Page 1 TROPIC SHORES REHABILITATION PROJECT The fourteen assigned workers continued gaining ground for this rehabilitation project, with the fall temperatures reaching record highs the employees stayed hydrated withstanding the heat with minimal time lost this reporting period. Gulfstream Glass, which is the glazing sub-contractor, mobilized on October 24, 2019 and the three workers began installation at the 01-stack completing five sliding glass doors this period. Keystone verified the materials being used as Dymonic 100 polyurethane sealant applied under the threshold, including the surface of the 1x6-inch PVC sill extender, with 3-1/4 inch stainless tapcon style anchors that were encapsulated with the sealant. The stairwell shearwalls and elevator tower painting was finished, and the contractor plans to apply the primer on November 4, 2019 at the Porte-cochere. The east elevation 01-stack is currently forming the edge repairs and once completed the post tension sub-contractor is scheduled to complete the necessary hardware for the pre- pour evaluation by the engineer. Both the north and south elevations have the post tension hardware installed and with Keystonesapproval to cast, the crew pumped the 6000psi redi-mix concrete at Unit 308 where the balcony was fully replaced and with a total of 4-yards the employees also cst the kneewalls at Unit 208 and some other approved locations. Project Summary #6 Prime Contractor: SPEC Contractor Services Reporting Period: 10.21.2019 thru 11.1.2019 Superintendent: Beto Fuentes Daytona Beach Shores Permit # 20190844 PROJECT LOCATION 3111 South Atlantic Avenue, Daytona Beach Shores, Florida 32118

Upload: others

Post on 15-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TROPIC SHORES REHABILITATION PROJECT€¦ · where the balcony was fully replaced and with a total of 4-yards the ... Period: 10.21.2019 thru 11.1.2019 Superintendent: Beto Fuentes

Page 1

TROPIC SHORES

REHABILITATION PROJECT

The fourteen assigned workers continued gaining ground for this rehabilitation project,

with the fall temperatures reaching record highs the employees stayed hydrated

withstanding the heat with minimal time lost this reporting period.

Gulfstream Glass, which is the glazing sub-contractor, mobilized on October 24, 2019 and

the three workers began installation at the 01-stack completing five sliding glass doors this

period. Keystone verified the materials being used as Dymonic 100 polyurethane sealant

applied under the threshold, including the surface of the 1x6-inch PVC sill extender, with

3-1/4 inch stainless tapcon style anchors that were encapsulated with the sealant.

The stairwell shearwalls and elevator tower painting was finished, and the contractor plans

to apply the primer on November 4, 2019 at the Porte-cochere.

The east elevation 01-stack is currently forming the edge repairs and once completed the

post tension sub-contractor is scheduled to complete the necessary hardware for the pre-

pour evaluation by the engineer.

Both the north and south elevations have the post tension hardware installed and with

Keystones’ approval to cast, the crew pumped the 6000psi redi-mix concrete at Unit 308

where the balcony was fully replaced and with a total of 4-yards the employees also cst the

kneewalls at Unit 208 and some other approved locations.

Project Summary #6 Prime Contractor: SPEC Contractor Services

Reporting Period: 10.21.2019 thru 11.1.2019 Superintendent: Beto Fuentes

Daytona Beach Shores Permit # 20190844

PROJECT LOCATION

3111 South Atlantic Avenue, Daytona Beach Shores, Florida 32118

Page 2: TROPIC SHORES REHABILITATION PROJECT€¦ · where the balcony was fully replaced and with a total of 4-yards the ... Period: 10.21.2019 thru 11.1.2019 Superintendent: Beto Fuentes

Page 2

Photo during the

stucco application

View at the west

elevation with

SuperPaint

in-progress

Page 3: TROPIC SHORES REHABILITATION PROJECT€¦ · where the balcony was fully replaced and with a total of 4-yards the ... Period: 10.21.2019 thru 11.1.2019 Superintendent: Beto Fuentes

Page 3

Photo at the 08-

stack kneewall

formwork

View at the northeast

elevation

Page 4: TROPIC SHORES REHABILITATION PROJECT€¦ · where the balcony was fully replaced and with a total of 4-yards the ... Period: 10.21.2019 thru 11.1.2019 Superintendent: Beto Fuentes

Page 4

Photo of the door sub-

contractor assembling the

sliding glass door frame

Photo of Gulfstream

removing the SGD

frame at Unit 401

Page 5: TROPIC SHORES REHABILITATION PROJECT€¦ · where the balcony was fully replaced and with a total of 4-yards the ... Period: 10.21.2019 thru 11.1.2019 Superintendent: Beto Fuentes

Page 5

Unit 308 formwork

installation

Photo at the 01-

stack east elevation

Page 6: TROPIC SHORES REHABILITATION PROJECT€¦ · where the balcony was fully replaced and with a total of 4-yards the ... Period: 10.21.2019 thru 11.1.2019 Superintendent: Beto Fuentes

Page 6

View of the workers

installing steel at Unit

901-south

Picture of the

contractor at the 08-

stack during

inspection