turbine rolling
DESCRIPTION
Turbine RollingTRANSCRIPT
-
TURBINE ROLLING
COLD START UP
WARM START UP
HOT START UP
-
TURBINE ROLLINGMETAL TEMP < 250 C
METAL TEMP 250 C- 450 C
METAL TEMP 450 C
-
TURBINE ROLLING
MECHANICAL
EHC
-
TURBINE ROLLING
MECHANICAL - STARTING DEVICE & SPEEDER GEAR
EHC - SPEED LOOP - MANUAL / SGC
-
UNIT CONDITION
NO EQPT IN SERVICE
METAL TEMP < 120 c
-
OIL SCHEMESTART EOP CHARGING- STOPSTART AOP & OVEFSTART JOPOPEN GATE VALVE GEARINGTG ROTOR ON STGRESET FP GATE VALVE
-
OIL SCHEMECHARGE CONTROL OIL
CHARGE GOVERNING RACKCHARGE LP B/P RACK
-
CW SCHEMEOPEN DIS VALVE 10 %ISOLATE SUPPLYOPEN CONDENSER WB AIR VENTSTART ONE CWPCHARGE CW SCHEMECHARGE OIL COOLER, PHE,SEAL COOLER
-
ACW SCHEMEFILL ACW TANK
CHARGE ACW SCHEME BY GRAVITY
START ACW & ACWBP
-
DEAERATORFILL DEAERATOR
CHARGE AST HEADER
START ONE BFP & PUT IN RECIRCULATION
PREHEAT DEA & RAISE TEMP TO 80c
-
HOT WELLFILL HW WITH DM WATER
START CEP & PUT IN RECIRCULATION
CHARGE CONDENSATE SCHEME
-
HP B/P OIL SUPPLYSTART OSU PUMPS
SLOWLY CHARGE OIL LINE
ENSURE OPENING OF P&T LINE
-
SEALS
START OIL PUMPS OF MAW 10 & 50
START WARMING OF EJECTORS & SEALS
-
FEEDINGCHARGE FW UPTO FEED MANIFOLDSTART FEEDING AT 80 T/HrOPEN MS,HRH,CRH,B/P DRAINSLIGHT UP BOILER WITH 2 OBS AFTER DRUM LEVEL SIGHTEDDMT 90c . SURGING OF LEVEL.OPEN CBD TO CONTAIN DRUMLEVEL.CUTOUT 1 OB IF NECESSARY.
-
VACUUM RAISING
OPEN PILOT EJECTOR STEAM & AIR VALVE
START ONE GSEF
AT 100 mm of HG ADMIT SEALS
-
HP&LP B/P OPERATIONCUT IN 3rd OIL BURNEROPEN B/P 30% WHEN MS pr IS 5 K.sc & CHARGE REHEATERSBEFORE OPENING HP B/P CHECKSAFE DRUM LEVELOPENING OF BOILER STOP VALVESCLOSE STARTUP VENT
-
HP&LP B/P OPERATIONVAC IS STABLEFURTHER OPENING ACCORDING TO SH3 O/L pr RAISEOPEN LP B/P @ HRH pr 2 K.scRATE OF pr.RAISE MS- 1K.sc / 2 minHRH - 1K.sc / 4 min
-
FIXING PARAMETERSMETAL TEMP < 350c 50 k.sc & 350c 12k.sc &350cOTHERS, ADD 50c WITH MAX METAL TEMP. ACCORDINGLY CHOOSE PR
-
WARMING UP
START CVS WARMING UP AT 23k.sc & 250cCHECK K101&201 SWITCHED ONTEST VALVES&CVS OIL LINES OPENEHC &CRH NRV SLIDE VALVES MADE THROUGHTCV IN AUTO
-
WARMING UPBROUGHT ST.DEVICE TO ZEROOPEN MAL DRAINSGEN.TRIP IS RESETRESET TURBINECHECK TRIP OIL PR IS 5 k.scMIN TRIP OIL pr NEEDED IS 3.8 k.sc FOR SVs OPENING
-
WARMING UP
IF TRIP OIL PR IS BELOW 3.8 k.sc
i) ROTATE SFC FILTERS ii) CHECK LUB OIL O/L TEMP
IF IT IS NOT RAISING TRIP THE m/c AND RESET
-
WARMING UP
RAISE ST.DEVICE
ST UP OIL pr STARTS REDUCING
ESV STARTS OPEN AT 1.8 k.sc.IF NOT i) CHECK TEST VALVE IS OPENED ii)CHECK TRIP OIL pr IS ADEQUATE
-
WARMING UP
ESV OPENS AT 35% OF ST.DEVICECHECK OPENING BY LIMIT SWITCH & AT LOCALDURING WARMUP MS& HRH TEMP SHOULD DROP BELOW 300cAT 40k.sc PUT HP B/P INTO AUTO
-
WARMING UP
CHANGE STEAM TO SEALS FROM CRH, HP B/P D/S TEMP > 280c & CRH pr > 11 k.scKEEP IT FOR 20 MIN BEF ROLLINGROTATE SFCBEF ROLLING HP B/P OPENING MIN 50%
-
WARMING UP
RECORD METAL TEMP, SUPERVISORY READING,BRG TEMPSTART ROLLING AFTER 5th &6th pts REACH SATURATIONMARGIN SHOULD BE ABOVE 30 kEHC MADE THROUGHCRH NRV SLIDE VALVE IS THROUGH
-
WARMING UP
FC NRV TEST VALVES MADE THROUGH
ST.DEVICE & SPEEDER GEAR AT MAX
-
ROLLING TO 600 RPM
RAISE SPEED SET pt TO 600 RPMGVG CLOSES ON AUTO AT 240 RPMIF NOT OIL TEMP RAISE. CHECK i) DRAIN OIL TEMP ii) OIL pr AFTER GVGJOP STOPS AT 540RPM ON AUTO
-
SPEED SLOPES0-600 RPM - 300RPM/MIN600-2850 RPM 600RPM/MIN6003000rpm
-
ROLLING TO 3000 RPMWATCH HP SHAFT & CASING TEMP FOR ITS WARMINGUP MARGIN > 30kACCELERATION RATE 10 k - 200 RPM 20 k - 400 RPM 30 k - 600 RPM
-
DN / DT
TO AVOID CRITICAL SPEED
REQ .CONDITIONS i) GB OPEN ii) SPEED 600 2850 RPM iii) ACCN < 108 RPM
-
CRITICAL SPEED
-
3000 rpmNOTE DOWN VIBRATIONSCHECK TCV OPERATION IN AUTO AS THERE IS NO TRIPPING FOR BRG.TEMP RISECHECK FOR STOPPING OF AOPAT 3000 RPM IF TURBINE TRIPS ON GEN.PROTECTION HELD AT 600 RPM
-
SYNCHONISATION
MATCH SPEED WITH GRIDCLOSE FIELD BREAKERMATCH M/C VOLTAGE & GRID VOLTAGEAUTO SYNCHRONISE
-
LOADINGBLOCK LOAD N ref RAISE BY 20 RPM ON AUTO . IF NOT RAISE N ref TO AVOID REV.POWER TRIPCLOSE ALL DRAINSLOAD>4 MW TSE DISC CHANGES TO ADM SIDEIF NOT CHANGES,CONFIRM LOAD IS TAKEN UP OR RAISE N ref
-
LOAD CONTROLCONDITIONS: i)LOAD CONTROL ON ii) GEN.BREAKER CLOSE iii) SET ACTUAL LOAD > 5% OF RATED LOAD TAKE LOAD CONTROL @ 30 MWOBSERVE STRESS MARGINLOAD ACCORDINGLY & CLOSE B/P
-
LOAD RAISING
AT HRH 12 k.sc CHECK LP B/P SLIDING SET POINT IS TAKEN OVER MS pr 60 k.sc TEMP 400cCHARGE LPH S AT 50 MWFOR FURTHER LOAD RAISING HP CASING MARGIN MUST BE > 10 k
-
LOAD RAISING
START I st MILL.RAISE LOAD TO 70MW AT 2MW/MIN. MS pr 80 k.SC .TEMP 440cSTART 2nd MILL. LOAD 90MW . 100 k.sc TEMP 460cSTART 3rd MILL . REDUCE OIL FLOW 7 t/hr. LOAD 110MW . 120 k.sc TEMP 490c
-
LOAD RAISING
START 4th MILL.CUTOUT OIL BURNERS ONE BY ONE. LOAD 125MW . 130 k.sc TEMP 490c TAKE IP MODE. WARMUP HP HEATERS.
-
LOAD RAISINGA4 TO DEA MADE THROUGHSTART 5th MILL LOAD 150MW . 140 k.sc TEMP 500c .LOAD 210MW . 150 k.sc TEMP 540c