  • 8/13/2019 Tunnel Management Process_dec 2013

    1/1

    IDENTIFY & DESIGNPROTECTION WORK

    BUILDING RISK ASSESSMENTS &PROTECTION PLANS. AllowableLimits of Deformation

    ALIGNMENT OF RAILTRACK & STATIONLOCATION

    INSTRUMENTATIONDESIGN

    SETTLEMENT ANALYSISGround loss, shield loss,tailskin loss, sensitivity

    TBM OPERATIONAL PARAMETERS &RANGE -Face Pressure, grout

    pressure/volume

    SURVEYS FOR UTILITIES, ID NAOF MATERIAL & ALLOWABLELIMITS OF DEFORMATION

    GEOLOGICPARAMETE

    BUILDING CONDITION SURVEYS,STRUCTURAL SURVEYS,

    SAFE TUNNELLING

    Controlled settlement, minimal impact oninfrastructure, optimised face pressures,

    controlled progress

    CONSTRUCTIONTunnelling

    TBM OperationFace pressure,Grouting Volume & PressureMuck VolumeThrustTorqueSpeed of AdvanceSteering / Survey Control

    Lining ErectionBuild Quality / ReparsAlignment

    Ground TreatmentDrillingGroutingVerification

    Immediate ActionsAlarm PlansStandard Operating ProceduresEmergency Plans

    DESIGN OF TUNNEL ADVANCEHorizontal & Vertical Alignment - deeper tunnels have greater pressures, tight curve

    Geotechnical Interpretation - possible geological hazards, mixed face conditions,

    Face Pressures - control of face pressure to avoid stress relaxation & oveWeights / Volumes - assessment of weight based on range of in-situ density, assess likelInstrument Plan - types & distribution of instruments based on predicted settlements and location o

    Settlement Contours & Settlement Limits - assessment of extent of predicted settlement, alloconstruction

    Required Consolidation Works - building protection worked to prevent any adverseHigh Risk Areas, Structures & utilities- indicated on drawings to advise of ad

    Anticipated Anomalies & Actions - Loss of face pressure, additional grouProbing - predicted geology, tates of penetration

    TUNNEL MANAGEMENT PROCESS

    DESIGN INPUT

    DESIGN PROCESS

    DESIGN OUTPUT

    CONSTRUCTION INPUT

    CONSTRUCTION PROCESS

    CONSTRUCTION OUTPUT

    TBM - GROUND INTERACTION Compliance with settlement limits

    Compliance with Face Pressure & Groutrequirements

    Compliance with alignment

    TBM Design

    ALIGNMENT

    VALIDATION -Wriggle survey

    ALIGNMENT

    VERIFICATION - Track WorkValidation

    CONFIRM

    ALIGNMENT - Designmodifiaction may benecessary, signalling,route restrictions.