TENTATIVE FIVE YEAR WORK PROGRAMFISCAL YEARS 2017-2021
TENTATIVE FIVE YEAR WORK PROGRAMFISCAL YEARS 2017-2021
MANATEE COUNTY
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
MISSION STATEMENT The Department will provide a safe, interconnected statewide transportation system for Florida's citizens and visitors that ensures the mobility of people and goods, while enhancing economic prosperity and sustaining the quality of our environment.
Robin StublenCommunications SpecialistDistrict One Headquarters801 North BroadwayP.O. Box 1249Bartow, FL 33831(863) 519-2362
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 210/26/2015Run Date: SnapShot Date: 10/26/2015
Zachary BurchGovernment Affairs &Communications ManagerSouthwest Area Office10041 Daniels ParkwayFort Myers, Fl. 33913(239) 225‐1950
DRAFT
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
COUNTYMANATEE
July 1, 2016 Through June 30, 2021
CURRENTLY REPORTED ACTIVE FUND CODESDRAFT
TENTATIVE WORK PROGRAM REPORT
ACSA Advance Construction (SA)
ACSU Advance Construction (SU)
BRRP State Bridge Repair And Rehab
DDR District Dedicated Revenue
DIH State In-house Product Support
DITS Statewide ITS - State 100%
DPTO State PTO
DS
FTA Federal Transit Administration
FTAT FHWA Transfer to FTA (non-bud)
GMR General Revenue for SIS
HSP Highway Safety Program
LF Local Funds
LFP Local Fund for Participating
SA STP, Any Area
SU STP, Urban Areas > 200k
TRIP Trans Regional Incentive Prog
DSB1
ACNP
NHRE
TALT
TALU
TRWR
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 310/26/2015Run Date: SnapShot Date: 10/26/2015
Trans Regional Incentive Prog
State Primary Highways and PTO
Advances Tolls or Bonds Skyway
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
DRAFT
HIGHWAYS
FPN: 4331422 Project/Location: 10TH AVE FROM RIVERSIDE DRIVE TO 17TH
STREET
Project Length: 1.126Desc: URBAN CORRIDOR IMPROVEMENTS
Comments: Begin Mile Post: 0.000 End Mile Post: 1.126
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $825,000
$825,000Project Total:
FPN: 4331421 Project/Location: 10TH AVENUE FROM RIVERSIDE DRIVE TO 17TH
STREET
Project Length: 1.126Desc: PD&E/EMO STUDY
Comments: Begin Mile Post: 0.000 End Mile Post: 1.126
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE ACSU $1,000,000
PDE SU $4,500
$1,004,500Project Total:
FPN: 4380861 Project/Location: 13TH AVENUE WEST AT US 301/US 41
Project Length: 0.010Desc: ADD RIGHT TURN LANE(S)
Comments: Begin Mile Post: 0.000 End Mile Post: 0.010
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $135,000
CST SU $574,441
$135,000 $574,441Project Total:
FPN: 4369821 Project/Location: 51ST STREET WEST AT 53RD AVENUE
WEST
Project Length: 0.030Desc: ADD TURN LANE(S)
Comments: Begin Mile Post: 0.000 End Mile Post: 0.030
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $120,000
CST SU $353,621
$120,000 $353,621Project Total:
FPN: 4351131 Project/Location: 63RD AVE E AT 33RD STREET E
Project Length: 0.470Desc: ADD LEFT TURN LANE(S)
Comments: Begin Mile Post: 1.530 End Mile Post: 2.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
RRU SU $225,000
ROW LFP $89,116
CST SU $1,902,309
$89,116 $2,127,309Project Total:
FPN: 4350901 Project/Location: 9TH AVE E AT 15TH ST EAST
Project Length: 0.136Desc: ADD TURN LANE(S)
Comments: Begin Mile Post: 0.431 End Mile Post: 0.567
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
RRU SU $100,000
ROW SU $385,920
CST SU $1,268,969
$385,920 $1,368,969Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 410/26/2015Run Date: SnapShot Date: 10/26/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
DRAFT
FPN: 4369831 Project/Location: BLACKSTONE PARK AT 14TH AVE W, 23RD ST W
& BUSINESS 41 (VALENCIA DR)
Project Length: 0.001Desc: SIDEWALK
Comments: Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST TALU $487,672
$487,672Project Total:
FPN: 4136391 Project/Location: BRADENTON TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.790Desc: TRAFFIC SIGNALS
Comments: Begin Mile Post: 6.559 End Mile Post: 7.349
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $193,089 $199,391 $205,372 $221,368 $228,009
$193,089 $199,391 $205,372 $221,368 $228,009Project Total:
FPN: 4390131 Project/Location: BUSINESS 41 (8TH AVE) FROM 14TH STREET
WEST TO 9TH STREET WEST
Project Length: 0.209Desc: PEDESTRIAN SAFETY IMPROVEMENT
Comments: Begin Mile Post: 7.388 End Mile Post: 7.552
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DIH $10,000
CST DS $601,659
$611,659Project Total:
FPN: 4351201 Project/Location: ELLENTON GILLETTE RD AT 69TH ST
E
Project Length: 0.200Desc: ADD LEFT TURN LANE(S)
Comments: Begin Mile Post: 3.502 End Mile Post: 3.702
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SU $681,575
$681,575Project Total:
FPN: 4332771 Project/Location: EMERGENCY VEHICLE PRIORITY SYSTEM
MANATEE COUNTY
Project Length: 0.001Desc: ATMS - ARTERIAL TRAFFIC MGMT
Comments: Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SU $1,631,700
$1,631,700Project Total:
FPN: 4136401 Project/Location: HOLMES BEACH TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.100Desc: TRAFFIC SIGNALS
Comments: Begin Mile Post: 0.000 End Mile Post: 0.100
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $9,384 $8,469 $8,723 $8,985 $9,255
$9,384 $8,469 $8,723 $8,985 $9,255Project Total:
FPN: 4363211 Project/Location: I 75 (SR 93) SOUTH OF UNIVERSITY BLVD NORTH
OF US 301
Project Length: 11.400Desc: WETLAND MITIGATION/RESTORATION
Comments: Begin Mile Post: 0.000 End Mile Post: 11.400
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV DS $394,900 $311,500
$394,900 $311,500Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 510/26/2015Run Date: SnapShot Date: 10/26/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
DRAFT
FPN: 4379731 Project/Location: I-275 AT SKYWAY REST AREA
Project Length: 0.250Desc: REST AREA
Comments: Begin Mile Post: 10.700 End Mile Post: 10.950
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DSB1 $216,800
DSB DSB1 $8,965,663
$9,182,463Project Total:
FPN: 4385281 Project/Location: I-275 AT SUNSHINE SKYWAY
SEAWALL
Project Length: 0.250Desc: MISCELLANEOUS STRUCTURE
Comments: Begin Mile Post: 10.700 End Mile Post: 10.950
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DSB1 $125,000
DSB DSB1 $5,194,970
ENV DSB1 $215,000
$5,534,970Project Total:
FPN: 4362991 Project/Location: I-275 SB TO I-75 NB DECK
REPLACEMENT
Project Length: 0.425Desc: BRIDGE-REPAIR/REHABILITATION
Comments: Begin Mile Post: 0.364 End Mile Post: 0.789
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE BRRP $300,000
PE DIH $10,000
CST BRRP $6,908,642
CST DIH $10,530
$310,000 $6,919,172Project Total:
FPN: 4389951 Project/Location: I-75 (SR 93) AT SR 64
Project Length: 0.807Desc: LANDSCAPING
Comments: Begin Mile Post: 6.908 End Mile Post: 7.715
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
CST DIH $11,380
CST DS $1,138,000
$10,000 $1,149,380Project Total:
FPN: 2010327 Project/Location: I-75 (SR 93) AT UNIVERSITY PARKWAY
(MANATEE)
Project Length: 0.460Desc: LANDSCAPING
Comments: Begin Mile Post: 0.000 End Mile Post: 0.460
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DDR $947,700
CST DIH $59,758
$1,007,458Project Total:
FPN: 4340261 Project/Location: I-75 (SR 93) FROM N OF I-275 TO MANATEE
COUNTY LINE
Project Length: 5.320Desc: ITS FREEWAY MANAGEMENT
Comments: Begin Mile Post: 15.251 End Mile Post: 20.571
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DITS $125,000
DSB DIH $87,840
DSB DITS $3,173,531
$3,386,371Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 610/26/2015Run Date: SnapShot Date: 10/26/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
DRAFT
FPN: 2010324 Project/Location: I-75 (SR93) AT UNIVERSITY
INTERCHANGE
Project Length: 0.460Desc: INTERCHANGE - ADD LANES
Comments: Begin Mile Post: 0.000 End Mile Post: 0.460
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
INC DDR $2,500,000
$2,500,000Project Total:
FPN: 2010326 Project/Location: I-75 AT SR 64
Project Length: 0.807Desc: INTERCHANGE IMPROVEMENT
Comments: Begin Mile Post: 6.908 End Mile Post: 7.715
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
RRU ACNP $2,137,481
CST ACNP $42,676,837
CST DI $4,292,295
$49,106,613Project Total:
FPN: 4349291 Project/Location: I-75 S OF MOCCASIN WALLOW RD TO
HILLSBOROUGH C/L
Project Length: 4.857Desc: RESURFACING
Comments: Begin Mile Post: 15.714 End Mile Post: 20.571
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST ACNP $8,381,301
$8,381,301Project Total:
FPN: 4350382 Project/Location: MANATEE COUNTY SCOUR COUNTERMEASURE
AT VARIOUS LOCATIONS
Project Length: 0.802Desc: BRIDGE-REPAIR/REHABILITATION
Comments: Begin Mile Post: 0.480 End Mile Post: 1.204
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE BRRP $97,099
$97,099Project Total:
FPN: 4126731 Project/Location: MANATEE COUNTY TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 5.519Desc: TRAFFIC SIGNALS
Comments: Begin Mile Post: 0.560 End Mile Post: 6.079
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DITS $446,384 $471,739 $490,665 $510,302 $525,611
$446,384 $471,739 $490,665 $510,302 $525,611Project Total:
FPN: 1961421 Project/Location: MANATEE MPO IDENTIFIED OPERATIONAL
IMPROVEMENTS - FUNDING
Project Length: 0.000Desc: FUNDING ACTION
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SU $20,000 $161,522 $2,639,078
$20,000 $161,522 $2,639,078Project Total:
FPN: 4371061 Project/Location: MANATEE/SARASOTA TMC OPS FUND COUNTY
WIDE
Project Length: 0.001Desc: OTHER ITS
Comments: Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DS $429,000 $429,000 $429,000 $429,000 $429,000
$429,000 $429,000 $429,000 $429,000 $429,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 710/26/2015Run Date: SnapShot Date: 10/26/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
DRAFT
FPN: 4353691 Project/Location: MOCCASIN WALLOW ROAD AT US 41
Project Length: 0.200Desc: ADD TURN LANE(S)
Comments: Begin Mile Post: 11.469 End Mile Post: 11.669
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ROW SU $58,350
CST SU $236,452
$58,350 $236,452Project Total:
FPN: 4332131 Project/Location: MORGAN JOHNSON ROAD FROM RIVERSIDE
TERRACE TO SR 64
Project Length: 0.657Desc: SIDEWALK
Comments: Begin Mile Post: 1.543 End Mile Post: 2.200
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST TALT $92,112
CST TALU $455,243
$547,355Project Total:
FPN: 4136421 Project/Location: PALMETTO TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.751Desc: TRAFFIC SIGNALS
Comments: Begin Mile Post: 0.505 End Mile Post: 1.256
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $49,373 $49,389 $50,871 $52,397 $53,969
$49,373 $49,389 $50,871 $52,397 $53,969Project Total:
FPN: 4389921 Project/Location: SOUTHERN PARKWAY WEST FROM 43RD STREET
WEST TO 26TH STREET WEST
Project Length: 0.001Desc: BIKE PATH/TRAIL
Comments: Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE TALT $215,000
$215,000Project Total:
FPN: 4380621 Project/Location: SR 43 (US 301) FROM 2ND AVENUE TO W. OF 51ST
AVE
Project Length: 3.324Desc: RESURFACING
Comments: Begin Mile Post: 0.542 End Mile Post: 3.866
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
RRU DS $500,000
CST DDR $1,137,182
CST DIH $541,000
CST DS $9,503,840
$10,000 $500,000 $11,182,022Project Total:
FPN: 4081853 Project/Location: SR 64 (MANATEE AVE) FROM SR 789 TO PERICO
BAY BOULEVARD
Project Length: 1.936Desc: BRIDGE REPLACEMENT
Comments: Begin Mile Post: 0.216 End Mile Post: 2.152
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV DDR $825,000
$825,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 810/26/2015Run Date: SnapShot Date: 10/26/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
DRAFT
FPN: 4366841 Project/Location: SR 64 (MANATEE AVE) FROM E OF 7TH STREET W
TO E OF 5TH STREET W
Project Length: 0.106Desc: RAIL SAFETY PROJECT
Comments: Begin Mile Post: 1.194 End Mile Post: 1.300
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV DS $50,000
RRU DS $250,000
CST DDR $345,281
CST DIH $10,250
$310,250 $345,281Project Total:
FPN: 4351361 Project/Location: SR 64 FROM MARTINIQUE DR TO EAST OF 107TH
CT WEST
Project Length: 0.987Desc: BIKE LANE/SIDEWALK
Comments: Begin Mile Post: 1.583 End Mile Post: 2.570
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DS $23,343
CST TALT $10,530
CST TALU $327,917
$361,790Project Total:
FPN: 4371451 Project/Location: SR 684 (CORTEZ ROAD) AT 43RD STREET
WEST
Project Length: 0.001Desc: ADD TURN LANE(S)
Comments: Begin Mile Post: 5.979 End Mile Post: 5.980
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DIH $1,000
CST LFP $240,300
CST TRIP $177,631
CST TRWR $62,669
$481,600Project Total:
FPN: 4365511 Project/Location: SR 684 FROM 119TH ST WEST TO 86TH ST
WEST
Project Length: 2.068Desc: SKID HAZARD OVERLAY
Comments: Begin Mile Post: 1.188 End Mile Post: 3.256
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
CST DIH $54,100
CST DS $54,271
CST HSP $2,803,241
$10,000 $2,911,612Project Total:
FPN: 4369241 Project/Location: SR 70 AT 30TH STREET EAST
Project Length: 0.200Desc: INTERSECTION IMPROVEMENT
Comments: Begin Mile Post: 1.148 End Mile Post: 1.348
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $150,000
$150,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 910/26/2015Run Date: SnapShot Date: 10/26/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
DRAFT
FPN: 4388431 Project/Location: SR 70 AT US 301
Project Length: 0.002Desc: ADD RIGHT TURN LANE(S)
Comments: Begin Mile Post: 1.001 End Mile Post: 1.002
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $245,000
$245,000Project Total:
FPN: 4145062 Project/Location: SR 70 FROM LORRAINE RD TO CR
675/WATERBURY ROAD
Project Length: 6.091Desc: PD&E/EMO STUDY
Comments: Begin Mile Post: 9.476 End Mile Post: 15.567
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE DDR $1,200,000
PDE DIH $430,000
PE DDR $3,580,000
PE DIH $20,000
$5,230,000Project Total:
FPN: 4365461 Project/Location: SR 70 FROM US 41 TO 540' EAST OF US
41
Project Length: 0.102Desc: INTERSECTION IMPROVEMENT
Comments: Begin Mile Post: 0.000 End Mile Post: 0.102
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DS $4,611
CST HSP $170,510
CST SA $22,208
$197,329Project Total:
FPN: 4366761 Project/Location: SR 789 (LONGBOAT KEY) FROM NORTH SHORE
RD TO COQUINA PARK ENT
Project Length: 0.710Desc: PD&E/EMO STUDY
Comments: Begin Mile Post: 4.467 End Mile Post: 5.177
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE SA $2,325,000
$2,325,000Project Total:
FPN: 4279952 Project/Location: SR43 (US 301) FROM CR 675 TO MOCCASIN
WALLOW ROAD
Project Length: 1.212Desc: LANDSCAPING
Comments: Begin Mile Post: 10.457 End Mile Post: 11.669
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DDR $462,220
$462,220Project Total:
FPN: 4366821 Project/Location: US 301 (10TH STREET) FROM 5TH AVENUE DR W.
TO E. 3RD AVENUE W.
Project Length: 0.328Desc: RAIL SAFETY PROJECT
Comments: Begin Mile Post: 0.196 End Mile Post: 0.524
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
RRU DDR $650,000
CST DDR $1,336,613
CST DIH $21,060
$671,060 $1,336,613Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 1010/26/2015Run Date: SnapShot Date: 10/26/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
DRAFT
FPN: 4352861 Project/Location: US 301 AT ERIE RD/OLD TAMPA HWY
Project Length: 0.200Desc: ADD LEFT TURN LANE(S)
Comments: Begin Mile Post: 6.127 End Mile Post: 6.327
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $178,000
CST SU $576,308
$178,000 $576,308Project Total:
FPN: 4345051 Project/Location: US 301 AT SR 70
Project Length: 0.500Desc: INTERSECTION IMPROVEMENT
Comments: Begin Mile Post: 3.810 End Mile Post: 4.310
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV ACSA $20,000
CST ACSA $10,250
CST DDR $240,576
CST HSP $581,942
$852,768Project Total:
FPN: 4295061 Project/Location: US 41 / SR 45 FROM 63RD AVE W TO 53RD AVE
W
Project Length: 1.247Desc: LIGHTING
Comments: Begin Mile Post: 3.019 End Mile Post: 4.266
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ROW HSP $34,200
$34,200Project Total:
FPN: 4335491 Project/Location: US 41 AT US 301 (10TH STREET E) IN
PALMETTO
Project Length: 0.200Desc: SIDEWALK
Comments: Begin Mile Post: 0.508 End Mile Post: 0.708
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST ACSU $587,047
$587,047Project Total:
FPN: 4335492 Project/Location: US 41 AT US 301 LANDSCAPING
Project Length: 0.200Desc: LANDSCAPING
Comments: Begin Mile Post: 0.508 End Mile Post: 0.708
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
CST DIH $10,820
CST DS $110,364
$10,000 $121,184Project Total:
FPN: 4365091 Project/Location: US 41 BUSINESS (9TH STREET WEST) FROM 3RD
AVENUE TO MANATEE AVE (SR64)
Project Length: 0.134Desc: ADD RIGHT TURN LANE(S)
Comments: Begin Mile Post: 0.213 End Mile Post: 0.347
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DDR $1,288,602
CST DIH $54,698
CST DS $5,265
$1,348,565Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 1110/26/2015Run Date: SnapShot Date: 10/26/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
DRAFT
FPN: 4335471 Project/Location: US 41 BUSINESS AT 3RD AVE
Project Length: 0.048Desc: ADD RIGHT TURN LANE(S)
Comments: Begin Mile Post: 0.323 End Mile Post: 0.371
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DS $5,265
CST SU $158,606
$163,871Project Total:
FPN: 4383741 Project/Location: US 41 FROM 301 BLVD TO 21ST AVE
Project Length: 1.038Desc: SAFETY PROJECT
Comments: Begin Mile Post: 0.220 End Mile Post: 1.258
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
PE HSP $242,790
CST DIH $21,640
CST DS $36,815
CST HSP $739,151
$252,790 $797,606Project Total:
FPN: 4335922 Project/Location: US 41 FROM 63RD AVENUE WEST TO 69TH
AVENUE WEST (BAY DRIVE)
Project Length: 0.767Desc: SIDEWALK
Comments: Begin Mile Post: 2.252 End Mile Post: 3.019
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ROW DIH $45,520
ROW LF $671,543
ROW SU $1,202,937
$1,920,000Project Total:
FPN: 4353491 Project/Location: US 41 GREEN BRIDGE MULTI-USE
PATH
Project Length: 1.032Desc: BIKE PATH/TRAIL
Comments: Begin Mile Post: 0.347 End Mile Post: 1.379
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV TALU $30,000
CST DS $52,650
CST TALT $2,220,941
$2,303,591Project Total:
HIGHWAYS TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$89,665,943 $22,227,029 $19,430,120 $5,587,675 $8,293,151
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 1210/26/2015Run Date: SnapShot Date: 10/26/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
DRAFT
FLP: SEAPORT
FPN: 4333021 Project/Location: PORT MANATEE RAIL TO DOCKSIDE CAPITAL
IMPROVEMENTS
Project Length: 0.000Desc: SEAPORT CAPACITY PROJECT
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP GMR $2,000,000
CAP LF $2,000,000
$4,000,000Project Total:
FLP: SEAPORT TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$4,000,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 1310/26/2015Run Date: SnapShot Date: 10/26/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
DRAFT
FLP: TRANSIT
FPN: 4378391 Project/Location: BUS STOPS IN MANATEE COUNTY VARIOUS
LOCATIONS
Project Length: 0.000Desc: PUBLIC TRANSPORTATION SHELTER
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTAT $292,082
CAP SU $292,082
$584,164Project Total:
FPN: 4345172 Project/Location: MANATEE CO./SAR-BRADENTON UZA FTA
SECTION 5339 CAPITAL ASSISTANCE
Project Length: 0.000Desc: CAPITAL FOR FIXED ROUTE
Comments: MANATEE COUNTY MCAT- DESIGNATED RECIPIENTBegin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTA $408,943 $408,943 $408,943 $408,943 $416,326
CAP LF $102,236 $102,236 $102,236 $102,236 $104,081
$511,179 $511,179 $511,179 $511,179 $520,407Project Total:
FPN: 4108951 Project/Location: MANATEE COUNTY AREA TRANSIT - OPERATING
ASSISTANCE - CORRIDOR
Project Length: 0.000Desc: URBAN CORRIDOR IMPROVEMENTS
Comments: STATE TRANSIT CORRIDOR PROGRAMBegin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DPTO $756,831 $807,140 $813,451 $837,864 $837,864
OPS LF $756,831 $807,140 $813,451 $837,864 $837,864
$1,513,662 $1,614,280 $1,626,902 $1,675,728 $1,675,728Project Total:
FPN: 4308451 Project/Location: MANATEE COUNTY AREA TRANSIT (MCAT)
OPERATING ASSISTANCE
Project Length: 0.000Desc: OPERATING FOR FIXED ROUTE
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DPTO $1,087,500
OPS LF $1,087,500
$2,175,000Project Total:
FPN: 4390351 Project/Location: MANATEE COUNTY AREA TRANSIT (MCAT) BUS
PURCHASES
Project Length: 0.000Desc: PURCHASE VEHICLES/EQUIPMENT
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTAT $1,780,000
CAP SU $1,780,000
$3,560,000Project Total:
FPN: 4101481 Project/Location: MANATEE COUNTY FTA SECTION 5307 CAPITAL
ASSISTANCE
Project Length: 0.000Desc: CAPITAL FOR FIXED ROUTE
Comments: SECTION 5307 - CAPITALBegin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTA $2,843,935 $2,843,935 $2,843,935 $3,002,710 $3,307,531
CAP LF $710,984 $710,984 $710,984 $750,678 $826,883
$3,554,919 $3,554,919 $3,554,919 $3,753,388 $4,134,414Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 1410/26/2015Run Date: SnapShot Date: 10/26/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
DRAFT
FPN: 4101482 Project/Location: MANATEE COUNTY FTA SECTION 5307
OPERATING ASSISTANCE
Project Length: 0.000Desc: OPERATING FOR FIXED ROUTE
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS FTA $850,000 $850,000 $850,000 $750,000 $500,000
OPS LF $850,000 $850,000 $850,000 $750,000 $500,000
$1,700,000 $1,700,000 $1,700,000 $1,500,000 $1,000,000Project Total:
FPN: 4101411 Project/Location: MANATEE COUNTY STATE TRANSIT BLOCK
GRANT OPERATING ASSISTANCE
Project Length: 0.000Desc: OPERATING FOR FIXED ROUTE
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $1,324
OPS DPTO $884,836 $907,711 $937,678 $984,562 $1,033,790
OPS LF $886,160 $907,711 $937,678 $984,562 $1,033,790
$1,772,320 $1,815,422 $1,875,356 $1,969,124 $2,067,580Project Total:
FLP: TRANSIT TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$11,227,080 $9,195,800 $9,268,356 $9,993,583 $12,958,129
COUNTY TOTALSMANATEE
Phase Fund Total2016/17 2017/18 2018/19 2019/20 2020/21
$100,893,023 $35,422,829 $28,698,476 $15,581,258 $21,251,280COUNTY Total: $201,846,866
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities