Contents 1 Presentation of TRANS@ctions 4 1.1 About the TRANS@ctions portal 4 1.2 Loging into the TRANS@ctions portal 4 1.3 Browsing 6 1.3.1 TRANS@ctions Home page 6 1.3.2 TRANS@ctions portal structure 6 1.3.3 Personal information modification 7 1.3.4 Access to functions 8 1.3.5 Publication search module 9 1.3.6 Global functionning 10 1.3.7 Alerts 11 1.3.8 Alerts subscription 13 1.3.9 Communication with GRTgaz 14 TRANS@ctions - Portal User’s Guide Shippers

Upload: others

Post on 28-Apr-2022

4 views

Category:

Documents


0 download

Embed Size (px)

TRANSCRIPT

1.2 Loging into the TRANS@ctions portal 4
1.3 Browsing 6
1.3.6 Global functionning 10
TRANS@ctions - Portal User’s
2
2.1 Access to your Contracts 15
2.2 Overview of the Capacity Management Process 15
2.3 Subscribing capacity on the Upstream Netwok 16
2.3.1 MT/LT capacity request 16
2.3.2 Requests for Short Term capacity : Daily and Auctions 23
2.3.3 Requests for “Auction” capacity 24
2.3.4 Capacity transfers 25
2.4 Subscribing capacity on the Downstream Network 27
2.4.1 Capacity request on a Consumer Delivery Point (LI) or a Regional Network Interconnection Point
(PIRR) 27
2.4.3 Capacities on Distribution Points (PITD) 33
2.5 Service Subscription 36
2.5.2 Optional Balancing Tolerance 37
2.5.3 Short-term daily capacity reservation 38
2.5.4 Test Phase Offer 39
2.6 Checking your Services and Capacities Portfolio (PSC) 40
2.6.1 Presentation of PSC 40
2.6.2 Checking PSC « live data » 43
2.6.3 Checking published PSC 43
3 Operationnal Capacities 45
3.1 Accessing Restriction Data 46
3.1.1 Case of a point without interruptibility conditions and with engineering work 46
3.1.2 Case of a point with interruptibility conditions and without engineering work 46
3.1.3 Case of a point with interruptibility conditions and with engineering work 47
3.1.4 Consolidated Maintenance Schedule - Publication 48
3.2 Accessing Operationnal Capacity 49
3.2.1 Checking the Summary of Operationnal Capacity 50
3.2.2 Notice, Statement and Schedule of Operationnal Capacity 51
4 Nominations and Scheduling 53
4.1 Cycle 53
4.2.1 Transmission request 55
4.2.2 UIOLI optimisation 63
3
4.3.2 Confirmation Notice 66
5.1 Process Presentation 68
5.1.5 Publication Operationnal tolerances 71
5.2 Measurements 71
5.3 Calculating Tolerances 78
5.3.2 Tolerances graph 79
5.4.1 Intraday allocations 81
5.4.4 Checking the CEA monitoring statement 87
5.5 Overruns 89
6 Invoices 92
4
1.1 About the TRANS@ctions portal
The TRANS@ctions Portal (which replaces the ECT website) is a new secured tool that allows shippers to get access to contractual information and perform operations such as:
Creating and consulting capacity or service requests
Subscribing to alerts
1.2 Loging into the TRANS@ctions portal
The login to the portal is personal, and is performed using an user and a password. You must have a valid user account to login into the TRANS@ctions portal, if this is not the case please contact your GRTgaz account manager to get them via email. Open your web browser and enter the following URL in the address bar : https://transactions- prd2.grtgaz.com/,
5
Note : When login the first time, the system asks you to change your password. Forgotten Password In case you have forgotten your password, you can click on « Forgot your password ? » in the login screen. A new password will be emailed to you after answering the challenges chosen by you.
TRANS@ctions - Portal User’s Guide (V0.1)
6
1.3.1 TRANS@ctions Home page
The homepage TRANS@ctions portal consists of a top bar, a central area containing five available interactive menus and a bottom bar.
1.3.2 TRANS@ctions portal structure
The top bar is always visible and allows a quick access to :
- user’s personal settings, - some functionalities of the main menu - the search for publication, - the management of alerts:
TRANS@ctions - Portal User’s Guide (V0.1)
7
The bottom bar on the home page gives you a quick access to the maintenance schedule, as well as to the effective temperatures of the three balancing zones :
1.3.3 Personal information modification
To change your personal information, click on « Your parameters » on the top bar :
TRANS@ctions - Portal User’s Guide (V0.1)
8
1.3.4 Access to functions
The access to different functionalities is possible either via the top bar :
Or by the homepage :
9
The top bar and the home menu always give you access to the most recent publication: to consult the historical publications please use the search tool
1.3.5 Publication search module
The publication search module is a functionality giving you access to the different publications generated by TRANS@ctions and allowing you to download them. To get access to this module click on « Find » on the top bar :
TRANS@ctions displays all the publications meeting the search criteria selected and lists them from most recent to oldest. You can download any publication in XML and CSV formats.
TRANS@ctions - Portal User’s Guide (V0.1)
10
1.3.6 Global functionning
Search screen This screen consists of a form containing different search criterias according to the menu selected. Mandatory criteria are indicated by asterisks. Example of research Consolidated Maintenance Schedule screen :
If no criteria is entered, the system will display all data available
Result screen This area situated below the search form displays the results meeting the search criteria. Example of a capacity offer search:
To get access to the details of each capacity offer, click on the « + » icon displayed on the left of the results list.
TRANS@ctions - Portal User’s Guide (V0.1)
11
Request screen This type of screen allows the user to make a capacity request, a transmission request … Example of a capacity request screen:
1.3.7 Alerts
On some occasions, processes trigger an alert that is displayed on the portal and sent by e-mail and/or by fax. To get access to the alerts click on « Alerts » in the top bar :
Calendar
12
Click on the column « Reference » to get access to the detail of an alert :
If you click on « Complete » the alert will not be visible, although it will remain available via the search tool. If you subscribe to receive alerts by email, these alerts will be sent to you as below :
TRANS@ctions - Portal User’s Guide (V0.1)
13
1.3.8 Alerts subscription
You can choose the alerts you want to receive. To subscribe to the different alerts, click on « Your parameters » in the top bar and tick the alerts you want:
You can select the email address entered in your personal information. You will receive the alert’s mail at this address.
TRANS@ctions - Portal User’s Guide (V0.1)
14
1.3.9 Communication with GRTgaz
The Portal will be your working tool for communicating with GRTgaz. Moreover :
EDIGAS is not affected by the introduction of TRANS@ctions
A new FTP platform is available for files not supported by EDIGAS
TRANS@ctions - Portal User’s Guide (V0.1)
15
2.1 Access to your Contracts
By clicking on “Consult your Contracts”, you’ll be redirected to the website etransmission.grtgaz.com,
where you can consult and manage your contracts, amendments and invoices, if you have opted for the
electronic signature of contractual documents.
2.2 Overview of the Capacity Management Process
The following flowchart describes the capacity management process on the Upstream network as well as
on the Downstream network.
This process is the same on both networks, with two differences:
On the Upstream network, you can check the level of available capacity before booking your capacity.
You can transfer all or part of your capacity on some points of the upstream network.
TRANS@ctions - Portal User’s Guide (V0.1)
16
2.3 Subscribing capacity on the Upstream Netwok The TRANS@ction portal allows you to subscribe capacity on the following points of the network :
o Network Interconnection Points o North/South Link o H-gas to L-gas and L-gas to H-gas Conversion Points o Transmission-Production Interface Point
NB : On Transmission-Storage Interface Points and Transmission-LNG Terminal Interface Points, GRTgaz applies an automatic capacity allocation. In the portal you can check the capacity that has been allocated. The TRANS@ction portal allows you also to track your capacity transfers :
o Full capacity transfers o Transfers of capacity right-of-use
2.3.1 MT/LT capacity request
A MT / LT capacity request could be multi-annual, seasonal, annual, seasonal or monthly . The process for booking MT / LT capacity in TRANS@ctions includes four steps :
1. Consulting commercialised and available capacity 2. Searching for the corresponding Capacity Offer 3. Creating, Saving and Confirming your capacity request 4. Tracking your request
TRANS@ctions - Portal User’s Guide (V0.1)
17
Step 1 : Consulting available capacity Click on « Capacities & Services> Manage your LT/MT Main Network Request> Consult the Marketed Capacities » on the top bar menu or the homepage menu :
NB : You can consult any file published by GRTgaz (at kWh 25°C or MWh 0°C) or download them in csv or xml formats (at kWh 25 °C). These files are updated by GRTgaz at least 3 times a month. Step 2 : Searching for the corresponding Capacity Offer Click on « Capacities & Services > Manage your LT/MT Main Network Request > Create a Capacity Request » on the top bar menu or the homepage menu :
TRANS@ctions - Portal User’s Guide (V0.1)
18
Offer Coding Principle : Contractual Point Code – Flow direction – Type of Capacity (firm/interruptible) – Type of Subscription (annual/seasonal/monthly) NB : If you enter the first letters of the Code or the PCR name, all offers associated with this PCR will be displayed (regardless of the type of capacity or type of subscription).
Step 3 : Creating, Saving and Confirming a MT/LT capacity request Life cycle of a MT/LT capacity request and related status:
TRANS@ctions - Portal User’s Guide (V0.1)
19
Creating the request : Drill down the capacity offer by clicking on the « + »
Shipper
Capacity
20
NB: The request can be a feasibility or a reservation
Saving and Confirming the request : Click on « Capacities & Services > Manage your LT/MT Main Network Request > Registrate your Capacity Requests » Then click on « Capacities & Services > Manage your LT/MT Main Network Request > Validate your Capacity Requests » on the top bar menu or the homepage menu :
TRANS@ctions - Portal User’s Guide (V0.1)
21
Remember to save and confirm the request, because requests will only be processed by GRTgaz if they have been confirmed (i.e. “Sent” status).
Step 4 : Tracking the request Click on « Capacities & Services > Manage your LT/MT Main Network Request > Create a Capacity Request » on the top bar menu or the homepage menu :
TRANS@ctions - Portal User’s Guide (V0.1)
22
Click on the reference of the request to display the details:
TRANS@ctions - Portal User’s Guide (V0.1)
23
2.3.2 Requests for Short Term capacity : Daily and Auctions
Life cycle of a Short Term capacity request in TRANS@ctions and related status :
The process for a ST capacity request in TRANS@ctions includes three steps :
1. Consulting available capacity 2. Creating, Confirming and Tracking your capacity request 3. Checking the auction results if any
Step 1 : Checking available capacity
Click on « Capacities & Services > Manage your Short Term Main Network Request > Consult The Short Term Available Capacities » on the top bar menu or the homepage menu :
TRANS@ctions - Portal User’s Guide (V0.1)
24
NB : Click on the « Daily capacity request » link to access directly to the capacity request screen.
Step 2 : Creating/Confirming/Tracking a ST capacity request Click on « Capacities & Services > Manage your Short Term Main Network Request » or Capacities & Services > Manage your Auctions Requests » on the top bar menu or the homepage menu to get access to the creation and confirmation submenus of your ST capacity request :
2.3.3 Requests for “Auction” capacity
Life cycle of a request for Auction capacity in TRANS@ctions
Step 3 : Checking results and the auction price Click on « Capacities & Services > Manage your Auctions Requests > Consult The auction results » on the top bar menu or the homepage menu :
The procedures are similar to those for MT/LT requests. The main difference is that the request does not need to be registered, as it can be approved directly after initialisation. In the case of an auctions capacity request, enter a level of capacity and an auction price in € / MWh 0°C (whatever the unit chosen for the input).
TRANS@ctions - Portal User’s Guide (V0.1)
25
NB: You can export the results of an auction in a csv file by clicking on the "Export .csv" button.
2.3.4 Capacity transfers
Full capacity transfers : In the case of a full transfer, all the rights and obligations relating to the transferred capacity are transferred from the transferor to the transferee. The full rights and obligations being transferred, the full transfer impacts the level of subscribed capacities of each shipper. The full capacity transfers can be made via Capsquare or joint notification (e-mail then letter) to GRTgaz. In both cases, the capacity acquired and transferred are updated and can be consulted via TRANS@ctions in the Capacities Portfolio (PSC) menu. Transfers of capacity right-of-use : In the case of a right-of-use transfer, the transferor shipper (first holder of the capacity) continues to be liable to GRTgaz for all the obligations relating to the capacity on which the right of use has been transferred. The shipper receiving the transfer, for their part, acquires the use of that capacity. The transfer therefore impacts on the operational capacity of both shippers concerned, and not on the capacity subscribed for by the transferor. The transfers of capacity right-of-use on the Upstream Network are made exclusively on Capsquare.
TRANS@ctions - Portal User’s Guide (V0.1)
26
The capacity acquired and transferred is updated and can be accessed via TRANS@ctions in the Services and Capacities Portfolio (PSC). Checking your acquired and/or transferred capacities in the Services and Capacities Portfolio (PSC).
Click « Capacities & Services > Consult your subscribed Capacities & Services > Consult your Services &
Capcity Portolio D or M » on the top bar menu or the homepage menu, then click on the icon to display the details of your subscribed capacities on the concerned point :
TRANS@ctions - Portal User’s Guide (V0.1)
27
2.4 Subscribing capacity on the Downstream Network
2.4.1 Capacity request on a Consumer Delivery Point (LI) or a Regional Network Interconnection
Point (PIRR)
Life-cycle of a capacity request in TRANS@ctions and related status :
The process for capacity request on LI/PIRR in TRANS@ctions includes three steps :
1. Searching for the corresponding Capacity Offer 2. Creating, Saving and Confirming your capacity request 3. Tracking your request
Step 1 : Searching for the capacity offer Click on « Capacities & Services > Manage your Regional Network Requests > Create a Capacity Request » on the top bar menu or the homepage menu :
Shipper GRTgaz
28
Offer Coding Principle : Contractual Point Code – Flow direction – Type of Capacity (firm/interruptible/empty) – Type of Subscription (annual/seasonal/monthly/daily) NB : If you don't fill the "Capacity type" field on the regional network, you will create a single request for firm and interruptible capacities
Step 2: Creating, Saving and Validating your request The procedure is the same as for Upstream Network Requests. The corresponding input screen is below :
TRANS@ctions - Portal User’s Guide (V0.1)
29
NB: By clicking on "Monthly Services and Capacities Portfolio", you can check the yearly and monthly capacities that you have already subscribed on this point. As on the Upstream Network, you can make a feasibility request or a Reservation.
From now on, you must enter the extra capacity you need, regardless the time step of your subscription. If you have already subscribed the capacity on this point and you want to change it to higher level of capacity, you must enter a positive request. Similarly, if you have already subscribed the capacity on this point and you want to change it to lower this level of subscription, you must enter a negative request.
Step 3 : Tracking your requests Click on « Capacities & Services > Manage your Regional Network Requests > Consult your Capacity Requests » on the top bar menu or the homepage menu :
TRANS@ctions - Portal User’s Guide (V0.1)
30
2.4.2 Manage your Right of Use Transfers (RoU)
During a Right of Use Transfer of downstream capacities on a delivery point, the transferor shipper is allowed to transfer the Operational downstream capacity, while keeping it in its contractual portfolio. The Right of Use Transfer covers at least a full month and must be entered in TRANS@ctions before the 15th of month M-1 to start the first of the month M. For the Right of Use Transfer on a Delivery Point, the whole capacity on the dedicated point will be transferred (annual, monthly, daily, firm or interruptible) and any new subscription during the transfer period will automatically be transferred to the transferee. Re-transferring a transferred capacity is not permitted. You can cancel a RoU (before starting) or interrupt (once started) by informing GRTgaz. Life-cycle of a RoU Request in TRANS@ctions and related status :
TRANS@ctions - Portal User’s Guide (V0.1)
31
Step 1 : The Transferor creates the RoU request Click « Capacities & Services > Manage your Regional Network Transfer of Right-of-Use > Create a TRU Request » on the top bar menu or the homepage menu :
Transferor GRTgaz
32
NB : The transfer involves the full capacity subscribed at a point, therefore you simply enter the delivery point concerned. Step 2 : The Transferee accepts the RoU request Click « Capacities & Services > Manage your Regional Network Transfer of Right-of-Use > Consult your TRU Request » on the top bar menu or the homepage menu :
Click on the request reference to view its details and accept it :
TRANS@ctions - Portal User’s Guide (V0.1)
33
NB : Once the request has been processed by GRTgaz, both Shippers are notified by a specific alert and both Shippers Portfolios are updated.
2.4.3 Capacities on Distribution Points (PITD)
Standardized Subscription principle All capacity subscribed on any PITD is allocated in a standardized way, whatever the subscription type (annual/monthly/daily), on the basis of the information sent by the Distribution System Operators.
DSO Sousnorms Files : Subscriptions/ CAR & Profiles
Standardised
34
You don't need to make any capacity request at these regional network's points, but send a joint declaration (ie declare a Transmission Contract and a Distribution Transmission Contract active in one or more Distribution Points), so GRTgaz will automatically allocate capacity on the basis of the DSOs data (see flowchart below) :
Creating a joint declaration Click on « Contract > Manage your PITD Counterparties > Create a Joint Declaration » on the top bar menu or the homepage menu :
Shipper GRTgaz
Joint Declaration
created Initialised
Processed by GRTgaz
Standardized Allocation of
35
Please notify GRTgaz for any new CAD (Distribution Contract)
Save your declaration once you have selected the PITD(s) and entered the starting and ending date :
Sending your joint declaration to GRTgaz
TRANS@ctions - Portal User’s Guide (V0.1)
36
Click on « Contract > Manage your PITD Counterparties > Send your Joint Declarations » on the top bar menu or the homepage menu :
You can print your joint declaration by clicking on : « Contract > Manage your PITD Counterparties > Print your Joint Declarations »
2.5 Service Subscription
Services provided by GRTgaz : o Access to the PEG o Subscription for Optional Contractual Tolerances o Short-Notice Reservation Offer o Test Phase Offer
The subscription to a service is automatic, provided that the fields are correctly completed and consistent
2.5.1 Access to the PEGs
Click on « Capacities & Services > Subscribe to a Service > Suscribe to Access to Title Transfer Point » on the top bar menu or the homepage menu :
TRANS@ctions - Portal User’s Guide (V0.1)
37
2.5.2 Optional Balancing Tolerance
This service allows you to increase your standard balancing tolerance up to 3% of your subscribed daily delivery capacity. Click on « Capacities & Services > Subscribe to a Service > Suscribe to Optional Balancing Tolerance » on the top bar menu or the homepage menu :
TRANS@ctions - Portal User’s Guide (V0.1)
38
2.5.3 Short-term daily capacity reservation
This service allows you to subscribe daily capacity on a consumer delivery point with a short notice period. Click on « Capacities & Services > Subscribe to a Service > Suscribe to reduced-notice offer » on the top bar menu or the homepage menu :
TRANS@ctions - Portal User’s Guide (V0.1)
39
2.5.4 Test Phase Offer
This service allows you to use up to 10 days of daily delivery capacity, depending on your needs over a month, with the possibility of changing the days of use retrospectively. Click on « Capacities & Services > Subscribe to a Service > Suscribe to Trial Offer » on the top bar menu or the homepage menu :
LIXXX1
LIXXX2
40
Click on the « Subscribe » link at the chosen contractual point to enter the trial offer details :
2.6 Checking your Services and Capacities Portfolio (PSC)
2.6.1 Presentation of PSC
your possible capacity transfers or/and your Right-of-Use transfers,
your Operational subscribed capacity, in 3 sections (Upstream Network, Downstream Network, Services) The portfolio can be consulted in 2 different formats :
The Daily PSC : o Aggregates the datas gas day by gas day o Covers your capacities and services subscribed on Months M-1, M, M+1
The Monthly PSC : o Aggregates the datas on a monthly basis o Covers your capacities and services subscribed on Month M+2 to your last subscription o Also provides a valuation in €uros of the subscribed capacity (valuation at the tariff which is in
force when the PSC is generated) Section 1 : Upstream Network
LIXXX1 Name XXX1
41
Capacity allocated through a TRANS@ctions request : Link / Conversion / PIR / PITP
Capacity automatically allocated by GRTgaz, on the basis of the adjacent operators data : PITS / PITTM
Example of Monthly PSC :
Example of Daily PSC :
TRANS@ctions - Portal User’s Guide (V0.1)
42
Capacity allocated through a TRANS@ctions request : LI / PIRR
Capacity automatically allocated by GRTgaz, on the basis of the DSOs data : PITD Example of Monthly PSC :
Example of Daily PSC :
In the Daily PSC you can consult the details of Standardized Capacity on the PITDs (Annual Standardized Consumption and profile of your profiles customers and/or subscriptions of your non-profiled customers).
Section 3 : Services This section contains all the capacities and services you have subscribed :
TRANS@ctions - Portal User’s Guide (V0.1)
43
2.6.2 Checking PSC « live data »
Click on « Capacities & Services > Consult your subscribed Capacites & Services > Consult your subscribed Services & Capacity Portfolio D or M » on the top bar menu or the homepage menu :
The PSC “live data” is available on the portal. These data are updated at each new capacities subscription.
2.6.3 Checking published PSC
Access to publications is possible by clicking on the « Find » link on the top bar or by clicking on the « Consult publications » button of the PSC live data view screens :
TRANS@ctions - Portal User’s Guide (V0.1)
44
The published PSC is updated : The day after the subscription of new capacity for the Monthly PSC The hour after the subscription of new capacity for the Daily PSC
You can therefore see a gap between the live data and the published data.
TRANS@ctions - Portal User’s Guide (V0.1)
45
The publications related to your Operationnal capacities
The Consolidated Maintenance Schedule : indicate the restrictions that may impact your capacities.
The following flowchart describes the process of Operationnal capacity.
GRTgaz
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
TRANS@ctions - Portal User’s Guide (V0.1)
46
3.1 Accessing Restriction Data Definitions
3.1.1 Case of a point without interruptibility conditions and with engineering work
Example: Montoir
3.1.2 Case of a point with interruptibility conditions and without engineering work
Example: North/South Link
to the physical capacity associated with a
Contractual Point defining firm Saleable
-
event of engineering works.
Can decrease until D-5
Can increase until D-1
event of engineering works.
Can change until D-1
CMXTi CRT (D-3 / D-2) Maximum Technical Capacity including available
interruptible capacity (F+I). From D-3
CTE CRT
It is the actual total technical capacity on a PCR
that GRTgaz can actually guarantee to all
Shippers per Gas Day. It can differ from CTN in
the event of restrictions.
∑COSf / ∑COSi CFS / CIS Subscribed Firm / Interruptible capacity by all
shippers for a day. -
47
3.1.3 Case of a point with interruptibility conditions and with engineering work
Example: Dunkerque
If there is a variation in the restriction rates calculated for 3:30 pm on D+1, you will be sent an alert to notify you. Restriction Data can be accessed in the “Consolidated Maintenance Schedule” document (PTC). This publication gives the following data:
The daily Restriction Data: CMXTt, CMNTt, CMXTi, CMNTi and CTE.
The daily restriction rates: Max TRf, Min TRf, Max TRi, Min TRi, TRf and TRi.
Firm technical capacity: CTNf
Subscribed firm and interruptible capacity: ∑COSf and ∑COSi
Fact sheets specifying the nature of the engineering work The Consolidated Maintenance Schedule is updated 2 times par day: 3:30 pm.
CTE
CMXTt
CMNTt
CMNTi
CMXTi
48
Download in csv format for a research (ex: on a point/day) Download in csv and xml formats for the all PTC
3.1.4 Consolidated Maintenance Schedule - Publication
Click « Operations > Consult the Maintenance » on the top bar menu or the homepage menu :
Click on the « Search » button to display results :
TRANS@ctions - Portal User’s Guide (V0.1)
49
To access past Restriction Data, click on the Gas Day. To access the details of a fact sheet, click on the publication notice reference To access the Operationnal Capacity Summary, click on the « Operationnal Capacity Summary » link at the bottom of the page.
3.2 Accessing Operationnal Capacity The summary of the Operationnal capacity is detailed in several publications:
Summary of Operationnal Capacity (SCO) containing live data and ongoing updates - consultable via the menu
Operationnal Capacity Notice : Snapshot of SCO at each cycle for a gasday – available in the Search module
Operationnal Capacity Statement: Snapshot of SCO from the 1st of the current month to the current gasday (daily publication at 5:50 am) – available in the Search module
Operationnal Capacity Schedule: Snapshot of the PTC for the next day (3 publications: 9:30 am/ 12:30 pm / 3:30 pm) – available in the Search module
It contains the following data :
The most recent transmission requests by the shipper
The Subscribed Operationnal Capacity
The restriction rates
When the page opens, you see only columns TRf, Tri and CTE. When you click on the « + » buttons attached to those columns, you see the min and max for the Restriction Rates and Restriction Data.
TRANS@ctions - Portal User’s Guide (V0.1)
50
The Allocated Operationnal Capacity, guaranteed COA & planned COA
UIOLI D (“within rights”) and HD (“without rights”) capacity, which correspond to the parts assigned with and without rights (CU D & CU HD), where “CU” refers to “UIOLI Capacity”.
Available UIOLI capacity Except for the Operationnal Capacity Schedule which does not include :
Allocated Operationnal Capacity
3.2.1 Checking the Summary of Operationnal Capacity
Click « Operations > Consult your Operationnal capacities > Consult your Operationnal capacities » on the top bar menu or the homepage menu :
In the search screen, two types of searches are possible :
Either a single gasday as search criteria
Or several criterias : a contractual point type and/or a contractual point and/or a direction and a period
Click on the « Search » button to display results :
TRANS@ctions - Portal User’s Guide (V0.1)
51
To access the Consolidated maintenance schedule, click on the « Consolidated maintenance schedule » link at the bottom of the page.
Click on the icon to access the curve that display your Transportation Requests and your capacities (subscribed and effective). This function works only if you select a single point/direction :
3.2.2 Notice, Statement and Schedule of Operationnal Capacity
Click on « Find » on the top bar and choose the type of publication :
TRANS@ctions - Portal User’s Guide (V0.1)
52
53
Two new processing cycles were added in day-ahead :
Nominations received between 4:00 pm and 6:00 pm in day-ahead will be processed at 6:00 pm. The related Confirmation Notice will be updated at 8:00 pm
Nominations received between 8:00 pm and 9:00 pm in day-ahead will be processed at 9:00 pm. The related Confirmation Notice will be updated at 11:00 pm
TRANS@ctions - Portal User’s Guide (V0.1)
54
4.1.2 Intra Day
In intraday updating of the Confirmation Notice takes two full hours. A Partial Confirmation Notice is published 15 minutes after the start of each processing cycle. It makes available the Confirmation data on PEGs :
Nomination
Renomination intra-day
2:00 pm 4:00 pm 6:00 pm 8:00 pm6:00 am 1:00 pm 6:00 am3:00 pm
Matching Notice
D-1
D
10 pm
Renomination CN
Cycle n+1
55
4.2 Elaboration of scheduled quantities The following flowchart describes the actions performed on the transmission requests to elaborate the scheduled quantities :
Below the different steps of the process in the TRANS@ctions Portal.
4.2.1 Transmission request
A Point
A Counterparty
A Direction
Energiy (kW 25°C) Each new transmission request replaces the previous one The setting of new counterparties is made directly via the portal
Check that nominations are in line with
Operational Capacities
Lose It capacity
Matching at PEGs
Available
UIOLI
Alert
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
Données lues en base accessibles sur le portail
Edigas (échange de fichiers via le canal Edigas) FTP (échange de fichiers via la plateforme FTP)
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
1
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
Données lues en base accessibles sur le portail
Edigas (échange de fichiers via le canal Edigas) FTP (échange de fichiers via la plateforme FTP)
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
Données lues en base accessibles sur le portail
Edigas (échange de fichiers via le canal Edigas) FTP (échange de fichiers via la plateforme FTP)
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
Verification of entry/exit balance
Confirmation Notice (PGD>1)
Mirror Notice (PGD = 1)
Quantity Statements (last PGD)
56
Nomination Entry Network: positive
No time constraints
Possibility of sending transmission requests up to 6 months in advance
If a daily transmission request is missing, forecasts are used as transmission requests
4.2.1.1 Creating un transmission request
Click « Operations > Manage your Transportation requests » on the top bar menu or the homepage. Then, you can make a manual input for each contractual point or Upload a batch file (.csv)
Uploading a file of transmission requests : Click «Operations > Manage your Transportation requests > Creation of a batch of transmission requests» on the top bar menu or the homepage:
TRANS@ctions - Portal User’s Guide (V0.1)
57
The file format must be CSV. Manual input of transmission requests : The manual input for each contractual point is made on the same screen as previously.
You can select the contractual point type and the gas days for which you want to make a request.
TRANS@ctions - Portal User’s Guide (V0.1)
58
Click on the « Search » button to access the list of contractual point related to the selected type and tick the points you want to nominate on. Entering a transmission request : The screen below displays the transmission requests by contractual point, counterparty and gas day. The upper part of the screen summarizes the imbalance due to the last transmission requests. The data are displayed by zone and gas day. At any time, you can recalculate these imbalances by clicking the « Refresh » button.
TRANS@ctions - Portal User’s Guide (V0.1)
59
The modified transmission requests are highlighted in green. Tick the rows that you want to take into account and confirm by clicking the « Confirm batch input » button. Add a new counterparty : To enter a transmission request, you have to modify the "quantity" column. Click the « Add a Counterparty/Direction pair to this Contractual Point » link to add a new counterparty :
TRANS@ctions - Portal User’s Guide (V0.1)
60
You can select a counterparty already used on a point. You can also enter a new counterparty and select a direction. Checking the direction : The quantities must be signed according to the principle below :
Transmission request in Reception (REC): Entering a positive transition request
Transmission request in Deliveru (DEL): Entering a negative transmission request If the sign is inconsistent with the direction of the transmission request, an error message is displayed and the request is reset to 0 in the input screen :
TRANS@ctions - Portal User’s Guide (V0.1)
61
You can then renew your entry. Only selected lines are included in the Confimation.
4.2.1.2 Creating a batch of transmission requests by copy
You can create a batch of transmission requests for a given period from the copy of a transmission request. In the input screen of transmission requests :
1. Select the request that you want to copy 2. Click the «Create a batch from selected requests » button 3. You can then select the desired period
4.2.1.3 Looking up transmission requests
Click on « Operations > Consult your Transportation Request Batches » on the top bar menu or the homepage:
TRANS@ctions - Portal User’s Guide (V0.1)
62
A search screen then allows you to access the batch of transmission requests according to several criterias:
The channel (Edig@s, File upload on the portal, Manual input on the portal)
The status (Accepted, Rejected)
The batch generation period
Click the batch number to access :
The reason for rejection if the batch is rejected
The transmission requests of the batch if the batch is accepted
TRANS@ctions - Portal User’s Guide (V0.1)
63
4.2.2.1 Checking available UIOLI
Click « Operations > Consult the UIOLI Offer » on the top bar menu or the homepage :
Select the gas day and click the « Search » button. The UIOLI offer is displayed by contractual point :
TRANS@ctions - Portal User’s Guide (V0.1)
64
The UIOLI capacity allocated is available on the Operational Capacities statement :
The columns "CU D" and "CU HD" correspond respectively to the UIOLI capacity gained within the shipper’s rights and the UIOLI capacity gained above the shipper’s rights.
TRANS@ctions - Portal User’s Guide (V0.1)
65
4.3.1.1 Publication of Partial Confirmation Notice
Confirmation on the PEGs is done by the publication of a Partial Confirmation Notice in the first 15 minutes of each processing cycle. It makes available the programing data on the PEGs. Access to that publication is possible by clicking the « Find » link on the top bar :
4.3.1.2 Access to alerts
Potential mismatches due to the scheduling process at PEGs are reported via the alerts publication on the portal. These alerts are indicated to the user on the home page:
Following matching on the PEGs, the following alerts may be sent to shippers :
Matching at the Exchange Operator’s (alert displayed on the portal and/or sent by e-mail)
o Mismatch : Retention of the compensating party’s nomination o Exchange Operator not authorised for the contract (→ Confirmation at 0)
Matching at the PEGs (alert displayed on the portal and/or sent by e-mail)
o Mismatch : Counterparty not nominated (→ Confirmation at 0)
TRANS@ctions - Portal User’s Guide (V0.1)
66
o Mismatch : protection of last matched state/Lesser of Rule o PEG service not subscribed by the counterparty (→ Confirmation at 0)
4.3.2 Confirmation Notice
Click « Operations > Consult your Scheduling > Consult your Confirmation Notice D (or D+1) » on the top bar menu or the homepage :
Then you access to latest confirmation notice of the selected gas day (D or D+1) :
TRANS@ctions - Portal User’s Guide (V0.1)
67
find details of the publication
download the notice in CSV and XML format Scheduled quantities by contractual point are grouped per balancing perimeter. For each perimeter, the imbalance of latest transmission requests and scheduled quantities are reported. In case of a mismatch the "Variation" box column are displayed in red. Historical scheduled quantity is published since the first cycle of the gas day. The shipper can access it by clicking on the contractual point :
By clicking on the scheduled quantity you can access the reason for capping if any :
TRANS@ctions - Portal User’s Guide (V0.1)
68
5.1 Process Presentation The following flowcharts indicate the making process for each publication type :
Publication of intraday data
Publication of provisional data
Publication of definitive data
Publication of adjusted data
Publication of operationnal tolerances
TRANS@ctions - Portal User’s Guide (V0.1)
69
Intraday Measurement Notice
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
GRTgaz Shippers
70
ADA tracking statement
Validation of allocations
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
Données lues en base accessibles sur le portail
Edigas (échange de fichiers via le canal Edigas) FTP (échange de fichiers via la plateforme FTP)
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
GRTgaz Shippers
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
Portail TRANS@ctions
Publication
Mise à disposition d’une publication via un canal
Processus
TRANS@ctions - Portal User’s Guide (V0.1)
71
5.1.5 Publication Operationnal tolerances
5.2 Measurements Measurements are the quantities arising from metering or estimate on the PCE. They are published on the PLC and PLCd. Customer industrial measurements are viewable by his supplier if the customer has given him an official permission to view them. They are integrated into the TRANS@ctions system and can be checked on the portal through the following documents:
Intraday measurements
Measurement notices
measurements on the PCE (“Metering and
Estimation Point”) for each cycle.
Every day at 11 am, 3 pm, 7 pm, in
11 pm and 2 am.
Measurement
Notice
It contains the hourly and daily
measurements on the PCE for a gas day. At 11 am on D+1.
Provisional
Measurement
Statement
measurements on the PCE for every day
from the 1 st of the month until D.
At noon on D+1.
Definitive
Measurement
Statement
measurements on the PCE for the period
from the first gas day in month M until
the last day of that month.
On the 3 rd
working day in month
Adjusted
Measurement
Statement
adjustment is required) and definitive
measurements (for the gas days without
adjustment) for confirmed month M.
In M+n following validation of the
adjusted Allocations or in month
M+1 following validation of the
definitive Allocations calculated
using adjusted measurements.
72
Intraday Measurement Notice
73
The latest publication is displayed :
The publication contains all of the metering points according to your authorizations. Click on the “Delivered quantity” of a metering point to access details of hourly measurements in the gas day:
Conversion between "kWh 25°C" and "kWh 0°C" is possible in each publication. Oldest publications are available in the Search module (top right).
5.2.2 Checking Measurement notice
Click on « Metering & Allocations > Consult your Metering > Consult your Metering Notice » on the top bar menu or the homepage menu :
TRANS@ctions - Portal User’s Guide (V0.1)
74
The latest publication is displayed :
The publication contains all the metering points according to your authorizations. Click on the “Delivered quantity” of a metering point to access the characteristics of the daily measurements :
TRANS@ctions - Portal User’s Guide (V0.1)
75
Click on the “Delivered energy quantities” to access the details of the hourly measurements in the gas day.
Conversion between "kWh 25°C" and "kWh 0°C" is possible in each publication. Oldest publications are available in the Search module (top right).
5.2.3 Checking Measurement statement
Click on « Metering & Allocations > Consult your Metering > Consult your Metering Statement » on the top bar menu or the homepage menu :
TRANS@ctions - Portal User’s Guide (V0.1)
76
The latest publication is displayed :
The publication contains all the metering points according to your authorizations. Click on the “Delivered quantities” to access the details of the measurements for a gas month :
TRANS@ctions - Portal User’s Guide (V0.1)
77
Click on the “Gas Day” to access the characteristics of the daily measurements :
Click on the “Delivered energy quantities” to access the details of the hourly measurements in the gas day.
Conversion between "kWh 25°C" and "kWh 0°C" is possible in each publication. Oldest publications are available in the Search module (top right). Particulary at the begining of a month, two statements may be temporary. You will always find the current month's notice through the menu.
5.2.4 Definitive measurements statement
For access to this publication, click on « Find » on the top bar :
5.2.5 Adjusted measurements statement
For access to this publication, click on « Find » on the top bar :
TRANS@ctions - Portal User’s Guide (V0.1)
78
Effective temperature for day D+1
Effective temperatures are published for the three balancing zones using the values from the Paris, Lyon and Lille weather stations.
Standard Contractual Tolerance (TCS)
Capacity allocated automatically based on capacity subscribed on the PLC/PLCd and PITD.
Optional Operationnal Tolerance (TOO)
It’s the real optional tolerance available taking into account Teff.
Total Contractual Tolerance (TCS)
TCS + TCO
Daily Imbalance (EBJ) An EBJ is calculated for each Gas Day and balancing zone. It is the difference between the total entries and the total exits.
Mid-Range This is based on a percentage of the tolerance, a percentage that varies from one gas day to another.
5.3.1 Checking Effective temperatures
Effective temperatures of the day are visible on the bottom bar of the homepage.
To consult the effective temperatures for a period, click on « Metering & Allocations > Consult your Operationnal Tolerances > Consult the Effective Temperatures » on the top bar menu or the homepage menu :
TRANS@ctions - Portal User’s Guide (V0.1)
79
5.3.3 Checking Maximum Imbalances Statement
The balancing variables can be checked in the maximum imbalances statement.
The provisional maximum imbalances statement is daily updated at 10:30 am.
TRANS@ctions - Portal User’s Guide (V0.1)
80
The definitive maximum imbalances statement is published before the 10th working day of the M+1 month.
Click on « Metering & Allocations > Consult your Operationnal Tolerances > Consult your Maximum Imbalances Statement » on the top bar menu or the homepage menu :
5.4 Calculating Allocations and Balancing Definitions
Document Definition Publication
Intraday Allocations Document giving the hourly intraday
allocation on the PLC/PLCd. Every day at 11 am, 3 pm, 7 pm, in
11 pm and 2 am.
Allocation Notice It contains the allocations arising from the
balancing mechanism for gas day D. Before 1pm on D+1
Provisional
Quantities
Statement
1 st
Definitive
Quantities
Statement
balancing mechanism for the period from
the first gas day in month M until the last
day of that month.
month M+1
taken place) and definitive adjustments
(for gas days without adjustment) for
validated month M.
following confirmation of the
81
Click on « Metering & Allocations > Consult your Allocations > Consult your Within-Day Allocation Notice » on the top bar menu or the homepage menu :
Intraday Allocations
Allocation Notice
82
The latest publication is displayed :
The publication contains all the PLC/PLCd according to your authorizations. Click on the “Delivered pool/point” to access the details of the hourly consumptions of the point :
Conversion between "kWh 25°C" and "kWh 0°C" is possible in each publication. Oldest publications are available in the Search module (top right).
5.4.2 Checking Allocation notice
Click on « Metering & Allocations > Consult your Allocations > Consult your Allocation Notice » on the top bar menu or the homepage menu :
TRANS@ctions - Portal User’s Guide (V0.1)
83
The latest publication is displayed :
The quantities are classified per perimeter (North-B zone, North-H zoen and South zone) then per category, PCR and direction.
You can hide perimeters by clicking on . If the allocation is different from the confirmation then it appears in red (this may be the case for a Delivered pool).
TRANS@ctions - Portal User’s Guide (V0.1)
84
Click on the Code of a Contractual Point to view the details of the Contractual Point by counterparty :
Click on the arrow to view the details of the contractual point under the delivery point
Conversion between "kWh 25°C" and "kWh 0°C" is possible in each publication. Oldest publications are available in the Search module (top right).
5.4.3 Checking Quantity statement
This is a new document merging the confirmation statement with the allocation statement (published at first at 6:00am with nominations and schedules then updated with the allocations at 1:00 pm).
TRANS@ctions - Portal User’s Guide (V0.1)
85
To consult the checking quantity statement, click on « Metering & Allocations > Consult your Allocations > Consult your Quantity Statement » on the top bar menu or the homepage menu :
Click on the « Find » link on the top bar to consult the other quantity statements : definitive, adjusted and provisional ( for the M-1 month, before validation).
TRANS@ctions - Portal User’s Guide (V0.1)
86
1/ The first array summarizes imbalances per perimeter:
You can access to details by date or by counterparty by clicking on a perimeter. 2/ Then, when clicking on the contractual point, you will have 2 access possibilities to the details by date or by counterparty :
3/ Details of the contractual point by counterparty :
TRANS@ctions - Portal User’s Guide (V0.1)
87
If you click on a counterparty, you can see the details of the contractual point by date for a given counterparty
Conversion between "kWh 25°C" and "kWh 0°C" is possible in each publication. Oldest publications are available in the Search module (top right). Particulary at the begining of a month, two statements may be temporary. You will always find the current month's notice through the menu.
On the Adjusted Quantity Statement, The pictogram indicates that adjustments have been done on a point / balancing perimeter.
Click on to acccess the Adjustment Difference Account and the oldest adjustments.
5.4.4 Checking the CEA monitoring statement
To consult the CEA monitoring statement, click on « Metering & Allocations > Consult your Allocations > Consult your CEA Monitoring Statement » on the top bar menu or the homepage menu :
TRANS@ctions - Portal User’s Guide (V0.1)
88
The latest publication is displayed :
Conversion between "kWh 25°C" and "kWh 0°C" is possible in each publication. Oldest publications are available in the Search module (top right).
TRANS@ctions - Portal User’s Guide (V0.1)
89
5.5 Overruns Capacity overruns are available on the portal through the: “Capacity Overruns Statement” publication type.
Publication Definition
Provisional Capacity Overruns Statement
Published on D+1 at 1pm for the current month Contains for the 1st gas day of the month to D :
Provisional overruns
Provisional allocation
Published :
Around the 4th working day of month M+1 for LI
Around the10th working day of month M+1 for PITD Contains for the gas month :
Definitive overruns
Definitive allocation
Adjusted Capacity Overruns Statement
Published after validation of the adjusted allocations on M+n. Contains for the M month :
Adjusted and Definitive overruns
Adjusted and Definitive allocation
TRANS@ction calculates daily and hourly capacity overruns. Daily capacity overruns are calculated on :
exit from the Main Network
transmission on the Regional Network
delivery on the Regional Network Hourly capacity overruns calculated on :
transmission on the Regional Network
delivery The possible overruns are:
the difference between the allocation and the subscribed capacity if the allocation is greater than the subscribed capacity
0 else
Click on « Metering & Allocations > Consult your Allocations > Consult your Capacity Overruns Statement » on the top bar menu or the homepage menu :
TRANS@ctions - Portal User’s Guide (V0.1)
90
The latest published Capacity overruns statement is displayed :
You can download the publication in XML and CSV format. You can also access it directly on the portal :
NB :
The pictogram indicates that the status of the capacity overruns is “adjusted”.
The daily and hourly overruns are indicated by a yellow pictogram if their status are provisional and by
a red pictogram if their status are definitive or adjusted. Click on the Contractual Point to access the daily capacity overruns :
R
91
Click on the Gas Day Point to access the hourly capacity overruns :
R
R
92
6 Invoices Note the simplification of the current invoices process by creating an amendment invoice:
The amendment invoice replaces the correction invoice and the adjustment invoice
It provides a delta amendment for a Transmission Invoice with both corrected capacity and adjusted quantities
It can apply to a period of 1 to n months The invoice for a M month includes :
Terms of capacity for M
Terms of quantities for M-1
UIOLI for M-1. To access latest published invoice, click on « Invoices » on the top bar menu or the homepage menu :
The latest publication is displayed :
TRANS@ctions - Portal User’s Guide (V0.1)
93
Points of attention Attached documents are :
- Your invoice - Your record of purchase - Possible explanatory notes for patches - The amendment invoice if a quantity or a capacity has been modified and the
related invoice statement
Shippers can export the invoices and the related documents in PDF, XML and CSV format. Here below an example of CSV format :