TW@ESI 4 th September 2016 Hope all of you had a good weekend The following is a record of what was done during the past week and a forecast of the next week.....

Upload: simon-abela

Post on 20-Feb-2017

99 views

Category:

Business


0 download

TRANSCRIPT

Page 1: TW@ESI 4th September 2016

TW@ESI4th September 2016

Hope all of you had a good weekend

The following is a record of what was done during the past week and a forecast of the next week.....

Page 2: TW@ESI 4th September 2016

A General Note before we start- New premisesThe new premises.... The offices are looking really nice and Crisp now!! Thanks to all for you efforts.. It is now up to all of us to take care of our new offices and respect the huge investment done by our director. A bit more to do including list below- lets make an effort and conclude:a) Air Conditioning controls with JACEb) Re installation of all wall mounted items in tech area.

This area has been made a show case and it is to reflect organisation and technology

c) Automation system integrated with lighting and the other systems installed

Page 3: TW@ESI 4th September 2016

A General Note before we start- Some General Notes• Hope our new employee Romina Buttigieg has had a good first week and I am sure we will all help to bring her up to speed with all our procedures and make her transition to the company a smooth one•Dalma Eszenyi has finished her internship with ESI which was a very positive one for all parties- we wish her luck on her future •Last week I gave you last years company objectives and their status- I would like some of your feedback to compile ESI’s objectives for next year- I ask all to stop and reflect about these objectives

Page 4: TW@ESI 4th September 2016

Projects and deadlines• 15_044_Hilton_Restaurant_Kitchen_AHU and

15_034_Hilton_Calorifier_Monitoring. We are targeting to complete in the next weeks

• 15_008 - Aurobindo PH02 BMS- This is now nearly done and I estimate it will be ready shortly- most of the works pending are now due to others

• 12_027- Parliament – we have handed over the Intruder- prosit CCI/JPO and SAI... We need to now update Maxpro, integrate ProWatch and conclude all documentation

• 14_069- Q019 AS410 – we are currently working on requests for information from the client

• 14_069- Q021_TF4- We are about to finish the panel design to allow us to go to panel construction now

Page 5: TW@ESI 4th September 2016

Projects and deadlines• 13_070- SCM Lagoona Plant room We need to conclude all pending

installation works – we will also try to finish the programming but commissioning will be on hold till the client asks us to continue

• 15_038_new_HA_Ovt and 15_026_Apap Residence are two home automation projects scheduled for Q1 2017 – we have nearly completed panel design and it is now down to panel build (for Apap we are working on the second DDC/Lighting panel)

• 16_023_GGY- is another home automation project which is on a much faster track- the lighting will have to be commissioned in September 2016

• 14_083_Intercontinental – We have started works to start up the plant and start commissioning here- software development has also now advanced on this project. We will also start design work on the second Pool Panel

Page 6: TW@ESI 4th September 2016

DesignLast week• Various as built updates etc• City Gate DAC as built feedback (LVA sketches)• Completed Life Sciences Panel Drawings additional as built

feedback from CCi• Apap Residence – LTG-G Panel Design handover for Panel Build• OTM – 5DP02-EXT – completed Rittal Parts list & sent &

Received Rittal quote• OTM – 5DP02-EXT – completed MF Parts list & awaiting quote• OTM – SAS000768 – completed labels for CFH• GGY – IT rack issue – asked Rittal for quote, now DSH & CCI to

confirm new dimensions on site before we order IT Rack

Page 7: TW@ESI 4th September 2016

DesignNext Week:• City Gate - continue on DAC as built feedback (LVA

sketches)• City Gate – meet Stefan for his as built feedback• Site visits with DSH• General TBR Exercise re: Panel Quoting (1-2 days

approx)• Sliema Graham Apts – BMS Enclosures panel sizing• Apap – release DDC-1 for Panel Build • RSM Dali – Kick-off with SAA DSH & CCI

Page 8: TW@ESI 4th September 2016

InstallationThis past week: • Building test rigs in tech room• Completed test rig building in tech room• Installation testing at Aurobindo• Changed coldroom TT sensors at Hilton• Maintenance works at officesNext week: • Installation testing at Aurobindo• Fix frames at offices• Maintenance works at offices

Page 9: TW@ESI 4th September 2016

Panel Build

Next panels planned are fora) OVT panelsb) OTM Panels TF4c) FM Environmental Panel

Page 10: TW@ESI 4th September 2016

Mater DeiThe team at Mater Dei is going through some though changes with the

resignation of Simon Florian and most recently of Michael Abdilla.

The whole team at MDH have to dig deep and work as a team until we find the required replacements for these team members. If any of you out there know of people who can join the MDH team as technicians/electricians, we presently have two vacancies to fill- please give them my contacts so that they may apply!!

Page 11: TW@ESI 4th September 2016

Development and Commissioning• Parliament project - NEXT IS TO TACKLE SNAGS ON

PARLIAMENT so as to close off the whole job • The last issues on the DAC for SCM PH2- IT IS NOW A

PRORITY AND WE NEED TO GET COMPLETION CERTIFICATION

• 12_043_Life Sciences – we need to call for an inspection of snags to close everything down- we also need to start scripting on the tenant building module

• SCM PH2 needs also some attention on the tagging purchase order for the BMS- CVA is to work on this

• The Bosch HSDK interface is well advanced and we have documented and we should shortly be expecting to go overseas to commission

Page 12: TW@ESI 4th September 2016

Development and Commissioning• OTM on going works and some large orders (AS410 upgrade and

TF4 )• Oncology 14_066- We have done most of the work here and are

waiting from Panta on this• Aurobindo We are very nearly done here and expect to conclude

shortly. • 14_081_Siggiewi School- Lets move on concluding issues related

to Data acquisition and analysis.... We need good data to prove our systems- CCI has done a plan- stick to it- I need feedback from CCI as to where we are on this

• 16_011_Intruder_UOM- Some snags pending here which need to be addressed

• 13_031_CCA- still issues with values on ILPS!!

Page 13: TW@ESI 4th September 2016

Sales and Business DevelopmentWe have been working on a quote for Actavis ,

offer for Oil Tanking Malta (supply only of field devices) and an offer for RSM offices - security

We have won two jobs this week16_015 RSM new offices Lighting controls

..... And our largest order this year so far is now very very close !!

Page 14: TW@ESI 4th September 2016

Data, data and more data• We have a lot of projects which are giving us a lot

of data and I would like to start telling “stories” by data

• I have received feedback required and will now be normalizing this data to make it presentable and analyse it

• Margarita and Simeon are helping me out and soon I will be presenting our findings

Page 15: TW@ESI 4th September 2016

Birthday wishes go to

Manuel Camilleri – 6th September 2016

Page 16: TW@ESI 4th September 2016

Team ESI• I urge you all to follow this blog and keep up to date with

what is happening at ESI • I await all your feedback on all the ESI discussions –

without this feedback – this group will not be alive and fruitful- so take time off from your busy agendas, read what we have and participate and comment

• Please urge and assist all you colleagues to have a linkedin profile and join this discussion group

• Share your thoughts and participate actively on this blog- make this YOUR blog- your comments on this blog are always welcome and eagerly awaited for

Page 17: TW@ESI 4th September 2016

Team ESI

• Lets all work to get the work done on time, on budget and to the required quality

• We need to communicate, pull the rope in the same direction to make our projects a success and profitable