Southern Gas Corridor Paving the Way to Europe’s Energy Security
• Investment of approx. USD 45 bln
• Crossing six countries – 3,500 km
• Nine energy companies involved
3 TAP – the European Leg of the Southern Gas Corridor
TAP's key features
• Designed to expand from 10 to 20 bcm/a (plus)
• 870 km in length (105 km offshore)
• 48” onshore, 36” offshore
4
Aligned with EU’s energy policy objectives
TAP – the European Leg of the Southern Gas Corridor
TAP’s shareholders
5
Supported by major energy companies
SOCAR
(20%)
BP
(20%)
Statoil
(20%)
Fluxys
(19%)
Enagás
(16%)
Axpo
(5%)
TAP – the European Leg of the Southern Gas Corridor
TAP will bring supplies of Caspian gas to European markets
TAP will connect to the
Italian natural gas grid to
provide firm capacity at the
Italian virtual trading point
(PSV), from which all Italian
gas exit points can be
reached
Caspian gas can then
ultimately be delivered to:
• Austria
• Germany and France (via
Switzerland)
• N.W EU markets
6 TAP – the European Leg of the Southern Gas Corridor
Cooperation in SEE – Facilitating connections in the region
IGB
• IGB is designed to connect Greece (Komotini) to Bulgaria (Stara Zagora).
• Planned Capacity: up to 3 bcma (option for capacity increase to 5 bcma)
IAP • TAP-IAP Joint Working Groups • Planned Capacity: up to 5 bcma • Feasibility Study is being developed by
WBIF-COWI-IPF** Consortium.
7
** WBIF/COWI IPF Consortium is the Technical Assistance Contractor contracted by the EU to implement the EU funded Western Balkans Investment Framework (WBIF)
Infrastructure Projects' Facility (IPF)
TAP – the European Leg of the Southern Gas Corridor
TAP in Albania
8 TAP – the European Leg of the Southern Gas Corridor
From project planning to implementation
• Access roads: 110km (new and upgraded)
• Bridges: 50 refurbished and 2 new
• 9,000 plots of land
• 8 block valve stations (BVS)
• Crossing 570 roads, 440 rivers & railway (major and minor crossings)
9 TAP – the European Leg of the Southern Gas Corridor
Local engagement
• 7 pillar community investment programme
Upgrade of 5 social facilities
• 130 meetings (ESIA disclosure)
• 60 meetings in the frame of implementation processes (LEA disclosure, compensation values disclosure) attended by over 1,000 participants.
• Around 13,000 individual owner meetings in the frame of Pre-census & Asset Inventory.
• Business networking event with over 110 local companies (January 2015 – Tirana)
10 TAP – the European Leg of the Southern Gas Corridor
Benefits
11
Construction
Direct benefits
Sourcing locally
Induced benefits
Operations
Direct benefits
Induced benefits
Taxes Gas exit capacities
TAP – the European Leg of the Southern Gas Corridor
What’s next for TAP?
12
Schedule to completion
Pipeline construction
2013 2014 2015 2016 2017 2018 2019
Q4 2013 TAP’s Resolution to Construct
Q4 2013 Shah Deniz 2 Final Investment Decision
End 2015 Final Contract Award
2020 First Gas / TAP starts operations
Q2 2013 TAP selected by SDC
TAP – the European Leg of the Southern Gas Corridor
Pre-qualification ongoing
Pre-qualification (PQ) process for interested suppliers checks capability, capacity and availability of goods and services in the market:
13
Status
• Construction and rehabilitation of access roads and bridges in Albania
PQ completed, ITT issued April
2014
• Line pipes, casing pipes and bends (onshore and offshore)
PQ (onshore) launched Dec 2014
PQ (offshore) launched Feb 2015
• Large diameter ball valves PQ complete, ITT issued Dec 2014
• SCADA systems PQ to be launched
• Turbo compressors PQ complete, ITT issued Dec 2014
• Fibre optic cable PQ to be launched
• Onshore pipeline construction PQ complete, ITT issued Oct 2014
• Compressor stations PQ complete, ITT issued Nov 2014
• Offshore pipeline construction PQ launched Feb 2015
• Pipeline receiving terminal (PRT) and pipeline construction
PQ to be launched
Early works contracts
Company Provided Items (CPI)
Engineering, Procurement and Construction (EPC)
TAP – the European Leg of the Southern Gas Corridor
LEA (Land Easement & Acquisition) process
14
Transparent, Auditable, Compliant
LEA
preparation
Secure
land access Audit and
closure
2012 – 2015
– Determine social and environmental
baseline
– Define compensations framework
and methodology
– Disbursement to landowners
2016 – 2019
– Monitoring
– Implement Right of Way
– Compensate for unforeseen damages
2020
– Land restoration process monitoring
– Audit & Close-out
TAP – the European Leg of the Southern Gas Corridor
Construction & Land restauration
Key elements for successful construction
15 TAP – the European Leg of the Southern Gas Corridor
Reputation
Legacy
Schedule Safety
Cost
Thank you