tsunami risk mitigation strategy for thailand

36
Tsunami Risk Mitigation Strategy for Thailand Kjell Karlsrud Norwegian Geotechnical Institute (NGI)

Upload: others

Post on 18-Dec-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tsunami Risk Mitigation Strategy for Thailand

Tsunami RiskMitigation Strategyfor Thailand

Kjell KarlsrudNorwegian Geotechnical Institute

(NGI)

Page 2: Tsunami Risk Mitigation Strategy for Thailand

Copyright: www.asiantsunamivideos.com

The project was undertaken by NGI in cooperation with: NORSAR, UiB, UiO, NIBR, B.Heyerdahl, NTNU, Sintef

Page 3: Tsunami Risk Mitigation Strategy for Thailand
Page 4: Tsunami Risk Mitigation Strategy for Thailand

The 26 December 2006 disaster

• Caused by M 9.3 earthquake• 220,000 fatalities

– 180,000 in Indonesia– 30,000 in Sri Lanka and India– 8,000 in Thailand

Page 5: Tsunami Risk Mitigation Strategy for Thailand

Elements of the project• Determine causes and consequences of Dec.

2004 event• Establish future earthquake and tsunami-

generating scenarios and their return periods (hazard)

• Model future tsunamis and their inundation levels

• Assess future risk to human life and acceptance criteria

• Recommend risk mitigation measures• Ensure local involvement and dissemination of

results

Page 6: Tsunami Risk Mitigation Strategy for Thailand

Regional seismicity and plate movements

From Lay et al. (2005)

Page 7: Tsunami Risk Mitigation Strategy for Thailand

Plate movements in subduction zone

Page 8: Tsunami Risk Mitigation Strategy for Thailand

Phang Nga

Kra

Phuket

Trang and Satuami affe cted areas Phi Phi Is lands

Zone 1

Zone 2

3

Summary of consequences of 26 December 2004 tsunami

4-7 m

7-12 m

6-8 m

Nam Khem

Bang Niang

Patong

Page 9: Tsunami Risk Mitigation Strategy for Thailand

Observed inundation- Bang Niang

02468

101214

416500 417000 417500 418000 418500

East coordinate (UTM) [m]

Inun

datio

n le

vel [

m]

InundationLand elevation

Page 10: Tsunami Risk Mitigation Strategy for Thailand

• Major tourist city• 15 - 30.000

inhabitants• 10.000 tourists • Ground at +3.5• Inundation +5-6• 160 died

Case Patong City

Page 11: Tsunami Risk Mitigation Strategy for Thailand
Page 12: Tsunami Risk Mitigation Strategy for Thailand

Case Bang Niang resort areas• 12 km long beach with about 100

tourist resorts• About 3000 of 15000 people killed• Ground level +4 -+5• Inundation level +10 -+12

Page 13: Tsunami Risk Mitigation Strategy for Thailand

Case Nam Khem fishing village

•3000 out of 4800 inhabitants killed•Ground level +3-5•Inundation level +7-8

Page 14: Tsunami Risk Mitigation Strategy for Thailand

The earthquake of 26 Dec 2004 was the second largest since 1900

1. 1960 May 22, Southern Chile, M=9.5

2. 2004 Dec 26, Off west coast of N-Sumatra, M=9.3

3. 1964 March 28, Prince William Sound, Alaska, M=9.2

4. 1957 March 9, Andreanoff Islands Alaska, M=9.1

5. 1952 Nov 4, Kamchatka M=9.0

Source: USGS

Page 15: Tsunami Risk Mitigation Strategy for Thailand

Future earthquake scenarios

• The energy released in the 2004 event means it will take several hundred years before a similar event can happen in the future

• It takes earthquake larger than M 8.0 to create tsunami of any significance, but not all will do so

• Largest credible earthquake in the next 100-200 years is M 8.5

Page 16: Tsunami Risk Mitigation Strategy for Thailand

Extent of Dec.2004 seabed movements

Page 17: Tsunami Risk Mitigation Strategy for Thailand

Back-calculations of the26. December 2004 M=9.3 event

M=9.3; t=60 minM=9.3; t=40 minM=9.3; t=80 minM=9.3; t=20 minM=9.3; t=100 minM=9.3; t=120 min

Page 18: Tsunami Risk Mitigation Strategy for Thailand

Considered future scenariosM9.3

Water depth M8.5 S M8.5 N

M7.0M7.5 NM7.5 MM7.5 S

Page 19: Tsunami Risk Mitigation Strategy for Thailand

Tsu

nam

i Ris

k M

itiga

tion

Stra

tegy

for

Tha

iland

Estimated future tsunami risk to human life in Thailand

1 10 1002 5 20 50 200 500Years after 26 December 2004

1E-006

1E-005

0.0001

0.001

0.01

0.1

1

10

100

Ris

k to

Hum

an L

ife

Acceptable

Tolerable

Unacceptable

Conservative risk estimate

Average risk estimate

Low risk estimate

Page 20: Tsunami Risk Mitigation Strategy for Thailand

Conclusions from risk assessment

• Within next 50-100 years maximum credible earthquake affecting Thailand is M 8.5 giving inundation level +2.5 to +3.0 at high tide.

Such tsunamis will give small consequences in ThailandNo immediate mitigation measures strictly necessary, but increased public awareness is desirable

Page 21: Tsunami Risk Mitigation Strategy for Thailand

Tsu

nam

i Ris

k M

itiga

tion

Stra

tegy

for

Tha

iland

Conclusions from risk evaluation

• In the Long term (100 – 400 years) the probability of occurrence of a major tsunami will increase gradually with time.

• If no risk mitigation measures are taken, the societal risk due to a major tsunami will be unacceptably high after about 50 – 100 years, approaching catastrophic levels in 200 – 400 years.

Mitigation measures are needed to reduce long term risks

Page 22: Tsunami Risk Mitigation Strategy for Thailand

Tsunami Risk Mitigation MeasuresMain question:

Should it be the responsibility ofpresent societies to reduce inevitableand unacceptable risks somehundred years ahead?

Page 23: Tsunami Risk Mitigation Strategy for Thailand

Types of mitigation measures

• Awareness building (and warning systems)• Land Use and Master Plans • Building Codes• Site and Project Planning• Functional network of escape routes to safe

places• Establishment of safe places (elevated land,

buildings or other structures)• Physical protection barriers

Page 24: Tsunami Risk Mitigation Strategy for Thailand

How to ensure lasting awareness is a key issue

Page 25: Tsunami Risk Mitigation Strategy for Thailand

Building measures

Hmax

• Upper floor safe from tsunami surge• Easily accessible escape to safe floor• Bedrooms at safe level (Hmax)• Main structure shall not collapse• Front and back walls at ground levels may be

designed to collapse

Page 26: Tsunami Risk Mitigation Strategy for Thailand

Elevated areas for housing or escape pods

H

L2L1

•Required height in relation to tsunami inundation level•Fill from dredging or land pits•Can also function as escape pods

Page 27: Tsunami Risk Mitigation Strategy for Thailand

Protection barriers

•Practical upper limit of height?•Core and protection material•Outlets through dike•Limited overtopping may be acceptable

Page 28: Tsunami Risk Mitigation Strategy for Thailand

Specific recommendations for Thailand

• Within next few years implement measures to ensure lasting long term awareness

• Within next 5-10 years implement at leastsome physical measures to reduceconsequences of future tsunamis.

Page 29: Tsunami Risk Mitigation Strategy for Thailand

Case Nam Khem fishing village

Page 30: Tsunami Risk Mitigation Strategy for Thailand

Thank you for your attention!

Special thanks to:

DMR

CCOP

The project team!

Page 31: Tsunami Risk Mitigation Strategy for Thailand

Case - Bang Niang Resort-example of proposed site plan

Page 32: Tsunami Risk Mitigation Strategy for Thailand

Case Patong City- masterplan

Dike

Page 33: Tsunami Risk Mitigation Strategy for Thailand

Causes and consequences

Page 34: Tsunami Risk Mitigation Strategy for Thailand

Calculated tsunami Dec. 2004

-8-6-4-202468

10

0 1 2 3 4 5Time [hours]

Sur

face

ele

vatio

n [m

]BangNiangPatong

Page 35: Tsunami Risk Mitigation Strategy for Thailand

Return periods for the scenario earthquakes

From seismicity data:M 8.5: ~1100 years for Andaman-

Nicobar

M 8.5: ~200 years for Sumatra and Java trenches

M 9.3: ~1100 years for Sumatra North

From subduction rates:M 8.5: ~200 years for Nicobar-

Andaman South

M 8.5: ~400 years for Nicobar-Andaman North

M 9.3: ~300 years for Sumatra North

Page 36: Tsunami Risk Mitigation Strategy for Thailand

Design criteria for Thailand

• Magnitude 8.5 is largest credible

tsunamigenic earthquake to be

prepared for within next 50-100

years

Inundation 1.5 – 2 m above mean

sea level, + 1 m for tide and storm

surges