29
TRF : Maintenance Schedule 2019

Upload: tranquynh

Post on 14-Feb-2019

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

TRF :

Maintenance Schedule 2019

Page 2: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

Main changes

Maintenance Schedule 2019

How to read the Excel file

Summary & schedule

Agenda

GRTgaz │ Maintenance Schedule 2019 2

Page 3: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Maintenance Schedule 2019 3

Main changes

Page 4: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Maintenance Schedule 2019 4

Main changes: overview

• Creation of new superpoints

Who is impacted by superpoints?

Every shipper who has capacities on PIR, PITS or PITTM on our

network.

• Introduction of the CPRTt

Important: The storages are now included in the superpoints.

That means more shippers are impacted than before.

Page 5: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Maintenance Schedule 2019 5

Main changes

4 superpoints with planned restrictions in GRTgaz this summer:

• SPN3U (formerly SP0003)

• SPNS1U (formerly SP0004)

• SPNS2D (new)

• SPNS3D (new)

U = Upstream

(the entries are restricted)

D = Downstream

The exits are restricted

SPAIN

ITALIA

GERMANY

SWITZERLAND

BELGIUM

LUX.

Obergailbach

Fos

Montoir

Oltingue

Virtualys

Dunkerque

Pirineos

Lussagnet

Sud-Est

Atlantique

Nord-Ouest

Nord-Est

NS1

NS2

NS3

Dunkerque LNG

Aval

Amont

N3

Page 6: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Maintenance Schedule 2019 6

Main changes

A publication only applicable on GRTgaz’s network…..

• For superpoints co-managed with Téréga, each TSO publishes the

restriction on its sub-superpoint :

• SPNS2D -> Restriction published on SSPNS2D (Atl+SE+Montoir+Fos)

• SPNS3D -> Restriction published on SSPNS3D (Atl+Montoir+Fos)

…but the same restriction rate for GRTgaz and Téréga’s sub-superpoint

Page 7: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Maintenance Schedule 2019 7

Overview table

Superpoints restricted in 2019

SPN1U SPN2U SPN3U SPNS1U SPNS2U SPNS3U SPNS4U SSPNS2D SSPNS3D SPEO1U SPEO2U SSPEO1D SSPEO2D SPSN2D SPSN3D

DUNKERQUE √ √ √ √ √ √ √ √ √

OBERGAILBACH √ √ √ √ √ √ √ √ √

OLTINGUE √ √ √ √ √ √ √ √

Virtualys √ √ √ √ √ √ √ √ √ √

FOS √ √ √ √ √ √

MONTOIR √ √ √ √ √

Dunkerque GNL √ √ √ √ √ √ √ √ √

Nord-Ouest √ √ √ √ √ √ √

Nord-Est √ √ √ √ √ √ √

Atlantique √ √ √ √ √

Sud-Est √ √ √ √ √ √ √

Page 8: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Maintenance Schedule 2019 8

Main changes

CPRTt

Capacity available during maintenance when the network is

reasonably used. It is based on medium flows and consumption

scenarios and do not take into account the uncertainties of works.

Restriction rates

Are calculateds based on subscribed capacities. For storages and

LNG terminals, as the capacities are not booked yet, we

assumed that the level of booking is the same as this year.

Page 9: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Maintenance Schedule 2019 9

Maintenance Schedule 2019

Page 10: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

10

Dates of superpoints activation (summer 2019)

SPAIN

ITALIA

GERMANY

SWITZERLAND

BELGIUM

LUX.

Obergailbach

Fos

Montoir

Oltingue

Virtualys

Dunkerque

Pirineos

Lussagnet

Sud-Est

Atlantique

Nord-Ouest

Nord-Est

NS1

NS2

NS3

Dunkerque LNG

N1

Aval

Amont

GRTgaz │ Programme travaux 2019

SSPNS2D: 28/06 to 30/06, 7/10 to 28/10

Impacted points (DEL): Atlantique and South-East PITS

SPNS1U: 9/05,

14/06 to 16/06,

28/06 to 26/07,

20/08 to 23/08,

30/09 to 31/10

Impacted points (REC):

Virtualys, Obergailbach and

Oltingue PIR

SSPNS3D:

13/05 to 17/05

27/05 to 27/06

01/07 to 02/08

07/09 to 27/09

30/09 to 06/10

Impacted point (DEL): Atlantique PITS

N3

SPN3U: 9/09 to 27/09

Impacted points (REC): Virtualys and Obergailbach PIR

Page 11: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Changements sous T@ – TRF & PEG 11

The following graphs show for each day:

Storengy restriction (for storages)

GRTgaz restriction directly on the point

GRTgaz superpoints restrictions : be careful, the indicated restriction rate does not take into

account the superpoint’s flexibility; it corresponds to the restriction rate for a monopoint shipper

The indicated restriction rates are calculated on the base of:

The probably available capacity (CPRTt)

The subscribed capacity (last year’s for the storages)

4 points are impacted by the superpoints in 2019:

PITS South-East and Atlantique, PIR Virtualys et Obergailbach

The other points are not impacted by the superpoints; the graphs are shown in the

back-up slides.

The restrictions point by point

Page 12: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Changements sous T@ – TRF & PEG 12

South-East PITS

Probable restriction rates (based on the CPRTt)

on South-East PITS injection capacities (Saline)

SSPNS2D: (Atl+SE+Fos+Montoir)

Possibility to obtain more UIOLI if

LNG in Montoir or Fos+ flexibility between Atlantic and South-East

+ flexibility and UIOLI with Teréga SSP

Page 13: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Changements sous T@ – TRF & PEG 13

Atlantic PITS

Probable restriction rates (based on the CPRTt)

on Atlantic PITS injection capacities

SSPNS3D: (Atl + Fos + Montoir)

Possibility to obtain more UIOLI if

LNG in Montoir or Fos+ flexibility and UIOLI with Teréga SSP

SSPNS2D: (Atl+SE+Fos+Montoir)

Possibility to obtain more UIOLI if

LNG in Montoir or Fos+ flexibility between Atlantic and South-East

+ flexibility and UIOLI with Teréga SSP

Page 14: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

14

Taking into account Storengy restrictions and GRTgaz PITS and

superpoints restrictions, without using the flexibility or additional capacity

generated by the superpoints (unfavorable hypothesis).

The Atlantic storage can be filled

with this maintenance schedule

Atlantic storage filling simulation

Page 15: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Changements sous T@ – TRF & PEG 15

Virtualys and Obergailbach PIR

SPNS1U:

(Virtualys + Obergailbach+Oltingue)

Possibility to obtain more UIOLI if

exits in Oltingue+ flexibility between the 3 entry points

SPN3U:

(Virtualys + Obergailbach)

flexibility between the 3 entry points

Probable restriction rates (based on the CPRTt)

on Virtualys and Obergailbach entry PIRs

Page 16: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Maintenance Schedule 2019 16

How to read the Excel file

Page 17: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

SPN1U SPN2U SPN3U SPNS1U SPNS2U SPNS3U SPNS4U SSPNS2D SSPNS3D SPEO1U SPEO2U SSPEO1D SSPEO2D SPSN2D SPSN3D

DUNKERQUE √ √ √ √ √ √ √ √ √

OBERGAILBACH √ √ √ √ √ √ √ √ √

OLTINGUE √ √ √ √ √ √ √ √

Virtualys √ √ √ √ √ √ √ √ √ √

FOS √ √ √ √ √ √

MONTOIR √ √ √ √ √

Dunkerque GNL √ √ √ √ √ √ √ √ √

Nord-Ouest √ √ √ √ √ √ √

Nord-Est √ √ √ √ √ √ √

Atlantique √ √ √ √ √

Sud-Est √ √ √ √ √ √ √

GRTgaz │ Maintenance Schedule 2019 17

Example of a client active on Atlantique

I booked 10GWh/d of capacities:

1) I need to check which superpoints include Atlantique :

2) I apply filters to the Excel Maintenance Schedule file:

Page 18: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Maintenance Schedule 2019 18

Example of a client active on Atlantique

I booked 10GWh of capacities:

1) My relevant restriction rates are:

max𝑇𝑅𝑓𝑓𝑖𝑛𝑎𝑙 = max(max𝑇𝑅𝑓𝐴𝑡𝑙𝑎𝑛𝑡𝑖𝑞𝑢𝑒; max𝑇𝑅𝑓𝑆𝑆𝑃𝑁𝑆2𝐷; max𝑇𝑅𝑓𝑆𝑆𝑃𝑁𝑆3𝐷)

𝑇𝑅𝑓 𝑝𝑟𝑜𝑏𝑎𝑏𝑙𝑒𝑓𝑖𝑛𝑎𝑙 = max( 𝑇𝑅𝑓 𝑝𝑟𝑜𝑏𝑎𝑏𝑙𝑒𝐴𝑡𝑙𝑎𝑛𝑡𝑖𝑞𝑢𝑒; 𝑇𝑅𝑓 𝑝𝑟𝑜𝑏𝑎𝑏𝑙𝑒𝑆𝑆𝑃𝑁𝑆2𝐷; 𝑇𝑅𝑓 𝑝𝑟𝑜𝑏𝑎𝑏𝑙𝑒𝑆𝑆𝑃𝑁𝑆3𝐷)

2) My effective capacities will be:

𝑚𝑖𝑛𝐶𝑂𝐸 = (1 − 𝑚𝑎𝑥𝑇𝑅𝑓) 𝑥 COS𝐶𝑂𝐸𝑝𝑟𝑜𝑏𝑎𝑏𝑙𝑒 = (1 − 𝑇𝑅𝑓𝑝𝑟𝑜𝑏𝑎𝑏𝑙𝑒) 𝑥 COS

Example on 27/06 :

minCOE = (1-max(30%;54%)) x 10 = 4,6GWh

COEprobable = (1-max(30%;51%)) x 10 = 4,9GWh

Page 19: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

SPN1U SPN2U SPN3U SPNS1U SPNS2U SPNS3U SPNS4U SSPNS2D SSPNS3D SPEO1U SPEO2U SSPEO1D SSPEO2D SPSN2D SPSN3D

DUNKERQUE √ √ √ √ √ √ √ √ √

OBERGAILBACH √ √ √ √ √ √ √ √ √

OLTINGUE √ √ √ √ √ √ √ √

Virtualys √ √ √ √ √ √ √ √ √ √

FOS √ √ √ √ √ √

MONTOIR √ √ √ √ √

Dunkerque GNL √ √ √ √ √ √ √ √ √

Nord-Ouest √ √ √ √ √ √ √

Nord-Est √ √ √ √ √ √ √

Atlantique √ √ √ √ √

Sud-Est √ √ √ √ √ √ √

GRTgaz │ Maintenance Schedule 2019 19

Example of a client active on Virtualys

and Obergailbach:1) I need to check which superpoints include Virtualys and Obergailbach:

2) Example on 08/07 with a booked capacity of 30GWh on Obergailbach and 10GWh

onVirtualys :

Obergailbach : minCOE = (1-max(56%;42%)) x 30 = 13GWh

SPNS1U : minCOE = (1 - 42%) x (30+10) = 23GWh

Virtualys : minCOE = 23 - 13 = 10GWhVirtualys : minCOE = (1 - 42%) x 10 = 5,8GWh

Page 20: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Maintenance Schedule 2019 20

Use of bonuses:

Important : Each KWh nominated in the bonus direction gives you an additional

KWh to nominate in the restricted direction.

Using bonuses increases your capacities on the other points

of the superpoint :

We consider bonuses :

• Every exit point for upstream superpoints (Exit PIR and injections in storages)

• Every entry for downstream superpoints (Entry PIR, PITTM and withdrawals from storages)

If a shipper nominates a bonus but don’t use the extra

capacity, the spare bonus is given as UIOLI to the whole

community.

Page 21: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Maintenance Schedule 2019 21

Summary & Schedule

Page 22: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

Summary

GRTgaz │ Maintenance Schedule 2019 22

You also have to take into account the superpoint constraint to know

your restriction by point.

When a superpoint is active, you can obtain more UIOLI than when

the restriction is directly on the point

In particular if the « bonus » nominations are large

(ex: Oltingue exit for NS1U and Montoir and Fos LNG entries for NS2D et NS3D)

Page 23: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

1st nov 2018:

TRF

Schedule

GRTgaz │ Maintenance Schedule 2019 23

1st april 2019:

beginning of the first

maintenance period

with merged zones

Dec 2018:

maintenance

schedule update

with CPRTt

End of February

2019: consolidated

maintenance

schedule on t@

6th december 2018:

1st Webinar about

maintenance

Other Webinars about maintenance:

- Maintenance schedule update in February

- Transfers between GRTgaz and Teréga

- How to read the maintenance schedule on t@,

with the superpoints

Page 24: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Programme travaux 2019 24

Back-up slides

Page 25: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Programme travaux 2019 25

North-West PITS

Probable restriction rates (based on the CPRTt)

on North-West PITS injection capacities (Sediane)

Page 26: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Programme travaux 2019 26

North-East PITS

Probable restriction rates (based on the CPRTt)

on North-East PITS injection capacities (Serene North)

Page 27: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Programme travaux 2019 27

Dunkerque PIR

Probable restriction rates (based on the CPRTt)

on Dunkerque entry PIR

Page 28: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)

GRTgaz │ Programme travaux 2019 28

Oltingue PIR

Probable restriction rates (based on the CPRTt)

on Oltingue exit PIR

Page 29: TRF - grtgaz.com · GRTgaz │ Changements sous T@ –TRF & PEG 12 South-East PITS Probable restriction rates (based on the CPRTt) on South-East PITS injection capacities (Saline)