TVA Colbert Fossil Facility Ash Disposal Pond 4 Improving Operations While Preparing for Closure May 10, 2010 2011 World of Coal Ash (WOCA) Conference – May 9-12, 2011 in Denver, CO, USA http://www.flyash.info/

Upload: nguyenkien

Post on 15-Jul-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

TVA Colbert Fossil Facility Ash Disposal Pond 4

Improving Operations

While Preparing for Closure

May 10, 2010

2011 World of Coal Ash (WOCA) Conference – May 9-12, 2011 in Denver, CO, USA http://www.flyash.info/

Page 2: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

M. Scott Turnbow – Tennessee Valley Authority (TVA)

J. Chris Buttram – Tennessee Valley Authority (TVA)

Mark D. Rokoff – URS Corporation

Michael J. Stepic – URS Corporation

Sherry E. Potoma – URS Corporation

2

Presentation Authors

Page 3: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Presentation Outline

• Colbert Fossil Facility

• Pond 4 - Existing Conditions & History

• Pond 4 - Evaluation

• Pond 4 - Improvements

– High Hazard Removal: Design & Construction

– Spillway Replacement: Design & Construction

– Seepage Remediation: Design & Construction

• Partial Closure Phases 1 & 2

3

Page 4: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Colbert Fossil Facility

• Located in Tuscumbia, Alabama

• Five coal-fired generating units

• Yearly generation =7.8 billion kW-hours

• Winter net dependable generating capacity = 1,198 MW

• Consumes 8,900 tons of coal/day

4

Page 5: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Pond 4 – Existing Conditions

• 52 acres

• Used for:

• Disposal of coal combustion bottom ash

• Treatment of several wastewater streams

• Operational Features

• Inlets/outlets, sluicing and stacking

5

Sluiced Bottom Ash

Coal Yard Runoff

Wastewater Streams

Pond 4 Cane Creek

Page 6: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Pond 4 – Existing Conditions

• Enclosed by approximately 6,700 feet of perimeter dikes

• Dike side slopes =2.5H:1V to 3H:1V.

• Bounded by:

– Cane Creek on east side

– Railroad tracks and US Route 72 on south side

6

Page 7: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Pond 4 – Existing Conditions

• Initial conditions (2009):

– Average crest = El. 462.9

– Pool elevation = El. 456.6

– Free water volume = 89 million gallons

• Historical information:

– 1972 – constructed with 20 feet high dikes (El. 440)

– Originally used for fly ash disposal

– 1984 - dikes raised by approximately 20 feet

7

El. 462.9 El. 456.6

Fly Ash ~ El. 440

Page 8: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Pond 4 - Evaluation

• Project Drivers:

– Plant-wide assessment of effective CCP management improvements

– Federal classification of impoundments yielded a High Hazard rating

– TVA-driven policies to remove high hazard facilities and improve spillway conditions

• Evaluations included site visits, conceptual engineering, planning and assessing effective solutions

• Planning ahead and looking at the Project Drivers as a “collection” was key

8

Page 9: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Pond 4 - Evaluation

• Evaluation of Pond 4 conditions and operations performed to address needs related to:

– Remediation of instabilities

– Improvement of operations through upgrades

– Preparation for eventual closure of the pond

9

Page 10: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Pond 4 - Evaluation

• Key Improvement Objectives:

1. Remove High Hazard rating.

2. Four “morning glory” spillway riser structures require redesign for operational concerns (age, construction, stability).

3. Resolve seepage observed in the earthen perimeter dikes.

4. Conceptual design of eventual closure of pond.

• All engineering and construction needed to occur without interruption of pond operations.

10

Page 11: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Pond 4 – Evaluation Summary

11

ISSUE #1: High Hazard Condition in the Event of Dike Breach

As Determined Status: Based on Conditions Prior to November 2009

LEGEND

“As Found” Factor of Safety (FS) 1.1

1.5

ISSUE #3: Seepage Along Mid-Slope to Toe of East Dike

ISSUE #2: Tall, Unsupported Spillway Structures

1.4

1.5

1.9

1.5

1.5

ISSUE: Low to Marginal Slope Stability FS on East Dike

Page 12: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

High Hazard Classification

• TVA classified Pond 4 as a High Hazard structure

• Evaluation performed in general accordance with FEMA’s Hazard Potential of Dams (FEMA, 2004)

• High Hazard classification based on consequences (not probability) of failure in terms of probable loss of human life.

– US Route 72 and railroad to the south

– Existing structures to east and west side of Colbert Steam Plant Road

12

Page 13: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

High Hazard Alternative Study

• Alternatives evaluated for High Hazard removal:

– Armor/ protect downstream features

– Lower crest level of dike

– Partial closure to redirect possible dike breach

– Close the pond entirely

– Purchase impacted property

– Change grades/ topography

– Raise features downstream of inundation

13

Page 14: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

High Hazard Alternative Study

• Alternatives evaluated for High Hazard removal:

– Armor/ protect downstream features

– Lower crest level of dike

– Partial closure to redirect possible dike breach

– Close the pond entirely

– Purchase impacted property

– Change grades/ topography

– Raise features downstream of inundation

• A joint decision was made to lower the crest of a portion of the dike

14

Page 15: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

High Hazard Removal Design

• Dam break inundation analyses performed to determine final dike elevation for high hazard removal – Overtopping analyses

• Dam failure will not reach the railroad or highway if a portion of the dike crest is lowered to EL 458 (~5 ft)

• Dike lowering: – Length ~900 ft – Location chosen based on

inundation analysis and future construction projects

15

Lower a Portion of Dike to Remove High Hazard

Page 16: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

High Hazard Removal Construction

View Looking East at Southern Portion of Lowered Dike.

Lowered Portion

High Hazard Removal (Dike Lowering) Construction

Beginning of High Hazard Removal

• Start Date =8/23/10

• End Date = 9/03/10

16

Page 17: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Spillway Replacement

• Facility assessment found Pond 4 spillway structure at higher risk for failure than other spillways in TVA system

• Potential hazard due to age and possible instabilities

17

Spillway Location

Page 18: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Spillway Replacement

• Pond 4 initially discharged through four “morning glory” structures at north end of stilling basin

• The morning glory spillways consist of four 48-inch risers on concrete base with 36-inch outlet pipe passing through the dike leading to discharge channel.

18

Spillway Location

Morning Glory Structures

Existing Walkway

Page 19: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Typical Spillway Section

Concrete base

Concrete riser

Outlet pipe

Trapezoidal Discharge channel

Page 20: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Spillway Replacement Design

• TVA selected a design for the new spillway consistent with other successful projects.

– New system will consist of spillway structure and siphons.

20

Siphons

New Spillway

Main Pond

Stilling Pond

Page 21: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Spillway Replacement Design

• Spillway structure

– Four stop-log weirs & four 30-inch HDPE conduits draining to channel north of the pond

– Design allows adjustments in water level with plastic stop logs

• Siphons

– Keep Stilling Pond lowered under normal plant flows during construction

21

Page 22: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Spillway Replacement Design

• Challenge: Construct new spillway system while maintaining normal plant operation

– The water in the Stilling Pond must be lowered while maintaining the required free water volume

• Solution: Design and & construction of a rock buttress with sheet piling

22

Siphons

New Spillway

Main Pond

Stilling Pond

Page 23: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Main Pond

Stilling Pond

Spillway Replacement Design

• Rock Buttress and Sheet Pile wall separate Stilling Pond from Main Pond.

• Allows temporary lowering of water in Stilling Pond for construction

• Remainder of pond is at normal pool elevation

– Free water volume maintained

23

Rock Buttress and Sheet Pile Wall

Page 24: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Spillway Replacement Design

• Rock Buttress and Sheet Pile Wall:

– Slope stability and hydraulic analyses performed to determine design configuration

24

Stilling Pond

Main Pond

Prior to Construction

Page 25: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Spillway Replacement Design

• Rock buttress & sheet pile wall design configuration:

– Buttress slopes:

• 2.5H:1V - Main Pond side

• A broken (separated by a 20 ft wide bench) 1.5H:1.5V Stilling Pond side

– Sheet pile wall driven down the center of buttress to provide hydraulic separation.

– Lowered center opening section through the crest of the buttress to allow inflows to Stilling Pond

25

Stilling Pond

Main Pond

Prior to Construction

Design

Page 26: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Spillway Replacement Construction

26

Driving Sheet Piling

Placement of Buttress Rock

Grading of Rock Buttress

Completed Rock Buttress and Sheet Pile Wall

Center Opening

Page 27: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Spillway Replacement Construction

Existing Walkway

Pre-Construction Spillway Structures

`

Morning Glory Structures

Lowered Pond Water Level

`````````````

Excavation of Dike for New Spillway Inlet

27

Page 28: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Original Channel – Pre-Construction

Construction of New Headwall

Siphon Pipes

New Headwall

New Walkway

28

Spillway Replacement Construction

Page 29: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Spillway Replacement Construction

• Start Date = 7/06/10

• End Date = 1/20/11

29

Page 30: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Seepage Concerns

• Perimeter dikes- history of seepage along the east and southeast

• Seepage noted near El. 445

– Possible contact of the original dike and new fill

– May indicate permeable hydraulic connection from interior of pond

30

Seepage Locations

Page 31: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Seepage Remediation Design

• Seepage remediation system consists of the following:

– Stone Buttress

– Seepage Collection Drain

– Lateral Piping

– Conveyance Line

31

Seepage Remediation Locations

Page 32: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Seepage Remediation Design

• Access Road/Stone Buttress- working surface for construction of the conveyance line

• Seepage Collection Drain - intercept the seepage near the interface of the upper and lower dikes (~ El. 445 and 440)

• Lateral Pipes – convey flow to seepage conveyance line

• Conveyance Pipe - convey flows to new headwall structure and to existing treatment wetlands to the south of Pond 4

32

Page 33: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Seepage Remediation Design

33

Page 34: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

ACTION: Remediate Seepage and Low FS with Collection Pipes and Buttress Construction

1.5

Seepage Remediation Design

34

Page 35: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Seepage Remediation Construction

• Stone Buttress:

– East and south sides of dike

– Construction start = 12/14/10

– Construction Complete = 02/21/11

• Construction of remaining portions of seepage remediation to restart May 2011 (due to weather delays)

35

Placement of Stone Buttress

Placement of Stone Buttress

Page 36: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Pond 4 – Improvements Summary

36

• High Hazard removed

• New spillway and siphons installed

• Seepage remediation in progress

• Successful pond operation maintained throughout construction

• Construction progressed as scheduled

Page 37: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Partial Closure – Phases 1 & 2

37

• Pond 4 Closure

— Closure of Pond 4 is part of TVA’s Programmatic goals for the Colbert Plant.

— Closure will be accomplished in a “Phased” approach, wherein portions of the pond will be closed to allow for continued sluicing and wastewater treatment options.

• Regulatory framework:

— No specific ADEM regulations for pond closure

— Coordination with ADEM for other applicable permits

— TVA Programmatic Document

Page 38: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Partial Closure – Phase 1

• Partial Closure Phase 1 includes :

– New channel in divider dike to redirect inflows.

– Separator dike to “close off” the south of Pond 4.

– Filling the southern portion with the existing material from the bottom ash stack.

– Stilling Pond to remain in use for other plant flows.

38

Page 39: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Partial Closure – Phase 2 • Phase 2 to begin after completion of Phase 1

• Bottom ash will be stacked on the southern portion of the pond

• Final grades and storm water management configuration to be determined based on generation rates and plant operation.

39

Page 40: TVA Colbert Fossil Facility Ash Disposal Pond 4 · TVA Colbert Fossil Facility Ash Disposal Pond 4 ... Four “morning glory” spillway riser structures ... TVA Colbert Fossil Facility

Copyright©2011

Partial Closure – Phase 2 • Partial Closure Phase 2 (FY18–FY19) and Final

Closure (FY19-FY20)

• As the bottom ash production at the plant is converted from a wet operation to dry, the remaining portion of the south end of Pond 4 will be closed.

• TVA to evaluate continued use of Stilling Pond