At the October 2009 AC Transit Transbay Taskforce meeting, attendees were treated to a great historical presentation. Heather Price from William Self Associates presented facts and findings from the excavation process related to the construction of San Francisco's Temporary Transbay Terminal. She was followed with a presentation by Joyce Oishi on the salvage and historical preservation efforts within the existing Transbay Terminal. Several smaller items salvaged from the Terminal will be on display in an interpretive exhibit at the new Transbay Transit Center (not the Temporary Terminal), while larger items not taken by local museums will be properly recycled.TRANSCRIPT
![Page 1: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/1.jpg)
Archaeology
October 13, 2009
![Page 2: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/2.jpg)
RegulatoryGuidelinesGuidelines
Section 106 National Historic Preservation Act (1966)Section 106, National Historic Preservation Act (1966)– TJPA must take into account the effect of the program on historic
propertiesproperties
– Historic Properties are buildings, structures, objects, sites, districts, or
archaeological resources that are listed, or eligible for listing on the
National Register of Historic Places
Memorandum of Agreement (MOA)
• Historic building recordation
• Archaeological treatment plan (testing, data recovery)g p ( g, y)
![Page 3: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/3.jpg)
Historic ContextHistoric Contextof the
Transbay Transit CenterTransbay Transit CenterNeighborhood
![Page 4: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/4.jpg)
P hi tPrehistory
Locations of oca o s oknown prehistoric archaeological sites
![Page 5: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/5.jpg)
Spanish Period
from 1776
![Page 6: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/6.jpg)
Post Gold RushView from Rincon Hill, 1851
Temporary Terminal (Block 2)
Fremont Street
![Page 7: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/7.jpg)
Post Gold Rush
1856 photo1856 photoFolsom and Second streets
![Page 8: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/8.jpg)
Second Street Cut1869 view north1869 view north
![Page 9: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/9.jpg)
Industrial Developmentp
Temporary Terminal
Risdon Ironworks
View from Harrison and Main 1872
![Page 10: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/10.jpg)
1906 Earthquake and FireFire
Third and Howard streets
![Page 11: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/11.jpg)
T t tiTransportation Center
1930s
![Page 12: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/12.jpg)
History of Land Formation
![Page 13: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/13.jpg)
A h lArchaeologyof the
Region
![Page 14: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/14.jpg)
300 Spear Street Site1906-1950s
8 to10 feet deep
Brick warehouse foundation
8 to10 feet deep
![Page 15: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/15.jpg)
300 Spear Street Site
10 to 15 feet deep
thick layer of coal coated floor
12
Mineral Water
![Page 16: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/16.jpg)
300 Spear Street Lumber Yardca.1886Lumber Yard
WalkwayFallen fenceWood-lined well
Photo 1872
![Page 17: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/17.jpg)
300 Spear Street Site
Wood-lined Wellca. 1886
Child’s Shoe
Marbles
![Page 18: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/18.jpg)
300 Spear Street SiteArtifacts from WellArtifacts from Well
![Page 19: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/19.jpg)
300 Spear Street Site
Ship-breaking yard 1850 18571850-1857
15 to 21 feet deep
![Page 20: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/20.jpg)
Whaling Barque Candace, 1818-1855300 Spear Street Site
28 feet deep
![Page 21: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/21.jpg)
Shipyard artifacts300 Spear Street Site
S pya d a ac spre-1857
Rope Pulley
SpikePipe
![Page 22: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/22.jpg)
Prehistoric spear pointsEmeryville Site
Prehistoric spear pointsca. 1,200 years old
![Page 23: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/23.jpg)
Salvageable Items
![Page 24: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/24.jpg)
Mitigation Measures in FEIS/EIR
Cultural and historic resources are addressed in the Mitigation Measures adopted as part of g p pFEIS/EIR of April 2004 by:
• Transbay Joint Powers AuthorityTransbay Joint Powers Authority
• Federal Transit Administration
• Peninsula Corridor Joint Powers Board• Peninsula Corridor Joint Powers Board
• City and County of San Francisco
• San Francisco Redevelopment Agency• San Francisco Redevelopment Agency
![Page 25: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/25.jpg)
Memorandum of Agreement
Memorandum of Agreement addressing historic and archaeological properties was executed in June 2004 by:
• Federal Transit Administration
• California State Historic Preservation Officer
• Transbay Joint Powers AuthorityTransbay Joint Powers Authority
• City and County of San Francisco
• Peninsula Corridor Joint Powers BoardPeninsula Corridor Joint Powers Board
• California Department of Transportation
![Page 26: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/26.jpg)
Salvageable Items
• MOA requires interpretive exhibit in new Transit Center
• MOA requires salvageable items beMOA requires salvageable items beoffered to other interested agencies
![Page 27: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/27.jpg)
Transbay TerminalTransbay Terminalyy
1939 photo courtesy of Paul C. Trimble CollectionCollection published in The Bay BridgeArcadia Publishing, 2005
![Page 28: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/28.jpg)
The Present
![Page 29: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/29.jpg)
Salvageable Items
Documenting Salvageable Items
g
Documenting Salvageable Items• Archival research• 1993 historical assessment report by Caltrans• Site visits with agency staff, historians, architects• Documentation with photographs• Conversations with Terminal and Caltrans staff Conversations with Terminal and Caltrans staff---------------------------------------------------------Categorization of items• Architectural features• Artifacts/objects/ephemera
• Historic• Non historic• Art
![Page 30: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/30.jpg)
Historic Architectural Features
![Page 31: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/31.jpg)
![Page 32: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/32.jpg)
Historic Objects and Artifacts
![Page 33: Transbay Terminal Archaeology](https://reader033.vdocuments.mx/reader033/viewer/2022060115/557920edd8b42a9c578b4abb/html5/thumbnails/33.jpg)
CONTACT INFORMATION
Transbay Joint Powers Authority201 Mission Street, Suite 2100San Francisco, CA 94105(415) 597-4620www transbaycenter orgwww.transbaycenter.org
Robert BeckSenior Program Managerg [email protected]