TURNER-KIEWIT JOINT VENTURE Subcontractor Monthly Community Outreach 9:00-9:30 Breakfast & Networking 9:30-10:00 Presentation and Q&A 10:00-10:15 Business Introduction Opportunity 10:15-11:00 Meet & Greet

Upload: others

Post on 09-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

TURNER-KIEWIT JOINT VENTURE

Subcontractor Monthly Community Outreach

9:00-9:30 Breakfast & Networking

9:30-10:00 Presentation and Q&A

10:00-10:15 Business Introduction Opportunity

10:15-11:00 Meet & Greet

Page 2: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

Introduction

David Crane

Sharon Somner

Jeff Bush

Andrew Cameron

Turner-Kiewit JV

Page 3: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes
Page 4: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes
Page 5: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

$1.1B CAPITAL IMPROVEMENT PLAN (CIP)

MAJOR ELEMENTS

Maintain existing facilities to standards consistent with The Orlando Experience®

Modify and expand facilities to achieve ultimate North Terminal capacity of 45 MAP

Improve international processing to accommodate growth

Increase multi-modal transportation access

Develop facilities to generate non-aviation revenue and provide strategic redundancy

Page 6: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

LEAD CONTRACTORS

$1.1B CAPITAL IMPROVEMENT PLAN (CIP)

Page 7: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

TURNER-KIEWIT JOINT VENTURE

Subcontractor Monthly Community Outreach

South Airport

Intermodal Terminal Facility Complex

Greater Orlando Aviation Authority

Orlando International Airport

Page 8: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes
Page 9: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

Turner-Kiewit JVProject Team

Field SupervisionProject EngineeringDocument Control

Field EngineeringConcrete SupervisionDocument Control

Project ControlsQuality ControlProject Engineering

Page 10: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

Turner-Kiewit Joint Venture

CMAR for ITF & PDL

Intermodal Terminal Facility (ITF)Passenger Drop-Off Lobby (PDL)Rail Platform (Viaduct)

Page 11: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes
Page 12: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

DBE Goal for Construction30% Goal

DBE Requirements

Page 13: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

DBE Success Stories

• L & S Diversified 100%

• JMD Global 100%

• The Middlesex Co./Denson Construction 31%

• Baker Concrete/Shelby Erectors 30%

• Ardaman & Associates /Page One & Tierra 60%

Currently, The Middlesex Company, has teamed up with DensonConstruction Company and has 31% DBE PARTICIPATION! Ardaman& Associates has teamed up with Page One Consultants, Inc. andTierra to reach 60% DBE PARTICIPATION!! These are great successstories and we would love to spotlight your Company for meetingand exceeding its goals!

Page 14: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

“Community Outreach” Networking Sessions• Specific details will be provided for bid packages

• Next Outreach – 11/17/2015

Assistance Programs • Prequalification Workshop

at Valencia College

Pre Bid Meeting/Matchmaking• Interior Finishes – November 2015

Outreach Efforts

“Stay tuned to the website”

www.tkgoaa.com

Page 15: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

Prequalification & Procurement

Project website – www.tkgoaa.com

Page 16: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

2 Steps

that can be implemented at the same time.

Prequalify with Turner-Kiewit JV thru the TKGOAA.com website online.

DBE Certification• Florida UCP is the Unified Certification Program for DBE’s.

• NAICS Codes- North American Industry Classification System Is the standard used by Federal statistical agencies in classifying business establishments for the

purpose of collecting, analyzing, and publishing statistical data related to the U.S. business economy.

The Turner-Kiewit Team is looking not only to meet GOAA’s Goals, but to Exceed them.

HOW TO BE A PART OF THIS PROJECT

Page 17: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

This Project will be pursuing certification under LEED V4 Building Design& Construction. Every contractor associated with the project will beexpected to participate in the certification process.

Information regarding the goals and requirements associated with thecertification can be found both within your bid package (as a referencechart) and detailed within specification 018330.

Greater Orlando Aviation AuthoritySouth Airport APM Complex & South Airport Intermodal Terminal Project

Page 18: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes
Page 19: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

Bolder and More Specialized

• Includes a focus on materials that goes beyond how much is used to get a better understanding of what’s in the materials being specified and the effects those components have on health and environment.

• Take a more performance-based approach to indoor environmental quality.

• Provides a clearer picture of water efficiency by evaluating total building water use.

Page 20: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

• We have the opportunity to divert construction waste and debris away from landfills.

• As a construction team you play an important role in achieving project goals and obtaining LEED certification.

• Every team member will embrace the strong initiative of utilizing green building practices as our culture while constructing an environmentally friendly building.

Page 21: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes
Page 22: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

Overview Schedule

Page 23: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

Upcoming Bid Packages

• BP-12.13/BP-15.01 – Glazed Alum Framing Systems/Curtainwall

(Joint Procurement) – Due Wednesday, October 28, 2015 at 3:30 PM

• BP-12.34 – Electrical – Due Friday, October 30, 2015 at 3:30 PM

• BP-12.48 – Metal-Framed Skylights – Due Thursday, November 12,

2015 at 9:00 AM

Page 24: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

Primes & 2nd tier Subcontractorworking on the project

• The Middlesex Corporation

• Denson Construction, Inc.

• Ongrade Contracting

• Bonn J. Contracting

• Shelby Erectors

• Finishing Systems, Inc.

• J. B. Webb & Associates

• Paul E. Walsh Trucking, Inc.

• T & T Construction, Inc.

• John B. Webb & Associates

• Ace Rebar

• HJ Foundations, Inc.

• John B. Webb & Associates

• Ace Rebar

• Walsh Trucking, Inc.

• Gracicarl Services, Inc.

• JMD Global Developers, LLC.

• L & S Diversified, Inc.

• Shelter’s Cleaning, LLC

• Baker Concrete• Shelby Erectors, Inc.

• Modular Building Systems International • Prime Electric, Inc.

• Wendt

• Adeb, Inc.

• Merit Fasteners

• Aerial Innovations

• Ardaman & Associates• Page One

• Tierra

• TK JV Self Perform• OLP

• Gulf Coast Reinforcing

• Shelters Cleaning, LLC

• Ken Sandlin Welding Contractors, Inc

• Lavender Lady Plumbing

DBE SubcontractorsDBE Primes

Page 25: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

Remaining Packages

18 bid packages

12.44 Resinous Flooring

12.24 Resilient Flooring & Marking

12.12 Coiling Doors

12.21 Ceramic Tile

12.22 Acoustical Ceilings

12.27 Div. 10 Specialties/Toilet Accessories

12.30 Signage (int & ext)

12.18 Interior Glazing

12.29 Fountains

Interior Finishes

12.46 Point Supported Glass Canopy

12.47 Sunshade/Louvers

12.07 Ornamental Railings

12.16 Fireproofing

12.45 Automatic Entrances

12.41 Access Flooring

12.43 Asphalt Paving & Markings

12.26 Final Cleaning

12.42 Aluminum Walkway

Page 26: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

iSqFt Site

Page 27: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

Bid Package Parts

`

`

``

`

Page 28: TURNER-KIEWIT JOINT VENTUREtkgoaa.com/uploads/3/4/7/4/34745257/tk_monthly_community_outre… · 26/10/2015  · Airport Intermodal Terminal Project. Bolder and More Specialized •Includes

Questions?

Business Introduction OpportunityPrime Contractors, Vendors and DBEs