tul_srisompun_resume and portfolio_

12
e Beaumont Partnership ( Architecture design firm base in Bangkok) RMIT University (Melbourne) Silpakorn University (Bangkok) RMIT University (Melbourne) Wat Ram Poeng (Chiang Mai) Hanasan Scrub Silpakorn University (Bangkok) Branding project for a skincare production Silpakorn University (Bangkok) Kathletic Architecture Internship B. Architectural Design B. Architectural Design English for Academic Purposes Buddhist Monk-hood Billboard Design Volunteers Dec 2014- Jan 2015 2014 - 2016 2011-2012 Jan 2014 2013 Freelance Graphic Designer June 2012 Oct 2012 Communicate with client in order to delivers the design soluon that we both appreciat- ed. The graphic design producon was conducted in work session between adobe suite and manual watercolouring. communicate and iterate the design with client to deliver a Computer generated logo design that we both appreciated. In charge of the graphic design of the board, which it was to celebrate senior gradua- on. the work also include dividing the sensible workload for the team. Logo Design for a small sport apparel production Volunteering for customer service within the University's events by working in a wide range of services in the event for example waing and heavy liſting, 624 High Street, Thornbury, Melbourne, VIC, 3071 T: 0413 730 932 E: [email protected] Facebook: hps://www.facebook.com/tul.nanotec Instagram: Tul1 (Tul Srisompun) Website: hp://cargocollecve.com/TulSrisompun Revit Auto CAD Photoshop Indesign Illustrator 3Ds Max Rhinoceros Grasshopper Maya Architecture Drawing physical model making Sketch Up Photography English (advance) Thai (Nave) Microsoſt office Management skills with calmness +++++ ++++ +++++ +++++ +++++ +++ +++++ ++++ +++ +++++ +++++ ++++ +++ Skills Others About Tul Experiences Educations Mr. Jock Gilbert Mr. Navacha Navasith Mr. Vorabhat Somsantichai Productions Designs Utilities Assisted in the design process by producing a concept model in a supervision of the pro- ject designer, mainly in computer soſtware such as SketchUp and Revit. the projects in- clude a terrace, facade, pavilion and Gate pavilion. Assisted in post-producon processes such as presentaon drawings, renders, and docu- mentaon layouts using Auto CAD, Adobe Suite, and soſtware menoned above. Assisted in the researching process for the design project include surveying a physical condion of the site, and research on precedent projects. - - - - - - - Graduate with 3.50 GPA and consistently achieving high disncon in design studios, which mostly specialized in architecture conceptual design. Have finished the first year in the school in which, heavily focus on the design soluon and applicable architecture knowledge. Succesfully completed the course. Registered Architect, Architect council of Thai land. (Former) Project architect design, at The Beaumont Partnership The Millennia Tower 18th floor, Unit 1804, 62 Langsuan Road, Lumpini, Pathumwan, Bangkok, Thailand 10330 Email: [email protected] Registered Architect, Architect council of Thai land. (Former) Senior Project architect designer, at The Beaumont Partnership 19/F Sathorn City Tower 175 South Sathorn Road, South Sathorn, Sathorn, Bangkok, Thailand 10120 Email: [email protected] Lecturer Registered Landscape Architect, AILA Lower Pool Design Studio Coordinator Landscape Architecture Program School of Architecture + Design RMIT University GPO Box 2467 Melbourne VIC 3001 Australia Locaon: Bldg 8 Level 11 Room 52 Phone: (03) 9925 1856 Fax: (03) 9925 1820 Email: [email protected] Tul Srisompun Professional references for Tul Srisompun the performance of assigned tasks for the maintenance of the monasc instuon. meditate daily as part of the pracce parcipaon in collecve observances like the recitaon of the disciplinary code on new moon and full moon days and the performance of religious services for the lay community. Graduate architecture student from B. Architec- tural design, RMIT University. Skilled in Archi- tectural Representaon drawing and Graphic design from ranges of experience. Experienced operang design soſtware in Architectural pro- fession from student placement in the design firm; The Beaumont partnership. Able to com- municate and Collaborate with client in order to deliver in graphic design from freelance de- signer jobs in the field of branding. Other ex- periences include volunteer works within the university and monk-hood in the monastery.

Upload: tul-srisompun

Post on 09-Jan-2017

19 views

Category:

Documents


1 download

TRANSCRIPT

The Beaumont Partnership( Architecture design firm base in Bangkok)

RMIT University (Melbourne)

Silpakorn University (Bangkok)

RMIT University (Melbourne)Wat Ram Poeng (Chiang Mai)

Hanasan Scrub

Silpakorn University (Bangkok)

Branding project for a skincare production

Silpakorn University (Bangkok)

Kathletic

Architecture Internship

B. Architectural Design

B. Architectural Design

English for Academic Purposes Buddhist Monk-hood

Billboard Design

Volunteers

Dec 2014- Jan 2015

2014 - 2016

2011-2012

Jan 2014 2013

Freelance Graphic Designer

June 2012

Oct 2012

Communicate with client in order to delivers the design solution that we both appreciat-ed. The graphic design production was conducted in work session between adobe suite and manual watercolouring.

communicate and iterate the design with client to deliver a Computer generated logo design that we both appreciated.

In charge of the graphic design of the board, which it was to celebrate senior gradua-tion. the work also include dividing the sensible workload for the team.

Logo Design for a small sport apparel production

Volunteering for customer service within the University's events by working in a wide range of services in the event for example waiting and heavy lifting,

624 High Street, Thornbury, Melbourne, VIC, 3071T: 0413 730 932E: [email protected]

Facebook:https://www.facebook.com/tul.nanotec

Instagram:Tul1 (Tul Srisompun)

Website:http://cargocollective.com/TulSrisompun

Revit Auto CADPhotoshopIndesignIllustrator3Ds Max

Rhinoceros GrasshopperMayaArchitecture Drawingphysical model makingSketch UpPhotography

English (advance)Thai (Native)Microsoft officeManagement skills with calmness

+++++++++

+++++++++++++++

+++

+++++++++

+++++++++++++

+++++++

Skills OthersAbout Tul

Experiences

Educations

Mr. Jock Gilbert Mr. Navacha Navasith Mr. Vorabhat Somsantichai

Productions

Designs

Utilities

Assisted in the design process by producing a concept model in a supervision of the pro-ject designer, mainly in computer software such as SketchUp and Revit. the projects in-clude a terrace, facade, pavilion and Gate pavilion.

Assisted in post-production processes such as presentation drawings, renders, and docu-mentation layouts using Auto CAD, Adobe Suite, and software mentioned above.

Assisted in the researching process for the design project include surveying a physical condition of the site, and research on precedent projects.

-

-

-

-

-

-

-

Graduate with 3.50 GPA and consistently achieving high distinction in design studios, which mostly specialized in architecture conceptual design.

Have finished the first year in the school in which, heavily focus on the design solution and applicable architecture knowledge.

Succesfully completed the course.

Registered Architect, Architect council of Thai land.

(Former) Project architect design, at The Beaumont Partnership

The Millennia Tower 18th floor, Unit 1804, 62 Langsuan Road, Lumpini, Pathumwan, Bangkok, Thailand10330

Email: [email protected]

Registered Architect, Architect council of Thai land.

(Former) Senior Project architect designer, at The Beaumont Partnership

19/F Sathorn City Tower 175 South Sathorn Road, South Sathorn, Sathorn, Bangkok, Thailand 10120

Email: [email protected]

LecturerRegistered Landscape Architect, AILALower Pool Design Studio CoordinatorLandscape Architecture Program

School of Architecture + DesignRMIT UniversityGPO Box 2467Melbourne VIC 3001 Australia

Location: Bldg 8 Level 11 Room 52Phone: (03) 9925 1856Fax: (03) 9925 1820Email: [email protected]

Tul Srisompun

Professional references for Tul Srisompun

the performance of assigned tasks for the maintenance of the monastic institution.

meditate daily as part of the practice

participation in collective observances like the recitation of the disciplinary code on new moon and full moon days

and the performance of religious services for the lay community.

Graduate architecture student from B. Architec-

tural design, RMIT University. Skilled in Archi-

tectural Representation drawing and Graphic

design from ranges of experience. Experienced

operating design software in Architectural pro-

fession from student placement in the design

firm; The Beaumont partnership. Able to com-

municate and Collaborate with client in order

to deliver in graphic design from freelance de-

signer jobs in the field of branding. Other ex-

periences include volunteer works within the

university and monk-hood in the monastery.

Tul SrisompunArchitectural Port Folio

My interests are reside in between a con-ceptual framework of architecture and the tool for its representation, includes draw-ing style and graphic design. As I believe that architecture is also some form of a cultural practice, it is also a spatial setting that set a circumnavigation of form, it’s generates a cultural imagination and ad-aptable to toward its situation. Therefore, Most of Tul works are heavily focuses on the question; what can architecture do and possibly be in an ever changing envi-ronment?

Additionally, as I aim to explore and ex-plaining this conceptual question, most of Tul architectural works revolve around conceptual related representational graphics and drawings.

Field Junction

Arterial medini

The Living Fence

Delirious Melbourne

Burining Cemetery

Revit Documentation

Statement Content

Field Junction “Field Junction”, is a project that aim ex-pand the landscape of Mutawintji National Park by planting nodal hubs for activities such as learning, teaching work shop, and camping, in the unused landscape.

Mutawintji national park is an indigenous landscape that culturally importance. It has 40000 years old traces of history. From ‘Closing the gap’ and handed back cam-paign, the park now suffers from political and cultural struggles.

Field junction project start from reformu-lates spatial relationship of the landscape as a foundation for the expansion, divided it into 3 spaces. This planning is a method derive from Bernard Tschumi Parc de la vil-lette, the grid is to organized the space into a familiar space in the same time mediated by the terrain, create a space junction.

its reformulates Mutawintji’s landscape paving the foundation for its new object.

Spatial Reformation

the objects within the field junction the object tectonically and materially rep-resent the landscape in order to form a dialogue between narratives imprinted within the landscape and the objects. as Lebbeus Woods’s statement; the tectonic field is experience within our imagination without any relative scale

Camping Infrastructure

Arterial Medini

The project is about the how objects occupying of public infrastructure could seed a negotia-tion of the public and private landscape own-ership between two parties, the project aims to blur the line, decrease the conflict between cultures raise by territorial ownership.

The project operates in 3 different political scales; First, the experiential scale, as people navigate the city, access and rights toward pub-lic space become sources of conflict. Second, the city scale where neighbouring community become an un-wanted growth within the Med-ini. The Last, is regional scale, the political con-flict between Singapore and Malaysia on terri-tories that made by an undefined boundary.

The conflicts within the city are often seen in Asian city is the conflict cause by the use of public space but in private experience, which mean no social interaction. Driving a personal car is a good example for such issue. By replac-ing the city arterial road, with the canal, and turn the adjacent space to a City CBD, that con-tain programs such as commercial, retail, park, and residential, strip off the personal right and access, force people to use a public infrastruc-ture.

However, the CBD will provide a fully accessi-ble route within, the car park will provide them full access to a public facility (boat stop and bike park). The architecture will intregrate and create a direct access toward the commercial building, (public space within), it will parasiti-cally occupied a commercial building and be-come an infrastructure for communal event, it create an access toward the centre of the park.

the second node of exchange is the recreation centre surround the wet market.The recreation program will keep the image of a “good city” while wet market is a real deal of this node. The wet-market within, occupying the canal by open itself to the canal, agriculture goods will be transport from farms and fishery outside of the town though these canal. The occupation by the unwanted images will then strengthen and emerge along the canal.

The last node is made of terminal for transpor-tation, Mall and square will act as a space of transition from Medini to Public Channel, im-migration office, desalination plant that trans-fer fresh water to Singapore. The node then, will act as a node of resources for both Malay-sia and Singapore, act as a buffer for land ex-tension from both sides, destabilised the occu-pation of the channel, which originally a public domain.

The Living Fence“The living fences” is an infrastructur-al project that aims to revitalize a ghost town; that used to be a gold mining town in a gold rush period, Victorian Era, since mining is prohibited; the town is turned into a real estate. by delivered a platform for activities within the town, facilitates activities ranged from artist in residence to major town event such as antique fair.

the living fence come in the form of ribbon is a platform for events such as mobile li-brary, town dinning, outdoor cinema, and artist in residence that weaves the town and landscape together; the ribbon itself.

As aim to effectively activate the land-scape, the ribbon is spatial sensitive to-ward the landscape. By occupying an un-used terrain and object, it become a mixed urban infrastructure, for example urban canopy, garden, movie screen, water tank and water channel.

Ribbon Form

SEASONAL CHANGES

Also, the living fence project is very de-manding for a support for its performance.The system within the fence was articulat-ed to be flexible toward adjustments by using this spacing wall system will allow them performs

Surface Articulation

Delirious Melbourne“Delirious Melbourne” is a hybrid archi-tecture project that formally and function-ally merges; the tower is to be a cultural representation situated within Melbourne CBD.

Delirious Melbourne re-constructs the spatial organization of its building type in the architectural scale. The project seeks to offer a vertical public space by distorted the service core of the building, the core will then authorize structure and programs that build upon it.

Spatial Reformation

The objects as found in Melbourne are oriented and voxelated to the vertical grid system disregard its originality in order to speak the same language as the city, its system, and its adjacency.

Additionally, the projects is in fact an act of superimposition within the process of change; in the same time spatially act as a time lapse of the landscapes history.

Vertical Urbanism

BURNBorder as a Universal Reunification of two Nations

Demilitarized Zone (DMZ); the last remnant of the cold war is the conflicted, tense, and complex border between North and South Korea, according to the change and mutation that mostly caused by human activities such as a bush fire in order to gain a visibility, emerging of agriculture, fence construction, etc. However, regardless of those ac-tivities, the Joint security area in DMZ also has a ‘life’ of its own. JSA or Joint security area is the beginning point of DMZ. As we know, the area should be the joint area as its name states, yet it has changed itself into a barrier. Other than that, JSA keep strengthening itself due to the major events and ‘things’ that still remain in the area today. The evidence is that in the past, JSA was not intensively guarded by duty officer, but it turns out that, today the officer defensively observing each other all the time.

Since, JSA become an undesirable growth to DMZ, we introduce “BURN” (Border as a Universal Reunification of two Nations) as a new growth in JSA. BURN working aspect is similar to the cauterization; the treatment of using burnt metal. For example, the old building will be burnt down and delivering the solution to the origin of the tension by obstructing the soldier visibility in JSA. Furthermore, BURN will pro-vide an intellectual observatory, which generated by an interaction be-tween citizen and the pavilion, causing individual to observe thoughts rather than view. In addition, BURN would remove the infection of this

border, and restore and fertilize JSA to its better life.

Burning Cemetery

Form

“Burning cemetery” project is a platform for observation that seeks to transform the act of observation within the demili-tarized zone of Korean peninsula to an ob-servatory that promotes peace between North and South Korea.

Demilitarized Zone or DMZ for short, used to be a front line, an elongated place for exchanging violence, now has been trans-formed into today’s DMZ; a tourist desti-nation and ironically a no man’s land.

The burning cemetery are formally repre-sents the forest within DMZ as a reflection of the fragility of landscape. The platform houses tangible scale activities such as me-morials and burning ceremony for tourist. This move is to change the landscape by turning the points of interest from territo-rial security and historical objects, to the platform itself.

Platform for observation Proposed Systems

Plat

form

Cem

eter

y

Mechanic

Interactive

The platform is entirely made of bamboo that is easily constructed and replaced, Tourist are invited to overlay and display their personal be-longings and in doing so, they are also aware of the others doing.

As audience, thorough-ly engage with an overall spatial transformation; between quiet and cha-os, active and inactive, intervened space shifting experience of interaction towards the landscape and cultural-scape that in the end, will unfold a specific cultural knowledge left in landscape

UP

UP

DN

UP

41

D C A

21900

B

Electrical Substation

3

Shop

4

Loading Bay

5

1A500

1A502

1A501

--------

1

A301

1

A302

1

A303

5477

392

23

19310

300 5217 2071 712 5588 5422

3443

3987

62631386

21378

40102604

7274

3441

925

15401382

8698021

6872

4996 1110

Room

6

Room

7R

oom

8

Scale

Checked by

Draw

n by

Date

Project number

Consultant

AddressAddressPhoneFaxe-m

ail

81-89 BOU

VERIE ST,

VIC 3053

CO

NSTR

UC

TION

TYPEFIN

ISHES

FIXTUR

ESELEC

TRIC

AL

Polished Concrete

Concrete

Painted PlasterboardPrecast C

oncreteC

upid 500 Above Counter Basin

600mm

x 200 mm

Sands Om

an antislip full body porcelain

Chrom

e Arona Wall Basin M

ixer

Urinal-W

all Hung-C

aroma Torres

Invisi Suite

WC

-Wall Faced-C

aroma Leda C

areInvisi II Suite

WC

-Wall Faced-C

aroma O

pal II EasyH

eight Suite

CO

N- 01

PRC

- 02

PPB- 01

PCL- 01

CO

N-02

20mm

x 70 mm

red and black MT-89

Mosaic tile

Exposed Brickwork

MO

S- 01

BRK

- 01

FLOO

RW

ALL

TMF- 01

Recyled Tim

ber Flooring

BHT 01

Bluestone Honed Paver

TMF- 02

Timber Flooring Polyurethane C

oatingC

UR

- 01

CU

R- 02

Curtainw

all 1Plasterboard

PB- 01

Curtainw

all 2

CO

N- 02

Concrete

CB

WB

UW

WC

01

WC

02

Ultralix petite N

29687

BRK

- 01Brickw

ork

Luxspace BB5480

Deco LED

Emergency

DEC

OLED

MS- BK

Lux Aib 218 LED 2x18W

LedIndustrial Batten Evolution

Electresafe double powerpoint

with 10A and 15A outlets

Electresafe triple powerpoint

with 10 A and 15A outlets

10 A gang standard size switch

10 A dimable standard size

switch

10 A Gang standard size sw

itch

General N

otes- All dim

ension s to be verified on site prior toconstructionand discrepencies to be clarified w

ith architect.- D

o not scale drawings. refer to figured

dimensions only.

- Architectural drawings are to be read in

conjunction with

specification and other consultantsdocum

entation.- G

F is the benchmark level taken from

the floorlevel of theexisting building.- D

imensions are in m

m.

- This drawing is copyright.

1 : 50

Ground Floor

Plan2016.01

JOH

N D

OYLE

06/03/2016

AuthorC

hecker

A102 1 : 50G

round Floor1

2C

afe

PC 01

TMF 01

PC 01

PC 01

PC 01

BHP 01

Street Access to Building

Lift 1

Lift 2

Waste

ElectricalH

ot Water

Cold W

ater

SITE BOU

ND

ARY

LobbyN

o.D

escriptionD

ate

Technical Drawings/ DocumentationBig Scale: Tutor John Doyle

GROUND FLOOR

0

Level 01- MEZZANINE

4300

LEVEL 02

7950

LEVEL 03

11700

LEVEL 04

15450

LEVEL 05

19200

LEVEL 06

22950

LEVEL 07

26700

LEVEL 08

30450

LEVEL 09

34200

LEVEL 10

37950

LEVEL11

41700

LEVEL 12

45450

PARAPET

49200

RL LIFT MACHINE ROOM

52950

BASEMENT

-3400

D C AB

BCL

-400

TOILET

TOILET

TOILET

TOILET

TOILETMOS-01

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILETOFFICE /WORK SPACE

OFFICE /WORK SPACE

OFFICE /WORK SPACE

OFFICE /WORK SPACE

OFFICE /WORK SPACE

OFFICE /WORK SPACE

OFFICE /WORK SPACE

OFFICE /WORK SPACE

OFFICE /WORK SPACE

OFFICE /WORK SPACE

OFFICE /WORK SPACE

SHOP

CON-02

1260

2490

3750

3750

3750

3750

3750

3750

3750

3750

3750

3750

3750

3650

4300

RL LIFT OVER-RUN

51690

----

MOS-01

MOS-01

MOS-01

MOS-01

MOS-01

MOS-01

MOS-01

MOS-01

MOS-01

MOS-01

MOS-01

CON-02

CON-02

CON-02

CON-02

CON-02

CUR-02

CUR-02

CUR-02

CUR-02

CUR-02

CUR-02

LOADING BAY

PB-01

ELECTRICAL ROOM

CON-02

Scale

Checke d

by

Draw

nby

Date

Project number

Consul tant

Addres sAddres sPhoneFaxe-m

ail

81-8 9BO

UVE R

IEST,

VIC3053

CO

NS TR

UC

TION

TYPEFIN

IS HES

FIXTUR

ESELEC

TRIC

AL

Polishe dC

oncreteC

oncre te

PaintedPlasterboard

Precas tConcrete

Cupid

5 00Above

Cou nterBasin

600mm

x200

mm

SandsO

man

antislipf ullbody

porcel ain

Chrom

eArona

WallB asin

Mixer

Urinal-W

allHung-C

aro ma

TorresInvisiS uite

WC

-Wa llFaced-C

aroma

LedaC

areInvisiII Suite

WC

-Wa llFaced-C

aroma

OpalIIEasy

Height Suite

CO

N-01

PRC

-02

PPB-01

PCL-01

CO

N-02

20mm

x70

mm

redan d

blackM

T-89M

osaictile

Expose dBrickw

ork

MO

S-01

BRK-01

FLOO

RW

ALL

TMF-01

Recyled

TimberFloori ng

BHT

01Bluesto ne

Honed

Pav er

TMF-02

Timbe rFlooring

Polyu rethaneC

oatin gC

UR

-01

CU

R-02

Curtain w

all1Plaster board

PB-01

Curtain w

all2

CO

N-02

Concre te

CB

WB

UW

WC

01

WC

02

Ultralix

petiteN

29687

BRK-01

Brickwo rk

Luxspa ceBB5480

Deco

L EDEm

ergencyD

ECO

L EDM

S-BKLux

Aib218

LED2x18 W

LedIndustr ialBatten

Evolu tion

Electre safedouble

po werpoint

with

10 Aand

15Aoutl ets

Electre safetriple

powe rpoint

with

10A

and15A

out lets

10A

ga ngstandard

si zesw

itch

10A

di mable

standardsize

switch

10A

Gang

standards ize

switch

Gene ralN

otes-Alldim

ensions

tobe

verifiedon

sitepriorto

constru ctionand

dis crepenciesto

b eclarified

with

architect.-D

ono tscale

drawing s.referto

figur eddim

ens ionsonly.

-Archit ecturaldrawing s

areto

berea d

inconjunc tion

with

specific ationand

othe rconsultantsdocum

e ntation.-G

Fis

thebenchm

arkleveltaken

fro mthe

floorlevelof theexisting

building.-D

imen sions

arein

mm

.-This

d rawing

iscopy right.

1: 100

Sec tionA -A'

201 6.01

Towerof Joy

JOH

ND

OYLE

06/03/2 016

Au thorC

he cker

A301

1 : 100Section A-A,

1

No.

Descriptio n

Date

Ground Floor0

680

2

Ground Floor0

D

180

100

914

900

345

680

90

Ground Floor0

2000

2

Ground Floor0

D

1524

2000

390

852

435

377

D

A700

2

A700 3

A700

4

A7005

610

3481

3780

990

991

183119

80

2090 1690

1500

490

241

496

348

496

250

235

350

263

762

2

Scale

Checked by

Drawn by

Date

Project number

ConsultantAddressAddressPhoneFaxe-mail

81-89 BOUVERIE ST,VIC 3053

CONSTRUCTION TYPE FINISHES FIXTURES ELECTRICAL

Polished ConcreteConcrete

Painted PlasterboardPrecast Concrete

Cupid 500 Above Counter Basin

600mm x 200 mmSands Oman antislip full body porcelain

Chrome Arona Wall Basin Mixer

Urinal-Wall Hung-Caroma TorresInvisi Suite

WC-Wall Faced-Caroma Leda CareInvisi II Suite

WC-Wall Faced-Caroma Opal II EasyHeight Suite

CON- 01

PRC- 02

PPB- 01

PCL- 01

CON-02 20mm x 70 mm red and black MT-89Mosaic tile

Exposed Brickwork

MOS- 01

BRK- 01

FLOOR WALL

TMF- 01 Recyled Timber Flooring

BHT 01 Bluestone Honed Paver

TMF- 02 Timber Flooring Polyurethane CoatingCUR- 01

CUR- 02

Curtainwall 1PlasterboardPB- 01

Curtainwall 2

CON- 02 Concrete

CB

WB

UW

WC 01

WC 02

Ultralix petite N29687

BRK- 01 Brickwork

Luxspace BB5480

Deco LED EmergencyDECOLEDMS- BKLux Aib 218 LED 2x18W LedIndustrial Batten Evolution

Electresafe double powerpointwith 10A and 15A outlets

Electresafe triple powerpointwith 10 A and 15A outlets

10 A gang standard size switch

10 A dimable standard sizeswitch

10 A Gang standard size switch

General Notes- All dimension s to be verified on site prior toconstructionand discrepencies to be clarified with architect.- Do not scale drawings. refer to figureddimensions only.- Architectural drawings are to be read inconjunction withspecification and other consultantsdocumentation.- GF is the benchmark level taken from the floorlevel of theexisting building.- Dimensions are in mm.- This drawing is copyright.

1 : 20

WomensAmenities

2016.01

JOHN DOYLE

06/03/2016

AuthorChecker

A701

1 : 20Elevation A

2 1 : 20Elevation B

3

1 : 20Elevation C

4 1 : 20Elevation D

5

1 : 20Womens Toilets

1

Cupid 500 Above Counter Basin

20mm x 70 mm red and black MT-89Mosaic tile600mm x 200 mmSands Oman antislip full body porcelain

Chrome Arona Wall Basin Mixer

LEGEND

CONSTRUCTION TYPE FINISHES FIXTURES ELETRICAL GENERAL NOTES

No. Description Date

Ground Floor0

457

585

100

180

1009

091

4

120341457634501892

1500

300

Ground Floor0

Ground Floor0

1900

680

Ground Floor0

2000

A700

2

A701

2

A701 3

A701

4

A7015

110496278496120

450

267443170237443200

895 895

1990 1790

1582

3780

2

Scale

Checked by

Drawn by

Date

Project number

ConsultantAddressAddressPhoneFaxe-mail

81-89 BOUVERIE ST,VIC 3053

CONSTRUCTION TYPE FINISHES FIXTURES ELECTRICAL

Polished ConcreteConcrete

Painted PlasterboardPrecast Concrete

Cupid 500 Above Counter Basin

600mm x 200 mmSands Oman antislip full body porcelain

Chrome Arona Wall Basin Mixer

Urinal-Wall Hung-Caroma TorresInvisi Suite

WC-Wall Faced-Caroma Leda CareInvisi II Suite

WC-Wall Faced-Caroma Opal II EasyHeight Suite

CON- 01

PRC- 02

PPB- 01

PCL- 01

CON-02 20mm x 70 mm red and black MT-89Mosaic tile

Exposed Brickwork

MOS- 01

BRK- 01

FLOOR WALL

TMF- 01 Recyled Timber Flooring

BHT 01 Bluestone Honed Paver

TMF- 02 Timber Flooring Polyurethane CoatingCUR- 01

CUR- 02

Curtainwall 1PlasterboardPB- 01

Curtainwall 2

CON- 02 Concrete

CB

WB

UW

WC 01

WC 02

Ultralix petite N29687

BRK- 01 Brickwork

Luxspace BB5480

Deco LED EmergencyDECOLEDMS- BKLux Aib 218 LED 2x18W LedIndustrial Batten Evolution

Electresafe double powerpointwith 10A and 15A outlets

Electresafe triple powerpointwith 10 A and 15A outlets

10 A gang standard size switch

10 A dimable standard sizeswitch

10 A Gang standard size switch

General Notes- All dimension s to be verified on site prior toconstructionand discrepencies to be clarified with architect.- Do not scale drawings. refer to figureddimensions only.- Architectural drawings are to be read inconjunction withspecification and other consultantsdocumentation.- GF is the benchmark level taken from the floorlevel of theexisting building.- Dimensions are in mm.- This drawing is copyright.

1 : 20

Mens Amenities

2016.01

JOHN DOYLE

06/03/2016

AuthorChecker

A702

1 : 20Elevation 5 - a

2 1 : 20Elevation 6 - a

3

1 : 20Elevation 7 - a

4 1 : 20Elevation 8 - a

5

1 : 20Mens Toilets

1

No. Description Date

4

Scale

Checke d

by

Draw

nby

Date

Project number

Consul tant

Addres sAddres sPhoneFaxe-m

ail

81-8 9BO

UVE R

IEST,

VIC3053

CO

NS TR

UC

TION

TYPEFIN

IS HES

FIXTUR

ESELEC

TRIC

AL

Polishe dC

oncreteC

oncre te

PaintedPlasterboard

Precas tConcrete

Cupid

5 00Above

Cou nterBasin

600mm

x200

mm

SandsO

man

antislipf ullbody

porcel ain

Chrom

eArona

WallB asin

Mixer

Urinal-W

allHung-C

aro ma

TorresInvisiS uite

WC

-Wa llFaced-C

aroma

LedaC

areInvisiII Suite

WC

-Wa llFaced-C

aroma

OpalIIEasy

Height Suite

CO

N-01

PRC

-02

PPB-01

PCL-01

CO

N-02

20mm

x70

mm

redan d

blackM

T-89M

osaictile

Expose dBrickw

ork

MO

S-01

BRK-01

FLOO

RW

ALL

TMF-01

Recyled

TimberFloori ng

BHT

01Bluesto ne

Honed

Pav er

TMF-02

Timbe rFlooring

Polyu rethaneC

oatin gC

UR

-01

CU

R-02

Curtain w

all1Plaster board

PB-01

Curtain w

all2

CO

N-02

Concre te

CB

WB

UW

WC

01

WC

02

Ultralix

petiteN

29687

BRK-01

Brickwo rk

Luxspa ceBB5480

Deco

L EDEm

ergencyD

ECO

L EDM

S-BKLux

Aib218

LED2x18 W

LedIndustr ialBatten

Evolu tion

Electre safedouble

po werpoint

with

10 Aand

15Aoutl ets

Electre safetriple

powe rpoint

with

10A

and15A

out lets

10A

ga ngstandard

si zesw

itch

10A

di mable

standardsize

switch

10A

Gang

standards ize

switch

Gene ralN

otes-Alldim

ensions

tobe

verifiedon

sitepriorto

constru ctionand

dis crepenciesto

b eclarified

with

architect.-D

ono tscale

drawing s.referto

figur eddim

ens ionsonly.

-Archit ecturaldrawing s

areto

berea d

inconjunc tion

with

specific ationand

othe rconsultantsdocum

e ntation.-G

Fis

thebenchm

arkleveltaken

fro mthe

floorlevelof theexisting

building.-D

imen sions

arein

mm

.-This

d rawing

iscopy right.

1:10

North

Par apetD

etail201 6.01

Towerof Joy

JOH

ND

OYLE

06/03/2 016

Au thorC

he cker

A403

1 : 10Roof and Parapet Detail 01

2

10mm THICK GYPSUMBOARD TO MFTR'S DETAIL

STL. TRIANGLE KEELTO MFTR'S DETAIL

38 STL. MAIN KEELTO MFTR'S DETAIL

HANGING PARTOF VISIBLE KEEL

HANGING ROD/SUSPENDER

8mm THICKDOUBLE GLAZING

TO MFTR'SDETAIL

65x50 mm STL. WINDOW FRAME FIXED TO RHS

TO MFTR'S DETAIL

RSA 35x100 mmTO ENGR'S DETAIL

RHS 65x125mm TO ENGR'S DETAIL

PERFORATED STL GALV.CLIP ON METAL MESH

PANEL TO ARCH DETAIL

35x75 STL. MULLIONTO ENGR'S DETAIL

35x130 mm BASE PLATE TO ENGR'S DETAIL

FLASHING

SQUARE STL. PANEL

200x90x30mm PFCSTL.TO ENGR'S DETAIL

200x90x30mm PFC STL.TOENGR'S DETAIL

120x60 mm BASEPLATE TO ENGR'S

DETAIL

DRAINAGE LAYER

THERMALINSULATION

INSULATION

INSULATION

No.

Descriptio n

Date

1

Scale

Checke d

by

Draw

nby

Date

Project number

Consul tant

Addres sAddres sPhoneFaxe-m

ail

81-8 9BO

UVE R

IEST,

VIC3053

CO

NS TR

UC

TION

TYPEFIN

IS HES

FIXTUR

ESELEC

TRIC

AL

Polishe dC

oncreteC

oncre te

PaintedPlasterboard

Precas tConcrete

Cupid

5 00Above

Cou nterBasin

600mm

x200

mm

SandsO

man

antislipf ullbody

porcel ain

Chrom

eArona

WallB asin

Mixer

Urinal-W

allHung-C

aro ma

TorresInvisiS uite

WC

-Wa llFaced-C

aroma

LedaC

areInvisiII Suite

WC

-Wa llFaced-C

aroma

OpalIIEasy

Height Suite

CO

N-01

PRC

-02

PPB-01

PCL-01

CO

N-02

20mm

x70

mm

redan d

blackM

T-89M

osaictile

Expose dBrickw

ork

MO

S-01

BRK-01

FLOO

RW

ALL

TMF-01

Recyled

TimberFloori ng

BHT

01Bluesto ne

Honed

Pav er

TMF-02

Timbe rFlooring

Polyu rethaneC

oatin gC

UR

-01

CU

R-02

Curtain w

all1Plaster board

PB-01

Curtain w

all2

CO

N-02

Concre te

CB

WB

UW

WC

01

WC

02

Ultralix

petiteN

29687

BRK-01

Brickwo rk

Luxspa ceBB5480

Deco

L EDEm

ergencyD

ECO

L EDM

S-BKLux

Aib218

LED2x18 W

LedIndustr ialBatten

Evolu tion

Electre safedouble

po werpoint

with

10 Aand

15Aoutl ets

Electre safetriple

powe rpoint

with

10A

and15A

out lets

10A

ga ngstandard

si zesw

itch

10A

di mable

standardsize

switch

10A

Gang

standards ize

switch

Gene ralN

otes-Alldim

ensions

tobe

verifiedon

sitepriorto

constru ctionand

dis crepenciesto

b eclarified

with

architect.-D

ono tscale

drawing s.referto

figur eddim

ens ionsonly.

-Archit ecturaldrawing s

areto

berea d

inconjunc tion

with

specific ationand

othe rconsultantsdocum

e ntation.-G

Fis

thebenchm

arkleveltaken

fro mthe

floorlevelof theexisting

building.-D

imen sions

arein

mm

.-This

d rawing

iscopy right.

1:10

Sout hPar apet

Detail201 6.01

Towerof Joy

JOH

ND

OYLE

06/03/2 016

Au thorC

he cker

A404

1 : 10Core to Parapet Detail

1

8mm THICKDOUBLE GLAZINGTO MFTR'SDETAIL

65x50 mm STL. WINDOW FRAME FIXED TO RHSTO MFTR'S DETAIL

RSA 35x100 mmTO ENGR'S DETAIL

RHS 65x125mm TO ENGR'S DETAIL

PERFORATED STL GALV.CLIP ON METAL MESHPANEL TO ARCH DETAIL

35x75 STL. MULLIONTO ENGR'S DETAIL

35x130 mm BASE PLATE TO ENGR'S DETAIL

FLASHING

GRILL 550mm WIDTH

FLASHING

FLASHING TO CURTAINWALL STRUCTURE

150x120mm BRACKET TO ENGR'S DETAIL

PLASTER CLADDINGFIXED TO BATTEN

20x30mm THICK BATTEN FIXED TO PARAPET

ALUM. ROOF SHEET

100x120 BRACKET TO ENGR'SDETAIL

No.

Descriptio n

Date

1

Scale

Checke d

by

Draw

nby

Date

Project number

Consul tant

Addres sAddres sPhoneFaxe-m

ail

81-8 9BO

UVE R

IEST,

VIC3053

CO

NS TR

UC

TION

TYPEFIN

IS HES

FIXTUR

ESELEC

TRIC

AL

Polishe dC

oncreteC

oncre te

PaintedPlasterboard

Precas tConcrete

Cupid

5 00Above

Cou nterBasin

600mm

x200

mm

SandsO

man

antislipf ullbody

porcel ain

Chrom

eArona

WallB asin

Mixer

Urinal-W

allHung-C

aro ma

TorresInvisiS uite

WC

-Wa llFaced-C

aroma

LedaC

areInvisiII Suite

WC

-Wa llFaced-C

aroma

OpalIIEasy

Height Suite

CO

N-01

PRC

-02

PPB-01

PCL-01

CO

N-02

20mm

x70

mm

redan d

blackM

T-89M

osaictile

Expose dBrickw

ork

MO

S-01

BRK-01

FLOO

RW

ALL

TMF-01

Recyled

TimberFloori ng

BHT

01Bluesto ne

Honed

Pav er

TMF-02

Timbe rFlooring

Polyu rethaneC

oatin gC

UR

-01

CU

R-02

Curtain w

all1Plaster board

PB-01

Curtain w

all2

CO

N-02

Concre te

CB

WB

UW

WC

01

WC

02

Ultralix

petiteN

29687

BRK-01

Brickwo rk

Luxspa ceBB5480

Deco

L EDEm

ergencyD

ECO

L EDM

S-BKLux

Aib218

LED2x18 W

LedIndustr ialBatten

Evolu tion

Electre safedouble

po werpoint

with

10 Aand

15Aoutl ets

Electre safetriple

powe rpoint

with

10A

and15A

out lets

10A

ga ngstandard

si zesw

itch

10A

di mable

standardsize

switch

10A

Gang

standards ize

switch

Gene ralN

otes-Alldim

ensions

tobe

verifiedon

sitepriorto

constru ctionand

dis crepenciesto

b eclarified

with

architect.-D

ono tscale

drawing s.referto

figur eddim

ens ionsonly.

-Archit ecturaldrawing s

areto

berea d

inconjunc tion

with

specific ationand

othe rconsultantsdocum

e ntation.-G

Fis

thebenchm

arkleveltaken

fro mthe

floorlevelof theexisting

building.-D

imen sions

arein

mm

.-This

d rawing

iscopy right.

1:10

Wes tFac adeD

etails201 6.01

Towerof Joy

JOH

ND

OYLE

06/03/2 016

Au thorC

he cker

A405

1 : 10Facade to Core Details

1

8mm THICKDOUBLE GLAZINGTO MFTR'SDETAIL

65x50 mm STL. WINDOW FRAME FIXED TO RHSTO MFTR'S DETAIL

RSA 35x100 mmTO ENGR'S DETAIL

RHS 65x125mm TO ENGR'S DETAIL

PERFORATED STL GALV.CLIP ON METAL MESHPANEL TO ARCH DETAIL

35x75 STL. MULLIONTO ENGR'S DETAIL

35x130 mm BASE PLATE TO ENGR'S DETAIL

100x120mm BRACKET TO ENGR's DETAIL

GRILL 550mm WIDTH

RHS 65x125mm TO ENGR'S DETAIL

FLASH

No.

Descriptio n

Date

4

Scale

Checke d

by

Draw

nby

Date

Project number

Consul tant

Addres sAddres sPhoneFaxe-m

ail

81-8 9BO

UVE R

IEST,

VIC3053

CO

NS TR

UC

TION

TYPEFIN

IS HES

FIXTUR

ESELEC

TRIC

AL

Polishe dC

oncreteC

oncre te

PaintedPlasterboard

Precas tConcrete

Cupid

5 00Above

Cou nterBasin

600mm

x200

mm

SandsO

man

antislipf ullbody

porcel ain

Chrom

eArona

WallB asin

Mixer

Urinal-W

allHung-C

aro ma

TorresInvisiS uite

WC

-Wa llFaced-C

aroma

LedaC

areInvisiII Suite

WC

-Wa llFaced-C

aroma

OpalIIEasy

Height Suite

CO

N-01

PRC

-02

PPB-01

PCL-01

CO

N-02

20mm

x70

mm

redan d

blackM

T-89M

osaictile

Expose dBrickw

ork

MO

S-01

BRK-01

FLOO

RW

ALL

TMF-01

Recyled

TimberFloori ng

BHT

01Bluesto ne

Honed

Pav er

TMF-02

Timbe rFlooring

Polyu rethaneC

oatin gC

UR

-01

CU

R-02

Curtain w

all1Plaster board

PB-01

Curtain w

all2

CO

N-02

Concre te

CB

WB

UW

WC

01

WC

02

Ultralix

petiteN

29687

BRK-01

Brickwo rk

Luxspa ceBB5480

Deco

L EDEm

ergencyD

ECO

L EDM

S-BKLux

Aib218

LED2x18 W

LedIndustr ialBatten

Evolu tion

Electre safedouble

po werpoint

with

10 Aand

15Aoutl ets

Electre safetriple

powe rpoint

with

10A

and15A

out lets

10A

ga ngstandard

si zesw

itch

10A

di mable

standardsize

switch

10A

Gang

standards ize

switch

Gene ralN

otes-Alldim

ensions

tobe

verifiedon

sitepriorto

constru ctionand

dis crepenciesto

b eclarified

with

architect.-D

ono tscale

drawing s.referto

figur eddim

ens ionsonly.

-Archit ecturaldrawing s

areto

berea d

inconjunc tion

with

specific ationand

othe rconsultantsdocum

e ntation.-G

Fis

thebenchm

arkleveltaken

fro mthe

floorlevelof theexisting

building.-D

imen sions

arein

mm

.-This

d rawing

iscopy right.

1:10

Nort h

Fac adeD

e tails02201 6.01

Towerof Joy

JOH

ND

OYLE

06/03/2 016

Au thorC

he cker

A402

1 : 10North Facade Detail 02

2

8mm THICKDOUBLE GLAZING

TO MFTR'SDETAIL

65x50 mm STL. WINDOW FRAME FIXED TO RHS

TO MFTR'S DETAIL

RSA 35x100 mmTO ENGR'S DETAIL

RHS 65x125mm TO ENGR'S DETAIL

GRILL 550mm WIDTH

PERFORATED STL GALV.CLIP ON METAL MESH

PANEL TO ARCH DETAIL

35x75mm STL. MULLIONTO ENGR'S DETAIL

35x130 mm BASE PLATE TO ENGR'S DETAIL

30x20mm STL.RAISED FLOORJOIST TO MFTR'SDETAIL

STL. PEDESTAL

10 GYPSUM BOARDTO MFTR'S DETAIL

FLASHING

10mm THICK GYPSUMBOARD TO MFTR'S DETAIL

STL. TRIANGLE KEELTO MFTR'S DETAIL

38 STL. MAIN KEELTO MFTR'S DETAIL

HANGING PARTOF VISIBLE KEEL

HANGING ROD/SUSPENDER

SQUARE STL. PANEL

120x60mm BASE PLATETO ENGR'S DETAIL

STL PLATE 3 mmTHICK

No.

Descriptio n

Date

GROUND FLOOR

0

Level 01- MEZZANINE

4300

LEVEL 02

7950

LEVEL 12

45450

PARAPET

49200

RL LIFT MACHINE ROOM

52950

BASEMENT

-3400

2 1

RL LIFT OVER-RUN

51690

1A404

1A405

Scale

Checke d

by

Draw

nby

Date

Project number

Consul tant

Addres sAddres sPhoneFaxe-m

ail

81-8 9BO

UVE R

IEST,

VIC3053

CO

NS TR

UC

TION

TYPEFIN

IS HES

FIXTUR

ESELEC

TRIC

AL

Polishe dC

oncreteC

oncre te

PaintedPlasterboard

Precas tConcrete

Cupid

5 00Above

Cou nterBasin

600mm

x200

mm

SandsO

man

antislipf ullbody

porcel ain

Chrom

eArona

WallB asin

Mixer

Urinal-W

allHung-C

aro ma

TorresInvisiS uite

WC

-Wa llFaced-C

aroma

LedaC

areInvisiII Suite

WC

-Wa llFaced-C

aroma

OpalIIEasy

Height Suite

CO

N-01

PRC

-02

PPB-01

PCL-01

CO

N-02

20mm

x70

mm

redan d

blackM

T-89M

osaictile

Expose dBrickw

ork

MO

S-01

BRK-01

FLOO

RW

ALL

TMF-01

Recyled

TimberFloori ng

BHT

01Bluesto ne

Honed

Pav er

TMF-02

Timbe rFlooring

Polyu rethaneC

oatin gC

UR

-01

CU

R-02

Curtain w

all1Plaster board

PB-01

Curtain w

all2

CO

N-02

Concre te

CB

WB

UW

WC

01

WC

02

Ultralix

petiteN

29687

BRK-01

Brickwo rk

Luxspa ceBB5480

Deco

L EDEm

ergencyD

ECO

L EDM

S-BKLux

Aib218

LED2x18 W

LedIndustr ialBatten

Evolu tion

Electre safedouble

po werpoint

with

10 Aand

15Aoutl ets

Electre safetriple

powe rpoint

with

10A

and15A

out lets

10A

ga ngstandard

si zesw

itch

10A

di mable

standardsize

switch

10A

Gang

standards ize

switch

Gene ralN

otes-Alldim

ensions

tobe

verifiedon

sitepriorto

constru ctionand

dis crepenciesto

b eclarified

with

architect.-D

ono tscale

drawing s.referto

figur eddim

ens ionsonly.

-Archit ecturaldrawing s

areto

berea d

inconjunc tion

with

specific ationand

othe rconsultantsdocum

e ntation.-G

Fis

thebenchm

arkleveltaken

fro mthe

floorlevelof theexisting

building.-D

imen sions

arein

mm

.-This

d rawing

iscopy right.

1:50

Part sSec tion

B -B'0 2201 6.01

Towerof Joy

JOH

ND

OYLE

06/03/2 016

Au thorC

he cker

A306

1 : 50Part Section B-B' 02

1

No.

Descriptio n

Date

4

Scale

Checke d

by

Draw

nby

Date

Project number

Consul tant

Addres sAddres sPhoneFaxe-m

ail

81-8 9BO

UVE R

IEST,

VIC3053

CO

NS TR

UC

TION

TYPEFIN

IS HES

FIXTUR

ESELEC

TRIC

AL

Polishe dC

oncreteC

oncre te

PaintedPlasterboard

Precas tConcrete

Cupid

5 00Above

Cou nterBasin

600mm

x200

mm

SandsO

man

antislipf ullbody

porcel ain

Chrom

eArona

WallB asin

Mixer

Urinal-W

allHung-C

aro ma

TorresInvisiS uite

WC

-Wa llFaced-C

aroma

LedaC

areInvisiII Suite

WC

-Wa llFaced-C

aroma

OpalIIEa sy

Height Suite

CO

N-01

PRC

-02

PPB-01

PCL-01

CO

N-02

20mm

x70

mm

redan d

blackM

T-89M

osaictile

Expose dBrickw

ork

MO

S-01

BRK-01

FLOO

RW

ALL

TMF-01

Recyled

TimberFloori ng

BHT

01Bluesto ne

Honed

Pav er

TMF-02

Timbe rFlooring

Polyu rethaneC

oatin gC

UR

-01

CU

R-02

Curtain w

all1Plaster board

PB-01

Curtain w

all2

CO

N-02

Concre te

CB

WB

UW

WC

01

WC

02

Ultralix

petiteN

29687

BRK-01

Brickwo rk

Luxspa ceBB5480

Deco

L EDEm

ergencyD

ECO

L EDM

S-BKLux

Aib218

LED2x18 W

LedIndustr ialBatten

E volu tion

Electre safedouble

po werpoint

with

10 Aand

15Aoutl ets

Electre safetriple

powe rpoint

with

10A

and15A

out lets

10A

ga ngstandard

si zesw

itch

10A

di mable

standardsize

switch

10A

Gang

standards ize

switch

Gene ralN

otes-Alldim

ensions

tobe

verifiedon

sitepriorto

constru ctionand

dis crepenciesto

b eclarified

with

architect.-D

ono tscale

drawing s.referto

figur eddim

ens ionsonly.

-Archit ecturaldrawing s

areto

berea d

inconjunc tion

with

specific ationand

othe rconsultantsdocum

e ntation.-G

Fis

thebenchm

arkleveltaken

fro mthe

floorlevelof theexisting

building.-D

imen sions

arein

mm

.-This

d rawing

iscopy right.

1:10

Nort h

Fac adeD

e tails01201 6.01

Towerof Joy

JOH

ND

OYLE

06/03/2 016

Au thorC

he cker

A401

8mm THICKDOUBLE GLAZING

TO MFTR'SDETAIL

1 : 10North Facade Detail 01

1

65x50 mm STL. WINDOW FRAME FIXED TO RHS

TO MFTR'S DETAIL

RSA 35x100 mmTO ENGR'S DETAIL

RHS 65x125mm TO ENGR'S DETAIL

GRILL 550mm WIDTH

PERFORATED STL GALV.CLIP ON METAL MESH

PANEL TO ARCH DETAIL

35x75 STL. MULLIONTO ENGR'S DETAIL

35x130 mm BASE PLATE TO ENGR'S DETAIL

10mm THICK GYPSUM BOARD TO ENGR'S DETAIL

MINERAL WOOL INSULATION

100x50x150mm GALV.BRACKET TO ENGR'S

DETAIL

30x20mm STL. RAISED FLOORJOIST TO MFTR'S DETAIL

STL. PEDESTAL

10 GYPSUM BOARDTO MFTR'S DETAIL

FLASHING

120x60mm BASE PLATETO ENGR'S DETAIL

STL PLATE 3 mmTHICK

No.

Descriptio n

Date

Scale

Checked by

Drawn by

Date

Project number

ConsultantAddressAddressPhoneFaxe-mail

81-89 BOUVERIE ST,VIC 3053

CONSTRUCTION TYPE FINISHES FIXTURES ELECTRICAL

Polished ConcreteConcrete

Painted PlasterboardPrecast Concrete

Cupid 500 Above Counter Basin

600mm x 200 mmSands Oman antislip full body porcelain

Chrome Arona Wall Basin Mixer

Urinal-Wall Hung-Caroma TorresInvisi Suite

WC-Wall Faced-Caroma Leda CareInvisi II Suite

WC-Wall Faced-Caroma Opal II EasyHeight Suite

CON- 01

PRC- 02

PPB- 01

PCL- 01

CON-02 20mm x 70 mm red and black MT-89Mosaic tile

Exposed Brickwork

MOS- 01

BRK- 01

FLOOR WALL

TMF- 01 Recyled Timber Flooring

BHT 01 Bluestone Honed Paver

TMF- 02 Timber Flooring Polyurethane CoatingCUR- 01

CUR- 02

Curtainwall 1PlasterboardPB- 01

Curtainwall 2

CON- 02 Concrete

CB

WB

UW

WC 01

WC 02

Ultralix petite N29687

BRK- 01 Brickwork

Luxspace BB5480

Deco LED EmergencyDECOLEDMS- BKLux Aib 218 LED 2x18W LedIndustrial Batten Evolution

Electresafe double powerpointwith 10A and 15A outlets

Electresafe triple powerpointwith 10 A and 15A outlets

10 A gang standard size switch

10 A dimable standard sizeswitch

10 A Gang standard size switch

General Notes- All dimension s to be verified on site prior toconstructionand discrepencies to be clarified with architect.- Do not scale drawings. refer to figureddimensions only.- Architectural drawings are to be read inconjunction withspecification and other consultantsdocumentation.- GF is the benchmark level taken from the floorlevel of theexisting building.- Dimensions are in mm.- This drawing is copyright.

1 : 25

AxonometricDetail

2016.01

Tower of Joy

JOHN DOYLE

06/03/2016

AuthorChecker

A601

1 : 25Axonometric Detail

1

No. Description Date

8mm THICK DOUBLEGLAZING TO MFTR'SDETAIL

65x50 mm STL. WINDOWFRAME FIXED TO RHSTO MFTR'S DETAIL

RSA 35x100 mmTO ENGR'S DETAIL

GRILL 550mm WIDTH

PERFORATED STL GALV.CLIP ON METAL MESH

PANEL TO ARCH DETAIL

35x75mm STL. MULLIONTO ENGR'S DETAIL

35x130 RSA TO ENGR'S DETAIL

UP

2

3

3D

3

A200

1

A2021A202 2

A201

1

B D

1

3

2

A C G H

1

A301

38578

5338 4220 9500 9593 9600

1915 1920 5259 2435 800

2408

0

3954

1243

4326

7202

2400

2435

3020

1292 14

94

1121

1

A300

1

A400

2

A4002

A302

1

A302

5

1216

656

4959

51

D4

D3

D2

D1

D7

D8

D5

2032

5300

3049 2000 4761 2160

Driveway (02)+0.00

Service Area (17)+0.00

Loading Area (03)+0.00

System (18)+10.0

WC (16)+10.0

Storage (15)+10.0

1

2

3

4

5

1

2

3

4

5

UP

Customer Storage (01)+0.00

Reception (28)+0.00

SETOUTSTRUCTURAL WALL SETOUTGRID SETOUTLENGTH

5040 299 13400 324 2184 5497 1342 10184

200

1840

200

2580

200

1400

STRU

CTUR

AL W

ALL

&OP

ENING

SETO

UT

GRID S

ETOU

TLE

NGTH

4810

4000

4245

2180

8205

LIFT

Fall

PC1

PC1

PC1

PC1PC1

PC1

PC2

PC2

PC2

PC2

PC2

AX

BR

PC2

PC1

PC2

PC1

AX

AX

PC3

CT

PC3

PC3

PC3

PC3

PC3

Yellow painted border

Yellow painted border

PC3

TL

VN

DS

SOSO

SO

Brick 110Double Brick 270ConcreteLightweight Structures

Ultralux N29688

Ultralux petite N29687

Luxspace BB5480

Deco LED Emergency DECOLEDMS-BK

Lux Aib 218 LED 2x18W Led Industrial Batten Evolution

50 mm Asterix Cladding Panels (900 x 2100 mm) with fire rated Sicaflex caulk at all joints.AX

BR

DA

MA

PC

CA

LI

CT

FPB

PB

WPB

VA

AS

Danpalon DP30 Honeycomb (900 x 1800 mm) with specific joins following manufacturer's specification.

Megaclad steel roof sheets (800 x 1200 mm) installed following manufacturer's specification.

Polished poured concrete slab

Studio selections satalite dyed nylon cut plush pile carpet

Existing Brick wall

Classic Mystique PUR Nocturne 1380 Linoleum

Wickes White Gloss Cermaic Floor Tiles (150 x 150mm) applied with black grout andsealant - Sellys Wet Area Silicone (black)

Painted 16mm Gyprock Standard Plasterboard (1200 x 2400 mm) for all fire-rated wall

Painted 10 mm Gyprock Standard Plasterboard (1200 x 2400mm)

10 mm mpoisture resistant plasterboard substratefor all wet areas

Polished Victorian Ash

Anti-slip Carborundum Hazard #60 over edge of stair tread

Reve wall-mount bathroom sinkVN

DS

BN

CB

SK

DS1

S0

TL

Bench to be specified by MVB

Kitchen cabinet

Vault under mount kitchen sink

Dining table to be specified by MVB

Working desk to be specified by MVB

Sofa to be specified by MVB

Caravell Smart one piece easy height elongated #9899000

- All dimension s to be verified on site prior to construction and discrepencies to be clarified with architect.- Do not scale drawings. refer to figured dimensions only.- Architectural drawings are to be read in conjunction with specification and other consultants documentation.- GF is the benchmark level taken from the floor level of the existing building.- Dimensions are in mm.- This drawing is copyright.

CONSTRUCTION TYPE FINISHES FIXTURES ELECTRICAL GENERAL NOTES

10 A 1 gang standard size switch

10 A 3 Gang standard size switch

10 A 1 dimable standard size switch

Electresafe triple powerpoint with 10A and 15A outlets

Electresafe double powerpoint with 10A and 15A outlets

26 Henry StreetAbbotsfordMelbourne

Scale

Checked by

Drawn by

Date

Project Number

DESCRIPTIONNO DATE

Zul Rahaman1, Queen Street

Melbourne0430 020 811

[email protected]

Marnie Newton1, Queen Street

Melbourne0401 422 376

[email protected]

Tul Srisompun1, Queen Street

Melbourne0413 730 932

[email protected]

MV01

Tul Srisompun

Zul Rahaman

A100A101A102A103A104A105A106A200A201A202A300A301A302A400A500A501A502A600A700A701A702

DEMOLITION PLANSITE PLANPROPOSED GROUND FLOOR PLANPROPOSED FIRST FLOOR PLANGROUND FLOOR REFECTIVE CEILING PLANFIRST FLOOR REFLECTIVE CEILING PLANPROPOSED ROOF PLANNORTH ELEVATIONSOUTH ELEVATIONEAST AND WEST ELEVATIONLONG SECTIONSHORT SECTIONSTORAGE AND DRIVEWAY AREAPLAN DETAILSTAIRS SECTION DETAILROOF SECTION DETAILROOF CONNECTION SECTION DETAILWET AREAWINDOW SCHEDULEDOOR SCHEDULESTRUCTURAL SCHEDULE

13/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/2015

1 : 100

A10210/06/15

A102 1 : 100

1 PROPOSED GROUND FLOOR PLAN

LEGEND

D

3

1 32

1

A3002

A3022

A501

3

A502

5

D15D16

D8

W7

W11

AS01

C01

D6

B01

B01 B02 B01

Driveway (02)Concrete flooring+0.00

ServiceArea (17)Concrete flooring+0.00

CustomerStorage (01)Concrete flooring+0.00

Call Centre (09)Carpet+ 4600

Balcony (22)Linoleum+ 4600

300

4056

303

241

3012

293

300

3824

3778

303

1104

9912

08

LATE

RAL

STRU

CTUR

E(EXIST

ING

BUILDING

)

LATE

RAL

STRU

CTUR

E(EXT

ENSION

)

PB01

10.00°

GF +0

FCL 1 +4360

CL 1 +7600

BL 3 +10000

13 2

CW +1700

BL 1 +7905

FFL 1 +4600

1

A300

2

A3021

A502

1

A501

5

W7

W18

BL 2 +9017

D5

D22Balcony (22)Linoleum+ 4600

Locker Room (05)Linoleum+ 4600

Driveway (02)Concrete flooring+0.00

DriverCommon Room (04)Linoleum+ 4600

AS01

C01

AS01

PB01

PB01 PB01

AS01

C01

300

1700

5900

305

1112

983

208

LATE

RAL

STRU

CTUR

E(EXT

ENSION

)

300

4125

23424

130

0030

5LA

TERA

L ST

RUCT

URE

(EXIST

ING

BUILDING

)

10.00°

10.00°

Brick 110Double Brick 270ConcreteLightweight Structures

Ultralux N29688

Ultralux petite N29687

Luxspace BB5480

Deco LED Emergency DECOLEDMS-BK

Lux Aib 218 LED 2x18W Led Industrial Batten Evolution

50 mm Asterix Cladding Panels (900 x 2100 mm) with fire rated Sicaflex caulk at all joints.AX

BR

DA

MA

PC

CA

LI

CT

FPB

PB

WPB

VA

AS

Danpalon DP30 Honeycomb (900 x 1800 mm) with specific joins following manufacturer's specification.

Megaclad steel roof sheets (800 x 1200 mm) installed following manufacturer's specification.

Polished poured concrete slab

Studio selections satalite dyed nylon cut plush pile carpet

Existing Brick wall

Classic Mystique PUR Nocturne 1380 Linoleum

Wickes White Gloss Cermaic Floor Tiles (150 x 150mm) applied with black grout andsealant - Sellys Wet Area Silicone (black)

Painted 16mm Gyprock Standard Plasterboard (1200 x 2400 mm) for all fire-rated wall

Painted 10 mm Gyprock Standard Plasterboard (1200 x 2400mm)

10 mm mpoisture resistant plasterboard substratefor all wet areas

Polished Victorian Ash

Anti-slip Carborundum Hazard #60 over edge of stair tread

Reve wall-mount bathroom sinkVN

DS

BN

CB

SK

DS1

S0

TL

Bench to be specified by MVB

Kitchen cabinet

Vault under mount kitchen sink

Dining table to be specified by MVB

Working desk to be specified by MVB

Sofa to be specified by MVB

Caravell Smart one piece easy height elongated #9899000

- All dimension s to be verified on site prior to construction and discrepencies to be clarified with architect.- Do not scale drawings. refer to figured dimensions only.- Architectural drawings are to be read in conjunction with specification and other consultants documentation.- GF is the benchmark level taken from the floor level of the existing building.- Dimensions are in mm.- This drawing is copyright.

CONSTRUCTION TYPE FINISHES FIXTURES ELECTRICAL GENERAL NOTES

10 A 1 gang standard size switch

10 A 3 Gang standard size switch

10 A 1 dimable standard size switch

Electresafe triple powerpoint with 10A and 15A outlets

Electresafe double powerpoint with 10A and 15A outlets

26 Henry StreetAbbotsfordMelbourne

Scale

Checked by

Drawn by

Date

Project Number

DESCRIPTIONNO DATE

Zul Rahaman1, Queen Street

Melbourne0430 020 811

[email protected]

Marnie Newton1, Queen Street

Melbourne0401 422 376

[email protected]

Tul Srisompun1, Queen Street

Melbourne0413 730 932

[email protected]

MV01

Tul Srisompun

Zul Rahaman

A100A101A102A103A104A105A106A200A201A202A300A301A302A400A500A501A502A600A700A701A702

DEMOLITION PLANSITE PLANPROPOSED GROUND FLOOR PLANPROPOSED FIRST FLOOR PLANGROUND FLOOR REFECTIVE CEILING PLANFIRST FLOOR REFLECTIVE CEILING PLANPROPOSED ROOF PLANNORTH ELEVATIONSOUTH ELEVATIONEAST AND WEST ELEVATIONLONG SECTIONSHORT SECTIONSTORAGE AND DRIVEWAY AREAPLAN DETAILSTAIRS SECTION DETAILROOF SECTION DETAILROOF CONNECTION SECTION DETAILWET AREAWINDOW SCHEDULEDOOR SCHEDULESTRUCTURAL SCHEDULE

13/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/2015

1 : 100

A30110/06/15

A301 1 : 100

1 CROSS SECTION 1

A301 1 : 100

2 CROSS SECTION 2

LEGEND

2

W13

W18

5

300

45 72 45

300

3910

9

5

26 Henry StreetAbbotsfordMelbourne

Scale

Checked by

Drawn by

Date

Project Number

DESCRIPTIONNO DATE

Zul Rahaman1, Queen Street

Melbourne0430 020 811

[email protected]

Marnie Newton1, Queen Street

Melbourne0401 422 376

[email protected]

Tul Srisompun1, Queen Street

Melbourne0413 730 932

[email protected]

MV01

Tul Srisompun

Zul Rahaman

A100A101A102A103A104A105A106A200A201A202A300A301A302A400A500A501A502A600A700A701A702

DEMOLITION PLANSITE PLANPROPOSED GROUND FLOOR PLANPROPOSED FIRST FLOOR PLANGROUND FLOOR REFECTIVE CEILING PLANFIRST FLOOR REFLECTIVE CEILING PLANPROPOSED ROOF PLANNORTH ELEVATIONSOUTH ELEVATIONEAST AND WEST ELEVATIONLONG SECTIONSHORT SECTIONSTORAGE AND DRIVEWAY AREAPLAN DETAILSTAIRS SECTION DETAILROOF SECTION DETAILROOF CONNECTION SECTION DETAILWET AREAWINDOW SCHEDULEDOOR SCHEDULESTRUCTURAL SCHEDULE

13/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/2015

1 : 10

A50210/10/15

A502 1 : 10

1 GUTTER DETAIL

A502 1 : 10

2 ROOF TO WALL CONNECTION 1

A502 1 : 10

3 ROOF TO WALL CONNECTION 2

Timhber Packing

Steel Plate 3mm thickness

Flashing

Danpalon Cladding 30 mm

Steel Purlin 150X50 mm

Pink Batten R 2.6

Timber Packing

Flashing

Boxspan AluminiumRafter 100X50 mm

Aluminium Framing 75X35 mm

Double Glazing Glass 20 mmthickness

Flashing

Boxspan AluminiumRafter 100X50 mm

Aluminium Roof Sheet Kingspan air-cell

Boxed Gutter 300X300

U Beam 305X165X9.5 mm

Astrix Cladding 50mm Thickness

Flashing

Astrix Cladding 50mm Thickness

Purlins 150X50 mm

Pink Batten R 2.6

Gyprock Plasterboard10 mm Thickness

Purlins 150X50 mm

Insulation Batts

3

478

140

26 Henry StreetAbbotsfordMelbourne

Scale

Checked by

Drawn by

Date

Project Number

DESCRIPTIONNO DATE

Zul Rahaman1, Queen Street

Melbourne0430 020 811

[email protected]

Marnie Newton1, Queen Street

Melbourne0401 422 376

[email protected]

Tul Srisompun1, Queen Street

Melbourne0413 730 932

[email protected]

MV01

Tul Srisompun

Zul Rahaman

A100A101A102A103A104A105A106A200A201A202A300A301A302A400A500A501A502A600A700A701A702

DEMOLITION PLANSITE PLANPROPOSED GROUND FLOOR PLANPROPOSED FIRST FLOOR PLANGROUND FLOOR REFECTIVE CEILING PLANFIRST FLOOR REFLECTIVE CEILING PLANPROPOSED ROOF PLANNORTH ELEVATIONSOUTH ELEVATIONEAST AND WEST ELEVATIONLONG SECTIONSHORT SECTIONSTORAGE AND DRIVEWAY AREAPLAN DETAILSTAIRS SECTION DETAILROOF SECTION DETAILROOF CONNECTION SECTION DETAILWET AREAWINDOW SCHEDULEDOOR SCHEDULESTRUCTURAL SCHEDULE

13/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/201513/10/2015

1 : 10

A50110/10/15

A501 1 : 10

2 ROOF DETAIL 1

A501 1 : 10

1 ROOF DETAIL 2

Flashing

Boxspan Aluminium rafter 100X50 mm

Flashing

Gutter

Double Glazing Glass

Aluminium Framing 160X50 mm

Boxspan Aluminium Rafter 100X50 mm

Aluminium Roof Sheet

Flashing

Timber Purlins 90X45 mm

Timber Finishes 10 mm thickness

Aluminium Framing 160X50 mm

Single Glazing Glass 10 mm thickness

SHS 150X150X3.8

SHS 203.2 X 203.2 X 9.5

Aluminium Roof Sheet kingSpan air-cell

Box Gutter 180X20 mm

Steel Chanel Beam 200X100 mm

U Beam 305X165X9.7 mm

Technical Drawings/ DocumentationMediam Scale: Tutor James Staughton

THANK YOU

If you want to see more of Tul works feel free to Click the link below

http://cargocollective. com/TulSrisompun