transmissionhub forum: renewable energy and the grid · 2019. 4. 30. · transmissionhub forum:...

12
TransmissionHub Forum: Renewable energy and the grid July 26, 2018 Moderator: Corina Rivera-Linares, chief analyst, TransmissionHub Panelists: Himali Parmar, principal, ICF Dr. Dariush Shirmohammadi, technical director, CalWEA and executive vice president, GridBright, Inc. Dr. Brian Gemmell, vice president, Transmission Asset Management and Planning, National Grid and vice president, WIRES Group Sponsored by:

Upload: others

Post on 25-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TransmissionHub Forum: Renewable energy and the grid · 2019. 4. 30. · TransmissionHub Forum: Renewable energy and the grid July 26, 2018 Moderator: Corina Rivera-Linares, chief

TransmissionHub Forum: Renewable energy and the grid

July 26, 2018Moderator: Corina Rivera-Linares, chief analyst, TransmissionHubPanelists: Himali Parmar, principal, ICF

Dr. Dariush Shirmohammadi, technical director, CalWEA and executive vice president, GridBright, Inc. Dr. Brian Gemmell, vice president, Transmission Asset Management and Planning, National Grid and vice president, WIRES Group

Sponsored by:

Page 2: TransmissionHub Forum: Renewable energy and the grid · 2019. 4. 30. · TransmissionHub Forum: Renewable energy and the grid July 26, 2018 Moderator: Corina Rivera-Linares, chief

TransmissionHub Project Data

From January to July 2018, TransmissionHub has covered about $24.1bn worth of electric transmission projects in various stages of development, including:

• About $1.8bn worth of transmission projects that have been or will be completed in 2018

• About $1.3bn worth of transmission projects that will be completed in 2019• About $11bn worth of transmission projects that will be completed in 2020• About $1.2bn worth of transmission projects that will be completed in 2021• About $4.4bn worth of transmission projects that will be completed in 2022• About $1.1bn worth of transmission projects that will be completed in 2023

Page 3: TransmissionHub Forum: Renewable energy and the grid · 2019. 4. 30. · TransmissionHub Forum: Renewable energy and the grid July 26, 2018 Moderator: Corina Rivera-Linares, chief

Projects completed or expected to be completed in 2018 include:

Project Name Sponsor Line MilesVoltage (kV)

From State To State Status Estimated Cost ($M)

Badger Coulee ATC, Xcel, others 180 345 WI WI In construction 580

Greentown-ReynoldsPioneer Transmission LLC,

NIPSCO 70 765 IN IN Complete 347Brazos Valley Connection CenterPoint Energy 60 345 TX TX Energized 285Harper-to-Milan 138-kV Transmission Line Project Mid-Kansas Electric Company 77 138 KS KS In service 65Oakville-Alliance 230-kV Transmission Line Entergy Louisiana 10.5 230 LA LA In service 60

Page 4: TransmissionHub Forum: Renewable energy and the grid · 2019. 4. 30. · TransmissionHub Forum: Renewable energy and the grid July 26, 2018 Moderator: Corina Rivera-Linares, chief

Projects expected to be completed in 2019 include:

Project Name Sponsor Line MilesVoltage (kV)

From State To State Status Estimated Cost ($M)

Mark Twain Transmission Project ATXI 96 345 MO IA In

construction 250

Spring Valley-N. Lake Geneva Project ATC 23 138 WI WI

In design & construction

(vegetation management) 70.6

Boscobel to Lone Rock (Line Y124) Rebuild Project ATC 25 69 WI WI In design 32.4Possum Point-Smoketown Electric Transmission Improvement Project Dominion Energy 8.5 115 VA VA

In construction 18.8

Ross-Ginger Switch 138-kV Transmission Line Project AEP Ohio Transco 4.8 138 OH OH Permitting 10.1

Page 5: TransmissionHub Forum: Renewable energy and the grid · 2019. 4. 30. · TransmissionHub Forum: Renewable energy and the grid July 26, 2018 Moderator: Corina Rivera-Linares, chief

Projects expected to be completed in 2020 include:

Project Name Sponsor Line MilesVoltage (kV)

From State To State Status Estimated Cost ($M)

Wind Catcher Energy Connection

Southwestern Electric Power Co. 350 765 OK OK Permitting 4.5bn

SunZia Southwest Transmission Project SunZia Transmission, LLC 520 500 NM AZ Permitting 2bn

Southline Transmission Project

Southline Transmission, L.L.C. 360 345 & 115 NM AZ

Construction to begin in

2018 800Independence Energy Connection Transource 45 230 PA MD Permitting 320Western Nassau Transmission Project PSEG Long Island 7 138 NY NY Permitting 176

Page 6: TransmissionHub Forum: Renewable energy and the grid · 2019. 4. 30. · TransmissionHub Forum: Renewable energy and the grid July 26, 2018 Moderator: Corina Rivera-Linares, chief

Beyond 2020• The approximately $464m Alberhill System Project has an in-service date of June

2021; major components of the project include a new 500/115-kV transmission substation

• The estimated $3bn, 730-mile, 600-kV direct-current TransWest Express Transmission Project is estimated to be in service in 2021-2022

• The estimated $323.5m, 85-mile, 230-kV San Luis Transmission Project is expected to be in service in summer 2023

• The estimated $131.1m, 62-mile, 345-kV Lucky Corridor project has an estimated commercial operating date of July 31, 2023

Page 7: TransmissionHub Forum: Renewable energy and the grid · 2019. 4. 30. · TransmissionHub Forum: Renewable energy and the grid July 26, 2018 Moderator: Corina Rivera-Linares, chief

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 >2026

US/Canada Planned Transmission Investments - $M

PlannedUnder ConstructionOperating

Chart and data compiled by Aaron Moline, PennWell

Page 8: TransmissionHub Forum: Renewable energy and the grid · 2019. 4. 30. · TransmissionHub Forum: Renewable energy and the grid July 26, 2018 Moderator: Corina Rivera-Linares, chief

0 5,000 10,000 15,000 20,000 25,000 30,000 35,000

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

>2026

Transmission Development by Sponsor Type - $M

Regulated

Merchant

Chart and data compiled by Aaron Moline, PennWell

Page 9: TransmissionHub Forum: Renewable energy and the grid · 2019. 4. 30. · TransmissionHub Forum: Renewable energy and the grid July 26, 2018 Moderator: Corina Rivera-Linares, chief

0

5,000

10,000

15,000

20,000

25,000

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 >2026

Transmission Investment by ISO/RTO - $MSPP

PJM

OIESO

NYISO

NBSO

MISO

ISONE

ERCOT

CAISO

AESO

Chart and data compiled by Aaron Moline, PennWell

Page 10: TransmissionHub Forum: Renewable energy and the grid · 2019. 4. 30. · TransmissionHub Forum: Renewable energy and the grid July 26, 2018 Moderator: Corina Rivera-Linares, chief

Renewable energy and energy storage initiatives include:

• New York: Regulators adopted Offshore Wind Standard; Energy Storage Roadmap also recently released

• Iowa: Governor signed legislation providing for study of electric vehicle infrastructure support

• New Jersey: Regulators approved issuance of request for quotation involving offshore wind

• Colorado: Governor signed legislation involving energy storage• Massachusetts: Projects continue to advance following Clean Energy

solicitation

Page 11: TransmissionHub Forum: Renewable energy and the grid · 2019. 4. 30. · TransmissionHub Forum: Renewable energy and the grid July 26, 2018 Moderator: Corina Rivera-Linares, chief

Panelists’ presentations, followed by Q&A

• Himali Parmar, principal, ICF

• Dr. Dariush Shirmohammadi, technical director, CalWEA and executive vice president, GridBright, Inc.

• Dr. Brian Gemmell, vice president, Transmission Asset Management and Planning, National Grid and vice president, WIRES Group

Page 12: TransmissionHub Forum: Renewable energy and the grid · 2019. 4. 30. · TransmissionHub Forum: Renewable energy and the grid July 26, 2018 Moderator: Corina Rivera-Linares, chief

Thank you for attending!If you have any questions about today’s presentation, please email Corina Rivera-Linares: [email protected].

To learn more about TransmissionHub and to schedule a demonstration of our products, please call Zane Mabry, account manager, PennWell TransmissionHub, at 918-831-9860, or email him at [email protected].

You may also fill out a form on our website.

Thank you to our sponsor: