turbine centre site boundary - highland
TRANSCRIPT
224000 226000 228000 230000 232000 234000 236000 238000 240000
8200
0082
2000
8240
0082
6000
8280
0083
0000
8320
0083
4000
Contains Ordnance Survey data © Crown copyright and database right 2014. OS Licence No 100052584. © wpd Scotland Limited
Drawn: HKDate: 02.09.2014Ref No: S005_ENV_ECO_0022_D4
Beinn Mhor Wind FarmSite Location
Scale (A3) 1:60.000
0 21
KilometresThe information on this map has been reproduced from digitaland non digital sources. Minor discrepancies may occur.
Turbine Centre
Site Boundary
New Beauly-DennyOverhead Power Line
Redundant Beauly-DennyOverhead Power Line
RX1
RX2
RX4
RX3
3
1
5
2
4
6
230000 231000 232000
8250
0082
6000
8270
00
Contains Ordnance Survey data © Crown copyright and database right 2014. OS Licence No 100052584. © wpd Scotland Limited
Drawn: HKDate: 02.09.2014Ref No: S005_ENV_ECO_0023_D4
Beinn Mhor Wind FarmSite Layout
Scale (A3) 1:10.000
0 500250
MetersThe information on this map has been reproduced from digitaland non digital sources. Minor discrepancies may occur.
Transfer Area
Turbine Foundation AreaOn-Site Substation Area
HardstandingSite Boundary
Access Road (existing)
Access Road (new)New Beauly-Denny Power Line
Permanent Meteorological MastWatercourse Crossing
existingnew