A General Note before we start- Some General Notes•Margarita, Simeon and Martin have finished their internship with us. We wish them luck and hope they have learnt from their experience with ESI •Re company objectives – During the last few weeks/months, I have been asking people to give me ideas for our company objectives. I have now come up with a list of possible objectives which I would like all of you to score by taking this survey on the link below. 9 of you have taken this survey (which is good .... Would love to have some more responses till end of month)
A General Note before we start-•Next Friday 30th September 2016, we will be organising an end of summer BBQ at ESI premises from 1500hrs onwards. Partners, husbands, wives, children are welcome to join in the fun. Can you please advise MPA who will be attending by 27/9/2016.•On 30th September , I am starting a campaign on close out project meetings (I have invited the concerned people to this meeting) – I need everyone to give their input for these meetings- we will start by the projects
•16_011 University of Malta Intruder alarm for the Gateway Building•16_017 BMIT Controlled access through fire door at SCM •12_027_Parliament Intruder alarm system
Projects and deadlines• 15_044_Hilton_Restaurant_Kitchen_AHU and
15_034_Hilton_Calorifier_Monitoring. We are targeting to complete in the next weeks
• 15_008 - Aurobindo PH02 BMS- We need to make a big effort to close off what is pending – especially the KNX interface
• 12_027- Parliament –We need to now update Maxpro, integrate ProWatch and conclude all documentation
• 14_069- Q019 AS410 – we are currently working on requests for information from the client
• 14_069- Q021_TF4- We are working on the panel design to allow us to go to panel construction
Projects and deadlines• 13_070- SCM Lagoona Plant room We need to conclude all pending
installation works – we will also try to finish the programming but commissioning will be on hold till the client asks us to continue
• 15_038_new_HA_Ovt and 15_026_Apap Residence are two home automation projects scheduled for Q1 2017 – we have nearly completed panel design and it is now down to panel build (for Apap we are working on the second DDC/Lighting panel)
• 16_023_GGY- is another home automation project which is on a much faster track- the lighting will have to be commissioned in September 2016- we have fixed the panel on site and will now terminate and commission it
• 14_083_Intercontinental – We have started works to start up the plant and start commissioning here- software development has also now advanced on this project. We have also started design work on the second Pool Panel
DesignLast week• Intruder Panels templates (conclude &
Distribute)• OTM – Released OTM Q021 MF Parts & Green
Plugs• Intercontinental Pool Panel – (prepared Points
List, P&IDs)• OTM – Q021 5DP02-EXT – Started Panel Design
80% complete
DesignNext Week:• Intercontinental Pool Panel – draught P&IDs &
Panel Drawings• OTM – Q021 5DP02-EXT – Conclude & Submit
Panel Design• Intercontinental Pool Panel – Sketch Panel
Design for Draughting• Intercontinental Pool Panel – Request Material
quote & release accordingly• Nestle – Dimensions & Labels printing
InstallationThis past week: • Started Terminations on field devices at GGY• Assisted Claudio at Aurobindo• Panel modifications at OTMNext week: • Maintenance works at offices• Third fix at GGY• OTM panel modifications• Assisting Claudio at Aurobindo• Fix additional frames at offices
Panel BuildThe following is our plan for a busy Panel build
Target panel build Completion Date
Ovt Residence Portomaso One DDC panel 28-Sep-16Nestle Showroom Small wall mounted panel 4-Oct-16Intercontinental HVAC Panel Wall mounted panel 12-Oct-16OTM Additions 2 door panel floor mounted 25-Oct-16FM Env Control Panels 1 panel 28-Oct-16RSM DALI 4 lighting control panels 11-Nov-16Graham Sliema Apts Blk 4 DDC panels and 4 DAC panels 23-Nov-16
Project name
Mater DeiThe team at Mater Dei is going through some though changes with the
resignation of Simon Florian and most recently of Michael Abdilla.
The whole team at MDH have to dig deep and work as a team until we find the required replacements for these team members. If any of you out there know of people who can join the MDH team as technicians/electricians, we presently have two vacancies to fill- please give them my contacts so that they may apply!!
Development and Commissioning• Parliament project - NEXT IS TO TACKLE SNAGS ON
PARLIAMENT so as to close off the whole job and also tackle all the commissioning documentation
• The last issues on the DAC for SCM PH2- IT IS NOW A PRORITY AND WE NEED TO GET COMPLETION CERTIFICATION
• 12_043_Life Sciences – we need to call for an inspection of snags to close everything down- we also need to start scripting on the tenant building module
• SCM PH2 needs also some attention on the tagging purchase order for the BMS- CVA is to work on this
• The Bosch HSDK interface is well advanced and we have documented and we should shortly be expecting to go overseas to commission
Development and Commissioning• OTM on going works and some large orders
(AS410 upgrade and TF4 )• Aurobindo We are very nearly done here and
expect to conclude shortly. • 14_081_Siggiewi School- Lets move on
concluding issues related to Data acquisition and analysis.... We need good data to prove our systems- CCI has done a plan- stick to it- I need feedback from CCI as to where we are on this
• 13_031_CCA- still issues with values on ILPS!!
Sales and Business DevelopmentWe have been working on a quote for Actavis ,
offers for Qatar (lighting controls), Home automation and an offer for water front hotel
Birthday wishes go to
Claudio Vella – 29th September 2016
Team ESI• I urge you all to follow this blog and keep up to date with
what is happening at ESI • I await all your feedback on all the ESI discussions –
without this feedback – this group will not be alive and fruitful- so take time off from your busy agendas, read what we have and participate and comment
• Please urge and assist all you colleagues to have a linkedin profile and join this discussion group
• Share your thoughts and participate actively on this blog- make this YOUR blog- your comments on this blog are always welcome and eagerly awaited for
Team ESI
• Lets all work to get the work done on time, on budget and to the required quality
• We need to communicate, pull the rope in the same direction to make our projects a success and profitable