transforming los angeles

11

Upload: clancy

Post on 31-Jan-2016

19 views

Category:

Documents


0 download

DESCRIPTION

Transforming Los Angeles. MOVE LA. Who is Move LA ?. Convened business, labor, and enviro coalition Initiated the discussions that led to Measure R January, ‘08, conference catalyst for Measure R. Advocate acceleration of Measure R projects. A COALITION OF LEADERS. RESULTS. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Transforming Los Angeles
Page 2: Transforming Los Angeles

• Convened business, labor, and enviro coalition

• Initiated the discussions that led to Measure R

– January, ‘08, conference catalyst for Measure R.

• Advocate acceleration of Measure R projects

MOVE LA

Page 3: Transforming Los Angeles

Business

Communities

Academiaand

Students

Labor

Environment

A COALITION OF LEADERS

Page 4: Transforming Los Angeles

RESULTS

Measure R Press Conference, November 5, 2008

Page 5: Transforming Los Angeles

Economic Development

Affordable Housing

Job Growth

Environmental Justice

Environmental Sustainability

EnergyQuality of Life

Personal Health

Business Vitality

Healthy Communities

TRANSPORTATION

TRANSPORTATION

Page 6: Transforming Los Angeles

• Enhanced transit & Reduced congestion

• Reduced emissions

• More walkable communities

• More jobs & better access to jobs

• Enhanced position in the global economy

Future of LA County

LA County Today

• Worsening congestion, economic inefficiency• Increasing smog and greenhouse gases• Enormous projected population growth• Housing / employment imbalance

MEASURE RWILL TRANSFORM LA COUNTY

Page 7: Transforming Los Angeles

Rail riders: 38-42% previously drove a car

Date

Rail Track Miles*

Avg Daily

Riders

1991 10 mi. 10,000

2009 79 mi. 275,000

LA County Rail Transit Before Measure R in 2008

* Excludes 14 mi. BRT

Page 8: Transforming Los Angeles

MEASURE R RAIL TRANSIT

Adds 76 miles of new rail transit

Page 9: Transforming Los Angeles

Accelerating Measure R transit Accelerating Measure R transit program: program:

30/10 Plan30/10 Plan12 Measure R Transit ProjectsComplete or UnderwaySFV West Orange Line ExtExposition LRT (Phase 2)Gold Line Foothill LRTCrenshaw LRTSFV East North-South

To Be AcceleratedRegional Connector LRTGreen Line LRT – LAXGreen Line LRT - South BayGold Line Eastside LRT extWest Santa Ana LRTWestside SubwaySFV I-405

Page 10: Transforming Los Angeles

30/10 Initiative30/10 Initiative

TIFIA: Federal Low Interest Master Credit Agreement

+Measure J: 30-year extension on

Measure R this November

Page 11: Transforming Los Angeles

www.MoveLa.org