train the trainor final
DESCRIPTION
Presentation GuideTRANSCRIPT
Paano mag-apply ng New Service Connection?
1st
• Pumunta / Mag apply sa Collection Office• Response Time 5 to 10 mins
2nd
• Field Estimate • Reponse Time 3 to 5 Working Days
3rd
• Magbayad sa Collection office • Schedule for Installation of New Service Connection
New Service Connection EstimateTypes of New Service
Connection 3/4 inch. Dia. 1 inch. Dia. 2 to 3 Water Meter one Service Line
Single 4,500 to 5,000 5,500 to 6,000 6,500 to 9,000
Boring 7,000 to 8,000 8,500 to 10,000 10,500 to 15,000
With Concrete Breaking 7,000 to 8,000 8,500 to 10,000 10,500 to 15,000
50 % Down Payment, 50% Charge to Bill!!!!