RekapitulasiR E K A P I T U L A S I ESTIMASI RENCANA ANGGARAN BIAYAERROR:#REF!

PEKERJAAN L o k a s i Tahun NO. URAIAN PEKERJAAN T O T A L

123

A.PEKERJAAN PERSIAPAN DAN PENDAHULUAN Rp.6,717,162.73

B.PEKERJAAN SIPIL

IPEKERJAAN TANAH PONDASI DAN CERUCUK Rp.283,806,801.45IIPEKERJAAN PONDASI BETON DAN SLOOF Rp.IIIPEKERJAAN LANTAI DASAR Rp.IVPEKERJAAN STRUKTUR UTAMA BETON BERTULANGa.Lantai 1 Rp.556,719,737.85b.Lantai 2 Rp.148,167,767,421.03c.Lantai Atap Rp.VPEKERJAAN ATAP DAN PENUTUP ATAPa.Lantai 1 Rp.bLantai Atap Rp.VIPEKERJAAN LAIN-LAINa.Pekerjaan Septic Tank Type A ( 2 unit ) Rp.b.Pekerjaan Septic Tank Type B ( 2 unit ) Rp.c.Pekerjaan Saluran Keliling Bangunan Rp.

CPEKERJAAN ARSITEKTUR

IPEKERJAAN DINDING DAN PASANGAN LANTAIa.Lantai 1 Rp.b.Lantai 2 Rp.c.Lantai Atap Rp.dEntrance Canopy Rp.IIPEKERJAAN PLAFONDa.Lantai 1 Rp.b.Lantai 2 Rp.cLantai Atap Rp.dEntrance Canopy Rp.

IIIPEK. KUSEN, PINTU, JENDELA DAN JALUSIa.Lantai 1 Rp.bLantai 2 Rp.cLantai Atap Rp.IVPEKERJAAN PENGECATANa.Lantai 1 Rp.bLantai 2 Rp.c.Lantai Atap Rp. Rp.VPEKERJAAN ARSITEKTUR LAINNYA Rp.

DPEKERJAAN MEKANIKAL ELEKTRIKAL

IPEKERJAAN PLUMBINGa.Lantai 1 Rp.b.Lantai 2 Rp.c.Lantai Atap dan Shaft Rp.d.Ruang Pompa Dan Ground Tank Rp.IIPEKERJAAN SANITAIR & ALAT SANITAIRa.Lantai 1 Rp.b.Lantai 2 Rp.IIIPEKERJAAN LISTRIKa.Pekerjaan Listrik Tenaga Dan Kabel Feeder Utama Rp.b.Lantai 1 Rp.c.Lantai 2 Rp.d.Lantai Atap Rp.IVPEKERJAAN PENANGKAL PETIR Rp.VPEKERJAAN AIR CONDITIONER Rp.a.Lantai 1 Rp.b.Lantai 2 Rp.

(148,458,360,213.98)SUB JUMLAH Rp.149,015,011,123.07556,650,909.09PPN 10 % Rp.14,901,501,112.31556,650,909.090.00(163,359,861,326.28)TOTAL JUMLAH Rp.163,916,512,235.37556,650,909.09DIBULATKAN Rp.163,916,512,000.00556,650,909.090.00

Terbilang :

Menyetujui,Pontianak, tgl-bln-thn

OWNER / CV. _______/ PT. __________CV. / PT. ___________________________________Konsultan Perencana

NAMA LENGKAPNAMA LENGKAP[Jabatan]Direktur

&"BakerSignet BT,Italic"&8&F - &A&"Arial,Regular"&9halaman &P

&"Arial,Bold"&9CV. ANALISA MULTIPOLA&"BlacklightD,Italic"&"Arial,Regular"&8Konsultan Perencana dan Supervisi&"BakerSignet BT,Regular"&9&A - &P

RAB

ESTIMASI RENCANA ANGGARAN BIAYAERROR:#REF!

PEKERJAAN PERENCANAAN PEMBANGUNAN GEDUNG Q-LEARNING 3 LANTAI0L o k a s i JLN.SULAWESI PONTIANAKTahun2011

HARGAJUMLAH HARGANOURAIAN PEKERJAANSAT.SATUAN(Rp.) Sasaran/TargetVolume(Rp.)123456

A.PEKERJAAN PERSIAPAN DAN PENDAHULUAN

1Mobilisasi dan Demobilisasi alatls0.02Gudang & Barak Kerjam20.03Direksi Keetm20.04Pembersihan Lahanm27,822.50293.3292,294,566.105Pengukuran Dan Pemasangan Bowplankm'46,407.1095.3004,422,596.636Pemasangan Pagar Sementara Proyekm'0.07Air kerjabulan0.08Listrik Kerjabulan0.09Papan Nama ProyekLs0.010Biaya Laboratoriumls0.011Foto Dan Dokumentasils0.012As Built DrawingLs0.06,717,162.73

B.PEKERJAAN SIPIL

IPEKERJAAN TANAH PONDASI DAN CERUCUK

1Galian Tanah m331,892.00560.33017,870,044.362Urugan Pasir bawah pondasi dipadatkan t = 15 cmm3187,413.009.9021,855,669.823Urug dan pemadatan tanah bekas galian pada lubang galianm3183,953.001,435.590264,081,087.274Pemancangan Cerucuk pondasi dia. 15 - 12,00 meter + upahbtg0.05Pemancangan Cerucuk pondasi dia. 12 - 4,00 meter + upahbtg0.0283,806,801.45IIPEKERJAAN PONDASI BETON DAN SLOOF

1Pemancangan Cerucuk pondasi dia. 15 - 12,00 meter btg0.02Pemancangan Cerucuk pondasi dia. 12 - 4,00 meter btg0.03Upah Pancang Cerucuk dia. 15 - 12,00 meter btg0.04Upah Pancang dia. 12 - 4,00 meter btg49,000.0000.05Lantai Kerja cor beton camp. 1 : 3 : 5 t = 5 cm m31,149,801.003.2003,678,788.306Pondasi plat beton setempat P1, uk.120x120 cm0.0-Beton K-250m30.0-Besi 2 x M-8kg31,219.183.282102,461.35-Bekistingm255,505.7011.520639,425.667Pondasi plat beton Setempat P2, uk,150x150 cm0.0-Beton K-250m30.0-Besi D16 - 15kg31,219.184.891152,693.01-Bekistingm255,505.704.800266,427.368pondasi plat beton menerus P3, uk 220x90 cm0.0-Beton K-250m3ERROR:#REF!-Besi 2 x M-8kg31,219.1810.090315,001.53-Bekistingm255,505.701.76097,690.039pondasi plat beton menerus P4, uk,350x110 cm0.0-Beton K-250m30.0-Besi 2 x M-8kg31,219.1824.360760,499.22-Bekistingm255,505.705.152285,965.3710m30.0Beton sloof pondasi 25/60 : -Beton K-250m30.0-Besi 10 D19kg0.0-Bekistingm20.011m30.0Kolom Pondasi 30/40 :-Beton K-250m33.3750.0-Besi 6 D16kg31,219.180.0-Bekistingm255,505.704.500249,775.6512m30.0Kolom Pondasi 20/20 :-Beton K-250m30.0-Besi 4 D16kg0.0-Bekistingm20.0ERROR:#REF!

IIIPEKERJAAN LANTAI DASAR10.0Urugan tanah bawah lantai t = 30 cm :-Menggunakan tanah bekaas galianm331,892.000.0-menggunakan tanah datangm3183,953.000.02m30.03Urugan Pasir bawah lantai dipadatkan t = 30 cmm3187,413.00Beton Tutup Kolong ukuran 12/60 :-Beton K-250m30.0-Besi dia 8 - 200m20.0-Bekistingm20.04m30.05Urugan Pasir bawah lantai rabat dipadatkan t = 15 cmm3187,413.00Beton Rabat Selasar Keliling Luar tebal 10 cm :-Beton camp. 1 : 3 : 5m30.0-Besi M-5m20.0

6m3Beton Sloof Lantai rabat ukuran 12/40 :-Beton K-250m30.0-Besi 4 dia. 10m20.0-Bekistingm20.07m20.0Plesteran beton balok dan tutup kolong t = 1.5 cm camp.1:20.0IVa.PEKERJAAN STRUKTUR UTAMA BETON BERTULANG1Lantai 130/30m30.0Kolom ukuran 20/20 :-Beton K-250m31,392,791.000.360501,404.76-Besi 8-20kg0.0-Bekistingm265,385.4022.5001,471,171.502m30.0kolom ukuran 25/25-Beton K-250m31,392,791.001.1251,566,889.88-Besi 8 13kg0.0-Bekistingm265,385.404.500294,234.303m30.0Kolom ukuran 30/30 -Beton K-250m31,392,791.004.4556,204,883.91-Besi 12 13kg0.0-Bekistingm265,385.4017.8201,165,167.834m30.0Balok Induk ukuran 20/60 :-Beton K-250m31,392,791.0010.08014,039,333.28-Besi 5 13kg0.0-Bekistingm2123,774.2040.3204,990,575.745m30.0Balok induk ukuran 20/50 :-Beton K-250m31,392,791.004.8006,685,396.80-Besi 3 13kg0.0-Bekistingm2123,774.2019.2002,376,464.646m30.0Balok induk 20/50 :-Beton K-250m31,392,791.002.4003,342,698.40-Besi 3 13kg0.0-Bekistingm2123,774.209.6001,188,232.327m30.0Balok anak 15/35 :-Beton K-250m31,392,791.001.8902,632,374.99-Besi 2 13kg0.0-Bekistingm2123,774.201.260155,955.498m30.0balok anak 15/35 :-Beton K-250m31,392,791.000.630877,458.33-Besi 2 13kg0.0-Bekistingm2123,774.200.63077,977.759m3Kolom praktis 10/10 tul. Polos :-Beton K-250m30.0-Besi 4 dia 10kg0.0-Bekistingm20.0

10m3Balok dinding 10/10 tul. Polos :-Beton K-250m30.0-Besi 4 dia 10kg0.0-Bekistingm20.0

11Tangga Utama (tengah)m3Plat Beton Tangga tebal 15 cm :-Beton K-250m31,392,791.003.3904,721,561.49-Besi kg31,219.18103.6003,234,307.05-Bekistingm266,769.40114.0007,611,711.6012m3Balok Bordes ukuran 20/60 :-Beton K-250m31,392,791.0045.00062,675,595.00-Besi 8 D16kg31,219.18153.7004,798,387.97-Bekistingm266,769.40360.00024,036,984.0013m3Plat Bordes tebal = 15 cm :-Beton K-250m31,392,791.0036.00050,140,476.00-Besi 2 x M-8kg31,219.180.0-Bekistingm266,769.40360.00024,036,984.0014m3Beton anak Tangga :-Beton K-250m31,392,791.00160.000222,846,560.00-Besi dia 12 - 200kg31,219.183,198.00099,838,937.64-Bekistingm266,769.4078.0005,208,013.2015m20.016Plesteran beton kolom & balok camp. 1pc : 2ps tebal 1.5 cmm20.0Plesteran beton tangga camp. 1pc : 4ps tebal 1.5 cm556,719,737.85b.0.01Lantai 2 m30.0Kolom ukuran 30/30 -Beton K-250m31,392,791.004.4556,204,883.91-Besi 12 13kg0.0-Bekistingm2123,774.2017.8202,205,656.242m30.0Kolom ukuran 20/20 :-Beton K-250m31,392,791.000.360501,404.76-Besi 8-20kg0.0-Bekistingm2123,774.2022.5002,784,919.503m30.0kolom ukuran 25/25-Beton K-250m31,392,791.001.1251,566,889.88-Besi 8 13kg0.0-Bekistingm2123,774.204.500556,983.904m30.0Balok Induk ukuran 20/60 :-Beton K-250m31,392,791.0010.08014,039,333.28-Besi 5 13kg0.0-Bekistingm2123,774.2040.3204,990,575.744m30.0Balok Induk ukuran 20/50 :-Beton K-250m31,392,791.004.8006,685,396.80-Besi 3 13kg0.0-Bekistingm2123,774.2040.3204,990,575.745m30.0Balok induk 20/50 :-Beton K-250m31,392,791.002.4003,342,698.40-Besi 3 13kg0.0-Bekistingm2123,774.209.6001,188,232.326m30.0Balok anak 15/35 :-Beton K-250m31,392,791.001.8902,632,374.99-Besi 2 13kg0.0-Bekistingm2123,774.201.260155,955.497m30.0balok anak 15/35 :-Beton K-250m31,392,791.000.630877,458.33-Besi 2 13kg0.0-Bekistingm2123,774.200.63077,977.758m30.0Balok Tepi ukuran 15/40 (d) + janggutan :-Beton K-250m30.0-Besi 5 D16kg0.0-Bekistingm20.09m3Beton Plat Lantai 2 tebal = 10 cm :-Beton K-250m31,392,791.00106,344.000148,114,966,104.00-Besi 2 x M-6kg0.0-Bekistingm21,392,791.000.010m3Beton Plat Dak Kanopi tebal = 10 cm :-Beton K-250m30.0-Besi 2 x M-6kg0.0-Bekistingm20.011m30.0Kuda-kuda beton kanopi ukuran 15/30 :-Beton K-250m30.0-Besi 4 D13kg0.0-Bekistingm20.0

12m3Kolom praktis 10/10 tul. Polos :-Beton K-250m30.0-Besi 4 dia 10kg0.0-Bekistingm20.0

13m3Balok dinding 10/10 tul. Polos :-Beton K-250m30.0-Besi 4 dia 10kg0.0-Bekistingm20.014m3Beton Plat Sirip vertikal tebal = 12 cm :-Beton K-250m30.0-Besi 2 x M-6kg0.0-Bekistingm20.015m3Beton Plat Sirip horisontal tebal = 10 cm :-Beton K-250m30.0-Besi M-6kg0.0-Bekistingm20.016m20.0Plesteran beton kolom & balok camp. 1pc : 2ps tebal 1.5 cm148,167,767,421.03

c.0.01Lantai Atap m30.0Kolom ukuran 30/30 -Beton K-250m31,392,791.004.4556,204,883.91-Besi 12 13kg0.0-Bekistingm2123,774.2017.8202,205,656.242m30.0Kolom ukuran 20/20 :-Beton K-250m31,392,791.000.360501,404.76-Besi 8-20kg0.0-Bekistingm2123,774.2022.5002,784,919.503m30.0kolom ukuran 25/25-Beton K-250m31,392,791.001.1251,566,889.88-Besi 8 13kg0.0-Bekistingm2123,774.204.500556,983.903m30.0-Beton K-250m30.0-Besi 8 D16kg0.0-Bekistingm20.04m30.0Balok Pembagi ukuran 15/50 :-Beton K-250m30.0-Besi 6 D16kg0.0-Bekistingm20.05m30.0Balok Dinding ukuran 15/30 :-Beton K-250m30.0-Besi 4 D13kg0.0-Bekistingm20.06m30.0Balok Tepi ukuran 15/40 (b) + janggutan :-Beton K-250m30.0-Besi 5 D16kg0.0-Bekistingm20.07m3Beton Plat Lantai Atap tebal = 10 cm :-Beton K-250m30.0-Besi 2 x M-6kg0.0-Bekistingm20.08m30.0Ring Balok Untuk Konstruksi Atap uk. 20/65 (a) :-Beton K-250m30.0-Besi 10 D16kg0.0-Bekistingm20.0

9m30.0Ring Balok Konstruksi atap ukuran 15/40 (a) :-Beton K-250m30.0-Besi 4 D16kg0.0-Bekistingm20.010m3Kolom praktis 10/10 tul. Polos :-Beton K-250m30.0-Besi 4 dia 10kg0.0-Bekistingm20.0

11m3Balok dinding 10/10 tul. Polos :-Beton K-250m30.0-Besi 4 dia 10kg0.0-Bekistingm20.012m20.0Plesteran beton kolom & balok camp. 1pc : 2ps tebal 1.5 cm13,820,738.18VPEKERJAAN ATAP DAN PENUTUP ATAPa.1Lantai 1m30.02Konsol Kayu Klas Klas I Ekspose Tipe KSm30.03Bout angkur konsol dia. 16 mm - 25.00 cmbtg0.04Baut konsol 16 mm / Pasak Kayu kualitas sejenism30.05Gording dan Jurai kayu klas II uk. 6/12m20.06Rangka Atap (kasau dan reng) kayu klas IIls0.07Teer rangka atapm20.08Penutup atap Genteng metal 0.35 mmm'0.0Listplank papan Klas Klas I 2 x 2/180.0b1Lantai Atapm30.02Konsol Kayu Klas Klas I Ekspose Tipe KSm30.03Bout angkur konsol dia. 16 mm - 25.00 cmbtg0.04Baut konsol 16 mm / Pasak Kayu kualitas sejenism20.05Konstruksi Atap Multi truss baja ringanm20.06Rangka Atap (kasau dan reng) kayu klas IIls0.07Teer rangka atapm20.08Penutup atap Genteng metal 0.35 mmm'0.0Listplank papan Klas Klas I 2 x 2/180.0VIPEKERJAAN LAIN-LAINa.1Pekerjaan Septic Tank Type A ( 2 unit )m30.02Galian tanahm30.03Urugan Pasir bawah kantai septick tankm30.04Lantai kerja t = 5 cm0.0Beton Lantai Septick tank :-Betonm30.0-Besi dia. 8 - 120kg0.0-Bekistingm20.050.0Beton Dinding Septick tank :-Betonm30.0-Besi dia. 8 - 120kg0.0-Bekistingm20.060.0Beton Tutup Septick tank :-Betonm30.0-Besi dia. 8 - 120kg0.0-Bekistingm20.07m20.08Pelasteran atasm'0.09pipa hawa GIP dia. 2"m'0.010Tee GIP 2"ls0.0Pipa Pelimpahan ke Saluran0.0

b.1Pekerjaan Septic Tank Type B ( 2 unit )m30.02Galian tanahm30.03Urugan Pasir bawah kantai septick tankm30.04Lantai kerja t = 5 cm0.0Beton Lantai Septick tank :-Betonm30.0-Besi dia. 8 - 120kg0.0-Bekistingm20.050.0Beton Dinding Septick tank :-Betonm30.0-Besi dia. 8 - 120kg0.0-Bekistingm20.060.0Beton Tutup Septick tank :-Betonm30.0-Besi dia. 8 - 120kg0.0-Bekistingm20.07m20.08Pelasteran atasm'0.09pipa hawa GIP dia. 2"m'0.010Tee GIP 2"ls0.0Pipa Pelimpahan ke Saluran0.0c.Pekerjaan Saluran Keliling Bangunan 10.0Saluran Beton Terbuka Type A, panjang 20,50 m'-Beton K-250m30.0-Besi Wiremesh M-6kg0.0-Bekistingm20.0-Plesteran t = 1.5 cm camp.1:4m20.0-Urug Pasir Alas t = 5 cm dipadatkanm30.020.0Saluran Beton Tertutup Type B, panjang 34,80 m'-Beton K-250m30.0-Besi Wiremesh M-6kg0.0-Bekistingm20.0-Plesteran t = 1.5 cm camp.1:4m20.0-Urug Pasir Alas t = 5 cm dipadatkanm30.030.0Saluran Beton Tertutup Grill Besi Type C, panjang 19,20 m'-Beton K-250m30.0-Besi Wiremesh M-6kg0.0-Besi Tutup, Kombinasi Ulir dan profil Lkg0.0-Bekistingm20.0-Plesteran t = 1.5 cm camp.1:4m20.0-Urug Pasir Alas t = 5 cm dipadatkanm30.040.0Bak Kontrol Terbuka, 6 unit :-Beton K-250m30.0-Besi Wiremesh M-6kg0.0-Bekistingm20.0-Plesteran t = 1.5 cm camp.1:4m20.0-Urug Pasir Alas t = 5 cm dipadatkanm30.00.0

CPEKERJAAN ARSITEKTURIPEKERJAAN DINDING DAN PASANGAN LANTAIa.1Lantai 1m20.02Pasangan Dinding batako spesi 1pc : 4psm20.03Pelasteran dinding camp. 1pc : 4ps tebal 1,5 cmm20.04Keramik Granit u/ lantai uk 40/40 jenis anti gores Polishm20.05Keramik Granit u/ lantai rabat selasar luar uk 40/40 unpolish m20.06Pasangan Keramik dinding KM/WC uk. 20/20m20.07Lapis keramik Bak air WC/KM Uk. 20/20m20.08Pasangan keramik lantai KM/WC Uk. 20 x 20m20.09Lapis keramik meja beton dan bench lainnya Uk. 20/20m20.010Pasangan Keramik Tangga dan Bordes Tangga Utama Uk. 40/40 m20.011Pasangan Keramik Tangga dan Bordes Tangga Samping uk 40/40m20.0Keramik Plint Lantai ukuran 10/400.0b.1Lantai 2m20.02Pasangan Dinding batako spesi 1pc : 4psm20.03Pelasteran dinding camp. 1pc : 4ps tebal 1,5 cmm20.04Keramik Granit u/ lantai uk 40/40 jenis anti gores Polishm20.05Pasangan Keramik dinding KM/WC uk. 20/20m20.05Keramik Granit u/ dinding pantry uk 40/40 Polishm20.06Lapis keramik Bak air WC/KM Uk. 20/20m20.07Pasangan keramik lantai KM/WC Uk. 20 x 20m20.08Lapis keramik meja beton dan bench lainnya Uk. 20/20m20.09Pasangan Keramik Tangga dan Bordes Tangga Samping uk 40/40m20.0Keramik Plint Lantai ukuran 10/400.0c.1Lantai Atapm20.02Pasangan Dinding batako spesi 1pc : 4psm20.03Pelasteran dinding camp. 1pc : 2ps tebal 1,5 cmm20.04Keramik Granit u/ lantai uk 40/40 jenis anti gores Polishm20.05Water Proofing Lantai Dakm20.06Plesteran lantai dak t = 1.5 cm camp.1:2m20.0Keramik Plint Lantai ukuran 10/400.0d1Entrance Canopym20.02Pelasteran Grid Trawl untuk rampm20.03Keramik Granit u/ lantai rabat selasar luar uk 40/40 unpolish m20.04Water Proofing Lantai Dakm20.0Plesteran lantai dak t = 1.5 cm camp.1:20.0IIPEKERJAAN PLAFONDa.1Lantai 1m20.02Rangka langit-langit besi hoolow 20/40 dan 40/40m20.03Plafond GRC Board t=4 mmm20.04Plafond Gypsum Board t = 9mmm'0.05List Profil Gypsum ukuran 12 cmm'0.06List Profil Kayu klas I ukuran 10 cmm20.0Plafond LAmbressering Teritisan Atap0.0b.1Lantai 2m20.02Rangka langit-langit besi hoolow 20/40 dan 40/40m20.03Plafond GRC Board t=4 mmm20.04Plafond Gypsum Board t = 9mmm'0.05List Profil Gypsum ukuran 12 cmm'0.06List Profil Kayu klas I ukuran 10 cmm20.0Plafond LAmbressering Teritisan Atap0.0

c1Lantai Atapm20.02Rangka langit-langit besi hoolow 20/40 dan 40/40m20.03Plafond GRC Board t=4 mmm20.04Plafond Gypsum Board t = 9mmm'0.05List Profil Gypsum ukuran 12 cmm'0.0List Profil Kayu klas I ukuran 10 cm0.0d1Entrance Canopym20.02Rangka langit-langit besi hoolow 20/40 dan 40/40m20.03Plafond GRC Board t=4 mmm'0.0List Profil Kayu klas I ukuran 10 cm0.0IIIa.PEK. KUSEN, PINTU, JENDELA DAN JALUSILantai 11Pintuunit0.02P-1unit883,740.000.700618,618.003P-2unit883,740.000.700618,618.004P-3unit883,740.005.6004,948,944.005P-3unit0.06P-4unit0.07P-5unit0.08P-6unit0.09P-7unit0.010P-8unit0.011P-10unit0.012P-10aunit0.013P-12unit0.014P-16unit0.015P-16aunit0.016PSunit0.017PP1unit0.018PP2unit0.015Portal Pintu PP-1 stainless Steel ukuran 40 x 40 cmunit0.0DK-2 (kaca tebal 12 mm)0.01Jendelaunit0.02J-1unit883,740.009.4808,377,855.203J-2unit883,740.009.4008,307,156.004J-3unit883,740.001.014896,112.365J-4unit883,740.007.7606,857,822.406J-5unit883,740.005.6004,948,944.007J-6unit883,740.009.0007,953,660.008J-7unit883,740.005.1004,507,074.001JT-1 (pada seluruh tangga samping)unit0.02JT-2 (pada seluruh tangga samping)unit0.03Bovenlightunit0.04V-1unit0.05V-2unit0.06V-3unit0.07V-4unit0.08V-5unit0.09V-9unit0.010V-10unit0.011V-11unit0.012V-12unit0.013V-1348,034,803.9614V-1515V-16V-17VJ-1unit0.0bVJ-2unit0.0unit0.01unit0.02Lantai 2unit0.03Pintuunit0.04P-4unit0.05P-8unit0.06P-9unit0.07P-9aunit0.08P-10unit0.09P-10aunit0.010P-11unit0.011P-13unit0.012P-140.013P-14aunit0.014P-15unit0.0P-15aunit0.01PS0.02DK-1 (kaca tebal 12 mm)unit0.03Jendelaunit0.0J-2unit0.01J-3unit0.02JT-3 (Pada bordes Tangga tengah)unit0.03Bovenlightunit0.04V-6unit0.05V-7unit0.06V-8unit0.07V-130.08V-149V-16V-18V-19unit0.0cV-200.0

1Lantai Atapm20.0IVPintum20.0a.P-7m20.01m20.02PEKERJAAN PENGECATANm20.03Lantai 1m20.04Cat dinding dan beton m20.05Cat dinding weathershield0.06Cat Plafond 7Pekerjaan Cat Clear Ultran Lasur utk listplank dan konsolm20.0Pekerjaan Cat Duco Daun Pintu dobel Multipleksm20.0bPekerjaan Cat Clear Ultran Lasur Daun Pintu Panelm20.01Pekerjaan Cat Clear Ultran Lasur Plafond lambresseringm20.02m20.02Lantai 2m20.03Cat dinding dan beton 0.04Cat dinding weathershield5Cat Plafond m20.0Pekerjaan Cat Clear Ultran Lasur utk listplank dan konsolm20.0c.Pekerjaan Cat Duco Daun Pintu dobel Multipleksm20.01Pekerjaan Cat Clear Ultran Lasur Plafond lambresseringm20.020.03Lantai Atap4Cat dinding dan beton weathershieldCat Plafond Pekerjaan Cat Clear Ultran Lasur utk listplank dan konsolPekerjaan Cat Duco Daun Pintu dobel Multipleksm'0.0Vunit0.0m20.01ls0.02PEKERJAAN ARSITEKTUR LAINNYAls0.03m'0.04Bak bunga entrance dan seluruh kelengkapan, finishing batu alamm20.05Asesoris kolom entance6Pasangan granito kolom entrance0.07Plank Nama RSUD pada GedungAsesoris beton pada tangga sampingList Profil Beton pd sisi atas dinding Lantai atapDKaca Bening t = 10 mm untuk kanopi entrance

Im'0.0PEKERJAAN MEKANIKAL ELEKTRIKALm'0.0a.m'0.01PEKERJAAN PLUMBINGm'0.02m'0.03Lantai 1buah0.04Pipa Distribusi Air Bersih GIP 1" 5Pipa Distribusi Air Bersih GIP 1/2" 0.05Instalasi Air Kotor PVC 1,5" AW dari FD & washtafelInstalasi Kotoran PVC 4" AW m'0.0Instalasi Kotoran PVC 4" AW dari shaft ke septic tankm'0.0b.Clean Outls0.01ls0.02buah0.03Lantai 20.04Pipa Distribusi Air Bersih GIP 1" 5Pipa Distribusi Air Bersih GIP 1/2" m'0.0Instalasi Air Kotor PVC 1,5" AW dari FD & washtafelm'0.0c.Instalasi Kotoran PVC 4" AW m'0.01Clean Outm'0.02m'0.03Lantai Atap dan Shaftm'0.04Pipa Supply Air Bersih GIP 1.5" unit0.04Pipa Distribusi Air Bersih GIP 1" unit0.05Pipa Distribusi Air Bersih GIP 1/2" 0.06Instalasi Air Kotor PVC 1,5" AW dari FD & washtafel7Instalasi Kotoran dari dak lantai atap PVC 4" AWunit0.0Instalasi Drainage dari dak lantai atap PVC 4" AWbh0.0d.Roof Tank Fiber Glass Kapasitas 2 m2bh0.01Pompa distribusibh0.02bh0.03Ruang Pompa Dan Ground Tankbh0.04Pompa supply GWT ke roof tank 5,5 PK + accessoriesbh0.05Flexible join 2"bh0.06Flange dia. 2"bh0.07Gate valve 2" ex. KITZbh0.08Check valve 2" ex. KITZbh0.09Foot valve 2" ex. KITZls0.010Strainer 2"ls0.011Pressure Gaugels0.012Pressure switchunit0.013Water level controlls0.014Safety valve0.015Kabel kontrol / pengkabelan16Fitting (elbow, tee, socket)Pondasi beton utk pompa tanpa tulangan diplasterBak kontrol beton dengan tutup cheeker plate lengkapIITest dan Comissioningunit0.0a.unit0.0PEKERJAAN SANITAIR & ALAT SANITAIRbh0.01bh0.02Lantai 1set0.03Toilet Type-Aunit0.04Kloset jongkok lengkap setara TOTOm'0.05Washtafel lengkap (termasuk kran, sifon, pipa flexible) setara TOTO0.06Kran air bak KM/WC unit0.07Floor Drain unit0.0Kaca Cermin lengkap acessories ukuran ukuran besarunit0.01Beton Bak air KM/WC camp.1:3:5 tul praktis t = 7 cmbh0.02Beton Meja washtafel camp.1:3:5 tul praktis t = 7 cmbh0.03Toilet Type-Bset0.04Kloset jongkok lengkap setara TOTOunit0.05Washtafel lengkap (termasuk kran, sifon, pipa flexible) setara TOTOm'0.06Urinoir lengkap (termasuk kran, sifon, pipa flexible) setara TOTOunit0.07Kran air bak KM/WC 0.08Floor Drain Stainless Steelunit0.09Kaca Cermin lengkap acessoriesunit0.0Beton Bak air KM/WC camp.1:3:5 tul praktis t = 7 cmbh0.01Beton Meja washtafel camp.1:3:5 tul praktis t = 7 cmbh0.02Sekat Pembatas urinoirset0.03Toilet Type-Cunit0.04Kloset duduk lengkap setara TOTOm'0.05Washtafel lengkap (termasuk kran, sifon, pipa flexible) setara TOTO6Kran air bak KM/WC unit0.07Floor Drain Stainless Steelunit0.0Kaca Cermin lengkap acessoriesbh0.01Beton Bak air KM/WC camp.1:3:5 tul praktis t = 7 cmbh0.02Beton Meja washtafel camp.1:3:5 tul praktis t = 7 cmset0.03Toilet Type-Dunit0.04Kloset duduk lengkap setara TOTOm'0.05Washtafel lengkap (termasuk kran, sifon, pipa flexible) setara TOTO0.06Kran air bak KM/WC 7Floor Drain Kaca Cermin lengkap acessoriesunit0.0b.Beton Bak air KM/WC camp.1:3:5 tul praktis t = 7 cmunit0.0Beton Meja washtafel camp.1:3:5 tul praktis t = 7 cmbh0.01bh0.02Lantai 2set0.03Toilet Type-Eset0.04Kloset jongkok lengkap setara TOTOunit0.05Washtafel lengkap (termasuk kran, sifon, pipa flexible) setara TOTOm'0.06Kran air bak KM/WC 0.07Floor Drain unit0.08Kaca Cermin lengkap acessories ukuran besarunit0.0Kaca Cermin lengkap acessoriesbh0.01Beton Bak air KM/WC camp.1:3:5 tul praktis t = 7 cmbh0.02Beton Meja washtafel camp.1:3:5 tul praktis t = 7 cmset0.03Toilet Type-Funit0.04Kloset duduk lengkap setara TOTOm'0.05Washtafel lengkap (termasuk kran, sifon, pipa flexible) setara TOTO6Kran air bak KM/WC 0.07Floor Drain Stainless Steelunit0.0Kaca Cermin lengkap acessoriesunit0.0Beton Bak air KM/WC camp.1:3:5 tul praktis t = 7 cmbh0.01Beton Meja washtafel camp.1:3:5 tul praktis t = 7 cmbh0.02set0.03Toilet Type-Gunit0.04Kloset duduk lengkap setara TOTOm'0.05Washtafel lengkap (termasuk kran, sifon, pipa flexible) setara TOTO6Kran air bak KM/WC unit0.07Floor Drain Stainless Steelbh0.0Kaca Cermin lengkap acessoriesbh0.01Beton Bak air KM/WC camp.1:3:5 tul praktis t = 7 cmm'0.02Beton Meja washtafel camp.1:3:5 tul praktis t = 7 cm0.03Pantry4Sink wash alumunium I bakKran leher angsaIIIFloor Drain titik0.0Beton Meja washtafel camp.1:3:5 tul praktis t = 7 cm0.0a.m'0.01PEKERJAAN LISTRIKm'0.020.0 Pekerjaan Listrik Tenaga Dan Kabel Feeder Utamam0.0 Grounding Panel0.03Kabel NYFGbY 4x240 mm2 :m'0.0 - Dari MDP existing ke PT 1m'0.04- Dari MDP existing ke PT 2set0.0 Kabel NYY 4x25 mm2 :0.0 - Dari PT 1 ke PAC 10.05Kabel NYY 4x10 mm2 : - Dari PT 1 ke PP 1bh0.0- Dari PT 1 ke PK 1bh0.0b.Kabel NYFGbY 4x10 mm2bh0.01- Dari MDP existing ke PPLbh0.02bh0.03Lantai 1bh0.04Armatur Louvre Metal Inbow + TL 2 x 20 wattbh0.05Armatur Louvre Metal Inbow + TL 2 x 40 wattttk0.06Armature down light + PLC 23 wattset0.07Lampu Baret + TL ring 32 watt8Stop kontak 1 phasaset0.09Sakelar Tunggal NasionalSakelar Ganda Nasional0.010Instalasi Penerangan dan Stop Kontak NYM 3x2,5 mmPanel Distribusi (Sub Panel) Lt.1 bahan metal 2 mmbh0.0(lengkap isi MCB + MCCB dan Assesories)bh0.0c.Panel Distribusi Utama, bahan metal tebal 2mmbh0.01(lengkap isi MCB + MCCB dan Assesories)bh0.02bh0.03Lantai 2bh0.04Armatur Louvre Metal Inbow + TL 2 x 20 wattbh0.05Armatur Louvre Metal Inbow + TL 2 x 40 wattttk0.06Armature down light + PLC 23 wattset0.07Lampu Baret + TL ring 32 watt8Stop kontak 1 phasa0.09Sakelar Tunggal NasionalSakelar Ganda NasionalInstalasi Penerangan dan Stop Kontak NYM 3x2,5 mmbh0.0Panel Distribusi (Sub Panel) Lt.1 bahan metal 2 mmbh0.0d.(lengkap isi MCB + MCCB dan Assesories)bh0.01bh0.02bh0.03Lantai Atapbh0.04Armatur Louvre Metal Inbow + TL 2 x 20 wattbh0.05Armatur Louvre Metal Inbow + TL 2 x 40 wattttk0.06Armature down light + PLC 23 watt0.07Lampu Baret + TL ring 32 watt8Stop kontak 1 phasaSakelar Tunggal Nasionalm'0.0IVSakelar Ganda Nasionalls0.0Instalasi Penerangan dan Stop Kontak NYM 3x2,5 mmtitik0.01unit0.02PEKERJAAN PENANGKAL PETIRls0.03unit0.04Kabel Penghantar Coacxial cablebh0.05Klem dan Support kabells0.06Head protecktor radius 75 m setara EFbh0.07Tiang penyangga black steel dia.3" ke 2" ke 1 1/4"ls0.08Kawat labrang stainless steel & trekstang0.09Grounding Rod Cooper, tahanan R< 2 ohm10Terminal BoxTes tahanan groundingVBak kontrol 40x40x40m'0.0Material bantum'0.0a.unit0.01PEKERJAAN AIR CONDITIONERunit0.02unit0.03Lantai 1unit0.04Instalasi drainase PVC dia. 1/2" titik0.05Pipa refrigerant lengkap dengan spons & isolasi harmaplextitik0.06AC split 2 PK type wall mountedunit0.07AC split 1,5 PK type wall mountedunit0.08AC split 1 PK type wall mounted0.09AC cassette 5 PK type ceilling mounted10Instalasi AC single split NYM 3x2,5 mm2 (1 phase)m'0.0Instalasi AC cassette NYM 4x6 mm2 (3 phase)m'0.0b.Support dudukan outdoor unitunit0.01Pemasangan dan Pengetesan unit0.02unit0.03Lantai 2unit0.04Instalasi drainase PVC dia. 1/2" titik0.05Pipa refrigerant lengkap dengan spons & isolasi harmaplextitik0.06AC split 2 PK type wall mountedunit0.07AC split 1,5 PK type wall mountedunit0.08AC split 1 PK type wall mounted0.09AC cassette 5 PK type ceilling mounted10Instalasi AC single split NYM 3x2,5 mm2 (1 phase)Instalasi AC cassette NYM 4x6 mm2 (3 phase)Rp.ERROR:#REF!Support dudukan outdoor unitPemasangan dan Pengetesan ERROR:#REF!

SUB TOTAL

&"BakerSignet BT,Italic"&8&F - &A&"Arial,Regular"&9halaman &P

&"Arial,Bold"&9CV. ANALISA MULTIPOLA&"BlacklightD,Italic"&"Arial,Regular"&8Konsultan Perencana dan Supervisi&"BakerSignet BT,Regular"&9&A - &P

AnalisaDAFTAR ANALISA HARGA SATUAN PEKERJAAN(UNIT PRICE)

PEKERJAAN _______________________________________________________________________________________________________________________Lokasi ______________________Tahun _________________0I. PEKERJAAN PERSIAPAN (P.Ps)

1. PEMBERSIHAN LAPANGAN / M2

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.PekerjaHari/org69,200.000.0755,190.002.MandorHari/org105,300.000.0252,632.50Jumlah7,822.50B.BAHAN---JumlahD.Jumlah A + B7,822.50E.Harga Satuan = ( D + E )7,822.50

2. PENGUKURAN DAN PEMASANGAN BOUPLANK / M'

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.Tukang KayuHari/org87,700.000.1008,770.002.Kepala TukangHari/org102,200.000.0101,022.003.PekerjaHari/org69,200.000.1006,920.004.MandorHari/org105,300.000.005526.50Jumlah17,238.50B.BAHAN1.Papan Kls IIIM32,097,800.000.00714,684.602.Kayu Bulat Uk. Dia. 8/10 - 4 mbatang13,900.001.00013,900.003.PakuKg29,200.000.020584.00Jumlah29,168.60D.Jumlah A + B46,407.10E.Harga Satuan = ( D + E )46,407.10Acuan:ABK Bangunan Gedung Dan Perumahan - 6.4

3. PEKERJAAN PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M / M'

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.Tukang KayuHari/org87,700.000.20017,540.002.Kepala TukangHari/org102,200.000.0202,044.003.PekerjaHari/org69,200.000.40027,680.004.MandorHari/org105,300.000.0202,106.00Jumlah49,370.00B.BAHAN1.Seng Gelombang BJLS 0.20lembar68,200.001.20081,840.002.Kayu Bulat Uk. Dia. 8/10 - 4 mbatang13,900.001.25017,375.003Balok Kayu uk. 5/7M32,833,600.000.072204,019.204Semen PortlandZak85,900.000.0504,295.005Pasir betonM3138,000.000.005690.006Kerikil 2/3M3571,400.000.0095,142.607PakuKg29,200.000.0601,752.00

Jumlah315,113.80D.Jumlah A + B364,483.80E.Harga Satuan = ( D + E )364,483.80Acuan:ABK Bangunan Gedung Dan Perumahan - 6.2

II. PEKERJAAN TANAH (P.T.)

4. GALIAN TANAH BIASA / M3(P.T. 01)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.PekerjaHari/org69,200.000.40027,680.002.MandorHari/org105,300.000.0404,212.00Jumlah31,892.00B.BAHAN---Jumlah D.Jumlah A + B31,892.00E.Harga Satuan = ( D + E )31,892.00Acuan:ABK Bangunan Gedung Dan Perumahan - 6.1

5. URUGAN TANAH DATANG DIPADATKAN / M3(P.T. 8)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.Pekerja Hari/org69,200.000.25017,300.002.MandorHari/org105,300.000.0101,053.00Jumlah18,353.00B.BAHAN1.Tanah Urug / tanah datang M3138,000.001.200165,600.00Jumlah165,600.00D.Jumlah A + B183,953.00E.Harga Satuan = ( D + E )183,953.00Acuan:Analisa Biaya Pekerjaan BOW6. URUGAN PASIR DIBAWAH LANTAI TERHITUNG PENYIRAMANNYA / M3(P.T. 10)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.Pekerja Hari/org69,200.000.30020,760.002.MandorHari/org105,300.000.0101,053.00Jumlah21,813.00B.BAHAN1.Pasir urugM3138,000.001.200165,600.00Jumlah165,600.00D.Jumlah A + B187,413.00E.Harga Satuan = ( D + E )187,413.00Acuan:ABK Bangunan Gedung Dan Perumahan - 6.11

III. PEKERJAAN BETON BERTULANG (P.BB.)

7. PEKERJAAN BETON TUMBUK Camp. 1 : 3 : 5 / M3(P.BB. 01)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.0808,424.002.Kepala Tukang BatuHari/org102,200.000.0252,555.003.Tukang SemenHari/org86,700.000.25021,675.004.PekerjaHari/org105,300.001.650173,745.00Jumlah206,399.00B.BAHAN1.Kerikil 2/3M3571,400.000.870497,118.002.Pasir PasangM3138,000.000.52071,760.003.Zak SemenZak85,900.004.360374,524.00Jumlah943,402.00D.Jumlah A + B1,149,801.00E.Harga Satuan = ( D + E )1,149,801.00Acuan:ABK Bangunan Gedung Dan Perumahan - 6.1

8. PEKERJAAN BETON STRUKTUR Camp. 1 : 2 : 3 / M3(P.BB. 02)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.10010,530.002.Kepala Tukang BatuHari/org102,200.000.0353,577.003.Tukang SemenHari/org86,700.000.35030,345.004.PekerjaHari/org69,200.002.000138,400.00Jumlah182,852.00B.BAHAN1.Kerikil 1/1M3689,100.000.810558,171.002.Pasir PasangM3138,000.000.54074,520.003.Zak SemenZak85,900.006.720577,248.00Jumlah1,209,939.00D.Jumlah A + B1,392,791.00E.Harga Satuan = ( D + E )1,392,791.00Acuan:ABK Bangunan Gedung Dan Perumahan - 6.13

9. PEKERJAAN TUKANG BESI untuk Besi Polos / Kg(P.BB. 03)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1MandorHari/org105,300.000.0003536.862Kepala Tukang BesiHari/org102,200.000.000771.543Tukang BesiHari/org87,700.000.0070613.904PekerjaHari/org0.00700.0Jumlah 722.30B.BAHAN1.Besi Beton polos dia. < 13 mmKg17,800.001.050018,690.002.Kawat BetonKg42,300.000.0150634.50Jumlah19,324.50D.Jumlah A + B20,046.80E.Harga Satuan = ( D + E )20,046.80Acuan:ABK Bangunan Gedung Dan Perumahan - 6.25

10. PEKERJAAN TUKANG BESI untuk Besi Ulir / 100 Kg(P.BB. 03.a)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1MandorHari/org105,300.000.0003536.862Kepala Tukang BesiHari/org102,200.000.000771.543Tukang BesiHari/org87,700.000.007613.904PekerjaHari/org69,200.000.007484.40Jumlah 1,206.70B.BAHAN1.Besi Beton Ulir uk. D 13 mmKg17,800.001.05018,690.002.Kawat BetonKg42,300.000.015634.50Jumlah19,324.50D.Jumlah A + B20,531.20E.Harga Satuan = ( D + E )20,531.20Acuan:ABK Bangunan Gedung Dan Perumahan - 6.25

11. PEKERJAAN PEMBESIAN DENGAN BESI WIREMESH / Kg(P.BB. 03.b)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.Kepala Tukang BesiHari/org102,200.000.000771.542.Tukang BesiHari/org87,700.000.007613.903.PekerjaHari/org69,200.000.007484.402.MandorHari/org0.000350.0Jumlah 1,169.84B.BAHAN1.Besi Wiremesh M-6 / M-8Kg26,900.001.05028,245.002.Kawat BetonKg42,300.000.015634.50Jumlah28,879.50D.Jumlah A + B30,049.34E.Harga Satuan = ( D + E )31,219.18Acuan:ABK Bangunan Gedung Dan Perumahan - 6.25

12. PEKERJAAN BEKISTING UNTUK PONDASI / M2

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.005526.502.Kepala Tukang KayuHari/org102,200.000.0262,657.203.Tukang KayuHari/org87,700.000.26022,802.004.PekerjaHari/org69,200.000.30020,760.00Jumlah46,745.70B.BAHAN1.Papan MalM30.0300.02.PakuKg29,200.000.3008,760.00Jumlah8,760.00D.Jumlah A + B55,505.70E.Harga Satuan = ( D + E )55,505.70Acuan:ABK Bangunan Gedung Dan Perumahan - 6.28

13. PEKERJAAN BEKISTING SLOOF / M2

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.006631.802.Kepala Tukang KayuHari/org102,200.000.0262,657.203.Tukang KayuHari/org87,700.000.26022,802.004.PekerjaHari/org69,200.000.30020,760.00Jumlah46,851.00B.BAHAN1.Papan MalM30.0300.02.Balok Kayu Kelas II uk. 4/6btg2,833,600.000.01542,504.003.Cerucuk dia. 10 cm - 4 mbtg2.0000.04PakuKg29,200.000.3008,760.00Jumlah51,264.00D.Jumlah A + B98,115.00E.Harga Satuan = ( D + E )98,115.00Acuan:ABK Bangunan Gedung Dan Perumahan - 6.31

14. PEKERJAAN BEKISTING KOLOM / M2(P.BB. 06.a)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.006631.802.Kepala Tukang KayuHari/org102,200.000.0333,372.603.Tukang KayuHari/org87,700.000.33028,941.004.PekerjaHari/org69,200.000.30020,760.00Jumlah53,705.40B.BAHAN1.Papan MalM30.0400.02.Cerucuk dia. 8 cm - 4 mbtg2.0000.03Balok Kayu Klas III uk. 4/6M30.0150.04Minyak Bekistingltr0.2000.05PakuKg29,200.000.40011,680.00Jumlah11,680.00D.Jumlah A + B65,385.40E.Harga Satuan = ( D + E )65,385.40Acuan:ABK Bangunan Gedung Dan Perumahan - 6.30

15. PEKERJAAN BEKISTING BALOK ATAS / M2(P.BB. 07.a)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.006631.802.Kepala Tukang KayuHari/org102,200.000.0333,372.603.Tukang KayuHari/org87,700.000.33028,941.004.PekerjaHari/org69,200.000.32022,144.00Jumlah55,089.40B.BAHAN1.Papan MalM30.0400.02.Cerucuk dia. 8 cm - 4 mbtg2.0000.03Balok Kayu Klas III uk. 4/6M32,833,600.000.01851,004.804Minyak Bekistingltr30,000.000.2006,000.005PakuKg29,200.000.40011,680.00Jumlah68,684.80D.Jumlah A + B123,774.20E.Harga Satuan = ( D + E )123,774.20Acuan:ABK Bangunan Gedung Dan Perumahan - 6.3016. PEKERJAAN BEKISTING LANTAI ATAS / M2(P.BB. 08.a)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.006631.802.Kepala Tukang KayuHari/org102,200.000.0333,372.603.Tukang KayuHari/org87,700.000.33028,941.004.PekerjaHari/org69,200.000.32022,144.00Jumlah55,089.40B.BAHAN1.Papan MalM30.0400.02.Cerucuk dia. 8 cm - 4 mbtg6.0000.03Balok Kayu Klas III uk. 4/6M30.0150.04Minyak Bekistingltr0.2000.05PakuKg29,200.000.40011,680.00Jumlah11,680.00D.Jumlah A + B66,769.40E.Harga Satuan = ( D + E )66,769.40Acuan:ABK Bangunan Gedung Dan Perumahan - 6.30

17. BETON BAK AIR KAMAR MANDI / UNIT

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Beton 1:3:5M30.02Besi M-5kg0.03Bekistingm20.0

Jumlah0.0E.Harga Satuan / Unit0.0

IV. PEKERJAAN DINDING (P.Dnd.)18. PASANGAN BATU BATAKO dengan SPESI 1 : 4 / M2(P.Dnd. 03.)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.Pekerja Hari/org69,200.000.32022,144.002.Tukang BatuHari/org86,700.000.1008,670.003.MandorHari/org105,300.000.0151,579.504.Kepala Tukang Hari/org102,200.000.0101,022.00Jumlah33,415.50B.BAHAN1.Batako 20 X 40 X 7Buah2,600.0012.50032,500.002.Zak semenZak85,900.000.15012,885.003.Pasir PasangM3138,000.000.0273,726.00Jumlah49,111.00C.Jumlah A + B82,526.50D.Biaya Umum dan Keuangan = % x DE.Harga Satuan = ( D + E )82,526.50Acuan:ABK Bangunan Gedung Dan Perumahan - 6.20

19. PASANGAN BATU BATAKO dengan SPESI 1 : 2 TRASRAAM / M2(P.Dnd. 03.a)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.Pekerja Hari/org69,200.000.32022,144.002.Tukang BatuHari/org86,700.000.1008,670.003.MandorHari/org105,300.000.0151,579.504.Kepala Tukang Hari/org102,200.000.0101,022.00Jumlah33,415.50B.BAHAN1.Batako 20 X 40 X 7Buah2,600.0012.50032,500.002.Zak semenZak85,900.000.30025,770.003.Pasir PasangM3138,000.000.0273,726.00Jumlah61,996.00D.Jumlah A + B95,411.50E.Harga Satuan = ( D + E )95,411.50Acuan:ABK Bangunan Gedung Dan Perumahan - 6.20

V. PEKERJAAN PELASTERAN (P.Pls.) 20. PLESTERAN Tebal 1.50 Cm Camp. 1 : 2 / M2(P.Pls. 01)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.PekerjaHari/org69,200.000.20013,840.002.Tukang SemenHari/org86,700.000.15013,005.003.MandorHari/org105,300.000.0101,053.004.Kepala Tukang BatuHari/org102,200.000.0151,533.00Jumlah29,431.00B.BAHAN1.Pasir PasangM3138,000.000.0172,359.802.Zak SemenZak85,900.000.17014,637.36Jumlah16,997.16D.Jumlah A + B46,428.16E.Harga Satuan = ( D + E )46,428.16Acuan:ABK Bangunan Gedung Dan Perumahan - 6.2

21. PLESTERAN Tebal 1.50 Cm Camp. 1 : 4 / M2(P.Pls. 03)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.PekerjaHari/org69,200.000.20013,840.002.Tukang SemenHari/org86,700.000.15013,005.003.MandorHari/org105,300.000.0101,053.004.Kepala Tukang BatuHari/org102,200.000.0151,533.00Jumlah29,431.00B.BAHAN1.Pasir PasangM3138,000.000.0202,760.002.Zak SemenZak85,900.000.1048,933.60Jumlah11,693.60D.Jumlah A + B41,124.60E.Harga Satuan = ( D + E )41,124.60Acuan:ABK Bangunan Gedung Dan Perumahan - 6.4

VI. PEKERJAAN KAYU (P.K.)

22. PEKERJAAN KOSEN KAYU BELIAN / M3(P.K. 12)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.12012,636.002.Kepala Tukang KayuHari/org102,200.000.72073,584.003.Tukang KayuHari/org87,700.007.200631,440.004.PekerjaHari/org69,200.002.400166,080.00Jumlah883,740.00B.BAHAN1.Kayu Belian ketam 5/10M31.1000.0Jumlah0.0D.Jumlah A + B883,740.00E.Harga Satuan = ( D + E )883,740.00Acuan:ABK Bangunan Gedung Dan Perumahan - 6.1

23. PEKERJAAN KOSEN KAYU KLAS I / M3(P.K. 13)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.12012,636.002.Kepala Tukang KayuHari/org102,200.000.72073,584.003.Tukang KayuHari/org87,700.007.200631,440.004.PekerjaHari/org69,200.002.400166,080.00Jumlah883,740.00B.BAHAN1.Kayu Klas IM38,593,400.001.1009,452,740.00Jumlah9,452,740.00D.Jumlah A + B10,336,480.00E.Harga Satuan = ( D + E )10,336,480.00Acuan:ABK Bangunan Gedung Dan Perumahan - 6.1

24. PEKERJAAN DAUN PINTU TEBAL 3,5 Cm KAYU BELIAN / M2(P.K. 14)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.0505,265.002.Kepala Tukang KayuHari/org102,200.000.25025,550.003.Tukang KayuHari/org87,700.002.500219,250.004.PekerjaHari/org69,200.001.00069,200.00Jumlah319,265.00B.BAHAN1.Papan belian di ketam tebal = 3.5 cm bersihM38,961,400.000.039345,013.90Jumlah345,013.90D.Jumlah A + B664,278.90E.Harga Satuan = ( D + E )664,278.90Acuan:ABK Bangunan Gedung Dan Perumahan - 6.725. PEKERJAAN DAUN PINTU TEBAL 3,5 Cm KAYU KLAS I / M2(P.K. 15)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.0505,265.002.Kepala Tukang KayuHari/org102,200.000.25025,550.003.Tukang KayuHari/org87,700.002.500219,250.004.PekerjaHari/org69,200.001.00069,200.00Jumlah319,265.00B.BAHAN1.Papan Klas I tebal = 3.5 cm bersihM30.0390.0Jumlah0.0D.Jumlah A + B319,265.00E.Harga Satuan = ( D + E )319,265.00Acuan:ABK Bangunan Gedung Dan Perumahan - 6.7

26. PEKERJAAN DAUN JENDELA JUNGKIT KY KLAS I TEBAL 3,5 cm / M2(P.K. 17)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.0404,212.002.Kepala Tukang KayuHari/org102,200.000.20020,440.003.Tukang KayuHari/org87,700.002.000175,400.004.PekerjaHari/org69,200.000.80055,360.00Jumlah255,412.00B.BAHAN1.Papan Kls I ketam tebal = 3.5 cm bersihM30.0390.02.Paku LesKg0.0500.0Jumlah0.0D.Jumlah A + B255,412.00E.Harga Satuan = ( D + E )255,412.00Acuan:ABK Bangunan Gedung Dan Perumahan - 6.9

27. MENGERJAKAN JALUSI / VENTILASI PAPAN KLAS II / M2F.37.(4)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.Kepala Tukang KayuHari/org102,200.000.0808,176.002.Tukang KayuHari/org87,700.000.80070,160.003MandorHari/org105,300.000.0141,474.204PekerjaHari/org69,200.000.28019,376.00Jumlah99,186.20B.BAHAN1.Papan Kls II Diketam halusM30.0130.02.Paku LesKg0.1000.0Jumlah0.0D.Jumlah A + B99,186.20E.Harga Satuan = ( D + E )99,186.20Acuan:Analisa Satuan Pekerjaan BOW28. PEKERJAAN DAUN PINTU DOUBLE MULTIPLEKS 4 mm, T=4 Cm RANGKA KY KLAS I / M2(P.K. 20)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.0303,159.002.Pekerja Hari/org69,200.000.60041,520.003Kepala Tukang KayuHari/org102,200.000.20020,440.004Tukang KayuHari/org87,700.002.000175,400.00Jumlah240,519.00B.BAHAN1.Papan Klas I Bengkirai uk. 3.2/10M38,454,300.000.020169,086.002.Lapis Multiplek 4 mmLembar132,900.000.72996,906.25ERROR:#VALUE!Lem KayuKg0.3000.04Paku Kg29,200.000.2005,840.00Jumlah271,832.25D.Jumlah A + B512,351.25E.Harga Satuan = ( D + E )512,351.25Acuan:ABK Bangunan Gedung Dan Perumahan - 6.14

29. PEKERJAAN GORDING, IKAT ANGIN DAN JURAI(P.K. 26)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.20021,060.002.Kepala Tukang KayuHari/org102,200.001.200122,640.003.Tukang KayuHari/org87,700.0012.0001,052,400.004.PekerjaHari/org69,200.004.000276,800.00Jumlah1,472,900.00B.BAHAN1.PakuKg29,200.003.00087,600.002.Kayu Kls IIM32,833,600.001.1003,116,960.00Jumlah3,204,560.00D.Jumlah A + B4,677,460.00E.Harga Satuan = ( D + E )4,677,460.00Acuan:Analisa Biaya Pekerjaan BOW

30. PEKERJAAN KASAU & RENG / M2(P.K. 30)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.008789.752.Kepala Tukang KayuHari/org102,200.000.0101,022.003.Tukang KayuHari/org87,700.000.1008,770.004.PekerjaHari/org69,200.000.15010,380.00Jumlah20,961.75B.BAHAN1.PakuKg29,200.000.1002,920.002Kayu Kls II uk. 5/7 dan 3/5M32,833,600.000.01131,169.60Jumlah 34,089.60D.Jumlah A + B55,051.35E.Harga Satuan = ( D + E )55,051.35Acuan:Analisa Biaya Pekerjaan BOW

31. PEKERJAAN RANGKA LANGIT-LANGIT (60 cm X 60 cm) KAYU KLAs II / M2(P.K. 33)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.007737.102.Pekerja Hari/org69,200.000.1339,226.673Kepala Tukang KayuHari/org102,200.000.0202,044.004Tukang KayuHari/org87,700.000.20017,540.00Jumlah29,547.77B.BAHAN1.Kayu Klas II Mabang 5/7 dan 4/6M32,833,600.000.01028,336.002.Paku Kg29,200.000.1002,920.00Jumlah31,256.00D.Jumlah A + B60,803.77E.Harga Satuan = ( D + E )60,803.77Acuan:ABK Bangunan Gedung Dan Perumahan - 6.41

32. PEKERJAAN LISPLANK PAPAN KLAS I / M'(P.K. 37)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.0505,265.002.Kepala Tukang KayuHari/org102,200.000.0101,022.003.Tukang KayuHari/org87,700.000.1008,770.004.PekerjaHari/org69,200.000.1006,920.00Jumlah21,977.00B.BAHAN1.PakuKg29,200.000.0601,752.002.Papan Klas I 2 X 2/18M30.0110.0Jumlah1,752.00D.Jumlah A + B23,729.00E.Harga Satuan = ( D + E )23,729.00Acuan:ABK Bangunan Gedung Dan Perumahan - 6.53

33. PEKERJAAN KONSOL KAYU KLAS I EKSPOSE / M3F.27 (1)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.60063,180.002.Kepala Tukang KayuHari/org102,200.003.600367,920.003.Tukang KayuHari/org87,700.0036.0003,157,200.004.PekerjaHari/org69,200.0012.000830,400.00Jumlah4,418,700.00B.BAHAN1.PakuKg29,200.000.00.02.Kayu Klas I ukuran 10/10M38,454,300.001.1009,299,730.00Jumlah9,299,730.00D.Jumlah A + B13,718,430.00E.Harga Satuan = ( D + E )13,718,430.00Acuan:Analisa Biaya Pekerjaan BOW

34. PEKERJAAN LIST PROFIL UNTUK PLAFOND / M'(P.K. 46)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1MandorHari/org105,300.000.001105.302Pekerja Hari/org69,200.000.0211,453.203Kepala Tukang KayuHari/org102,200.000.002204.404Tukang KayuHari/org87,700.000.0211,841.70Jumlah3,604.60B.BAHAN1.PakuKg29,200.000.0752,190.002.List Profil ukuran sesuai gambarM'19,900.001.05020,895.00Jumlah23,085.00D.Jumlah A + B26,689.60E.Harga Satuan = ( D + E )26,689.60Acuan:ABK Bangunan Gedung Dan Perumahan - 6.60

VII. PEKERJAAN PINTU / JENDELA

35. MENGERJAKAN PINTU JENDELA P-1 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm27,729,100.000.03Kaca bening 5 mmm2172,700.000.04Kunci 2 slaag lengkap handelset495,400.000.05Kunci tanam pintupsg104,400.000.06Engsel pintu 4"buah29,200.000.07Lap Pintum'0.0Jumlah0.0E.Harga Satuan / Unit0.0

36. MENGERJAKAN PINTU JENDELA P-2 DAN P-2a / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm27,729,100.000.03Kaca bening 5 mmm2172,700.000.04Kunci 2 slaag lengkap handelset495,400.000.05Engsel pintu 4"buah29,200.000.0

Jumlah0.0E.Harga Satuan / Unit0.0

37. MENGERJAKAN PINTU JENDELA P-3 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm27,729,100.000.03Kaca bening 5 mmm2172,700.000.04Kunci 2 slaag lengkap handelset495,400.000.05Engsel pintu 4"buah29,200.000.0

Jumlah0.0E.Harga Satuan / Unit0.0

38. MENGERJAKAN PINTU P-4 / unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm27,729,100.000.03Kunci 2 slaag lengkap handelset495,400.000.04Engsel pintu 4"buah29,200.000.05Kaca Bening 5 mmm2172,700.000.0Jumlah0.0E.Harga Satuan / Unit0.0

39. MENGERJAKAN PINTU P-4a / unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm27,729,100.000.03Kunci 2 slaag lengkap handelset495,400.000.04Engsel pintu 4"buah29,200.000.05Kaca Bening 5 mmm2172,700.000.0

Jumlah0.0E.Harga Satuan / Unit0.0

40. MENGERJAKAN PINTU P-5 / unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm27,729,100.000.03Kunci 2 slaag lengkap handelset495,400.000.04Engsel pintu 4"buah29,200.000.05Kaca Bening 5 mmm2172,700.000.0Jumlah0.0E.Harga Satuan / Unit0.0

41. MENGERJAKAN PINTU P-6/ unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm27,729,100.000.03Daun Jendela Casement Lengkap karet, unit1,087,400.000.0seal dan asesoris uk. 100 x 115 cm0.04Kunci 2 slaag lengkap handelset495,400.000.05Engsel pintu 4"buah29,200.000.06Kaca Bening 5 mmm2172,700.000.0Jumlah0.0E.Harga Satuan / Unit0.0

42. MENGERJAKAN PINTU P-7 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen Kayu BelianM30.02Pintu Panel Kayu Belianm20.03Kunci 2 slaag lengkap handelset495,400.000.04Engsel pintu 4"buah29,200.000.05Kaca Buram 5 mmm2172,700.000.0Jumlah0.0E.Harga Satuan / Unit0.0

43. MENGERJAKAN PINTU P-8 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen Kayu BelianM30.02Pintu Panel PVC lengkap kunciunit16,598,400.000.03Engsel pintu 4"buah29,200.000.04Kaca Buram 5 mmm2172,700.000.0Jumlah0.0E.Harga Satuan / Unit0.0

44. MENGERJAKAN PINTU P-9 DAN P-9a / unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm27,729,100.000.03Kunci 2 slaag lengkap handelset495,400.000.04Engsel pintu 4"buah29,200.000.05Kaca Buram 5 mmm2172,700.000.0Jumlah0.0E.Harga Satuan / Unit0.0

45. MENGERJAKAN PINTU P-10 DAN P-10a / unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm27,729,100.000.03Kunci 2 slaag lengkap handelset495,400.000.04Engsel pintu 4"buah29,200.000.05Kaca Buram 5 mmm2172,700.000.0Jumlah0.0E.Harga Satuan / Unit0.0

46. MENGERJAKAN PINTU P-11/ unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm27,729,100.000.03Kunci 2 slaag lengkap handelset495,400.000.04Engsel pintu 4"buah29,200.000.05Kaca Bening 5 mmm2172,700.000.0Jumlah0.0E.Harga Satuan / Unit0.0

47. MENGERJAKAN PINTU P-12 / unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm27,729,100.000.03Daun Jendela Kayu Kelas Im20.04Kunci 2 slaag lengkap handelset495,400.000.05Engsel pintu 4"buah29,200.000.06Kaca Bening 5 mmm2172,700.000.0Jumlah0.0E.Harga Satuan / Unit0.0

48. MENGERJAKAN PINTU P-13 / unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm27,729,100.000.03Kunci 2 slaag lengkap handelset495,400.000.04Engsel pintu 4"buah29,200.000.05Kaca Bening 5 mmm2172,700.000.06Kunci tanam pintupsg104,400.000.07Lap Pintum'0.0Jumlah0.0E.Harga Satuan / Unit0.0

49. MENGERJAKAN PINTU P-14 DAN P-14a / unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm27,729,100.000.03Kunci 2 slaag lengkap handelset495,400.000.04Engsel pintu 4"buah29,200.000.05Kaca Bening 5 mmm2172,700.000.06Kunci tanam pintupsg104,400.000.07Lap Pintum'0.0Jumlah0.0E.Harga Satuan / Unit0.0

50. MENGERJAKAN PINTU P-15 DAN P-15a / unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm27,729,100.000.03Kunci 2 slaag lengkap handelset495,400.000.04Engsel pintu 4"buah29,200.000.05Kaca Bening 5 mmm2172,700.000.0Jumlah0.0E.Harga Satuan / Unit0.0

51. MENGERJAKAN PINTU P-16 / unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Pintu Panel Kayu Belianm20.03Kunci 2 slaag lengkap handelset495,400.000.04Engsel pintu 4"buah29,200.000.05Kaca Bening 5 mmm2172,700.000.0Jumlah0.0E.Harga Satuan / Unit0.0

52. MENGERJAKAN PINTU P-16a / unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Pintu Panel Kayu Belianm20.03Kunci 2 slaag lengkap handelset495,400.000.04Engsel pintu 4"buah29,200.000.05Ventilasi Jalusi Alumuniumm2172,700.000.0Jumlah0.0E.Harga Satuan / Unit0.0

53. MENGERJAKAN PINTU PS / unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Daun Pintu Double Multipleksm20.03Kunci 2 slaag lengkap handelset495,400.000.04Engsel pintu 4"buah29,200.000.0

Jumlah0.0E.Harga Satuan / Unit0.0

54. MENGERJAKAN PINTU PP-1 / unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Pintu Alumunium Frameless 2 Daun +m216,598,400.000.0kaca 12 mm dan assesoris lengkap3Floor Hingepasang2,450,400.000.04Kaca Bening 5 mmm2172,700.000.0

Jumlah19,368,600.000.0E.Harga Satuan / Unit0.0

55. MENGERJAKAN PINTU PP-2 / unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM3147,100.000.02Pintu Alumunium Frameless 2 Daun +m216,598,400.000.0kaca 12 mm dan assesoris lengkap0.03Floor Hingepasang2,450,400.000.04Kaca Bening 5 mmm2172,700.000.019,368,600.00Jumlah0.0E.Harga Satuan / Unit0.0

56. MENGERJAKAN JENDELA J-1 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Daun Jendela Casement Lengkap karet, unit16,598,400.000.0seal dan asesoris uk. 100 x 115 cm0.03Kaca Bening 5 mmm2172,700.000.0

Jumlah16,918,200.000.0E.Harga Satuan / Unit0.0

57. MENGERJAKAN JENDELA J-2 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Daun Jendela Casement Lengkap karet, unit16,598,400.000.0seal dan asesoris uk. 100 x 115 cm0.03Kaca Bening 5 mmm2172,700.000.0

Jumlah16,918,200.000.0E.Harga Satuan / Unit0.0

58. MENGERJAKAN JENDELA J-3/ Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Bening 5 mmm2172,700.000.0

Jumlah319,800.000.0E.Harga Satuan / Unit0.0

59. MENGERJAKAN JENDELA JT-1 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Bening 5 mmm2172,700.000.0

Jumlah319,800.000.0E.Harga Satuan / Unit0.0

60. MENGERJAKAN JENDELA JT-2 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Bening 5 mmm2172,700.000.0

Jumlah319,800.000.0E.Harga Satuan / Unit0.0

61. MENGERJAKAN JENDELA JT-3/ Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Bening 8 mmm2172,700.000.0

Jumlah319,800.000.0E.Harga Satuan / Unit0.0

62. MENGERJAKAN BOVENLIGHT V-1 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Bening 5 mmm2172,700.000.0

Jumlah319,800.000.0E.Harga Satuan / Unit0.0

63. MENGERJAKAN BOVENLIGHT V-2 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Buram 5 mmm2172,700.000.0

Jumlah319,800.000.0E.Harga Satuan / Unit0.0

64. MENGERJAKAN BOVENLIGHT V-3 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Buram 5 mmm2172,700.000.0

Jumlah319,800.000.0E.Harga Satuan / Unit0.0

65. MENGERJAKAN BOVENLIGHT V-4 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Buram 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

66. MENGERJAKAN BOVENLIGHT V-5 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Buram 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

67. MENGERJAKAN BOVENLIGHT V-6 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Buram 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

68. MENGERJAKAN BOVENLIGHT V-7 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Buram 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

69. MENGERJAKAN BOVENLIGHT V-8 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Buram 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

70. MENGERJAKAN BOVENLIGHT V-9 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Buram 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

71. MENGERJAKAN BOVENLIGHT V-10 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Buram 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

72. MENGERJAKAN BOVENLIGHT V-11 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Buram 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

73. MENGERJAKAN BOVENLIGHT V-12 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Bening 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

74. MENGERJAKAN BOVENLIGHT V-13 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Bening 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

75. MENGERJAKAN BOVENLIGHT V-14 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Bening 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

76. MENGERJAKAN BOVENLIGHT V-15 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Bening 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

77. MENGERJAKAN BOVENLIGHT V-16 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Bening 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

78. MENGERJAKAN BOVENLIGHT V-17 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Bening 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

79. MENGERJAKAN BOVENLIGHT V-18 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Bening 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

80. MENGERJAKAN BOVENLIGHT V-19 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Bening 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

81. MENGERJAKAN BOVENLIGHT V-20 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Kaca Bening 5 mmm2172,700.000.0Jumlah319,800.000.0E.Harga Satuan / Unit0.0

82. MENGERJAKAN BOVENLIGHT VJ-1 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Ventilasi Jalusi Alumuniumm2662,400.000.0Jumlah809,500.000.0E.Harga Satuan / Unit0.0

83. MENGERJAKAN BOVENLIGHT VJ-2 / Unit

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

1Kusen AlumuniumM'147,100.000.02Ventilasi Jalusi Alumuniumm2662,400.000.0Jumlah809,500.000.0E.Harga Satuan / Unit0.0

VIII. PEKERJAAN PENUTUP ATAP (P.PA.)

84. PEKERJAAN ATAP GENTENG METAL POLOS BERWARNA BJLS 0.35 / M2(P.PA. 03)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.0101,053.002.Kepala Tukang KayuHari/org102,200.000.0101,022.003.Tukang KayuHari/org87,700.000.1008,770.004.Pekerja Hari/org73,100.000.20014,620.00Jumlah368,300.0025,465.00B.BAHAN1.Genteng Metal Polos bjls 0.35Lbr1.6200.02.Paku AtapKg0.2000.0Jumlah0.0D.Jumlah A + B25,465.00E.Harga Satuan = ( D + E )25,465.00Acuan:ABK Bangunan Gedung Dan Perumahan - 6.32

85. MENUTUP 10 M BUBUNGAN DENGAN PLAT METAL SEJENIS BJLS 0.35 / 10 M'H.10

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.Kepala Tukang BesiHari/org102,200.000.0252,555.002.Tukang BesiHari/org87,700.000.25021,925.003.Pekerja Hari/org73,100.000.25018,275.00Jumlah42,755.00B.BAHAN1Zincalume Metal plat BJLS 0.35Lembar114,700.0012.3201,413,104.002Papan bubungan uk. 2/15m30.0660.03SekrupBuah12.0000.0Jumlah1,413,104.00D.Jumlah A + B1,455,859.00E.Harga Satuan = ( D + E )1,455,859.00

IX. PEKERJAAN PLAFOND (P.Pf.)

86. PEKERJAAN PLAFON GRC BOARD TEBAL 4mm / M2

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.005526.502.Pekerja Hari/org73,100.000.1007,310.003Kepala Tukang KayuHari/org102,200.000.005511.004Tukang KayuHari/org87,700.000.0504,385.00Jumlah12,732.50B.BAHAN1.GRC Board tebal 4 mmLembar114,200.000.36541,635.422.Paku Kg29,200.000.1103,212.00Jumlah44,847.42D.Jumlah A + B57,579.92E.Harga Satuan = ( D + E )57,579.92Acuan:ABK Bangunan Gedung Dan Perumahan - 6.24

87. PEKERJAAN PLAFON GRC BOARD TEBAL 4mm / M2

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.005526.502.Pekerja Hari/org73,100.000.1007,310.003Kepala Tukang KayuHari/org102,200.000.005511.004Tukang KayuHari/org87,700.000.0504,385.00Jumlah12,732.50B.BAHAN1.GRC Board tebal 4 mmLembar114,200.000.36541,635.422.Paku GRCKg29,200.000.1103,212.00Jumlah44,847.42D.Jumlah A + B57,579.92E.Harga Satuan = ( D + E )57,579.92Acuan:ABK Bangunan Gedung Dan Perumahan - 6.24

88. PEKERJAAN PLAFON GYPSUM 9 mm / M2SUPL.VIII (3)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.005526.502.Pekerja Hari/org73,100.000.1007,310.003Kepala Tukang KayuHari/org102,200.000.005511.004Tukang KayuHari/org87,700.000.0504,385.00Jumlah12,732.50B.BAHAN1Gypsum Board 9 mmLembar112,400.000.36540,979.172Sekrup GypsumKg58,000.000.1106,380.00Jumlah47,359.17D.Jumlah A + B60,091.67E.Harga Satuan = ( D + E )60,091.67Acuan:ABK Bangunan Gedung Dan Perumahan - 6.24

89. PEKERJAAN PLAFON LAMBRESSERING UK. 1/8 / M2SUPL.VIII (4)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.MandorHari/org105,300.000.005526.502.Pekerja Hari/org73,100.000.1007,310.003Kepala Tukang KayuHari/org102,200.000.005511.004Tukang KayuHari/org87,700.000.0504,385.00Jumlah12,732.50B.BAHAN1Papan Lambressering uk. 1/8 M30.0110.02Paku Kg29,200.000.2005,840.00Jumlah5,840.00D.Jumlah A + B18,572.50E.Harga Satuan = ( D + E )18,572.50Acuan:ABK Bangunan Gedung Dan Perumahan - 6.24

X. PEKERJAAN BESI & ALUMUNIUM (P.BA.)

90. PEKERJAAN TUKANG BESI untuk BAJA PROFIL (I, H) / Kg

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1MandorHari/org105,300.000.0030315.902Kepala Tukang BesiHari/org102,200.000.000661.323Tukang BesiHari/org87,700.000.0060526.204PekerjaHari/org73,100.000.06004,386.00Jumlah 5,289.42B.BAHAN1.Baja Profil (I, H)Kg1.1000.02.Kawat Lasbtg1.0000.0Jumlah0.0D.Jumlah A + B5,289.42E.Harga Satuan = ( D + E )5,289.42Acuan:ABK Bangunan Gedung Dan Perumahan - 6.1

XI. PEKERJAAN FINISHING LANTAI & DINDING (P.LD.)

91. PEKERJAAN LANTAI KERAMIK GRANIT 40/40 ANTI GORES(P.LD. 06)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.PekerjaHari/org73,100.000.62045,322.002.Tukang SemenHari/org86,700.000.35030,345.003.MandorHari/org105,300.000.0303,159.004.Kepala Tukang BatuHari/org102,200.000.0353,577.00Jumlah82,403.00B.BAHAN1.Keramik Granit 40/40 Anti GoresM2155,000.001.0000155,000.002.Pasir PasangM3138,000.000.02152,967.003.Zak SemenZak85,900.000.176015,118.404.Semen Pengisi Nat KeramikZak0.10000.0Jumlah173,085.40D.Jumlah A + B255,488.40E.Harga Satuan = ( D + E )255,488.40Acuan:ABK Bangunan Gedung Dan Perumahan - 6.14

92. PEKERJAAN LANTAI DAN DINDING KERAMIK 20/20 / M2(P.LD. 07)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.PekerjaHari/org73,100.000.50036,550.002.Tukang SemenHari/org86,700.000.25021,675.003.MandorHari/org105,300.000.0252,632.504.Kepala Tukang BatuHari/org102,200.000.0252,555.00Jumlah63,412.50B.BAHAN1.Tegel Keramik 20/20M2101,500.001.0000101,500.002.Pasir PasangM3138,000.000.04205,796.003.Zak SemenZak85,900.000.227619,550.844.Semen Pengisi Nat KeramikZak0.20000.0Jumlah126,846.84D.Jumlah A + B190,259.34E.Harga Satuan = ( D + E )190,259.34Acuan:ABK Bangunan Gedung Dan Perumahan - 6.44

XII. PEKERJAAN PENGECATAN (P.Ct.)

93. PENGECATAN BIDANG KAYU BARU DENGAN CAT TRANSPARANT ULTRAN LASUR / M2(P.Ct. 04.a) (1 Lapis Wood Filler, 1 Lapis Base Coat, 2 Lapis Colour Coat, 1 Lapis Top Coat Clear Dof)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.Kepala Tukang Cat Hari/org102,200.000.0060613.202.Tukang CatHari/org86,700.000.0090780.303.Pekerja Hari/org73,100.000.07005,117.004.MandorHari/org105,300.000.0025263.25Jumlah6,773.75B.BAHAN1.Base CoatLt0.1700.02.Wood Filler IMPRALt0.1500.03.Colour Coat 2 x LapisLt0.2600.04.Top Coat 1 x LapisLt0.1300.0Jumlah0.0D.Jumlah A + B6,773.75E.Harga Satuan = ( D + E )6,773.75Acuan:ABK Bangunan Gedung Dan Perumahan - 6.9

94. PENGECATAN DINDING BARU DENGAN CAT TEMBOK MUTU BAIK / 1 M2(P.Ct. 11) (1 LAPIS PLAMUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.Kepala Tukang Cat Hari/org102,200.000.0041418.510.00632.Tukang CatHari/org86,700.000.04103,550.370.0633.Pekerja Hari/org73,100.000.0130950.300.024.MandorHari/org105,300.000.0016171.110.0025Jumlah5,090.29B.BAHAN1.PlamurKg0.1000.00.12.AmplasLembar0.3000.00.33Cat DasarKg45,100.000.1205,412.000.124Cat Tembok Penutup 2 x lapisKg49,800.000.26012,948.000.26Jumlah18,360.00D.Jumlah A + B23,450.29E.Harga Satuan = ( D + E )23,450.29Acuan:ABK Bangunan Gedung Dan Perumahan - 6.14

95. PENGECATAN DINDING BARU DENGAN CAT TEMBOK WEATHERSHIELD MUTU BAIK / 1 M2(P.Ct. 11) (1 LAPIS PLAMUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.Kepala Tukang Cat Hari/org102,200.000.0041418.512.Tukang CatHari/org86,700.000.04103,550.373.Pekerja Hari/org73,100.000.0130950.304.MandorHari/org105,300.000.0016171.11Jumlah5,090.29B.BAHAN1.PlamurKg0.1000.02.AmplasLembar0.3000.03Cat DasarKg45,100.000.1205,412.004Cat Tembok Weathershield Penutup 2 x lapisKg49,800.000.26012,948.00Jumlah18,360.00D.Jumlah A + B23,450.29E.Harga Satuan = ( D + E )23,450.29Acuan:ABK Bangunan Gedung Dan Perumahan - 6.14

96. PENGECATAN BIDANG KAYU BARU DENGAN CAT MINYAK / M2(1 Lapis dempul, 1 Lapis meni, 1 Lapis dasar, 2 Lapis cat besi)(P.Ct. 04.a)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1.Kepala Tukang Cat Hari/org102,200.000.0040408.802.Tukang CatHari/org86,700.000.10509,103.503.Pekerja Hari/org73,100.000.07005,117.004.MandorHari/org105,300.000.0025263.25Jumlah14,892.55B.BAHAN1 Cat MeniKg0.2000.02 DempulKg47,900.000.1507,185.003 Cat Dasar Kg45,100.000.1707,667.004 Cat Kilat Penutup 2 KaliKg72,400.000.35025,340.00Jumlah40,192.00C.Jumlah A + B55,084.55D.Harga Satuan 55,084.55*Acuan:ABK Bangunan Gedung Dan Perumahan - 6.9

XIII. PEKERJAAN PLUMBING DAN INSTALASI LISTRIK

99. PEKERJAAN PIPA GIP Medium dia. 1.5" / M'H.18 (2)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

A.TENAGA KERJA1Tukang PipaHari/org0.0900.02.Kepala TukangHari/org102,200.000.009919.803.Pekerja terlatihHari/org73,100.000.0543,947.404.MandorHari/org105,300.000.003284.31Jumlah5,151.51B.BAHAN1.Pipa GIP dia 1.5" Medium setara BAKRIEbatang0.2000.02.Fitting (socket, tee elbow)ls1.0000.03.Alat dan material bantu ls1.0000.0Jumlah0.0D.Jumlah A + B5,151.51E.Harga Satuan = ( D + E )5,151.51

100. PEKERJAAN PIPA GIP Medium dia. 1" / M'H.18 (2)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

A.TENAGA KERJA1Tukang PipaHari/org0.0900.02.Kepala TukangHari/org102,200.000.009919.803.Pekerja terlatihHari/org73,100.000.0543,947.404.MandorHari/org105,300.000.003284.31Jumlah5,151.51B.BAHAN1.Pipa GIP dia 1" Medium setara BAKRIEbatang309,600.000.20061,920.002.Fitting (socket, tee elbow)ls1.0000.03.Alat dan material bantu ls1.0000.0Jumlah61,920.00D.Jumlah A + B67,071.51E.Harga Satuan = ( D + E )67,071.51

101. PEKERJAAN PIPA GIP Medium dia. 1/2" / M'H.18 (2)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

A.TENAGA KERJA1Tukang PipaHari/org0.0900.02.Kepala TukangHari/org102,200.000.009919.803.Pekerja terlatihHari/org73,100.000.0543,947.404.MandorHari/org105,300.000.003284.31Jumlah5,151.51B.BAHAN1.Pipa GIP dia 3/4" Medium setara BAKRIEbatang0.2000.02.Fitting (socket, tee elbow)ls228,200.001.000228,200.003.Alat dan material bantu ls1.0000.0Jumlah228,200.00D.Jumlah A + B233,351.51E.Harga Satuan = ( D + E )233,351.51

102. PEKERJAAN PIPA PVC dia. 1,5" AW Setara RUCIKA / M'H.18 (3)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

A.TENAGA KERJA1Tukang PipaHari/org0.0600.02.Kepala TukangHari/org102,200.000.006613.203.Pekerja terlatihHari/org73,100.000.0362,631.604.MandorHari/org105,300.000.002189.54Jumlah3,434.34B.BAHAN1.Pipa PVC dia 1,5" AW setara Rucikabatang0.3000.02.Fitting (socket, tee elbow)ls1.0000.03.Alat dan material bantu ls1.0000.0Jumlah0.0D.Jumlah A + B3,434.34E.Harga Satuan = ( D + E )3,434.34

103. PEKERJAAN PIPA PVC dia. 2,5" AW Setara RUCIKA / M'H.18 (3)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

A.TENAGA KERJA1Tukang PipaHari/org0.0600.02.Kepala TukangHari/org102,200.000.006613.203.Pekerja terlatihHari/org73,100.000.0362,631.604.MandorHari/org105,300.000.002189.54Jumlah3,434.34B.BAHAN1.Pipa PVC dia 2,5" AW setara Rucikabatang0.3000.02.Fitting (socket, tee elbow)ls1.0000.03.Alat dan material bantu ls1.0000.0Jumlah0.0D.Jumlah A + B3,434.34E.Harga Satuan = ( D + E )3,434.34

104. PEKERJAAN PIPA PVC dia. 4" AW Setara RUCIKA / M'H.18 (4)

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)

A.TENAGA KERJA1Tukang PipaHari/org0.1350.02.Kepala TukangHari/org102,200.000.0141,379.703.Pekerja terlatihHari/org73,100.000.0815,921.104.MandorHari/org105,300.000.004426.47Jumlah7,727.27B.BAHAN1.Pipa PVC dia 4" AW setara Rucikabatang417,700.000.300125,310.002.Fitting (socket, tee elbow)ls1.0000.03.Alat dan material bantu ls1.0000.0Jumlah125,310.00D.Jumlah A + B133,037.27E.Harga Satuan = ( D + E )133,037.27

XIV. PEKERJAAN LISTRIK DAN INSTALASI

105. PEKERJAAN KABEL FEEDER NYM 3 X 2.5mm / Titik Penerangan dan Stop Kontak

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1Pekerja TerlatihHari/org73,100.000.0503,655.002Tukang ListrikHari/org0.1500.0Jumlah3,655.00B.BAHAN1Kabel NYY 3 x 2.5mmm'19,300.0017.000328,100.002Pipa Conduit 1 1/2" m'17.0000.03Material Bantu (Socket, fitting, klem)ls1.0000.0Jumlah328,100.00D.Jumlah A + B331,755.00E.Harga Satuan = ( D + E )331,755.00

106. PEKERJAAN KABEL FEEDER NYM 3 X 4mm / Titik Untk Power AC

HARGAKUAN-BIAYANO.U R A I A NSATUANSATUANTITASSATUAN(Rp) (Rp)A.TENAGA KERJA1Pekerja TerlatihHari/org73,100.000.0503,655.002Tukang ListrikHari/org0.1500.0Jumlah3,655.00B.BAHAN1Kabel NYY 3 x 4mmm'22,000.0020.000440,000.002Pipa Conduit 1 1/2" m'20.0000.03Material Bantu (Socket, fitting, klem)ls1.0000.0Jumlah440,000.00D.Jumlah A + B443,655.00E.Harga Satuan = ( D + E )443,655.00

Menyetujui,Pontianak, tgl-bln-thn

OWNER / CV. _______/ PT. __________CV. / PT. ___________________________________Konsultan Perencana

NAMA LENGKAPNAMA LENGKAP[Jabatan]Direktur

&"Arial,Bold"&9ANALISA MULTIPOLA, cv.&"Copperplate Gothic Light,Regular"&7Konsultan Perencana DAn Supervisi&"BakerSignet BT,Regular"&9halaman &P - &A

Daftar HargaDAFTAR HARGA BAHAN DAN UPAH(BASIC PRICE)

PEKERJAAN _______________________________________________________________________________________________________________________Lokasi ______________________Tahun _________________

UPAH KERJA

No.JENIS UPAH KERJASAT.KOTA PONTIANAK0.0

1Pekerja tidak terlatih / ladenHari69,200.002Pekerja terlatihHari73,100.003MandorHari105,300.004Tukang BesiHari87,700.005Tukang KayuHari87,700.006Tukang SemenHari86,700.007Tukang AspalHari86,700.008Tukang BatuHari86,700.009Tukang CatHari86,700.0010Tukang PeliturHari86,700.0011Kepala TukangHari102,200.0012Penjaga MalamHari62,900.0013Penjaga ApiHari63,300.0014OperatorHari99,800.00

BAHAN BANGUNAN

No.JENIS BAHAN BANGUNANSAT.KOTA PONTIANAK

I. BAHAN PENGISI

1Tanah Urug / Tanah DatangM3169,600.0015,275ERROR:#DIV/0!2Pasir UrugM3138,000.0010575ERROR:#DIV/0!3Pasir PasangM3138,000.00ERROR:#DIV/0!4Pasir BetonM3138,000.005Batu Kali / Batu GunungM3339,400.006Batu belah 10 /15 cmM3339,400.007Batu Pecah Uk. 5/7 cmM3422,100.008Batu Pecah Uk. 4/6 cm - 3/4 cmM3545,200.009Batu Splite uk. 2/3 cmM3571,400.0010Batu Splite uk. 1/2 cmM3658,800.0011Batu Splite uk. 1/1 cm (kerikil)M3689,100.0012Portland Semen Type I 50 kg / zakZak85,900.0013 (Putih) Zak187,000.0014Batako uk. 7x20x40Buah2,600.0015Paving Blok K225m2208,800.0016Beton buis dia 30 - 100.00 cmbuah0.00.0II. BAHAN ATAP0.00.01Seng Gelombang BJLS 0.30 mmLembar81,500.002Seng Gelombang BJLS 0.20 mmLembar68,200.003Seng Plat BJLS 0.30 mmLembar95,600.004Seng Plat BJLS 0.20 mmLembar67,300.005Atap genteng metal polos BJLS 0.35 (1,32 x 0,42m2)Lembar114,700.000.0III. BAHAN KAYU0.00.01Belian / Ulin tidak ketam Uk. 9/9 x 360 cmM38,208,100.002Tiang Tongkat Uk. 10/10 x 200 cmM38,786,500.003Belian / Ulin ketam Uk. 8/8 x 400 cmM38,937,100.004 " Uk. 10/10 x 400 cmM38,937,100.000.05Belian Ulin Tidak Ketam Uk. 12/12 x 320 cmM30.06 " Uk. 15/15 x 400 cmM30.00.097Papan Belian Diketam Uk. 2/15 x 360 cmM38,961,400.000.0 " Uk. 3/20 x 400 cmM38,700,300.00 " Uk. 5/10 x 400 cmM38,676,800.008Papan mabang diketam halus uk. 1/6 untuk plafond renglapM310,298,600.009Papan Kayu Kls II Mabang Uk. 2/20 x 400 cmM36,573,900.0010Papan Kls II Mabang Uk. 3/20 x 360 cmM30.011Kayu Kls II Mabang Uk. 5/7 x 400 cmM32,833,600.0012 Reng Seng Uk. 3/5 x 400 cmM32,833,600.000.013 Reng Sirap Uk. 2/3 x 400 cmM32,811,200.0014 " Uk. 1,5/8 x 400 cmM30.00.0012615Kayu Klas I Uk. 8/15 x 400 cm diketam halusM38,593,400.001,984,126.9816 Kayu Kelas I ( Bengkirai , Tembesu ,dll ) diketam halusM38,454,300.0017Kayu Kls II Mabang / Meranti uk. 8/12M37,138,200.0018Kayu Kls III Papan CampuranM32,097,800.0019Papan Daun Pintu (Bengkirai) 3,5/20 - 400 cmM37,729,100.0020Kayu BakarM3322,200.0021Kayu Dolken dia 12 cm - 4 M Batang15,800.0022Upah Pancang Ceucuk dia 12 cm - 4 M Batang49,000.0023Kayu Dolken dia 15 cm - 12 M Batang183,700.0024Upah Pancang Cerucuk dia 15 cm - 12 M Batang49,800.0025Kayu Dolken dia 8 -10 cm - 4.00 M Batang13,900.0026Kayu Dolken dia 8 -10 cm - 2.00 M Batang6,400.000.0IV. BAHAN BESI DAN ALUMUNIUM0.00.0Besi Beton0.01Besi beton polos (rounded bar steel)Kg17,800.002Besi Beton UlirKg17,800.003Baja kanal [ 125.50.20.3,2Kg33,600.004Kawat Ikat BetonKg42,300.005Weldmesh M-8M226,900.000.0ERROR:#DIV/0!6Weldmesh M-6M226,900.000.0ERROR:#DIV/0!6Weldmesh M-5M226,700.000.0ERROR:#DIV/0!7Weldmesh M-4M226,700.000.0ERROR:#DIV/0!8Baut Baja dia. 5/8' - 25 cmBatang10,600.009Plat / Beugel Penyambungbuah57,100.0010Kusen Alumunium Ukuran 1 3/4 " x 4 "m'193,300.0011Kusen Alumunium Ukuran 1 1/2 " x 3 "m'147,100.0012Ventilasi jalusi alumuniumm2662,400.0013Pintu Alumunium Frameless 2 Daun kaca 12 mm ( Lengkap )unit16,598,400.0014Jendela Casement 60 x 230 cmunit1,087,400.0015Bingkai Jendela Casement alumuniumm'201,300.0016Floor Hingepasang2,582,100.000.00V. BAHAN LANTAI0.00.01Keramik Semi Granit 40 x 40 (anti gores)ktk155,000.002Keramik Semi Granit 40 x 40 unpolishktk170,400.003Tegel keramik Granit 30 x 30 (biasa)ktk92,300.004Tegel keramik Biasa uk. 20 X 20ktk101,500.005Tegel keramik Dinding ukuran 20/25ktk135,200.000.0VI. ALAT PENGGANTUNG0.00.01Paku 1" - 5"Kg29,200.002Paku anti karat (paku atap metal)Kg38,800.003Paku SengKg38,200.004Paku Sekrup GypsumKg58,000.005Paku GRCKg40,900.004Engsel Jendela stainless steel 3"buah26,000.005Engsel Pintu stainless steel 4"buah29,200.006Kait Angin Besarbuah26,300.007Grendel Pintu / Jendela 3" ( selot )buah30,200.008Kunci LemariBuah0.09Kunci Tanam Besar setara BELUCCIpasang104,400.0010Kunci 2 Slaag ukuran besar lengkap termasuk handel seetara BELUCCIunit495,400.0011Kunci silinder2 Slaag ukuran besar lengkap termasuk handel seetara BELUCCIunit445,900.0012Handle jendelabh23,700.0013Handle Laci / lemari dapurbh15,000.0014Floor Hingebuah2,450,400.000.0VII. BAHAN LANGIT-LANGIT0.00.01Teakwood Ukuran t = 6 mmLembar0.02Triplek Kura-kura Tebal 3,0 mmLembar0.03Mutipleks Tebal 4 mm Lembar132,900.004List Profil Plafond Gypsum ukuran 10 cmm'19,900.005Multiplek t 12 mmlembar325,700.006GRC Board tebal 4 mmLembar114,200.007Gypsum Board tebal 9 mmLembar112,400.007Tripleks Super Sungkai tebal 3.2 mmlembar0.08Tripleks Super Nyato tebal 3.2 mmLembar0.00.0VIII. BAHAN LISTRIK0.00.01Kabel Listrik Type NYMGbY 3x2,5 M'24,500.002Kabel Listrik Type NYMGbY 4x16M'169,400.003Kabel Listrik Type NYY 4x35 M'0.04Kabel Listrik Type NYY 4x16 M'134,500.005Kabel Listrik Type NYM 3x2,5 M'19,300.006Kabel Listrik Type NYM 3x4 M'22,000.007Isolator RollingBuah0.08Sekelar tunggal Nasional + platBuah33,800.009Sekelar ganda Nasional + platBuah49,900.0010Sekelar tripel Nasional + platBuah64,400.0011Stop Kontak Nasional inbow + platBuah40,200.0012Stop Kontak AC 10 ABuah0.013Lampu 10 Watt pijar Buah0.014Lampu 25 Watt pijar Buah0.015Lampu 40 Watt pijar Buah0.016 " 60 Watt (Phillip) clearBuah0.017Lampu philips PLC 23 Watt + armatur downlight inbowbh128,400.0018Lampu philips TL 20 Watt armatur kap bambubh0.019Lampu philips TL 40 Watt armatur kap bambubh0.020Outlet Kabel Teleponunit0.021Lampu Baret TL Ring 40 Watt + armatureBuah238,300.0022 " UV 2 x 40 Watt + armatur acrilic prismatik In BowBuah795,700.0023 " TL 2 x 40 Watt + armatur metal louvre (RMI)Buah599,500.0024 " TL 2 x 20 Watt + armatur metal louvre (RMI)Buah417,400.000.0IX. BAHAN SANITASI0.00.01PVC 1/2" AW btg77,400.002PVC 3/4 " AW btg98,200.003PVC 1" AW btg154,800.002PVC 1 1/2" AW btg196,500.003PVC 2" AW btg208,300.004PVC 2 1/2 " AW btg233,200.004PVC 3" AW btg375,100.005PVC 4" AW btg417,700.003GIP 1/2 "btg195,500.004GIP 3/4 "btg228,200.005GIP 1 "btg309,600.006GIP 1 1/2 "btg453,500.007GIP 2 "btg510,000.008Kran Kitchen Sink Stainless sTeelbh199,400.009Kran Air Stainless Steelbh139,400.0010Stop Kran stainless steelbh282,700.0011Floor Drain Stainless Steelbh106,000.0012Kloset Duduk setara TOTO lengkap asesorisunit3,641,200.0013Kloset Jongkok Setara lengkap setara TOTOunit355,300.0014Tempat Sabun Keramik 10/20bh0.015Kitchen sink alumunium satu bakbh899,800.0016Washtafel lengkap (termasuk kran, pipa fleksibel, sifon) TOTObh3,794,600.00Type Omni LW 860 C.J0.017Urinoir lengkap (termasuk kran, pipa fleksibel, sifon) TOTObh4,021,900.000.0X. BAHAN KACA0.00.01Kaca Bening Uk. 3 mmM20.02 " Uk. 5 mmM2172,700.003 " Uk. 8 mmM2449,200.003 " Uk. 10 mmM2561,900.004 " Uk. 12 mmM2673,900.003Kaca es, Uk. 3 mmM20.04Kaca buram Uk. 5 mmM2251,300.005Kaca Rayban hitam, Uk. 5 mmM2190,500.006Kaca cermin, Uk. 3 mmM2281,400.007Kaca cermin, Uk. 2 mmM20.00.0XI. BAHAN FINISHING / CAT0.00.01Amplas KayuLembar2,400.002Amplas BesiLembar2,700.003DempulKg47,900.004Cat Dasar TembokKg45,100.005Thinner (Pengencer)Lt21,600.006Cat Kilat ( Kayu / Besi ) kualitas baikKg72,400.007Meni Cat Dasar Kayu / Besi Kg40,900.008Cat Kayu Clear setara Ultran LasurLtr103,800.009Cat tembok setara produk DANAPAINTKg49,800.0010Cat Tembok Weathershield Kg156,900.00

Menyetujui,Pontianak, tgl-bln-thn

OWNER / CV. _______/ PT. __________CV. / PT. ___________________________________Konsultan Perencana

NAMA LENGKAPNAMA LENGKAP[Jabatan]Direktur

BAHAN TRIPLEKTriplek t =9 mmLbr121,000.00Multiplek t =12 mmLbr170,500.00Multiplek t =20 mmLbr281,100.00Plywood 4" x 8" x 4 mmLbr66,000.00Panel GRC 120 x 240 x 40Lbr55,000.00Gypsum Board t = 9 mmLbr55,000.00

&"Arial,Bold"&9ANALISA MULTIPOLA, cv.&"Copperplate Gothic Light,Regular"&7Konsultan Perencana DAn Supervisi&"BakerSignet BT,Regular"&9halaman &P - &A