TW@ESI 14 th February 2015 Hope that you and all your families had a good weekend The following is a forecast of the next week

Upload: simon-abela

Post on 20-Feb-2017

104 views

Category:

Business


0 download

TRANSCRIPT

Page 1: TW@ESI 14th February 2015

TW@ESI14th February 2015Hope that you and all your families had a good weekend

The following is a forecast of the next week

Page 2: TW@ESI 14th February 2015

Projects and deadlines

• We are presently executing a number of fast track projects and I would like to summarise the major ones them as follows:– 12_043_Life_Sciences- We have done good progress and we

need to close off whatever is pending– 13_076 - MDH Block D Ext MAU- We have done most of

our functional tests and will now start importing onto the Master station

– 14_081 - Siggiewi Primary School BMS- We have completed nearly all snags here... Its now a matter of training, handover, witness commissioning and documentation...

Page 3: TW@ESI 14th February 2015

Projects and deadlines– 15_033_Westin_7-AHU- The plan is to commission within Feb 2016

(this delay is due to the fact that we have a delay in carrying out the installation due to Hotel operations). Next installation phase is now cable pulling... We need to set a target to complete by 20th February 2016.

– 13_070_SCM Lagoona_Pump room- We have pulled most cables and need to now start terminations on site... This, too, is going to become a hot project.

– 14_089_MGA_DAC_PA_Va and 14_027_SCM_FTIS- DAC – This is now nearly all wrapped up- excluding snags by others

– 15_008 - Aurobindo PH02 BMS- The project has been delayed by the contractor – so my message is to press on doing software until the contractor starts meeting the deadlines- we soon will have to continue on this project

Page 4: TW@ESI 14th February 2015

DesignLast week• Hilton Restaurant & Kitchen AHUs – continue on P&IDs,

Points List, Panel Drawings• Hilton Calorifiers create new P&IDNext Week• Re-do Sterling MCC-2 corrupted Panel Drawing• Next door showroom Electrical Drawings for Enemalta

Permit• Hilton Restaurant & Kitchen AHUs – continue on P&IDs,

Points List, Panel Drawings• Hilton Calorifiers create new P&ID

Page 5: TW@ESI 14th February 2015

Installation• Last Week

– Testing at Carlos Calamatta residence– Third fix at ESI new premises– Westin cable tray – about 95% complete– Commissioning at Life sciences– Repaired camera in the garage. All CCTV cameras at ESI offices are back to

normal• Next week

– Continue works at ESI new premises and offices– Commissioning at Life sciences– Finish cable tray and cable pulling at Westin– Sterling PPM– Continue terminations at Smart City Lagoon– Complete 3rd Fix at ESI new premises and apply for meter

Page 6: TW@ESI 14th February 2015

Panel Build• Intercontinental Panel to be completed

Page 7: TW@ESI 14th February 2015

Mater Dei

• We have some extremely good news here- we have signed off a new 7 year contract with MDH. This is an extremely important contract for ESI and we have won it with everyones hard work.

• Things are coming back to normal with the MDH operation and maintenance tasks- I expect all of you to pull the rope and get things normal and in line- it would be good to start getting feedback of what was done during the week and what is planned for the next from MDH

Page 8: TW@ESI 14th February 2015

Development and Commissioning• We have done large important steps on finishing off the Parliament we

need to get the documentation out of the way too to avoid us going time and time again on site- IT IS NOW A PRORITY AND WE NEED TO GET A COMPLETION CERTIFICATION- LVA is to come up with a plan- this plan is now very much needed

• The last issues on the DAC for SCM PH2- IT IS NOW A PRORITY AND WE NEED TO GET COMPLETION CERTIFICATION

• SCM PH2 needs also some attention on the tagging purchase order for the BMS- CVA is to work on this

• The Bosch HSDK interface is well advanced and we awaiting the client• The PLC/SCADA team have been working on the FUN Tests of MAU• We have also been addressing a number of issues for TSP Two Man

rule

Page 9: TW@ESI 14th February 2015

Development and Commissioning• Commissioning of Life Sciences 12_043- we have done a lot but

still have a bit to do- we need to complete by Feb 2016• OTM urgent jobs and snags were also done in the last weeks• Another project that needs attention is CCA Villa ... There are still

some snags to be addressed – Wall mounted controller on wall• Oncology 14_066- We have done most of the work here and are

waiting from Panta on this• The Siggiewi Primary school project – we need to close off – the

quicker the better!!• Aurobindo we are proceeding with sofware development and we

have done quite some progress • Hilton small projects –calorifier monitoring

Page 10: TW@ESI 14th February 2015

Sales and Business Development

• We have been working on Home automation offerings and quotes for OTM (some of which are quite large) and quotes for variations for existing projects.

• During the last week Trevor and John were in Holland on the ISE fair and meeting other potential HSDK clients

Page 11: TW@ESI 14th February 2015

• Many thanks to the people who have contributed already... I will shortly put out a summary of what was collected... Am giving myself a target of end of Feb 2016

Page 12: TW@ESI 14th February 2015

Team ESI• I urge you all to follow this blog and keep up to date with what is

happening at ESI • I await all your feedback on all the ESI discussions – without this

feedback – this group will not be alive and fruitful- so take time off from your busy agendas, read what we have and participate and comment

• Please urge and assist all you colleagues to have a linkedin profile and join this discussion group

• Share your thoughts and participate actively on this blog- make this YOUR blog- your comments on this blog are always welcome and eagerly awaited for

• Send me pictures of all your work and what you are up to , so that I may create some videos on this blog- Julian, Claudio, Clifton, Silvio, David and Clinton.... Well done!!

Page 13: TW@ESI 14th February 2015

Team ESI

• Lets all work to get the work done on time, on budget and to the required quality

• We need to communicate, pull the rope in the same direction to make our projects a success and profitable

• Have a good week