Greetings from Chiang Mai Hope all of you had a good weekend
The following is a record of what was done during the last working week and a forecast of the Next week.....
Initial Points
Projects and Deadlines
Design
Installation Panel Build
Mater Dei Hospital PPM
Business Development
Karolina Szczypka will be on leave from 13/2 to 17/2 .. Happy holidays
Some Points Before Starting
Also note that Shridar will be on long leave from 17 Feb 2017 to 20th
March
Projects and Deadlines
16_041_RSM_Security
We need to close off here – the sooner the better
SAI/CCI please give me a list of works which are pending by others and a date by when we will finish
16_025_DeLaRue_OFX
Training by overseas specialists was delivered and we now await client to install hardware in machines so as for us to commission
14_069_OTM Additions
Q019 AS410 – We are proceeding with works here in conjunction with Gruppo Sett in Italy- our high level target is to change over in May/June 2017
Q021_TF4- Panel is on site and installed- we have powered up the panel and started connecting and powering up MOVs
16_007_LeMeridien
We have started working on phase 1 panels – phase 1 which has to be completed by Feb 2017-
We have so far done 2 panels – we need to do 5 by end of Feb 2017- so we are a little behind here
16_058_Methode
Another fast tack project Jace Based AHU control system here –Panel design is completed
Panel build is to be completed by 17/2. Installation to commence with cable pulling by Sub contractors – for this project , in my absence, I will need Dennis/Clifton and Claudio to take over and ensure we deliver on time
Projects and Deadlines
16_023_GGY
We have some snags pending (Savant with Android TV, integration with Acs, under floor heating functionality) - we also have to transfer the old GGY system to the new platform
15_011- Sliema apartments
We have done most terminations and panel build is completed too. We are trying to finalise the installation and then testing and commissioning would be next... The completion date here is for March 2017
15_023_FM panels
D20 ASRD being built by sub contractor and scheduled for 9th March 2017
D05 M 110 – scheduled for 1st May 2017
D20 ASRD 690 is presently in quotation stage
14_083_Interconti
We have commissioned the system with snags - we will return to site when snags are done by others-
we also have to deliver the pool panel
15_038_new_HA_Ovt and 15_026_Apap
Residence
These two home automation projects are now urgent- we need to complete all installation
We also need to start working of the software development- they are urgent and we have to perform
Projects and Deadlines
12_043_LSP
We have an important and urgent snag to be rectified ASAP – treating the rust on enclosures
There are some points on the tenant billing application which we are tackling
13_031_CCA
We have a number of snags here , which are to be put to bed once and for all!!
The snags are centred around the AC controls and the NUOO CCTV system
14_08_Siggiewi School-
We have made a commitment to do training1. Training/ Data gathering and back up / Preventative maintenance on hardware /Transfer of server to SHE set up at MITA/Reactive maintenance/emergency call outs/Fine tuning / re commissioning of louvers
13_070- SCM Lagoona Plant room
We need to conclude all pending installation works – we will also try to finish the programming but commissioning will be on hold till the client asks us to continue
13_075_Bosch_ProWatch_Genetec_Interface
The Bosch HSDK interface is well advanced and we have documented and we should shortly be expecting to go overseas to commission
Projects and Deadlines
12_025_SCM PH2
The last issues on the DAC for SCM PH2- IT IS NOW A PRORITY AND WE NEED TO GET COMPLETION CERTIFICATION- SCM PH2 needs also some attention on the tagging purchase order for the BMS- CVA is to work on this
01 02 03 04
DesignFor the Past week we have been working on the following
OVT – completed Intruder Panel Drawing
AAP – completed LTG-G Panel Drawing As built udpateAAP – started implementation of Additions (to be continued after CFH leave)
FM Env – D20-ASRD – completed Design, including numerous updates from clientFM Env – D5M-110 - completed Design, including numerous updates from client
Design
OTM – Q020 Netherlocks – Completed & submitted TF3_NVC_004OTM – Q020 Netherlocks – Started TF3_NVC_002
01 02 03 04
DesignAnd next week… we will work on
OTM – Q020 Netherlocks – complete & submit TF3_NVC_002OTM – Q020 Netherlocks – switch to BH1_NVC_001
Preparation design works for new project
Design
This is what the Installation team have been working on last week
Testing of IO.s on 5DP02 at OTM
Continued with works at OVT
Connected out goers on 5DP02 at OTM
Installation
Started Data terminations at OVT
….. And this is what is planned for next week
commissioning at RSM
Continue with works at OVT penthouseComplete data at OVT
Installation
Additional DALI Sensors at RSM
Next week we will • 16_058_Methode- We need to complete this by 17/2-
come what may• FM Env D20-ASRD – This will be built by a sub contractor as
soon as we get the parts
Panel Build
Panel Build
Week 07PPMYearly Field devices checks, IR images & coordinated tests Feb-- D11-CC2, D12-CC1, F02-CC1, F05-CC1, F05-CC4, F05-CC5
Quarterly panel checks Feb -- D00-CC1, D01-CC1, DP1-CC1, D02-CC1, DP2-CC1, D04-CC1, DP3-CC1, D04-CC2, D04-CC3, DO5-CC1, D05-CC2, D06-CC1, DP4-CC1, D06-CC2, D06-CC3D07-CC1, D07-CC2, D08-CC1, DP5-CC1, D08-CC2, D08-CC3, D09-CC1, D09-CC2, D10-CC1, D10-CC2, D10-CC3, DP6-CC1, D11-CC1, D11-CC2,D12-CC1
Weekly update of antivirus on all BMS stations
Mater Dei Maintenance
ReactiveHandling of reactive work orders OthersParticipating in weekly fire drillsTraining of new team memberWO- 116184572 (Q131)To supply and replace existing control gear for F2-CHW1-P2 with a new simocode and sirus soft starter
Mater Dei Maintenance
Sterling Chemicals Line 2 PLC system – This is now a contract –
Well done to all!!
lighting control systems in Qatar
Quote for Fire alarm
Building automation in a private clinic
16_040_Playmobil_Factory_Ext_BMS- This is now finally a contract too!! Well
done to all !!These are the quotes the business development
team have been working on
Business Development
\
HAPPY BIRTHDAYKAROLINA SZCZYPKA FEBRUARY 16
Some Last Thoughts
As can be seen we have now won 2 major projects and we are also aiming to get new people on board.... I cannot stress more the importance of trying to work together and respect each other- It is the only we we can be successful!!!
I await all your feedback on all the ESI discussions – without this feedback – this group will not be alive and fruitful- so take time off from your busy agendas, read what we have and participate and comment
Share your thoughts and participate actively on this blog- make this YOUR blog- your comments on this blog are always welcome and eagerly awaited for
I urge you all to follow this blog and keep up to
date with what is happening at ESI
Lets all work to get the work done on time, on
budget and to the required quality
We need to communicate, pull the rope in the
same direction to make our projects a success
and profitable