTEM IN NEW CONSTRUC-TION IS USUALLY LESS THAN THE COST OF A BRICK WALL OR EVEN A METAL-CLAD WALL.
ENERGY STRATERGY
SOLAR PV TECHNOLOGIES
SOLARWALL SYSTEM
SOLAR PV TECHNOLOGIES : AS GLOBAL WARMING ACCELERATES AND OUR ENERGY DEMANDS CONTINUE TO RISE, WE HAVE TO ADOPT CLEANER, MORE SUSTAINABLE SOURCES OF ENERGY. SOLAR PV GENERATES ELECTRICITY DIRECTLY FROM LIGHT, WHATEVER THE WEATHER. IF EVERY SUITABLE ROOF HAD PV, WE COULD GENERATE 10,000 TIMES MORE ENERGY THAN THE WORLD CURRENTLY USES. ALL PV CELLS HAVE AT LEAST TWO LAYERS OF SUCH SEMICONDUCTORS: ONE THAT IS POSITIVELY CHARGED AND ONE THAT IS NEGATIVELY CHARGED. WHEN LIGHT SHINES ON THE SEMI-CONDUCTOR, THE ELECTRIC FIELD ACROSS THE JUNCTION BETWEEN THESE TWO LAYERS CAUSES ELECTRICITY TO FLOW - THE GREATER THE INTENSITY OF THE LIGHT, THE GREATER THE FLOW OF ELECTRICITY.
SOLAR WALL
STAIRCASES
LIFT CORE
SOLAR PV PANEL ROOF
AIR HANDLING UNIT / CHILLER
WATER TANK / STORAGE
RAIN WATER HARVESTING
RAIN WATER HARVESTING
RAIN WATER TRANSFERED TO UNDERGROUND WATER TANK
TO BE FILTERED AND LATER ON TO BE DISTRIBUTED.
ELECTRICAL ENERGY PRODUCED WILL BE USED . THIS COULD DECREASE ELECTRICAL CONSUMPTION OR BECOME
THE MAIN TOTAL SUPPLY BY CLEAN SOLAR ENERGY.
SOLAR ENERGY THROUGH OUT THE YAER ENSURE CONSISTENT ENERGY SUPPLY
NATURAL COOLING SYSTEM
CONTENTS: 85-95% POST-INDUSTRIAL DENIM SCRAPS, 5-15% SYNTHETIC FIBER TO ADD FLUFF, AND BORATES FOR PEST AND FLAME RESISTANCE.USE: THERMAL INSULATION - DENSER THAN STANDARD FIBER-GLASS AND KEEPS OUT MORE NOISE.BONUSES: NO ITCHINESS, NO TOXIC FUMES, DESPITE STARCHED COTTONY FEEL AND BORIC SMELL. REDUCES DENIM WASTE AND USES LESS ENERGY THAN FIBERGLASS PRODUC-TION. NICE SHADE OF BLUE. IT REPLACES THE CONVENTIONAL MATERIAL.ITS A DIFFERENT LOOKING INSULATION MATERIAL
NATURAL FIBER INSULATIONWALL PANEL NATURAL FIBER INSULATION
ELECTRICAL SUPPLY
LIGHTWEIGHT STEEL FRAME
MALAYSIA SUPPLIES 50 PERCENT OF THE WORLD’S PALM OIL. IN THIS COUNTRY, PALM TREES FLOURISH ON NEARLY EIGHT PERCENT OF THE LAND. IN ADDITION TO THE STRIPPED FRUIT STALKS, PALM LEAVES AND PARTS OF THE TREE TRUNK MAKE UP THE LARGE QUANTITIES OF WASTE LEFT BEHIND IN THE OIL PRODUCTION PROCESS. SCIENTISTS AT THE FRAUNHOFER INSTI-TUTE FOR WOOD RESEARCH, WILHELM KLAUDITZ INSTITUTE,WKI, HAVE BEEN COOPERATING WITH THE MALAYSIAN PALM OIL BOARD TO INVESTIGATE WAYS OF USING THIS VAST VOLUME OF FIBROUS WASTE = MEDIUM-DENSITY FIBERBOARD - MDF
PALM FIBERBOARDPALM FIBERBOARD
RIGHT ELEVATION
FRONT ELEVATION
ALTERNATIVE AFFORDABLE HOUSING BSC 07 HOUSING STUDIO DEPARTMENT OF ARCHITECTURE UITM SHAH ALAM ECO-RES DESIGN IDEAS COMPETITION 2011
TWINS RESIDENTIALAIDI AFFENDI BIN KUSIM . 2008215818
PUTRAJAYA HOLDINGSA PROPOSED HOUSING PROJECT FOR :
BASEMENT PARKING 2 BASEMENT PARKING 1134 PARKING BAYS150 PARKING BAYS
GROUND FLOOR PLANCOMMERCIAL LEVEL17 UNITS OF RESTAURANTS /CAFE
FIRST FLOOR PLANCOMMERCIAL LEVEL22 UNITS OF RETAILS
SECOND FLOOR PLANCOMMERCIAL LEVEL22 UNITS OF RETAILS
2 METER
2 METER
THIRD FLOOR PLAN FOURTH FLOOR PLANCOMMERCIAL LEVEL FACILITIES LEVEL22 UNITS OF RETAILS
SURAU. LAUNDERETTE, 1MALAYSIA CLINIC, DANCING/MULTIPURPOSE ROOM, INDOOR LEISURE ROOM, GYMNASIUM, DAYCARE CENTRE, MANAGMENT OFFICE, MULTIPURPOSE HALL, RESIDENTIAL SECURITY ROOM, PUBLIC MEETING ROOM, LIBRARY AND COMPUTER ROOM
2 METER
2 METER
FIFTH FLOOR PLAN SIXTH FLOOR PLANHOUSING LEVEL HOUSING LEVEL(SEVENTH FLOOR, NINTH FLOOR) (EIGHTH FLOOR, TENTH FLOOR)
2 METER
2 METER
TWINS RESIDENTIALCOST ESTIMATION AND CALCULATIONHOUSING TYPOLOGY FLOOR AREA SQM NUMBER OF UNIT TOTAL FLOOR AREA SQM
91 6 546THU 1104 6 624THU 2104 6 624THU 3104 6 624THU 4104 6 624THU 5104 6 624THU 678 6 468THU 7130 6 780THU 891 6 546THU 9117 6 702THU 1078 6 468THU 11130 6 780THU 1291 6 546THU 13117 6 702THU 14104 6 624THU 15104 6 624THU 16130 6 780THU 17
104 6 624THU 19104 6 624THU 20104 6 624THU 21104 6 624THU 2252 6 312THU 2352 6 312THU 24
78 6 624THU 18
16,302
39 15 585TCU 178 63 4914TCU 2117 5 585TCU 313 26 338TBCU
6,422
COMM. TYPOLOGY FLOOR AREA SQM NUMBER OF UNIT TOTAL FLOOR AREA SQM
2,288-FACILITIES FLOOR AREA SQM NUMBER OF UNIT TOTAL FLOOR AREA SQM
2,28812
16,302RESIDENTIAL UNIT 6,422COMMERCIAL UNIT+25,012 sqm=
2,288FACILITIES UNIT+
GCA : 30% OF TFA
25,012 sqm
= 30% X= 7,504 sqmGCA + GFA = 7,504 sqm+= 32,156 sqm
FUNCTIONAL AREA = 25,012 sqm X RM 2200= RM 55, 026, 400
CIRCULATION AREA = 7,504 sqm X RM 500= RM 3, 752, 00
25,012 sqm
RM 55, 026, 400 RM 3, 752, 00
30% GROSS PROFIT
INITIAL COST = +RM60, 128, 400=
RM 60, 128, 400= 30% X= RM 18, 038, 520
TOTAL ESTIMATED COST
5 % CONSULTANCY RM 60, 128, 400= 5% X
SERVICES/ LIFT CORE = 6 CORES X RM 225,000= RM 1, 350, 000
RM 1, 350, 000+
= RM 3, 006, 420= RM 81, 173, 340
TWINS RESIDENTIAL IS AN INTERPRETATION OF IMAGINARY AXES HIDDEN WITHIN THE URBAN STRETCH OF PRECINT 3, PUTRAJAYA. A SIMPLE CONTINUATION OF AXES CONNECTING ALL THE MINOR AXES SPINE TO CREATE BALANCE BETWEEN EXISTING ARCHITEC-TURE AND SURROUNDING. THE CONTINUATION OF AXES GROWS ALONG THE DEVELOPMENT OF PROGRAMMES AND NEEDS IN ORDER TO STAND WITH DISTINCT PERSONAL IMAGE WITHOUT NEGLECTING THE EXISTING CHARACTERISTICS OF THE SITE. THE CONCEPT OF BLENDING WITHOUT REPEATING HAPPENS WITH THE GUIDANCE OF THE AXES AS ELEMANTARY MEANS OF ORGANIZING THE SPACES AND FORM. TWINS RESIDENTIAL BECOMES THE URBAN BACKDROP OF PRECINT 3 WHICH COMPLEMENTING OTHER EXIST-ING URBAN COMPONENTS LIES WITHIN THE URBAN FABRIC
AXIAL DUPLICATIONA PHILOSOPHICAL DESIGN INTERPRETATION AND THOUGHTS