transmission projects update board of public utilities · 5.10.2012  · casa blanca power project...

19
Transmission Projects Update Board of Public Utilities October 5, 2012

Upload: others

Post on 09-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction

Transmission Projects Update

Board of Public Utilities October 5, 2012

Page 2: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction

Casa Blanca Power Project

Major System Improvement

Demolition of old 33 kV to 4 kV substation Construction of new 69 kV to 12 kV substation Property acquisition for new substation 4-12 kV conversion of existing 4 kV circuits HMPE cable replacements New 69 kV Lines into substation New 12 kV feeders out of substation

Identified through the Electric System Master Plan

Page 3: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction

Casa Blanca Power Project Budget

Project Elements and Approved Budget Substation: $ 9,000,000 Property Acquisition: $ 1,540,000 4-12 kV Conversion: $ 800,000 HMPE Cable Replacement: $ 380,000 Dist. Feeders and Transmission: $ 3,330,000

Total: $15,050,000

Final project costs pending and will be under budget

Page 4: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction
Page 5: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction
Page 6: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction
Page 7: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction
Page 8: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction
Page 9: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction
Page 10: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction
Page 11: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction

Riverside Transmission Reliability Project (RTRP)

RTRP - a second connection to the state electric transmission grid

RTRP consists of: A) 230 kV Transmission Line

Travels through City of Riverside, City of Norco, Riverside County, and City of Jurupa Valley

B) 230-69 kV Substations Two stations adjacent to each other in the City of

Riverside C) 69 kV Subtransmission Lines

Entirely within the City of Riverside

Page 12: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction

RTRP Project Costs

Original Estimate: $150 - $185M

Riverside portion - Substation and 69kV Grid: Approximately 75% of the project

SCE portion – Substation and Transmission Lines: Approximately 25% of the project

Page 13: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction

RTRP Phase 1 Work

Estimated Cost $3.9M SCE Studies Preliminary

Environmental Public Input Transmission Route Options Reimbursement Agreement (RPU – SCE) Interconnection Facilities Agreement (RPU – SCE –

FERC) Final approval required by CAISO and FERC Recommended Phase 2 Work Q1 2007

Page 14: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction

RTRP Phase 1 Work

Environmental surveys Public outreach efforts Drafting of the Environmental Impact Report (EIR) Comment Responses/Disposition Preparation of Final EIR Meetings support Detailed design Material procurement assistance Construction Management Technical assistance with FAA

Page 15: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction

RTRP Riverside Public Utilities’ Costs and Budget

PHASE 1 $ 3,900,000

PHASE 2 $ 11,477,600

CONSTRUCTION $121,622,400 TOTAL $137,000,000

Page 16: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction

Riverside Transmission Reliability Project (RTRP)

Draft Environmental Impact Report (DEIR) out for public comment Aug-2011 to Nov-2011

More than 100 commenters provided comments

City Planning Commission reviewed DEIR in Apr-2012, found it consistent with CEQA, and recommended item to City Council for approval

Page 17: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction

Also in April-2012, County’s Airport Land Use Commission found project to be consistent with County’s land use plan

Regional Conservation Authority review is underway – favorable Joint Project Ruling sought prior to City Council’s consideration

Final Environmental Impact Report nearly complete – targeting 12/4/2012 City Council meeting

Estimated Total Project Cost estimated at $171 million (Power Engineers Phase 1 Report, Sep-2006)

Riverside Transmission Reliability Project (RTRP)

Page 18: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction

Subtransmission Project (STP)

Major System Improvement and Reconfiguration of 69KV Transmission Network affecting 8 Substations

→ Vista Substation → Hunter Substation → University Substation → La Colina Substation → Riverside Substation → Springs Substation → Plaza Substation → Freeman Substation

Improvements Required for RTRP and System Reliability

Key Milestones

CEQA IS/MND approved 9/2009 Phases I, II, and III are complete Project Completion contingent upon completion of final phase

Page 19: Transmission Projects Update Board of Public Utilities · 5.10.2012  · Casa Blanca Power Project Major System Improvement Demolition of old 33 kV to 4 kV substation Construction

Construction of Phases I, II, and III are complete

Property rights for final phase through UCR are being negotiated

Project Budget is $20,500,000 (Board approved Nov-2009)

Subtransmission Project (STP)