Traffic Impact Study for
Innovation Industrial Park, London
Traffic Analysis Report
Final
October 2014
![Page 2: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/2.jpg)
![Page 3: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/3.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Table of Contents
MMM Group Limited October 2014 Page i
TABLE OF CONTENTS
1. INTRODUCTION..................................................................................................................1
1.1 Background ............................................................................................................................... 1
1.2 Study Scope ............................................................................................................................... 3
2. EXISTING CONDITIONS ...................................................................................................4
2.1 Existing Road Network ............................................................................................................. 4
2.2 Existing Traffic Volumes .......................................................................................................... 6
2.3 Existing Traffic Operations ....................................................................................................... 8
3. FUTURE CONDITIONS ....................................................................................................11
3.1 Estimate of Background Traffic Growth ................................................................................. 11
3.2 Estimate of Site Traffic ........................................................................................................... 11
3.2.1 Trip Generation Rates ................................................................................................ 11
3.2.2 Development Phasing and Characteristics ................................................................. 13
3.2.3 Innovation Park Trip Generation ................................................................................ 16
3.3 Traffic Assignment .................................................................................................................. 18
3.4 Assessment of Future Traffic Operations ................................................................................ 24
3.4.1 Planned Network Improvements ................................................................................ 24
3.4.2 Scenario 1: Development Rate of 35 acres/year ......................................................... 24
3.4.3 Scenario 2: Development Rate of 45 acres/year ......................................................... 33
3.4.4 Scenario 3: Development Rate of 55 acres/year ......................................................... 39
4. STUDY FINDINGS .............................................................................................................45
4.1 Existing Traffic Conditions ..................................................................................................... 45
4.2 Future Traffic Conditions and Recommendations .................................................................. 45
4.2.1 2018 Traffic Conditions and Recommendations ........................................................ 46
4.2.2 2023 Traffic Conditions and Recommendations ........................................................ 48
4.2.3 2033 Traffic Conditions and Recommendations ........................................................ 50
4.3 Review of Bradley Avenue Interchange Requirements as per MTO Improvement
Criteria .................................................................................................................................... 52
![Page 4: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/4.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Table of Contents
MMM Group Limited October 2014 Page ii
LIST OF TABLES
Table 1: Traffic Survey Date ........................................................................................................................ 6
Table 2: Intersection Level of Service Criteria (HCM) ................................................................................ 8
Table 3: LOS Summary for Existing Weekday Peak Hours ......................................................................... 9
Table 4: Highbury Industrial Park Development Characteristics ............................................................... 12
Table 5: Forest City Industrial Park Development Characteristics ............................................................. 13
Table 6: Trip Rate Comparison- Forest City Industrial Park versus ITE .................................................... 13
Table 7: Innovation Industrial Park Development Phasing and Characteristics ......................................... 14
Table 8: Innovation Industrial Park Development Phasing Summary (sq. ft. and % of
Development) ............................................................................................................................... 15
Table 9: Estimated Trip Generation for 35 acres/year Scenario ................................................................. 16
Table 10: Estimated Trip Generation for 45 acres/year Scenario ............................................................... 16
Table 11: Estimated Trip Generation for 55 acres/year Scenario ............................................................... 17
Table 12: LOS Summary for 2018 Weekday Peak Hours - Scenario 1 ...................................................... 26
Table 13: LOS Summary for 2023 Weekday Peak Hours - Scenario 1 ...................................................... 29
Table 14: LOS Summary for 2033 Weekday Peak Hours - Scenario 1 ...................................................... 32
Table 15: LOS Summary for 2018 Weekday Peak Hours - Scenario 2 ...................................................... 35
Table 16: LOS Summary for 2023 Weekday Peak Hours - Scenario 2 ...................................................... 38
Table 17: LOS Summary for 2018 Weekday Peak Hours - Scenario 3 ...................................................... 41
Table 18: LOS Summary for 2023 Weekday Peak Hours - Scenario 3 ...................................................... 44
Table 19: Summary of Network Improvement Requirements .................................................................... 51
![Page 5: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/5.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Table of Contents
MMM Group Limited October 2014 Page iii
LIST OF FIGURES
Figure 1: Study Area ..................................................................................................................................... 1
Figure 2: Development Phases for Innovation Industrial Park ..................................................................... 2
Figure 3: Existing Lane Configurations and Traffic Controls at Study Area Intersections .......................... 5
Figure 4: Existing Turning Movement Volumes .......................................................................................... 7
Figure 5: Forest City Industrial Park TMC Survey ..................................................................................... 12
Figure 6: Innovation Industrial Park Trip Distribution – External Trips (outside London) ........................ 18
Figure 7: Innovation Industrial Park Trip Distribution – Internal Trips (within London) .......................... 19
Figure 8: Traffic Assignment – Phases 1, 2 ................................................................................................ 20
Figure 9: Traffic Assignment – Phase 3 ...................................................................................................... 21
Figure 10: Traffic Assignment – Phase 4 .................................................................................................... 22
Figure 11: Traffic Assignment – Phase 5 .................................................................................................... 23
Figure 12: Total Traffic Volumes for 2018 Weekday Peak Hours - Scenario 1 ......................................... 25
Figure 13: Total Traffic Volumes for 2023 Weekday Peak Hours - Scenario 1 ......................................... 28
Figure 14: Total Traffic Volumes for 2033 Weekday Peak Hours - Scenario 1 ......................................... 31
Figure 15: Total Traffic Volumes for 2018 Weekday Peak Hours - Scenario 2 ......................................... 34
Figure 16: Total Traffic Volumes for 2023 Weekday Peak Hours - Scenario 2 ......................................... 37
Figure 17: Total Traffic Volumes for 2018 Weekday Peak Hours - Scenario 3 ......................................... 40
Figure 18: Total Traffic Volumes for 2023 Weekday Peak Hours - Scenario 3 ......................................... 42
![Page 6: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/6.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Table of Contents
MMM Group Limited October 2014 Page iv
LIST OF APPENDICES
Appendix 1: Existing (2013) Intersection Capacity Analysis Results
Appendix 2 ITE Trip Generation Rates for General Light Industrial (Land Use 110)
Appendix 3: Future (2018) Intersection Capacity Analysis Results for Scenario 1
Appendix 4: Future (2023) Intersection Capacity Analysis Results for Scenario 1
Appendix 5: Future (2033) Intersection Capacity Analysis Results for Scenario 1
Appendix 6: Future (2018) Intersection Capacity Analysis Results for Scenario 2
Appendix 7: Future (2023) Intersection Capacity Analysis Results for Scenario 2
Appendix 8: Future (2018) Intersection Capacity Analysis Results for Scenario 3
Appendix 9: Future (2023) Intersection Capacity Analysis Results for Scenario 3
![Page 7: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/7.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Introduction
MMM Group Limited October 2014 Page 1
1. INTRODUCTION
1.1 Background
The City of London is developing the Innovation Industrial Park, located in the southeast
corner of the City, north of Highway 401, along Veterans Memorial Parkway (VMP).
This industrial park would compass some 665 acres of land and proposed to develop in
five phases. The study area is bound by Thames River (Hamilton Road/Commissioners
Road) in the north to Highway 401 in the south, Old Victoria Road in the west to City
limit in the east. The study area is illustrated in Figure 1 and the development phasing for
the Innovation Industrial Park is presented in Figure 2.
The City of London retained MMM Group Limited to undertake a traffic impact study to
evaluate the potential impacts related to the planned development of Innovation Industrial
Park. This traffic study identifies the possible capacity constraints associated with the
background traffic growth and traffic generated by the industrial park; and identifies
mitigation measures for the short-term (5 years), mid-term (10 years) and long-term (20
years) planning horizons.
Figure 1: Study Area
Forest City
Industrial Park
InnovationIndustrial Park
![Page 8: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/8.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Introduction
MMM Group Limited October 2014 Page 2
Figure 2: Development Phases for Innovation Industrial Park
![Page 9: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/9.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Introduction
MMM Group Limited October 2014 Page 3
1.2 Study Scope
The following intersections have been identified as the intersections where the proposed
industrial development may trigger infrastructure improvement needs:
Old Victoria Road at Commissioners Road/Hamilton Road
Venture Gate at Hamilton Road
Veterans Memorial Parkway at Hamilton Road
Old Victoria Road at Bradley Avenue
Innovation Gate/Oetker Gate at Bradley Avenue
Veterans Memorial Parkway at Bradley Avenue
Bonder Road at Bradley Avenue
Existing turning movement volumes reflect a 2013 baseline condition and forecast travel
demand reflects 5, 10 and 20-year planning horizons to 2018, 2023 and 2033. Traffic
impact analysis of existing conditions as well as for each of the future planning horizons
reflect conditions during the weekday morning and afternoon peak hours, and were
assessed on the basis of capacity utilization and level of service analysis undertaken using
Synchro 8 software.
The future travel demand incorporates background traffic growth established on the basis
of the historical traffic growth confirmed in consultation with the City of London, and the
traffic generated by the proposed development (i.e. site traffic). The traffic analysis aims
at establishing existing traffic condition and confirming the adequacy of future traffic
operations. The future traffic operational analysis identifies the potential network
improvement needs, such as traffic signals, lane geometry improvements and
approximate timing for upgrading the VMP intersections (at Hamilton Road and Bradley
Avenue) with interchanges.
![Page 10: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/10.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Existing Conditions
MMM Group Limited October 2014 Page 4
2. EXISTING CONDITIONS
2.1 Existing Road Network
The study area encompasses Hamilton Road/Commissioners Road (Thames River) in the
north to Highway 401 in the south, Old Victoria Road in the west to City limit in the east.
The existing intersection lane configuration and traffic control are illustrated in Figure 3
and a brief description of the surrounding road network follows:
Commissioners Road is an east-west road south of the Thames River, extending
from Oxford Street in the west and connects to Hamilton Road in the east. Within
the study area, it has a 2-lane cross-section with a posted speed limit of 80 km/h.
Hamilton Road is an east-west road that’s runs on a diagonal with the grid road
network from the City’s core area to the southeast City limits. Hamilton Road is a
2-lane corridor with a posted speed limit of 80 km/h within the study area limits.
Hamilton Road intersections with Commissioners Road/Old Victoria Road and
Veterans Memorial Parkway operate with traffic signals; and intersection with
Venture Gate operates with a ‘Two-Way Stop Control’1.
Bradley Avenue is an east-west arterial road located in the southern portion of the
City of London, just north of Highway 401. It has a 2-lane cross-section with a
posted speed limit of 80 km/h within the study area limits. It provides access to
the commercial and residential areas to the west. Bradley Avenue intersections
with Old Victoria Road, Innovation Gate/Oetker Gate and Bonder Road are
currently un-signalized. The intersection with VMP operates with traffic signals.
Veterans Memorial Parkway (VMP) previously known as Airport Road is a 4-
lane expressway with at-grade intersections, runs in north-south direction,
connecting Highway 401 and major east-west arterial roads in the City of London.
With study area, it has a posted speed limit of 90 km/h. VMP provides the
easternmost access to Highway 401 and is one of four interchanges with
Highway 401 within the City of London. The City’s long-term vision is to
upgrade this corridor to a four-lane access controlled (grade separated) facility.
Highway 401 is a provincial access-controlled highway, under MTO’s jurisdiction
with a posted speed limit of 100 km/h. Highway 401 runs from the City of
Windsor in south-west Ontario to the Ontario-Quebec border in the east. Within
City of London, interchange access to and from Highway 401 is currently
available at Colonel Talbot Road, Wellington Road, Highbury Avenue and VMP;
and a new interchange is under construction at Wonderland Road South. .
1 Two-Way Stop Control: A ‘Stop’ control intersection where traffic approaching from minor-street is controlled
with a ‘Stop’ sign and traffic on major-street operates without any control – i.e. free-flow.
![Page 11: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/11.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Existing Conditions
MMM Group Limited September 2014 Page 5
Figure 3: Existing Lane Configurations and Traffic Controls at Study Area Intersections
Hamilton Rd Veterans Memorial Pkwy
Commissioners Rd E Hamilton Rd
Old Victoria Rd Venture Gate
Old Victoria Rd Innovation Gate Bonder Road
Bradley Ave Bradley Ave
Oetker Gate Veterans Memorial Pkwy
Discovery Drive
Old Victoria Rd
![Page 12: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/12.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Existing Conditions
MMM Group Limited September 2014 Page 6
2.2 Existing Traffic Volumes
All the turning movement counts for the study area intersections with the exception of
Hamilton Road intersection with Venture Gate were obtained from the City of London.
These counts were conducted between September 2011 and December 2013. A
significant discrepancy was noted for the traffic volume travelling along VMP, between
Hamilton Road and Bradley Avenue. To address this issue, fresh turning movement
counts were conducted for these two intersections in December 2013. The survey dates
for the traffic counts used for the traffic analysis are presented in Table 1.
Table 1: Traffic Survey Date
Intersection Survey Date
Old Victoria Road at Hamilton Road/Commissioners Road September 20, 2011
Venture Gate at Hamilton Road November 27, 2013
Veterans Memorial Parkway at Hamilton Road December 17, 2013
Old Victoria Road at Bradley Avenue March 26, 2012
Innovation Gate/Oetker Gate at Bradley Avenue March 22, 2012
Veterans Memorial Parkway at Bradley Avenue December 17, 2013
In addition to the above mentioned turning movement counts, 7-day mid-block (ATR)
counts were conducted on Bradley Avenue (east of Bonder Road) from April 29 to May
05, 2014.
The existing observed traffic volumes were balanced to ensure consistency in volumes
leaving one intersection and that arriving at the adjacent intersection. The balanced traffic
volumes are assumed to be representative of current conditions and appropriate for the
purpose of projecting general corridor traffic growth to future planning horizons. The
balanced turning movement volumes are summarized below in Figure 4.
![Page 13: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/13.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Existing Conditions
MMM Group Limited September 2014 Page 7
Figure 4: Existing Turning Movement Volumes
Hamilton Rd Veterans Memorial Pkwy
Hamilton Rd
Commissioners Rd E Hamilton Rd
Old Victoria Rd Venture Gate
LEGEND:
AM Peak Hr Vol
(PM) Peak Hr Vol Old Victoria Rd Innovation Gate Bonder Road
Bradley Ave Bradley Ave
Old Victoria Rd Oetker Gate Veterans Memorial Pkwy
(54
7)
(20
)
34
69
7
3
(9)
(37
)
(30
)
(3)
(1)
(5)
(33
)
1
0 0 1
(28) 24(11) 4
9 40
40 ()
(224) 176 (257) 220 (72) 25
(54) 44 (2) 6 (165) 177
42 (59) 3 (3) 3 (15)
193 (298) 235 (359) 43 (65)
(71
2)
4 (8) 1 (2) 69 (42)5
16
2
50
9
22
(54) 26
(26
6)
(86
3)
(71
)
24
26
11 4 0
(364) 362 (4)
(16
)
(65
)
(52
)
(5)
(3)
(2)
(3)
48
88
6
10
(2)
(78
)
(4)
(34
)
(44
)
(26
)
5 16
11 (12)
136 (91)
360 (438) 508 (534) 290 (135)(1
34
)
(11
2)
(13
4)
(38
2)
(11
34
)
(13
9)
2 (7) 31 (9)
99
(99)
64
43
59
20
1
65
6
57
151 (123)
18 (248) 105
(99) 102 (498) 406 (240) 291
(3) 41 51 3
() () ()
0 0 0
0 ()
115 (122)
() () ()
0 ()
() 0
(163) 50
() 0
0 0 0
![Page 14: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/14.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Existing Conditions
MMM Group Limited October 2014 Page 8
2.3 Existing Traffic Operations
The intersection capacity analysis was conducted using the Synchro 8 software using the
signal timing plans received from the City.
Capacity is defined as the maximum number of vehicles that can pass over a particular
road segment or through a particular intersection within set time duration. Capacity is
combined with level of service (LOS) to describe the operating characteristics of a road
segment or intersection. LOS is a qualitative measure that describes operational
conditions and motorist perceptions within a traffic stream. The Highway Capacity
Manual (HCM) defines six levels of service, LOS ‘A’ through LOS ‘F’. LOS ‘A’
represents the shorter average delay and LOS ‘F’ represents the longer average delays.
The highest possible rating is LOS ‘A’, under which the average total delay on a
movement, approach or intersection is less than 10 seconds per vehicle. When the
average delay exceeds 50 seconds at unsignalized intersections, or 80 seconds at
signalized intersections, the movement is classified as LOS ‘F’. Up to LOS ‘D’ is
generally considered as an acceptable level of service for signalized intersections in urban
areas. LOS ‘E’ is the point at which remedial measures are considered, depending on the
nature and extent of the delays. As per the City of London’s road network improvement
criteria, movements operating at an upper limit of LOS ‘E’ i.e. approaching near LOS ‘F’
(i.e. average delay of 75 s for signalized intersection and 45 s for signalized intersection)
and volume to capacity ratio (v/c) of 0.99 or greater were considered for geometric
improvement under this study.
For un-signalized intersections, only the movements that must yield right-of-way
experience the delay. Accordingly, minor street approach delays are reported herein for
un-signalized conditions. It is typical for ‘stop’ sign controlled side streets and driveways
intersecting major streets to experience longer delays during peak hours, while the
majority of the traffic moving through the intersection on the major street experiences
little or no delay.
The criteria for assessing level of service using the controlled delay for the ‘signalized’
and ‘stop-controlled/roundabout’ intersections are presented in Table 2.
Table 2: Intersection Level of Service Criteria (HCM)
LOS Controlled Delay/ Veh (Seconds) Criteria
Signalized Stop-Controlled/Roundabout
A <= 10 <= 10
B > 10 and <= 20 > 10 and <= 15
C > 20 and <= 35 > 15 and <= 25
D > 35 and <= 55 > 25 and <= 35
E > 55 and <= 80 > 35 and <= 50
F > 80 > 50
![Page 15: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/15.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Existing Conditions
MMM Group Limited October 2014 Page 9
Intersection capacity analyses were conducted for the morning and afternoon peak hours
for the study area intersections based on the traffic volume presented in Figure 4.
Intersection capacity analyses results for the existing condition are presented in Table 3.
Table 3: LOS Summary for Existing Weekday Peak Hours
AM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Signal 11.4 B SBL/T/R 32.0 C 0.58
Venture Gate/Hamilton Rd Stop 0.6 A NBL 20.5 C -
VMP/Hamilton Rd Signal 25.6 C NBT
SBL
28.2
41.8
C
D
0.78
0.58
Old Victoria Rd/Bradley Ave Stop 4.4 A NBL 15.8 C -
Innovation Gate/Bradley Ave Stop 0.4 A SBL/T/R 11.4 B -
VMP/Bradley Ave Signal 12.5 B EBL 28.0 C 0.68
PM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Signal 26.6 C SBL/T/R 67.0 E 0.97
Venture Gate/Hamilton Rd Stop 1.3 A NBL 25.8 D -
VMP/Hamilton Rd Signal 21.4 C WBT
SBT
30.8
25.2
C
C
0.53
0.84
Old Victoria Rd/Bradley Ave Stop 5.2 A NBL 27.2 D -
Innovation Gate/Bradley Ave Stop 0.4 A SBL/T/R 13.4 B -
VMP/Bradley Ave Signal 11.4 B EBL 26.7 C 0.64
The intersection capacity analysis for the existing condition confirms that the signalized
Old Victoria Road and Hamilton Road/Commissioners Road intersection operates
adequately at an overall intersection LOS ‘C’ or better during the weekday peak hours.
The critical movements at this intersection are shared left-through-right movements on
the southbound approach, which is operating at v/c ratio of 0.97 and LOS ‘E’ (with 67 s
of an average delay) during the afternoon peak hour.
Venture Gate and Hamilton Road intersection operates with a ‘Two Way Stop Control’,
at an overall intersection LOS ‘A’ during each of the weekday morning and afternoon
peak hours. The northbound left-turn movement operates at LOS ‘D’ during the
afternoon peak hour.
VMP and Hamilton Road is a ‘signalized’ intersection with the eastbound left-turn
movement operates with a protected plus permissive phases. This intersection operates at
![Page 16: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/16.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Existing Conditions
MMM Group Limited October 2014 Page 10
an overall intersection LOS ‘C’ during each of the weekday peak hours. All individual
turning movements operate with a v/c of no greater than 0.84 and at LOS ‘D’ or better.
The Old Victoria Road intersection with Bradley Avenue operates with a ‘Two Way Stop
Control’. Traffic approaching from Old Victoria Road controlled by ‘Stop’ signs and
traffic on Bradley Avenue operates without any control (i.e. free-flow). This intersection
is operating at an overall intersection LOS ‘A’ during each of the weekday morning and
afternoon peak hours. The northbound left-turn is a critical movement at this intersection
and this movement operates at LOS ‘C’ and LOS ‘D’ during morning and afternoon peak
hours, respectively.
Innovation Gate/Oetker Gate intersection with Bradley Avenue operates with a ‘Two
Way Stop Control’ at an overall intersection LOS ‘A’ during both the peak hours. The
southbound left/through/right movements are the critical movements at this intersection
and this approach is operating at LOS ‘B’ during both the peak hours.
The signalized intersection of VMP and Bradley Avenue operates at overall intersection
LOS ‘B’ during both the peak hours. The individual turning movements operate with a
v/c ratio of 0.68 or less, and at LOS ‘C’ or better during the weekday peak hours.
The Bonder Road and Bradley Avenue intersection is currently utilized by a very small of
number of vehicles and therefore, the turning movement count was not conducted for this
intersection. Based on the review of the mid-block (ATR) counts conducted east of
Bonder Road and turning movements at VMP/Bradley Avenue, it is confirmed that the
turning movement volumes at this intersection is negligible.
The existing (2013) intersection capacity analysis results from Synchro are provided in
Technical Appendix 1.
![Page 17: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/17.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 11
3. FUTURE CONDITIONS
In order to assess the future traffic conditions for the study area intersections, future
traffic volumes were estimated for planning horizons years of 2018, 2023 and 2033.
These volumes were estimated using the background traffic growth and site traffic (from
the proposed development of Innovation Industrial Park) demand.
3.1 Estimate of Background Traffic Growth
For this study, a general background traffic growth rate of 1.5% per annum for the short-
term and mid-term (5 and 10 years of planning horizon years) and growth rate of 1% per
annum after year 2023 (i.e. from year 2023 to 2033) were used in traffic analysis. These
growth rates were established in consultation with the City of London, and have been
assumed appropriate for the purpose of this analysis. This growth rates were applied to all
individual intersection turning movements within the study area for the respective
planning horizon year.
3.2 Estimate of Site Traffic
In addition to the background traffic growth rate, the future travel demand forecast for the
study-area intersection also incorporates estimate of specific development related traffic
generation. The traffic generation procedure for the Innovation Park entailed a
comparative review of locally observed trip rates and ITE trip rates; and required
understanding of the Industrial Park development characteristics such as gross available
land, land currently developed, and net developable land area for each of the
development phases. A detailed description of the same is presented below.
3.2.1 Trip Generation Rates
The ITE Trip Generation Handbook suggests use of local data when the value of the
independent variable - i.e. land area in this case, does not lie within the range of data
included in the ITE survey sample. We note that for the scale of development proposed
for the Innovation Industrial Park does not include within the weighted average rate line
or the fitted curve fall within the ITE survey data cluster. The morning and afternoon
peak hour ITE Trip generation rates for the ‘General Light Industrial (Land Use 110)’
per 1000 square feet gross floor area are presented in Technical Appendix 2 for
reference.
More specifically, the Innovation Industrial Park net developable square footage for each
of the phases 1/2, 3, 4 and 5 vary from approximately 0.7 million sq. ft. to upwards of
1.6 million sq. ft. compared to the ITE survey data cluster which is concentrated and
limited to the 0.4 million to 0.7 million sq. ft. range, respectively. We note that traffic
projections at this scale of development are extremely sensitive to the assumed trip
generation rates, and so this traffic analysis follows the ITE guiding principles and
focuses on using the local trip rates.
![Page 18: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/18.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 12
In order to ensure a more current and locally established trip rate for the industrial land
use, fresh trip generation surveys were undertaken at the Forest City Industrial Park
situated in the southeast quadrant of Highbury Avenue and Highway 401 Interchange.
The Forest City Industrial Park is almost built-out and occupied. The traffic counts were
undertaken at Wilton Grove Road intersections with Commerce Road and Cheese
Factory Road, which are the primary entrances of the Forest City Industrial Park.
It was also noted that an industrial building (part of the Highbury Industrial Park) located
on the Forest City Industrial Park’s westerly boundary also uses Commerce Road and
Cheese Factory Road to access their site, and so the traffic generated by these businesses
was considered in the trip rate analysis.
The traffic survey for the trip rate analysis was undertaken for highest 8 peak hours for a
weekday, include 6:30 to 9:30 a.m.; 11:00 a.m. to 1:00 p.m.; and 3:00 to 6:00 p.m.
Liaison with the City staff confirmed that the selected survey time periods were
appropriate for the purpose of deriving a local ‘Industrial Park’ trip generation rates and
that the same adequately captured the shift changes at the Industrial Park.
The existing traffic volumes at Commerce Road and Cheese Factory Road accesses are
summarized in Figure 5, presents morning and afternoon peak hour volumes.
Figure 5: Forest City Industrial Park TMC Survey
The individual businesses that account for the turning movement traffic (inbound and
outbound) at the Commerce Road and Cheese Factory Road accesses; and summaries of
the development characteristics for Highbury and Forest City Industrial Park are
presented in Table 4 and Table 5, respectively.
Table 4: Highbury Industrial Park Development Characteristics
Purchaser Gross Available Land
(Acres)
Estimated Building Size
(Sq. ft.) Coverage (%)
Columbia Sportswear
23.34
572,215
56% UTI Logistics ,Canadian Solar ,
Brose Canada Inc. 120,410
LEGEND: Commerce Rd Cheese Factory Rd
AM Peak Hr Vol Nov, 2013 Nov, 2013
(PM) Peak Hr Vol
Wilton Grove Rd
99
(99)
(169) 103 (207) 111
37 (17)
152 (179)
(121) 362 (8) 33
14 (3)
231 (161)
21
3
16
(22
)
7 5
(30
2)
(27
)
(38
)
![Page 19: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/19.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 13
Table 5: Forest City Industrial Park Development Characteristics
Purchaser Gross Available Land
(Acres)
Estimated Building Size
(Sq. ft.) Coverage (%)
Brose Canada Inc. 31.63 210,191 15%
TransForm Automotive 10.65 207,962 45%
Harring Doors 5.00 60,173 28%
Intier Qualtech Seating Systems 8.50 82,620 22%
Martinrea Automotive Systems Canada 4.68 40,200 20%
Bruce R. Smith Limited / Rosedale Group 8.1 24,872 7%
Canada Bread 4.00 19,800 11%
Churchill Logistics 10.00 72,417 17%
Parts Canada 15.51 172,947 26%
Sciencetech Inc. 1.50 10,000 15%
Torbram Electric Supply 2.15 21,730 23%
Mitten Aluminum Products 2.40 30,000 29%
Boncor Building Products 8.00 50,003 14%
Southwestern Truck Supply 2.35 28,352 28%
Sleep Country 4.00 49,000 32%
Fed-Ex 5.60 26,275 11%
Dancor - Building to be Constructed 2.40 26,275 25%
ATS 4.00 15,300 9%
The observed local ‘Industrial Park’ trip rates are lower (61% lower for morning peak
hour and 70% lower for afternoon peak hour) compared to the ITE – General Light
Industrial trip rates. The comparison of trip rates provided by the ITE and observed at
Forest City are presented in Table 6; presents trip rates for the morning peak hour and
afternoon peak hour per 1,000 square feet of gross floor area.
Table 6: Trip Rate Comparison- Forest City Industrial Park versus ITE
Source of data
Morning Peak Hour Afternoon Peak Hour
Trip
Rate
Inbound
(%)
Outbound
(%)
Trip
Rate
Inbound
(%)
Outbound (%)
ITE1 0.92 88% 12% 0.97 12% 88%
Forest City Survey 0.37 65% 35% 0.29 28% 72%
Note 1: Source: Land Use Code 110- Light Industrial, 9th Edition of the Trip Generation Guide, ITE
Given the scale of development area within Innovation Park, trip generation undertaken
using ITE rates may result in significant over-estimation of development traffic.
3.2.2 Development Phasing and Characteristics
The development phasing and characteristics summary are presented in Table 7. Note
that development of Phase 5 was assumed to begin 2017 onwards.
![Page 20: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/20.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 14
Table 7: Innovation Industrial Park Development Phasing and Characteristics
Phase Gross
Area
(acres)
Existing
Building
Coverage
Resulting Gross
Area with 20%
coverage
(acres)
Net
Developable
Area
(acres)
Estimated Building
Size with
20% Coverage
sq. ft. acres acres sq. ft.
Phase 1, 2 225.0 530,202 12.2 60.9 164.1 32.8 1,430,017
Phase 3 123.0 377,937 8.7 43.4 79.6 15.9 693,650
Phase 4 132.0 54,477 1.3 6.3 125.7 25.1 1,095,518
Phase 5 185.0 - - - 185.0 37.0 1,611,736
Total 665.0 962,616 22.1 110.5 554.5 110.9 4,830,921
Based on inputs from the City Staff, an overall coverage rate of 20% was assumed
appropriate for estimation of development traffic. The City advised to conduct the traffic
analysis with the base development/absorption rate of 35 acres/year, and conduct
sensitivity analyses with accelerated growth scenarios with development rate of
45 acres/year and 55 acres/year; in order to cover a range of possible outcomes with
respect to the need, type and timing of infrastructure improvements. Accordingly, the
traffic demands were estimated based on phase-specific developable land areas for the 5,
10 and 20 year planning horizons, for morning and afternoon peak hours, and for three
absorption rates.
For the absorption rate of 35 acres/year:
Phase 1, 2 and 3 is estimated to complete and fully occupied by 2024;
Phase 4 is estimated to complete and fully occupied by 2027, and
Phase 5 is estimated to complete and fully occupied by 2029.
For the absorption rate of 45 acres/year:
Phase 1, 2 and 3 is estimated to complete and fully occupied by 2022;
Phase 4 is estimated to complete and fully occupied by 2024, and
Phase 5 is estimated to complete and fully occupied by 2026.
For the absorption rate of 55 acres/year:
Phase 1, 2 and 3 is estimated to complete and fully occupied by 2020;
Phase 4 is estimated to complete and fully occupied by 2022, and
Phase 5 is estimated to complete and fully occupied by 2024.
![Page 21: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/21.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 15
Table 8 presents the summary of development phasing - consumption of developable area in square feet and % of
development, for planning horizon years of 2018, 2023 and 2033, for the three absorption rates.
Table 8: Innovation Industrial Park Development Phasing Summary (sq. ft. and % of Development)
Phase/
Scenario
Net Developable Area with
35 ac/yr. absorption rate
Net Developable Area with
45 ac/yr. absorption rate
Net Developable Area with
55 ac/yr. absorption rate
2018 2023 2033 2018 2023 2033 2018 2023 2033
Phase 1, 2 701,323 1,311,169 1,430,017 901,701 1,430,017 1,430,017 1,102,079 1,430,017 1,430,017
49% 92% 100% 63% 100% 100% 77% 100% 100%
Phase 3 350,661 655,584 693,650 450,850 693,650 693,650 551,039 693,650 693,650
51% 95% 100% 65% 100% 100% 79% 100% 100%
Phase 4 350,661 655,584 1,095,518 450,850 1,045,402 1,095,518 551,039 1,095,497 1,095,518
32% 60% 100% 41% 95% 100% 50% 100% 100%
Phase 5 121,969 426,892 1,611,736 156,818 751,369 1,611,736 191,666 1,572,484 1,611,736
8% 26% 100% 10% 47% 100% 12% 98% 100%
Total1
1,524,615 3,049,230 4,830,921 1,960,219 3,920,439 4,830,921 2,395,824 4,791,647 4,830,921
32% 63% 100% 41% 81% 100% 50% 99% 100%
Note 1: Consumption of developable area expressed in square feet and percentage of Development
![Page 22: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/22.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 16
3.2.3 Innovation Park Trip Generation
As described previously, trips generated by the proposed development were estimated for
morning and afternoon peak hours using the locally observed Industrial Park trip rates;
for 3 absorption rates and 3 planning horizon years. The estimated trip generation for 35,
45 and 55 acres/year scenarios are presented in Table 9, Table 10 and Table 11,
respectively.
Table 9: Estimated Trip Generation for 35 acres/year Scenario
Horizon
Year Phase
Developable Area
(Sq. Ft.)
Morning Peak Hour Afternoon Peak Hour
In Out Total In Out Total
2018
1, 2 701,323 170 92 262 57 148 205
3 350,661 85 46 131 28 74 102
4 350,661 85 46 131 28 74 102
5 121,969 30 16 46 10 26 36
Total 1,524,614 370 200 569 123 322 446
2023
1, 2 1,311,169 318 172 489 106 277 383
3 655,584 159 86 245 53 139 192
4 655,584 159 86 245 53 139 192
5 426,892 103 56 159 35 90 125
Total 3,049,229 739 400 1,138 247 645 891
2033
1, 2 1,430,017 346 187 534 116 302 418
3 693,650 168 91 259 56 147 203
4 1,095,518 265 143 409 89 232 320
5 1,611,736 391 211 602 130 341 471
Total 4,830,921 1,170 632 1,803 391 1,022 1,412
Table 10: Estimated Trip Generation for 45 acres/year Scenario
Horizon
Year Phase
Developable Area
(Sq. Ft.)
Morning Peak Hour Afternoon Peak Hour
In Out Total In Out Total
2018
1, 2 901,701 218 118 337 73 191 264
3 450,850 109 59 168 36 95 132
4 450,850 109 59 168 36 95 132
5 156,818 38 21 59 13 33 46
Total 1,960,219 474 257 732 158 414 573
2023
1, 2 1,430,017 346 187 534 116 302 418
3 693,650 168 91 259 56 147 203
4 1,045,402 253 137 390 85 221 306
5 751,369 182 98 280 61 159 220
Total 3,920,439 949 513 1463 318 829 1,146
![Page 23: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/23.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 17
Horizon
Year Phase
Developable Area
(Sq. Ft.)
Morning Peak Hour Afternoon Peak Hour
In Out Total In Out Total
2033
1, 2 1,430,017 346 187 534 116 302 418
3 693,650 168 91 259 56 147 203
4 1,095,518 265 143 409 89 232 320
5 1,611,736 391 211 602 130 341 471
Total 4,830,921 1,170 632 1,803 391 1,022 1,412
Table 11: Estimated Trip Generation for 55 acres/year Scenario
Horizon
Year Phase
Developable Area
(Sq. Ft.)
Morning Peak Hour Afternoon Peak Hour
In Out Total In Out Total
2018
1, 2 1,102,079 267 144 411 89 233 322
3 551,039 134 72 206 45 116 161
4 551,039 134 72 206 45 116 161
5 191,666 46 25 72 16 41 56
Total 2,395,824 581 313 894 195 506 700
2023
1, 2 1,430,017 346 187 534 116 302 418
3 693,650 168 91 259 56 147 203
4 1,095,497 265 143 409 89 232 320
5 1,572,484 381 206 587 127 332 460
Total 4,791,647 1160 627 1788 388 1013 1400
2033
1, 2 1,430,017 346 187 534 116 302 418
3 693,650 168 91 259 56 147 203
4 1,095,497 265 143 409 89 232 320
5 1,611,736 391 211 602 130 341 471
Total 4,830,900 1,170 632 1,803 391 1,022 1,412
As presented above, the future trips generated in year 2033 will be similar with each of
the absorption rates, as the Innovation Industrial Park is expected to be fully occupied.
![Page 24: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/24.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 18
3.3 Traffic Assignment
The estimated development traffic assignment to the study-area road network reflects
travel patterns identified based on a review of residential postal code information of
current employees at the occupied business at Innovation Industrial Park. The first 3
digits of the postal code were obtained from the City of London to identify current travel
patterns related to Industrial Park land use.
The available postal code information was compiled and reviewed in combination with
Canada Post’s Forward Sortation Area (FSA) maps for Southwestern Ontario and
London area to establish geographical location of the trip origins and in general
orientation of trips i.e. from within the city or outside of the city. The drivers’ trip origins
provided a reasonable orientation/distribution of these trips, which facilitated in traffic
assignment.
The FSAs for Southwestern Ontario and London area, and the Innovation Industrial Park
trip orientation patterns are presented in Figure 6 and Figure 7.
Figure 6: Innovation Industrial Park Trip Distribution – External Trips (outside London)
Map Source: Canada Post Forward Sortation Area Map - Southwestern Ontario
![Page 25: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/25.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 19
Figure 7: Innovation Industrial Park Trip Distribution – Internal Trips (within London)
Map Source: Canada Post Forward Sortation Area Map - Urban FSAs - London
The detailed traffic assignments for each of the Innovation Park phases are presented in
Figure 8 through Figure 11.
![Page 26: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/26.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 20
Figure 8: Traffic Assignment – Phases 1, 2
Hamilton Rd Veterans Memorial Pkwy
Commissioners Rd E Hamilton Rd
Old Victoria Rd Venture Gate
Old Victoria Rd Innovation Gate Veterans Memorial Pkwy
Bradley Ave
Bradley Ave
Old Victoria Rd Oetker Gate
4.5
%
4.5
%
4.0% 31.5%
20
.0%
20
.0%
4.5%
4.0% 2.5%
20.0%
4.0% 12.5% 2.5%
4.0%
4.0
%
4.5
%
4.0
%
12
.5%
31
.5% 9.0%
9.0
%
20
.0%
4.0
%
8.5
%
24
.5%
31
.5%
PHASE 1, 2
inbound %
outbound %
8.5% 31.5%
8.0% 2.5%
20
.0%
9.0
%
8.0%
24.5% 20.0%
8.0% 2.5%
4.0
%
8.0
% 9.0%
9.0
%
9.0
%
![Page 27: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/27.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 21
Figure 9: Traffic Assignment – Phase 3
Hamilton Rd Veterans Memorial Pkwy
Commissioners Rd E Hamilton Rd
Old Victoria Rd Venture Gate
Old Victoria Rd Innovation Gate Veterans Memorial Pkwy
Bradley Ave
Bradley Ave
Oetker Gate
Discovery Drive
Old Victoria Rd
9.0
%
40
.0%
2.5%
8.0%
8.0
%
9.0
%
40
.0%
2.5
%
8.5
%
8.5
%
42
.5%
8.5%
4.0% 2.5%
4.0% 63.0%
42.5%
4.0% 2.5%
4.0%
4.0
%
8.5
%
4.0
% 16.5%1
6.5
%
63
.0% 18.0%
18
.0%
4.0
%
12
.5%
12.5%
8.0%
4.0
%
8.0
%
inbound %
outbound %
PHASE 3
![Page 28: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/28.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 22
Figure 10: Traffic Assignment – Phase 4
Hamilton Rd Veterans Memorial Pkwy
Commissioners Rd E Hamilton Rd
Old Victoria Rd Venture Gate
Old Victoria Rd Innovation Gate Veterans Memorial Pkwy Bonder Road
Bradley Ave
Bradley Ave
Old Victoria Rd Oetker Gate
inbound %
outbound %
PHASE 4
9.0
%
40
.0%
9.0%
4.0% 13.0%
13.0%
4.0%
4.0%4
.0% 13.0%
13
.0%
40
.0%
4.0
%
91
.0%
9.0
%
4.0% 53.0%
8.0% 20.0% 20.0% 20.0%
53
.0%
9.0%
8.0% 18.0%
91.0%
8.0% 20.0% 20.0% 20.0%
18
.0%
8.0
%
![Page 29: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/29.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 23
Figure 11: Traffic Assignment – Phase 5
Hamilton Rd Veterans Memorial Pkwy
Commissioners Rd E Hamilton Rd
Old Victoria Rd Venture Gate
Old Victoria Rd Innovation Gate Veterans Memorial Pkwy Bonder Road
Bradley Ave
Bradley Ave
Old Victoria Rd Oetker Gate
outbound %
91
.0%
9.0
%
PHASE 5
inbound %
91.0%
18
.0%
9.0
%
40
.0%
9.0%
4.0% 13.0%
13.0%
4.0%
4.0%4
.0% 13.0%
13
.0%
40
.0%
4.0
%
53
.0%
4.0% 53.0%
8.0% 20.0% 20.0%
8.0% 18.0% 9.0%
8.0% 20.0% 20.0%
8.0
%
![Page 30: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/30.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 24
3.4 Assessment of Future Traffic Operations
3.4.1 Planned Network Improvements
In the study area, the following network improvements are planned by the City:
South extension of VMP to Wilton Grove Road with Highway 401 Interchange
Improvements, planned in 2016;
Upgrade of Old Victoria Road to 2 lane rural arterial standard between Hamilton
Road and Bradley Avenue, planned in 2018;
Upgrade of Bradley Avenue to 2 lane rural arterial standard between Phase 4 and
City limit, planned in 2028, and
Widening of Hamilton Road with 4 basic lanes and a two-way left turn lane,
between Old Victoria Road and VMP, planned in 2029.
The City of London has recently completed the Class EA Study for the Hamilton Road,
recommends widening of Hamilton Road and also intersection improvements at Old
Victoria Road, Venture Gate and VMP. The intersection at Old Victoria Road and
Hamilton Road is proposed to improve with 2-lane roundabout.
As discussed previously, three different development/absorption rates for the Industrial
Park development phases were used to cover a range of possible outcomes with respect to
the need, type and timing of infrastructure improvements. The future traffic volumes,
required infrastructure improvements and corresponding traffic operations for each of the
three scenarios are discussed under separate headings below.
3.4.2 Scenario 1: Development Rate of 35 acres/year
The assignment of traffic generated by the industrial park reflects the travel patterns
described in Section 3.3. The total traffic volumes for each of the planning horizon years
were estimated combining background traffic and site traffic.
2018 Traffic Conditions
The 2018 turning movement forecasts for the study-area intersections are presented in
Figure 12.
![Page 31: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/31.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 25
Figure 12: Total Traffic Volumes for 2018 Weekday Peak Hours - Scenario 1
Hamilton Rd Veterans Memorial Pkwy
Commissioners Rd E Hamilton Rd
LEGEND:
AM Peak Hour Volume
Old Victoria Rd Venture Gate (PM) Peak Hour Volume
Old Victoria Rd Innovation Gate Bonder Road
Bradley Ave Bradley Ave
Old Victoria Rd Oetker Gate Veterans Memorial Pkwy
(59
3)
(29
)
67
76
4
23
(13
)
(48
)
(41
)
(15
)
(1)
(52
)
(45
)
158 0 30 (56) 42(13) 7
12
54
69 (5)
(250) 215 (284) 260 (91) 53
(58) 47 (16) 48 (238) 228
59 (86) 57 (21) 14 (34)
221 (343) 265 (406) 64 (92)
(86
5)
19 (32) 55 (20) 106 (98)
34
24
4
55
5
85
(30
9)
(94
1)
(96
)
26
39
37
27 0
(394) 400 (11)
(19
)
(70
)
(64
)
(13
)
(39
)
(2)
(50
)
75
10
12
12
(18
)
(98
)
(6)
(56
)
(94
)
(46
)
17
46
14 (14)
146 (98)
394 (481) 554 (587) 316 (146)
63
10
(14
4)
(12
6)
(15
1)
(42
2)
(12
56
)
(14
9)
6 (14) 87 (28)
(76) 51
130 (133)
69
62
82
25
0
81
9
61
171 (148)
40 (271) 115
(106) 110 (540) 451 (288) 331
(8) 22
12
(99)
99
(24
)
(0)
(2)
3 (1)
(25) 77
(181) 57
(9) 27
15 0 1
(67
)
(0)
(7)
42 0 4
8 (3)
![Page 32: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/32.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 26
The 2018 traffic analysis was initially assessed with the existing network configuration
and based on the analysis results; the following network improvements were identified
for the study area intersections:
Old Victoria Road/Hamilton Road: At this intersection, a single lane southbound
approach is currently operating with shared left-through-right movements, at v/c
ratio of 0.97 and LOS ‘E’ during the afternoon peak hour. With the proposed
development and background traffic growth, this intersection would require
dedicated storage lane for eastbound left turn and southbound left turn
movements, or conversion with a 2-lane roundabout as proposed under Hamilton
Road EA study. Considering the recommendations from the Hamilton Road EA
study, the traffic analysis for this intersection was conducted assuming 2-lane
roundabout.
The 2-lane roundabout at this intersection would require 2-lane on each approach
and receiving lane. Considering the short distance between Old Victoria Road and
Venture Gate intersections, this segment of Hamilton Road is recommended
widening with 4 basic lanes.
VMP/Hamilton Road: This intersection would require dual eastbound left turn
lanes to accommodate the 2018 traffic demand. The pedestrian crossing on the
north-side of the intersection may need to be restricted to reduce the overall cycle
length and provide an acceptable level of service.
VMP/Bradley Avenue: This intersection would require protected plus permitted
phases for the eastbound left turn movement.
The intersection capacity analysis results for 2018 traffic conditions with the proposed
network improvements are summarized in Table 12.
Table 12: LOS Summary for 2018 Weekday Peak Hours - Scenario 1
AM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Roundabout 6.8 A WBT/R 7.4 A 0.34
Venture Gate/Hamilton Rd Stop 1.6 A NBL 30.0 D -
VMP/Hamilton Rd Signal 28.1 C WBT 50.6 D 0.86
Old Victoria Rd/Bradley Ave Stop 6.5 A SBL/T/R 22.7 C -
Innovation Gate/Bradley Ave Stop 3.0 A SBL/T/R 17.1 C -
VMP/Bradley Ave Signal 18.5 B WBT 40.6 D 0.59
Bonder Rd/Bradley Ave Stop 3.4 A NBL 12.8 B 0.03
![Page 33: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/33.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 27
PM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Roundabout 7.8 A SBT/R 8.5 A 0.32
Venture Gate/Hamilton Rd Stop 2.9 A NBL 38.8 E -
VMP/Hamilton Rd Signal 21.2 C EBL 48.5 D 0.79
Old Victoria Rd/Bradley Ave Stop 7.7 A NBL 40.8 E -
Innovation Gate/Bradley Ave Stop 3.4 A SBL/T/R 20.7 C -
VMP/Bradley Ave Signal 19.4 B WBT 36.4 C 0.60
Bonder Rd/Bradley Ave Stop 2.8 A NBL 13.4 B 0.06
With the proposed improvements, all the study area intersections are anticipated to
operate with an overall intersection LOS ‘C’ or better.
The northbound movement at Venture Gate and Hamilton Road intersection is controlled
by the ‘Stop’ sign. With the increase traffic demand, the northbound left turn movement
at this intersection is expected to operate at LOS ‘E’ during both the peak hours.
Similarly, the northbound left-turn at Old Victoria Road and Bradley Avenue intersection
is expected to operate at LOS ‘E’ during 2018 afternoon peak hour. The City is
recommended to monitor traffic operations at these two intersections and if the traffic
demand justifies the signal warrants then traffic control signals or roundabout should be
implemented.
The 2018 intersection capacity analysis results from Synchro software for Scenario 1 are
provided in Technical Appendix 3.
2023 Traffic Conditions
The 2023 turning movement forecasts for the study-area intersections are presented in
Figure 13.
![Page 34: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/34.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 28
Figure 13: Total Traffic Volumes for 2023 Weekday Peak Hours - Scenario 1
Hamilton Rd Veterans Memorial Pkwy
Commissioners Rd E Hamilton Rd
LEGEND:
AM Peak Hour Volume
Old Victoria Rd Venture Gate (PM) Peak Hour Volume
Old Victoria Rd Innovation Gate Bonder Road
Bradley Ave Bradley Ave
Old Victoria Rd Oetker Gate Veterans Memorial Pkwy
(82
)
(0)
(8)
9 (3)
(48) 145
(197) 64
(32) 94
51 0 5
(12
6)
(0)
(13
)
78 0 8
14 (5)
144 (144)
(39
)
97
83
1
51
(16
)
(59
)
(52
)
(26
)
(1)
(94
)
(58
)
271
4 0 55 (82) 58
13
66
98 (9)
(111) 88
(62) 51 (28) 85 (304) 275
(63
9)
(15) 11
155 (170)
60
31
8
60
0
16
4
76 (114) 103 (36) 28 (58)
250 (389) 298 (459) 89 (125)
(275) 254 (314) 306
(12
9)
28
51
64
47 0
(10
22
)
32 (55) 101 (35)
(75
)
(76
)
(23
)
(71
)
(2)
(90
)
10
2
11
43
14
(34
)
(11
5)
(9)
(74
)
(13
8)
(70
)
28
72 (99) 79
(35
0)
(10
17
)
(114) 117 (585) 501 (331) 369
(14) 41
20
75
16
(426) 439 (18)
(15
4)
(13
9)
(16
7)
(46
0)
(13
81
)
(16
0)
9 (19) 136 (43)
426 (525) 602 (644)
(99)
99
74
77
10
5
29
5
98
7
66
195 (174)
17 (15)
156 (105)
342 (158)
61 (292) 125
(21
)
![Page 35: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/35.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 29
For the 2023 traffic conditions, the following network improvements were identified in
addition to 2018 network improvements:
Venture Gate/Hamilton Road: This intersection would require signalization by
year 2023 to provide an acceptable level of service.
VMP/Hamilton Road: Hamilton Road would require 4-lane widening from
Venture Gate to east of VMP to provide 2 lanes for eastbound and westbound
through movements.
Old Victoria Road/Bradley Avenue: To accommodate 2023 traffic demand, this
intersection would either need to signalized or improved with roundabout. Based
on the discussion with the City, this intersection is assumed to improve with
2-lane roundabout. This would also require 2-lane on each approach and receiving
lane. Considering the short distance between Old Victoria Road and Innovation
Gate/Oetker Gate intersections, this segment of Bradley Avenue is recommended
for widening with 4-lane cross-section.
Innovation Gate/Bradley Avenue: This intersection may require signalization by
year 2023.
VMP/Bradley Avenue: This intersection would require dual eastbound left turn
lanes. The pedestrian crossing on the north-side of the intersection may need to be
restricted to reduce the overall cycle length and provide an acceptable level of
service.
The intersection capacity analysis results for 2023 traffic conditions with the proposed
network improvements are summarized in Table 13.
Table 13: LOS Summary for 2023 Weekday Peak Hours - Scenario 1
AM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Roundabout 8.5 A WBT/R 9.3 A 0.42
Venture Gate/Hamilton Rd Signal 6.7 A NBL 19.1 B 0.16
VMP/Hamilton Rd Signal 33.0 C EBL 68.7 E 0.95
Old Victoria Rd/Bradley Ave Roundabout 6.0 A NBT/R 6.3 A 0.14
Innovation Gate/Bradley Ave Signal 6.8 A SBL/T/R 29.9 C 0.45
VMP/Bradley Ave Signal 21.4 C EBL,
WBT
44.0
43.6
D
D
0.74
0.59
Bonder Rd/Bradley Ave Stop 5.1 A NBL 20.2 C -
![Page 36: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/36.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 30
PM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Roundabout 10.4 B SBT/R 11.9 B 0.42
Venture Gate/Hamilton Rd Signal 10.3 B NBL 39.1 D 0.45
VMP/Hamilton Rd Signal 30.0 C EBL
SBT
68.6
31.0
E
C
0.93
0.93
Old Victoria Rd/Bradley Ave Roundabout 7.0 A WBT/R 7.8 A 0.35
Innovation Gate/Bradley Ave Signal 11.5 B SBL/T/R 37.9 D 0.68
VMP/Bradley Ave Signal 22.0 C EBL
WBT
47.9
46.8
D
D
0.80
0.68
Bonder Rd/Bradley Ave Stop 5.4 A NBL 20.5 C -
With the proposed improvements, all the study area intersections are anticipated to
operate with an overall intersection LOS ‘C’ or better. All the movements for the study
area intersections are expected to operate with an acceptable level of service (i.e.
LOS ‘D’ or better); except eastbound left turn movement at VMP/Hamilton Road
intersection. This movement is expected to operate at LOS ‘E’ (with 69 s of average
delay) during morning and afternoon peak hours. The eastbound left turn is expected to
operate at v/c of 0.95 during morning peak hour and at v/c of 0.93 during afternoon peak
hour. The southbound through movement is expected to operate at v/c of 0.93 during
afternoon peak hour.
The VMP and Bradley Avenue intersection is expected to operate with some spare
capacity and all the movements are expected to operate with an acceptable level of
service in year 2023.
The 2023 intersection capacity analysis results from Synchro are provided in Technical
Appendix 4.
2033 Traffic Conditions
The 2033 turning movement forecasts for the study-area intersections are presented in
Figure 14.
![Page 37: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/37.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 31
Figure 14: Total Traffic Volumes for 2033 Weekday Peak Hours - Scenario 1
Hamilton Rd Veterans Memorial Pkwy
Commissioners Rd E Hamilton Rd
LEGEND:
AM Peak Hour Volume
Old Victoria Rd Venture Gate (PM) Peak Hour Volume
Old Victoria Rd Innovation Gate Bonder Road
Bradley Ave Bradley Ave
Old Victoria Rd Oetker Gate Veterans Memorial Pkwy
99
(99)
(69
4)
(64
)
10
4
90
2
12
2
(17
)
(63
)
(66
)
(28
)
(1)
(99
)
(61
)
29
15 0 58 (88) 63
406 (146) 169
(11
06
)
(16) 12
15
72
13
7 (9)
(308) 307 (365)
(68) 55 (31) 93 (328) 297
274 (357)
65
34
3
65
3
37
5
100 (150) 110 (39) 68 (122)
288 (449) 365 (563) 138 (199)
(20
5)
30
54
84
51 0
(12
38
)
43 (71) 110 (40)
(24
)
(81
)
(82
)
(30
)
(78
)
(3)
(99
)
(38
0)
13
7
13
22
15
(50
)
(12
5)
(10
)
(81
)
(15
0)
(11
7)
29
79 (124) 135(22) 59
29
80
18
(469) 494 (20) 66 (318) 136
(124) 128 (652) 593 (360) 401
10 (21) 148 (48) 18 (16)
170 (114)
471 (583) 681 (742) 372 (172)
80
85
14
9
32
0
12
18
71
229 (220)
(16
8)
(15
0)
(19
3)
(50
1)
(15
51
)
(17
4)
(21
1)
(0)
(21
)
13
0
0 13
24 (8)
157 (157)
(31
0)
(0)
(31
)
35 (12)
(81) 241
(216) 70
(118) 356
19
2
0 19
![Page 38: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/38.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 32
For the 2033 traffic analysis, no additional road network improvements were considered
except traffic signals at the Bonder Road and Bradley Avenue intersection. This
intersection may require traffic signals by year 2033 to provide an acceptable level of
service. The intersection capacity analysis results for 2033 traffic conditions are
summarized in Table 14.
Table 14: LOS Summary for 2033 Weekday Peak Hours - Scenario 1
AM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Roundabout 9.8 A WBT/R 10.7 B 0.48
Venture Gate/Hamilton Rd Signal 7.2 A NBL 20.9 C 0.18
VMP/Hamilton Rd Signal 46.7 D
EBL
WBT
NBL
NBT
90.1
76.1
56.4
45.1
F
E
E
D
1.03
0.97
0.89
0.89
Old Victoria Rd/Bradley Ave Roundabout 6.8 A NBT/R 7.5 A 0.21
Innovation Gate/Bradley Ave Signal 7.1 A SBL/T/R 32.8 C 0.52
VMP/Bradley Ave Signal 33.1 C
EBL
WBT
SBL
70.4
58.9
77.3
E
E
E
0.93
0.80
0.98
Bonder Rd/Bradley Ave Signal 9.0 A NBL 12.8 B 0.53
PM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Roundabout 12.4 B SBT/R 14.3 B 0.50
Venture Gate/Hamilton Rd Signal 11.2 B NBL 39.1 D 0.47
VMP/Hamilton Rd Signal 47.0 D
EBL
SBL
SBT
86.4
88.5
66.7
F
F
E
1.01
1.01
1.07
Old Victoria Rd/Bradley Ave Roundabout 7.9 A WBT/R 9.0 A 0.43
Innovation Gate/Bradley Ave Signal 12.8 B SBL/T/R 43.4 D 0.74
VMP/Bradley Ave Signal 31.9 C EBL
SBL
68.7
78.1
E
E
0.94
0.92
Bonder Rd/Bradley Ave Signal 11.4 B NBL 13.7 B 0.68
As presented in Table 14 , all the study area intersections are expected to operate with an
acceptable level of service except VMP intersections with Hamilton Road and Bradley
Avenue. By year 2033, the VMP and Hamilton Road intersection is expected to operate
at an overall LOS ‘D’, however, some movements are expected to operate at LOS ‘F’.
Similarly, the southbound left turn movement is expected to operate at upper limit of
LOS ‘E’ (approaching LOS ‘F’) at VMP and Bradley Avenue intersection.
![Page 39: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/39.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 33
The higher delays for some of the turning movements at these two intersections indicate
the need for an additional capacity by year 2033. To provide an acceptable level of
service on VMP corridor, either widening with a six-lane cross-section or implementation
of an interchange would be required. Nevertheless, the widening VMP to a six-lane
cross-section is inconsistent with the long-range vision of four-lane grade separated
facility and that improvements would result in ‘throw-away costs’ as these would be
removed when the grade separations take place. Based on the City’s network
improvement criteria (upper limit of LOS ‘E’), it is recommended that City implement
the planned interchanges at VMP intersections prior to the 2033.
The study does not include any detailed traffic analysis for an interim year between 2023
and 2033. Based on the high level review, the need for interchanges at Hamilton Road
and Bradley Avenue are expected around 2030/31 and 2032/33, respectively when the
future level of service is expected to reach at upper limit of LOS ‘E’ and v/c at 0.99. The
2033 intersection capacity analysis results for Scenario 1 are provided in Technical
Appendix 5.
Considering the lower anticipated traffic demand (i.e. less than 300 vehicles per
direction) in 2033 Weekday peak hours, presented in Figure 14, the segment of Bradley
Avenue between Bonder Road and Westchester Bourne is not recommended for any
additional capacity / lane widening. However, with the increase in traffic demand, the
intersection of Bradley Avenue and Westchester Bourne may require minor
improvements (e.g. additional turning lanes and/or traffic signals). The County of
Middlesex and/or Municipality of Thames Centre is recommended to monitor traffic
operations at this intersection and if require, necessary improvements should be
implemented.
3.4.3 Scenario 2: Development Rate of 45 acres/year
2018 Traffic Conditions
The 2018 turning movement forecasts for the study-area intersections are presented in
Figure 15.
![Page 40: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/40.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 34
Figure 15: Total Traffic Volumes for 2018 Weekday Peak Hours - Scenario 2
Hamilton Rd Veterans Memorial Pkwy
Commissioners Rd E Hamilton Rd
LEGEND:
AM Peak Hour Volume
Old Victoria Rd Venture Gate (PM) Peak Hour Volume
Old Victoria Rd Innovation Gate Bonder Road
Bradley Ave Bradley Ave
Old Victoria Rd Oetker Gate Veterans Memorial Pkwy
99
(99)
69
66
86
26
0
85
2
61
174 (153)
15 (14)
146 (98)
317 (147)
46 (272) 116
(19
)
(14
4)
(12
6)
(15
1)
(42
6)
(12
67
)
(14
9)
7 (16) 102 (33)
395 (484) 557 (590)
(106) 110 (542) 455 (296) 337
(11) 281
4
65
12
(396) 404 (13)
83
10
32
12
(23
)
(10
2)
(7)
(61
)
(10
7)
(51
)
20
54 (82) 58
(10
2)
26
42
46
33 0
(89
2)
22 (38) 70 (25)
42
26
4
55
8
10
2
(70
)
(67
)
(16
)
(50
)
(2)
(63
)
(31
6)
(94
5)
63 (93) 72 (26) 18
225 (350) 269 (412) 70
267 (94) 61
(58) 47 (20) 59 (255) 239
(13) 8
12
57
76 (6)
(252) 222 (286)
(134)
3 (1)
(3)
(59
5)
(30
)
77
76
9
30
(30
)
(0)
(3)
(182) 58
(12) 35
(33)
132
116 (112)
(39)
(99)
(14
)
(51
)
(43
)
(19
)
(1)
(65
)
(48
)
19
10 0 38 (64) 48
(86
)
(0)
(9)
54 0 5
10
99
19 0 2
![Page 41: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/41.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 35
The 2018 traffic analysis for this scenario was conducted with the proposed road network
improvements identified for the Scenario 1. The intersection capacity analysis results for
2018 traffic conditions for Scenario 2 are summarized in Table 15.
Table 15: LOS Summary for 2018 Weekday Peak Hours - Scenario 2
AM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Roundabout 6.8 A WBT/R 7.5 A 0.35
Venture Gate/Hamilton Rd Stop 1.9 A NBL 32.9 D -
VMP/Hamilton Rd Signal 28.8 C WBT 50.8 D 0.86
Old Victoria Rd/Bradley Ave Stop 7.4 A SBL/T/R 26.9 D -
Innovation Gate/Bradley Ave Stop 3.7 A SBL/T/R 20.0 C -
VMP/Bradley Ave Signal 19.6 B WBT 43.6 D 0.66
Bonder Rd/Bradley Ave Stop 3.9 A NBL 14.0 B -
PM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Roundabout 7.9 A SBT/R 8.6 A 0.32
Venture Gate/Hamilton Rd Stop 3.3 A NBL 42.3 E -
VMP/Hamilton Rd Signal 21.6 C EBL
WBT
49.5
48.4
D
D
0.81
0.72
Old Victoria Rd/Bradley Ave Stop 8.8 A NBL
SBL/T/R
44.7
35.6
E
E -
Innovation Gate/Bradley Ave Stop 4.6 A SBL/T/R 24.8 C -
VMP/Bradley Ave Signal 20.3 C WBT 38.2 D 0.64
Bonder Rd/Bradley Ave Stop 3.3 A NBL 14.5 B -
With the proposed improvements, all the study area intersections are anticipated to
operate with an overall intersection LOS ‘C’ or better. However, with the development
rate of 45 acres/year, various movements at study area intersections are expected to
operate with marginal increase in average delay compared to the Scenario 1.
The northbound movement at Venture Gate and Hamilton Road intersection is controlled
by ‘Stop’ sign. With the increase traffic demand by 2018, the northbound left turn
movement at this intersection is expected to operate at LOS ‘E’ during both the peak
hours. Similarly, the northbound left-turn at Old Victoria Road and Bradley Avenue
intersection is expected to operate at upper limit of LOS ‘E’ during 2018 afternoon peak
hour. The City is recommended to monitor traffic operations at these two intersections
![Page 42: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/42.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 36
and if the traffic demand justifies the signal warrants then traffic control signals or
roundabout should be implemented.
The 2018 intersection capacity analysis results from Synchro are provided in Technical
Appendix 6.
2023 Traffic Conditions
The 2023 turning movement forecasts for the study-area intersections are presented in
Figure 16.
The 2023 traffic analysis for the Scenario 2 was conducted with the proposed road
network improvements identified for the Scenario 1 for year 2023. In addition to these
improvements, the Bonder Road and Bradley Avenue intersection would require traffic
signals.
The intersection capacity analysis results for the 2023 are presented in Table 16.
![Page 43: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/43.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 37
Figure 16: Total Traffic Volumes for 2023 Weekday Peak Hours - Scenario 2
Hamilton Rd Veterans Memorial Pkwy
Commissioners Rd E Hamilton Rd
LEGEND:
AM Peak Hour Volume
Old Victoria Rd Venture Gate (PM) Peak Hour Volume
Old Victoria Rd Innovation Gate
Bradley Ave Bradley Ave
Old Victoria Rd Oetker Gate Veterans Memorial Pkwy
(63
9)
(49
)
10
0
83
3
82
(16
)
(60
)
(58
)
(27
)
(1)
(99
)
(58
)
29
15 0 58 (85) 61(15) 12
14
68
11
6 (9)
(281) 272 (325) 340 (124) 123
(62) 51 (30) 92 (312) 280
86 (129) 109 (38) 46 (86)
260 (404) 317 (489) 109 (155)
(10
90
)
38 (62) 110 (39) 204 (249)
65
32
6
60
2
25
5
(35
3)
(10
19
)
(15
9)
28
51
73
51 0
(77
)
(14
6)
(90
)
29
77 (108) 104
17 (15)
156 (105)
430 (531) 615 (664) 343 (158)
(15
4)
(13
9)
(17
2)
(46
2)
(14
07
)
(16
0)
9 (20) 145 (47)
74
80
12
3
30
0
10
64
66
203 (189)
64 (293) 126
(114) 117 (592) 524 (336) 372
(429) 447 (20)
(17) 49
24
75
17
(20
1)
(0)
(20
)
12
5
0 12
(22
)
(75
)
(77
)
(26
)
(77
)
(2)
(98
)
11
7
11
86
14
(41
)
(11
7)
(10
)
0 9
23 (8)
145 (144)
(14
5)
(0)
(14
)
16 (5)
99
(99)
(77) 230
(199) 65
(56) 166
89
![Page 44: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/44.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 38
Table 16: LOS Summary for 2023 Weekday Peak Hours - Scenario 2
AM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Roundabout 8.7 A WBT/R 9.5 A 0.43
Venture Gate/Hamilton Rd Signal 6.7 A NBL 40.8 D 0.27
VMP/Hamilton Rd Signal 34.7 C EBL
WBT
66.6
60.3
E
E
0.95
0.90
Old Victoria Rd/Bradley Ave Roundabout 6.3 A NBT/R 6.8 A 0.17
Innovation Gate/Bradley Ave Signal 7.1 A SBL/T/R 31.2 C 0.51
VMP/Bradley Ave Signal 25.3 C EBL
WBT
44.5
46.3
D
D
0.75
0.66
Bonder Rd/Bradley Ave Signal 6.9 A NBL 12.4 B 0.38
PM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Roundabout 10.7 B SBT/R 12.2 B 0.43
Venture Gate/Hamilton Rd Signal 10.6 B NBL 39.1 D 0.46
VMP/Hamilton Rd Signal 31.3 C EBL
SBT
72.0
33.1
E
C
0.95
0.94
Old Victoria Rd/Bradley Ave Roundabout 7.3 A WBT/R 8.1 A 0.37
Innovation Gate/Bradley Ave Signal 12.2 B SBL/T/R 39.5 D 0.72
VMP/Bradley Ave Signal 23.9 C EBL
WBT
49.5
47.2
D
D
0.82
0.73
Bonder Rd/Bradley Ave Signal 7.9 A NBL 11.5 B 0.52
Similar to the Scenario 1, all the study area intersections are anticipated to operate with
an overall intersection LOS ‘C’ or better.
All the turning movements for the study area intersections are expected to operate with an
acceptable level of service (i.e. LOS ‘D’ or better); except eastbound left and westbound
through movements during morning peak hour; eastbound left turn during afternoon peak
hour are expected to operate at LOS ‘E’ at VMP/Hamilton Road intersection.
The VMP and Bradley Avenue intersection is expected to operate with an overall
LOS ‘C’ and all the turn movements are expected to operate with an acceptable level of
service (i.e. LOS ‘D’ or better) during both the peak hours, indicates that this intersection
would have some spare capacity by year 2023. The 2023 intersection capacity analysis
results from Synchro are provided in Technical Appendix 7.
![Page 45: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/45.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 39
2033 Traffic Conditions
The 2033 traffic conditions for this scenario would be similar to the Scenario 1, as the
Innovation Industrial Park is expected to be fully build-out and occupied. The
intersection analysis results (refer to Table 14) indicate that both the VMP intersections
(at Hamilton Road and Bradley Avenue) would need interchanges prior to year 2033.
Based on the high level review and City’s improvement criteria, the need for an
interchange at VMP and Hamilton Road is expected around 2029/30 for the absorption
rate of 45 acres/year. For the VMP and Bradley Avenue intersection, the need for an
interchange is expected around 2031/32.
3.4.4 Scenario 3: Development Rate of 55 acres/year
The 2018 turning movement forecasts for the study-area intersections are presented in
Figure 17.
![Page 46: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/46.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 40
Figure 17: Total Traffic Volumes for 2018 Weekday Peak Hours - Scenario 3
Hamilton Rd Veterans Memorial Pkwy
Commissioners Rd E Hamilton Rd
LEGEND:
AM Peak Hour Volume
Old Victoria Rd Venture Gate (PM) Peak Hour Volume
Old Victoria Rd Innovation Gate
Bradley Ave Bradley Ave
Old Victoria Rd Oetker Gate Veterans Memorial Pkwy
(41) 122
(184) 60
(15) 42
23 0 2
12 (4)
134 (134)
(37
)
(0)
(4)
4 (1)
(14) 33
17
67
14
(10
6)
(0)
(10
)
66 0 6
52 (273) 117
(106) 110 (543) 459 (305) 342(1
44
)
(12
8)
(15
3)
(42
9)
(12
79
)
(14
9)
8 (17) 117 (38)
69
70
91
26
9
88
4
61
176 (156)
15 (14)
146 (98)
397 (487) 558 (594) 319 (147)
(398) 407 (15)
(20
)
(70
)
(69
)
(20
)
(60
)
(2)
(76
)
88
10
49
13
(27
)
(10
4)
(8)
(66
)
(12
0)
(56
)
23
62 (87) 64
(32
3)
(94
9)
(10
8)
26
45
53
39 0
(44)
230 (356) 272 (417) 75 (104)
(92
0)
26 (46) 85 (30) 125 (128)
50
28
4
56
0
11
9
(58) 47 (24) 71 (273) 250
68 (99) 87 (31)
(14) 9
13
60
84 (7)
(255) 230 (288)
99
(99)
(59
6)
(33
)
85
77
3
35
(15
)
(54
)
(46
)
(22
)
(1)
(78
)
(51
)
23
12 0 46 (72) 52
273 (98) 69
21
![Page 47: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/47.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 41
The 2018 traffic analysis for this scenario was conducted with the proposed road network
improvements identified for the Scenario 1. The intersection capacity analysis results for
2018 traffic conditions for Scenario 3 are summarized in Table 17.
Table 17: LOS Summary for 2018 Weekday Peak Hours - Scenario 3
AM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Roundabout 6.9 A WBT/R 7.6 A 0.35
Venture Gate/Hamilton Rd Stop 2.2 A NBL 36.3 E -
VMP/Hamilton Rd Signal 29.4 C
EBL
WBT
SBL
49.1
51.2
49.0
D
D
D
0.82
0.87
0.66
Old Victoria Rd/Bradley Ave Stop 8.6 A SBL/T/R 32.8 D -
Innovation Gate/Bradley Ave Stop 4.5 A SBL/T/R 24.3 C -
VMP/Bradley Ave Signal 20.8 C EBL
WBT
35.0
46.7
C
D
0.79
0.71
Bonder Rd/Bradley Ave Stop 4.4 A NBL 15.6 C -
PM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Roundabout 7.9 A WBT/R 8.7 A 0.33
Venture Gate/Hamilton Rd Stop 3.8 A NBL 46.5 E -
VMP/Hamilton Rd Signal 22.1 C EBL 51.2 D 0.82
Old Victoria Rd/Bradley Ave Stop 10.4 B NBL
SBL/T/R
48.9
44.1
E
E -
Innovation Gate/Bradley Ave Stop 6.1 A SBL/T/R 31.3 D -
VMP/Bradley Ave Signal 21.2 C WBT 39.4 D 0.68
Bonder Rd/Bradley Ave Stop 3.9 A NBL 15.8 C -
With the proposed improvements, all the study area intersections are anticipated to
operate with an overall intersection LOS ‘C’ or better. However, with the development
rate of 55 acres/year, various movements at study area intersections are expected to
operate with marginal increase in average delays compared to the Scenario 2.
Under Scenario 3, intersections at Venture Gate with Hamilton Road and Old Victoria
Road with Bradley Avenue would result in higher delays. With the higher demand, these
two intersections would require implementation of traffic signals/roundabout earlier than
Scenario 1 and 2.
![Page 48: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/48.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 42
The 2018 intersection capacity analysis results from Synchro are provided in Technical Appendix 8.
2023 Traffic Conditions
The 2023 turning movement forecasts for the study-area intersections are presented in Figure 18.
Figure 18: Total Traffic Volumes for 2023 Weekday Peak Hours - Scenario 3
` Hamilton Rd Veterans Memorial Pkwy
Commissioners Rd E Hamilton Rd
LEGEND:
AM Peak Hour Volume
Old Victoria Rd Venture Gate (PM) Peak Hour Volume
Old Victoria Rd Innovation Gate
Bradley Ave Bradley Ave
Old Victoria Rd Oetker Gate Veterans Memorial Pkwy
(30
2)
(0)
(30
)
34 (11)
(81) 241
(199) 65
(116) 347
18
7
0 19
(21
1)
(0)
(21
)
13
0
0 13
24 (8)
145 (144)
(63
9)
(62
)
10
0
83
3
12
0
(16
)
(60
)
(63
)
(27
)
(1)
(99
)
(58
)
29
15 0 58 (85) 61
14
68
13
2 (9)
(286) 288 (339) 382 (138) 165
(62) 51 (30) 92 (312) 280
(15) 12
264 (347)6
5
32
6
60
2
36
7
94 (144) 109 (38) 66 (119)
268 (419) 340 (525) 132 (191)
(19
6)
28
51
82
51 0
(11
64
)
43 (69) 110 (39)
(75
)
(77
)
(30
)
(77
)
(2)
(98
)
13
2
12
31
14
(48
)
(11
7)
(10
)
(77
)
(14
6)
(11
3)
29
77 (118) 131
(35
3)
(10
19
)
(114) 117 (602) 551 (336) 372
(21) 58
29
75
17
(433) 456 (20)
(15
4)
(13
9)
(17
8)
(46
2)
(14
36
)
(16
0)
9 (20) 145 (47)
435 (538) 630 (687)
99
(99)
74
80
14
2
30
0
11
48
66
214 (206)
17 (15)
156 (105)
343 (158)
64 (293) 126
(22
)
![Page 49: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/49.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 43
The 2023 traffic analysis was conducted with road network improvements identified for
the Scenario 2 (development rate of 45 acres/year). With the development/absorption
rate of 55 acres/year, the Innovation Industrial Park would almost fully occupied
(approximately 99%) by year 2023.
With this development growth, the VMP/Hamilton Road intersection is expected to
operate with an overall intersection LOS ‘D’ during both the peak hours. However,
eastbound left and westbound through movements during morning peak hour and
eastbound left during afternoon peak hour is expected to operate LOS ‘E’. The
southbound through movement is expected to operate at LOS ‘D’ with v/c of 0.99 during
afternoon peak hour. This indicates that with an additional growth in traffic volumes after
year 2023, the VMP and Hamilton Road intersection would require additional capacity.
The VMP and Bradley Avenue intersection is expected to operate at overall intersection
LOS ‘C’ during both the peak hours. For Scenario 3, this intersection would require dual
lanes for the southbound left turn movement. To accommodate two receiving lanes for
the southbound left turn movement, a segment of Bradley Avenue between VMP and
Bonder Road would require widening with 4-lane cross-section. With this improvement,
eastbound left turn and southbound left turn movements would operate at LOS ‘E’ with
v/c ratio reaching near 0.90. The intersection capacity analysis results for the 2023 are
presented in Table 18. The 2023 intersection capacity analysis results are provided in
Technical Appendix 9.
![Page 50: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/50.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Future Conditions
MMM Group Limited October 2014 Page 44
Table 18: LOS Summary for 2023 Weekday Peak Hours - Scenario 3
AM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Roundabout 9.0 A WBT/R 9.8 A 0.44
Venture Gate/Hamilton Rd Signal 6.8 A NBL 40.8 D 0.27
VMP/Hamilton Rd Signal 37.6 D EBL
WBT
66.3
60.3
E
E
0.95
0.90
Old Victoria Rd/Bradley Ave Roundabout 6.5 A NBT/R 7.2 A 0.20
Innovation Gate/Bradley Ave Signal 7.2 A SBL/T/R 32.8 C 0.52
VMP/Bradley Ave Signal 30.0 C EBL 59.4 E 0.87
Bonder Rd/Bradley Ave Signal 8.9 A NBL 12.7 B 0.53
PM Peak Hour
Intersection Control
Type
Overall
Intersection Critical Movement
Delay LOS Movement Delay LOS V/C
Old Victoria Rd/Hamilton Rd Roundabout 11.0 B SBT/R 12.5 B 0.44
Venture Gate/Hamilton Rd Stop 10.7 B NBL 39.1 D 0.46
VMP/Hamilton Rd Signal 35.3 D EBL
SBT
69.2
43.1
E
D
0.94
0.99
Old Victoria Rd/Bradley Ave Stop 7.5 A WBT/R 8.5 A 0.40
Innovation Gate/Bradley Ave Stop 12.5 B SBL/T/R 41.7 D 0.73
VMP/Bradley Ave Signal 29.4 C SBL
EBL
67.8
59.0
E
E
0.88
0.89
Bonder Rd/Bradley Ave Signal 10.8 B NBL 12.6 B 0.66
2033 Traffic Conditions
The 2033 traffic conditions for this scenario would be similar to the Scenario 1 and 2, as
the Innovation Industrial Park is expected to be fully build-out and occupied. The
intersection analysis results (refer to Table 14) indicate that both the VMP intersections
(at Hamilton Road and Bradley Avenue) would need interchanges prior to year 2033.
Based on the high level review and City’s improvement criteria, the need for an
interchange at VMP and Hamilton Road is expected around 2025/26 for the absorption
rate of 55 acres/year. For the VMP and Bradley Avenue intersection, the need for an
interchange is expected around 2029/30.
![Page 51: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/51.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Study Findings
MMM Group Limited October 2014 Page 45
4. STUDY FINDINGS
The following points summarize the key study findings and recommendations arising
from a review of existing traffic conditions and an evaluation of future traffic conditions
for the Innovation Industrial Park intersections.
4.1 Existing Traffic Conditions
The existing (2013) condition analysis was conducted for the morning and afternoon peak
hour traffic demands.
All individual movements at two signalized VMP intersections (with Hamilton Road
and Bradley Avenue) are operating with volume-to-capacity (v/c) ratios below 0.85.
The intersection capacity analysis confirms that all individual turning movements are
operating with an acceptable level of service (LOS ‘D’ or better) during both the
morning and afternoon peak hour.
A signalized intersection at Old Victoria Road and Hamilton Road/Commissioners
Road operates at an overall LOS ‘C’ or better during the weekday peak hours.
However, the single lane southbound approach currently operates with shared left-
through-right movements operate at LOS ‘E’ and v/c ratio of 0.97 during the
afternoon peak hour.
Venture Gate and Hamilton Road intersection operates with a ‘Two-Way Stop
Control’ where traffic approaching from Venture Gate controlled by the ‘Stop’ sign.
At this intersection, the northbound left turn movement is the critical movement
which operates at LOS ‘D’ during the afternoon peak hour.
The Old Victoria Road intersection with Bradley Avenue operates with a ‘Two-Way
Stop Control’. Traffic approaching from Old Victoria Road controlled by ‘Stop’ signs
and traffic on Bradley Avenue operates without any control (i.e. free-flow). The
northbound left turn is a critical movement at this intersection, which operates at
LOS ‘C’ and LOS ‘D’ during morning and afternoon peak hours, respectively.
Innovation Gate/Oetker Gate intersection with Bradley Avenue operates with a ‘Two
Way Stop Control’ at an overall LOS ‘A’ during both the peak hours. At this
intersection, all individual turning movements are operating at LOS ‘B’ or better
during both the peak hours.
4.2 Future Traffic Conditions and Recommendations
The future traffic condition analyses were assessed for the short-term (5 years), mid-term
(10 years) and long-term (20 years) planning horizons, which reflects the traffic volumes
estimated for year 2018, 2023 and 2033.
The traffic analysis was conducted with the base development/absorption rate of 35
acres/year (Scenario 1), and sensitivity analyses with accelerated growth scenarios with
development rate of 45 acres/year (Scenario 2), and 55 acres/year (Scenario 3); in order
to cover a range of possible outcomes with respect to the need, type and timing of
infrastructure improvements. The analysis results for three scenarios indicate that with
![Page 52: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/52.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Study Findings
MMM Group Limited October 2014 Page 46
the increase in development rate, the study area intersections would have marginal
increase in delays and v/c ratio. However, the improvement requirements for each of the
future planning horizons with various development rates are generally similar. The
network improvement requirements for three future planning horizon years (2018, 2023
and 2033) are presented in the following section under separate headings and summarized
in Table 19.
4.2.1 2018 Traffic Conditions and Recommendations
The traffic analysis for year 2018 was initially assessed with the existing network
configuration and based on the analysis results; the following network improvements
were identified for the study area intersections which will be required by year 2018:
Old Victoria Road/Hamilton Road:
With the proposed development and background traffic growth, this intersection
would require dedicated storage lane for eastbound left turn and southbound left turn
movements, or upgrade with a 2-lane roundabout configuration to provide an
acceptable level of service. Considering the recommendations from the Hamilton
Road EA study, the traffic analysis for this intersection was conducted assuming 2-
lane roundabout.
The 2-lane roundabout at this intersection would also require 2-lane on each approach
and receiving lane. Considering the short distance between Old Victoria Road and
Venture Gate intersections, this segment of Hamilton Road is recommended widening
with 4 basic lanes.
The traffic analysis results for three scenarios indicate that with 2-lane roundabout
configuration, all the turning movements would operate with a good level of service
(LOS ‘A’).
Venture Gate/Hamilton Road:
For 2018 traffic analysis, this intersection was assumed to operate with the existing
configuration of ‘Two-Way Stop Control’.
With the increase traffic demand, the northbound left turn movement at this
intersection is expected to operate at LOS ‘E’ during both the peak hours under each
of the three development scenarios. The City is recommended to monitor traffic
operations at this intersection and if the traffic demand justifies the signal warrants
then traffic control signals or roundabout should be implemented.
VMP/Hamilton Road:
This intersection would require dual eastbound left turn lanes to accommodate the
2018 traffic demand. The pedestrian crossing on the north-side of the intersection
may need to be restricted to reduce the overall cycle length and provide an acceptable
level of service.
![Page 53: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/53.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Study Findings
MMM Group Limited October 2014 Page 47
This intersection is expected to operate at overall intersection LOS ‘C’ during both
the peak hours under each of the development scenarios. The delay at the individual
turning movements would marginally increase with the higher development rate. For
example, the eastbound left turn movement during afternoon peak is expected to
operate with 48.5 s of an average delay and v/c ratio of 0.79 under Scenario 1 (35
acres/year) and with 51.2 s of an average delay and v/c ratio of 0.82 under Scenario 3
(55 acres/year).
Old Victoria Road/Bradley Avenue:
For 2018 traffic analysis, this intersection was assumed to operate with the existing
configuration of ‘Two-Way Stop Control’.
The northbound left-turn at this intersection is expected to operate at LOS ‘E’ during
2018 afternoon peak hour. The City is recommended to monitor traffic operations at
this intersection and if the traffic demand justifies the signal warrants then traffic
control signals or roundabout should be implemented.
Innovation Gate/Bradley Avenue:
For 2018 traffic analysis, this intersection was assumed to operate with the existing
configuration of ‘Two-Way Stop Control’.
All individual turning movements at this intersection are expected to operate with an
acceptable level of service (LOS ‘D’ or better) during both the peak hours under each
scenario.
VMP/Bradley Avenue:
This intersection would require protected plus permitted phases for the eastbound left
turn movement.
This intersection is expected to operate at overall intersection LOS ‘C’ during both
the peak hours under each of the development scenarios. The delay at the individual
turning movements would marginally increase with the higher development rate.
Bonder Road /Bradley Avenue:
For 2018 traffic analysis, this intersection was assumed to operate with the ‘Two-
Way Stop Control’ configuration.
All individual turning movements at this intersection are expected to operate with an
acceptable level of service (LOS ‘D’ or better) during both the peak hours under each
scenario.
![Page 54: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/54.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Study Findings
MMM Group Limited October 2014 Page 48
4.2.2 2023 Traffic Conditions and Recommendations
Old Victoria Road/Hamilton Road:
This intersection would require an additional capacity by providing a dedicated left
turn lane or improving with a 2-lane roundabout as proposed under Hamilton Road
EA Study.
The 2023 analysis assumes that this intersection will be improved with provision of a
2-lane roundabout and analysis results for the three scenarios indicate that with 2-lane
roundabout configuration, all the turning movements is expected to operate with a
good level of service (LOS ‘B’ or better).
Venture Gate/Hamilton Road:
This intersection would require signalization by year 2023 to provide an acceptable
level of service.
With traffic signals, this intersection is expected to operate at overall intersection
LOS ‘A’. The individual turning movement would operate with v/c ratios below 0.50.
VMP/Hamilton Road:
Hamilton Road would require 4-lane widening from Venture Gate to east of VMP to
provide 2 lanes for eastbound and westbound through movements.
For 2023 traffic demand under Scenario 1, this intersection is expected to operate at
an overall LOS ‘C’ during both the peak hours. The eastbound left turn movement is
expected to operate at LOS ‘E’ during both the peak hours. The eastbound left turn is
expected to operate at v/c of 0.95 during morning peak hour and at v/c of 0.93 during
afternoon peak hour. The southbound through movement is expected to operate at v/c
of 0.93 during afternoon peak hour.
Under Scenario 3, intersection delay would increase and this intersection is expected
to operate at an overall LOS ‘D’. The eastbound left and westbound through
movements during morning peak hour and eastbound left during afternoon peak hour
is expected to operate LOS ‘E’. The southbound through movement is expected to
operate at LOS ‘D’ with v/c of 0.99 during afternoon peak hour. This indicates that
with some additional growth in traffic volumes, the VMP and Hamilton Road
intersection would require additional capacity at this intersection for Scenario 3
traffic demand.
Old Victoria Road/Bradley Avenue:
To accommodate 2023 traffic demand, this intersection would either need to
signalized or improved with roundabout. Based on the discussion with the City, this
intersection is assumed to improve with 2-lane roundabout. This would also require
2-lane on each approach and receiving lane. Considering the short distance between
![Page 55: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/55.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Study Findings
MMM Group Limited October 2014 Page 49
Old Victoria Road and Innovation Gate/Oetker Gate intersections, this segment of
Bradley Avenue is recommended for widening with 4-lane cross-section.
The traffic analysis results for three scenarios indicate that with 2-lane roundabout
configuration, all the turning movements is expected to operate at a good level of
service (LOS ‘A’).
Innovation Gate/Bradley Avenue:
This intersection is expected to require traffic control signals by year 2023.
With signalization, all individual turning movements are expected to operate with an
acceptable level of service (LOS ‘D’ or better) under each development scenario.
VMP/Bradley Avenue:
This intersection would require dual eastbound left turn lanes. The pedestrian
crossing on the north-side of the intersection may need to be restricted to reduce the
overall cycle length and provide an acceptable level of service.
Under Scenario 1 and 2, this intersection is expected to operate with an overall
intersection LOS ‘C’ and individual turning movements are expected to operate at
LOS ‘D’ or better. This indicates that by year 2023, this intersection will have some
spare capacity available for additional traffic demand.
Under Scenario 3, this intersection would require dual lanes for the southbound left
turn movement in addition to the improvements identified for Scenario 1 and 2. To
accommodate two receiving lanes for the southbound left turn movement, a segment
of Bradley Avenue between VMP and Bonder Road would require widening with 4-
lane cross-section. With this improvement, eastbound left turn and southbound left
turn movements is expected to operate at LOS ‘E’ with v/c ratio reaching near 0.90.
Bonder Road /Bradley Avenue:
Under Scenario 1, this intersection would able to operate with the ‘Two-Way Stop
Control’ configuration.
Under Scenario 2 and 3, this intersection would require signalization by year 2023 to
provide an acceptable level of service. With provision of traffic signals, all the
turning movements are expected to operate with an acceptable level of service
(LOS ‘D’ or better) during both the peak hours.
![Page 56: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/56.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Study Findings
MMM Group Limited October 2014 Page 50
4.2.3 2033 Traffic Conditions and Recommendations
For year 2033, all the study area intersections are expected to operate with an
acceptable level of service except VMP intersections with Hamilton Road and
Bradley Avenue. At these two intersections, some of the turning movements are
expected to operate with LOS ‘E/F’. This confirms the need for an additional capacity
for these two intersections by year 2033.
The higher delays for some of the turning movements at these two intersections
indicate the need for an additional capacity by year 2033. To provide an acceptable
level of service on VMP corridor, either widening with a six-lane cross-section or
implementation of an interchange would be required. Nevertheless, the widening
VMP to a six-lane cross-section is inconsistent with the long-range vision of four-lane
grade separated facility and that improvements would result in ‘throw-away costs’ as
they would be removed when the grade separations take place. Based on the City’s
network improvement criteria (upper limit of LOS ‘E’), it is recommended that City
implement the planned interchanges at VMP intersections prior to Year 2033.
The study does not include any detailed traffic analysis for an interim year between
2023 and 2033. Based on the high level review and City’s network improvement
criteria (upper limit of LOS ‘E’ and v/c at 0.99), the need for an interchange at
Hamilton Road and Bradley Avenue is expected around 2030/31 and 2032/33 for
Scenario 1.
Under Scenario 2, the VMP and Hamilton Road intersection would require to be
upgraded with an interchange around 2029/30; the VMP and Bradley Avenue
intersection would require an interchange around 2031/32. Under Scenario 3, VMP
intersection at Hamilton Road and Bradley Avenue would require interchanges
around 2025/26 and 2029/30, respectively.
Considering the lower anticipated traffic demand (i.e. less than 300 vehicles per
direction) in 2033 Weekday peak hours, the segment of Bradley Avenue between
Bonder Road and Westchester Bourne is not recommended for any additional
capacity/lane widening. However, with the increase in traffic demand, the intersection
of Bradley Avenue and Westchester Bourne may require minor improvements (e.g.
additional turning lanes and/or traffic signals). The County of Middlesex and/or
Municipality of Thames Centre is recommended to monitor traffic operations at this
intersection and if require, necessary improvements should be implemented.
The network improvement requirements for each of the planning horizon years (2018,
2023 and 2033) under various development scenarios (35 acres/year, 45 acres/year and
55 acres/year) are summarized in Table 19.
![Page 57: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/57.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Study Findings
MMM Group Limited October 2014 Page 51
Table 19: Summary of Network Improvement Requirements
Intersection Improvement Requirement
Planning Horizon Year
2018 2023 2033
Development/Absorption Rate (acres/year)
35 45 55 35 45 55 35 45 55
Old Victoria Rd/
Hamilton Rd
- Roundabout with 2-lane approaches / Dedicated storage lane (50m) for
EBL and SBL √ √ √
- 4-lane widening of Hamilton Road (from Old Victoria Road to Venture
Gate)/ provision of storage lanes √ √ √
Venture Gate/
Hamilton Rd - Signalization - - - √ √ √
VMP/
Hamilton Rd
- Dual lanes for EBL; Pedestrian phase for E-W direction would need to
be restricted on the north side of intersection or provide 2-stage
clearance √ √ √
- 4-lane widening of Hamilton Road (from Venture Gate to VMP) - - - √ √ √
- Upgrade to Interchange (year)
√ (2030/31)
√
(2029/30)
√
(2025/26)
Old Victoria
Rd/Bradley Ave
- Roundabout/Signalization - - - √ √ √
- 4-lane widening of Bradley Ave (from Old Victoria Road to Innovation
Gate)/ provision of storage lanes - - - √ √ √
Innovation Gate/
Bradley Ave - Signalization - - - √ √ √
VMP/
Bradley Ave
- Permitted+ Protected phase for EBL √ √ √
- Dual lanes for EBL; Pedestrian phase for E-W direction would need to
be restricted on the he north side of intersection or provide 2-stage
clearance - - - √ √ √
- Dual lanes for SBL and 4-lane widening of Bradley Avenue (between
VMP and Bonder Road) - - - - - √ √ √
- Upgrade to Interchange (year) - - - - - - √
(2032/33)
√
(2031/32)
√
(2029/30)
Innovation Gate/
Bradley Ave - Signalization √ √ √
![Page 58: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/58.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Study Findings
MMM Group Limited October 2014 Page 52
4.3 Review of Bradley Avenue Interchange Requirements as per MTO Improvement Criteria
As mentioned earlier in the previous sections of the report, the improvements at the study
area intersection were identified based on the City of London’s criteria for network
improvements. As per the City of London’s road network improvement criteria,
movements operating at an upper limit of LOS ‘E’ i.e. approaching near LOS ‘F’ and
volume to capacity ratio (v/c) of 0.99 or greater were considered for geometric
improvement. For this study, an average delay of 75 s for signalized intersection and 45 s
for unsignalized intersection were considered as the upper limit of LOS ‘E’.
The ‘General Guidelines for the Preparation of Traffic Impact Studies’ from the Ministry
of Transportation recommends that movements that experience a v/c ratio of 0.85 or
greater should be considered for geometric improvement.
For Scenario 1 (with development rate of 35 acres/year), the eastbound left turn
movement at this intersection is a critical movement, which is expected to operate at v/c
of 0.80 during afternoon peak hour in year 2023. For all the development scenarios, in
year 2033, various movements (e.g. eastbound left turn and southbound left turn during
both peak hours ) at VMP and Bradley Avenue intersection are expected to operate at v/c
ratio higher than 0.85 and LOS ‘E’. For Scenario 2 (with development rate of 45
acres/year), the eastbound left turn movement at VMP/Bradley Avenue intersection is a
critical movement for Year 2023, which is expected to operate at v/c of 0.80 during
afternoon peak hour. For Scenario 2, the eastbound left turn is expected to operate at v/c
ratio of 0.82. Hence, for Scenario 1 and 2, the need for an interchange at VMP and
Bradley Avenue intersection is expected to arise between Year 2023 and 2033.
Considering the MTO’s improvement criteria, the VMP and Bradley Avenue intersection
would require an additional capacity or upgraded with an interchange around 2030/31.
However, for the Scenario 3 (with development rate of 55 acres/year), the eastbound left
turn movements during both the peak hours and southbound left turn movement in
afternoon peak hour are expected to operate at LOS ‘E’ and v/c ratio over 0.85, even after
providing dual left turn lanes. Based on the MTO’s criteria, the Scenario 3 would warrant
for an additional capacity or upgrade with an interchange by Year 2023.
![Page 59: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/59.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Appendices
MMM Group Limited October 2014
Technical Appendices
![Page 60: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/60.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Appendices
MMM Group Limited October 2014
Technical Appendix 1
Existing (2013) Intersection Capacity Analysis Results
![Page 61: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/61.jpg)
HCM Signalized Intersection Capacity Analysis Existing Conditions100: Old Victoria Road & Commissioners Road E & Hamilton Road AM Peak Hour
05/02/2014 Synchro 8 ReportPage 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 102 362 4 2 360 151 1 51 3 59 43 64Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 7.0 7.0 7.0 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 0.99 0.95Flt Protected 0.99 1.00 1.00 1.00 0.98Satd. Flow (prot) 1835 1862 1615 1818 1724Flt Permitted 0.83 1.00 1.00 0.99 0.86Satd. Flow (perm) 1536 1860 1615 1809 1507Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 111 393 4 2 391 164 1 55 3 64 47 70RTOR Reduction (vph) 0 0 0 0 0 56 0 2 0 0 30 0Lane Group Flow (vph) 0 508 0 0 393 108 0 57 0 0 151 0Heavy Vehicles (%) 7% 1% 0% 0% 2% 0% 0% 4% 0% 2% 0% 5%Turn Type Perm NA Perm NA Perm Perm NA Perm NAProtected Phases 2 6 8 4Permitted Phases 2 6 6 8 4Actuated Green, G (s) 50.1 50.1 50.1 13.2 13.2Effective Green, g (s) 50.1 50.1 50.1 13.2 13.2Actuated g/C Ratio 0.66 0.66 0.66 0.17 0.17Clearance Time (s) 7.0 7.0 7.0 5.7 5.7Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1012 1226 1064 314 261v/s Ratio Protv/s Ratio Perm c0.33 0.21 0.07 0.03 c0.10v/c Ratio 0.50 0.32 0.10 0.18 0.58Uniform Delay, d1 6.6 5.6 4.7 26.8 28.9Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.8 0.7 0.2 0.3 3.1Delay (s) 8.4 6.3 4.9 27.1 32.0Level of Service A A A C CApproach Delay (s) 8.4 5.9 27.1 32.0Approach LOS A A C C
Intersection SummaryHCM 2000 Control Delay 11.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.52Actuated Cycle Length (s) 76.0 Sum of lost time (s) 12.7Intersection Capacity Utilization 76.5% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 62: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/62.jpg)
HCM Signalized Intersection Capacity Analysis Existing Conditions300: Veterans Memorial Pkwy & Hamilton Road AM Peak Hour
05/02/2014 Synchro 8 ReportPage 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 291 105 26 11 290 136 48 886 10 57 656 201Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 1736 1776 1442 1656 1845 1553 1570 3282 1468 1612 3195 1509Flt Permitted 0.33 1.00 1.00 0.68 1.00 1.00 0.30 1.00 1.00 0.17 1.00 1.00Satd. Flow (perm) 595 1776 1442 1192 1845 1553 493 3282 1468 287 3195 1509Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 316 114 28 12 315 148 52 963 11 62 713 218RTOR Reduction (vph) 0 0 15 0 0 85 0 0 7 0 0 136Lane Group Flow (vph) 316 114 13 12 315 63 52 963 4 62 713 82Heavy Vehicles (%) 4% 7% 12% 9% 3% 4% 15% 10% 10% 12% 13% 7%Turn Type pm+pt NA Perm Perm NA Perm Perm NA Perm Perm NA PermProtected Phases 3 8 4 2 6Permitted Phases 8 8 4 4 2 2 6 6Actuated Green, G (s) 37.7 37.7 37.7 19.4 19.4 19.4 31.3 31.3 31.3 31.3 31.3 31.3Effective Green, g (s) 37.7 37.7 37.7 19.4 19.4 19.4 31.3 31.3 31.3 31.3 31.3 31.3Actuated g/C Ratio 0.45 0.45 0.45 0.23 0.23 0.23 0.37 0.37 0.37 0.37 0.37 0.37Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 463 800 650 276 428 360 184 1228 549 107 1196 564v/s Ratio Prot c0.12 0.06 0.17 c0.29 0.22v/s Ratio Perm c0.19 0.01 0.01 0.04 0.11 0.00 0.22 0.05v/c Ratio 0.68 0.14 0.02 0.04 0.74 0.17 0.28 0.78 0.01 0.58 0.60 0.14Uniform Delay, d1 16.3 13.5 12.7 24.9 29.7 25.7 18.3 23.2 16.4 20.9 21.1 17.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 4.1 0.1 0.0 0.1 6.5 0.2 3.8 5.1 0.0 20.9 2.2 0.5Delay (s) 20.4 13.5 12.7 25.0 36.2 25.9 22.1 28.2 16.4 41.8 23.3 17.8Level of Service C B B C D C C C B D C BApproach Delay (s) 18.2 32.7 27.8 23.2Approach LOS B C C C
Intersection SummaryHCM 2000 Control Delay 25.6 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.76Actuated Cycle Length (s) 83.6 Sum of lost time (s) 18.6Intersection Capacity Utilization 83.0% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group
![Page 63: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/63.jpg)
HCM Signalized Intersection Capacity Analysis Existing Conditions600: Veterans Memorial Pkwy & Bradley Avenue AM Peak Hour
05/02/2014 Synchro 8 ReportPage 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 177 25 24 3 43 69 34 697 3 22 509 162Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 7.7 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 0.91 1.00 1.00 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1626 1827 1495 1357 1667 1656 3215 1736 3167 1404Flt Permitted 0.68 1.00 1.00 0.74 1.00 0.44 1.00 0.34 1.00 1.00Satd. Flow (perm) 1158 1827 1495 1056 1667 766 3215 614 3167 1404Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 197 28 27 3 48 77 38 774 3 24 566 180RTOR Reduction (vph) 0 0 20 0 54 0 0 0 0 0 0 87Lane Group Flow (vph) 197 28 7 3 71 0 38 777 0 24 566 93Heavy Vehicles (%) 11% 4% 8% 33% 9% 0% 9% 12% 66% 4% 14% 15%Turn Type Perm NA Perm Perm NA Perm NA Perm NA PermProtected Phases 4 8 2 6Permitted Phases 4 4 8 2 6 6Actuated Green, G (s) 15.7 15.7 15.7 15.7 15.7 32.7 32.7 32.7 32.7 32.7Effective Green, g (s) 15.7 15.7 15.7 15.7 15.7 32.7 32.7 32.7 32.7 32.7Actuated g/C Ratio 0.25 0.25 0.25 0.25 0.25 0.52 0.52 0.52 0.52 0.52Clearance Time (s) 7.7 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 288 454 371 262 414 396 1666 318 1641 727v/s Ratio Prot 0.02 0.04 c0.24 0.18v/s Ratio Perm c0.17 0.00 0.00 0.05 0.04 0.07v/c Ratio 0.68 0.06 0.02 0.01 0.17 0.10 0.47 0.08 0.34 0.13Uniform Delay, d1 21.5 18.1 17.9 17.9 18.6 7.7 9.7 7.6 8.9 7.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 6.6 0.1 0.0 0.0 0.2 0.5 0.9 0.5 0.6 0.4Delay (s) 28.0 18.1 17.9 17.9 18.8 8.2 10.6 8.1 9.5 8.2Level of Service C B B B B A B A A AApproach Delay (s) 25.8 18.8 10.5 9.1Approach LOS C B B A
Intersection SummaryHCM 2000 Control Delay 12.5 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.54Actuated Cycle Length (s) 63.1 Sum of lost time (s) 14.7Intersection Capacity Utilization 57.0% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group
![Page 64: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/64.jpg)
HCM Unsignalized Intersection Capacity Analysis Existing Conditions200: Venture Gate & Hamilton Road AM Peak Hour
05/02/2014 Synchro 8 ReportPage 1
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (veh/h) 406 18 31 508 5 16Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91Hourly flow rate (vph) 446 20 34 558 5 18PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 466 1073 446vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 466 1073 446tC, single (s) 4.3 6.4 6.6tC, 2 stage (s)tF (s) 2.3 3.5 3.6p0 queue free % 97 98 97cM capacity (veh/h) 1026 238 545
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2Volume Total 446 20 34 558 5 18Volume Left 0 0 34 0 5 0Volume Right 0 20 0 0 0 18cSH 1700 1700 1026 1700 238 545Volume to Capacity 0.26 0.01 0.03 0.33 0.02 0.03Queue Length 95th (m) 0.0 0.0 0.8 0.0 0.6 0.8Control Delay (s) 0.0 0.0 8.6 0.0 20.5 11.8Lane LOS A C BApproach Delay (s) 0.0 0.5 13.9Approach LOS B
Intersection SummaryAverage Delay 0.6Intersection Capacity Utilization 36.7% ICU Level of Service AAnalysis Period (min) 15
![Page 65: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/65.jpg)
HCM Unsignalized Intersection Capacity Analysis Existing Conditions400: Old Victoria Road & Bradley Avenue AM Peak Hour
05/02/2014 Synchro 8 ReportPage 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 44 176 4 42 193 4 9 40 40 11 26 24Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 48 191 4 46 210 4 10 43 43 12 28 26PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 214 196 630 595 193 655 595 212vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 214 196 630 595 193 655 595 212tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 97 97 97 89 95 96 93 97cM capacity (veh/h) 1368 1359 344 392 845 315 387 833
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1Volume Total 48 196 46 214 10 87 66Volume Left 48 0 46 0 10 0 12Volume Right 0 4 0 4 0 43 26cSH 1368 1700 1359 1700 344 536 466Volume to Capacity 0.03 0.12 0.03 0.13 0.03 0.16 0.14Queue Length 95th (m) 0.9 0.0 0.8 0.0 0.7 4.6 3.9Control Delay (s) 7.7 0.0 7.7 0.0 15.8 13.0 14.0Lane LOS A A C B BApproach Delay (s) 1.5 1.4 13.3 14.0Approach LOS B B
Intersection SummaryAverage Delay 4.4Intersection Capacity Utilization 33.8% ICU Level of Service AAnalysis Period (min) 15
![Page 66: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/66.jpg)
HCM Unsignalized Intersection Capacity Analysis Existing Conditions500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue AM Peak Hour
05/02/2014 Synchro 8 ReportPage 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 6 220 1 3 235 1 0 0 1 5 0 4Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 239 1 3 255 1 0 0 1 5 0 4PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 257 240 518 515 239 515 515 255vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 257 240 518 515 239 515 515 255tC, single (s) 4.1 4.4 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.5 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 100 100 100 100 99 100 99cM capacity (veh/h) 1320 1165 466 463 805 470 463 788
Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1Volume Total 7 239 1 3 255 1 1 10Volume Left 7 0 0 3 0 0 0 5Volume Right 0 0 1 0 0 1 1 4cSH 1320 1700 1700 1165 1700 1700 805 573Volume to Capacity 0.00 0.14 0.00 0.00 0.15 0.00 0.00 0.02Queue Length 95th (m) 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.4Control Delay (s) 7.7 0.0 0.0 8.1 0.0 0.0 9.5 11.4Lane LOS A A A BApproach Delay (s) 0.2 0.1 9.5 11.4Approach LOS A B
Intersection SummaryAverage Delay 0.4Intersection Capacity Utilization 24.0% ICU Level of Service AAnalysis Period (min) 15
![Page 67: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/67.jpg)
HCM Signalized Intersection Capacity Analysis Existing Conditions100: Old Victoria Road & Commissioners Road E & Hamilton Road PM Peak Hour
05/02/2014 Synchro 8 ReportPage 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 99 364 3 7 438 123 2 78 4 134 112 134Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 7.0 7.0 7.0 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 0.99 0.95Flt Protected 0.99 1.00 1.00 1.00 0.98Satd. Flow (prot) 1864 1898 1583 1887 1778Flt Permitted 0.77 0.99 1.00 0.99 0.86Satd. Flow (perm) 1451 1884 1583 1875 1557Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 108 396 3 8 476 134 2 85 4 146 122 146RTOR Reduction (vph) 0 0 0 0 0 55 0 2 0 0 23 0Lane Group Flow (vph) 0 507 0 0 484 79 0 89 0 0 391 0Heavy Vehicles (%) 0% 1% 0% 0% 0% 2% 0% 0% 0% 0% 0% 0%Turn Type Perm NA Perm NA Perm Perm NA Perm NAProtected Phases 2 6 8 4Permitted Phases 2 6 6 8 4Actuated Green, G (s) 50.0 50.0 50.0 22.0 22.0Effective Green, g (s) 50.0 50.0 50.0 22.0 22.0Actuated g/C Ratio 0.59 0.59 0.59 0.26 0.26Clearance Time (s) 7.0 7.0 7.0 5.7 5.7Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 856 1112 934 487 404v/s Ratio Protv/s Ratio Perm c0.35 0.26 0.05 0.05 c0.25v/c Ratio 0.59 0.44 0.08 0.18 0.97Uniform Delay, d1 10.9 9.6 7.5 24.4 31.0Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 3.0 1.2 0.2 0.2 36.0Delay (s) 13.9 10.8 7.7 24.5 67.0Level of Service B B A C EApproach Delay (s) 13.9 10.1 24.5 67.0Approach LOS B B C E
Intersection SummaryHCM 2000 Control Delay 26.6 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.71Actuated Cycle Length (s) 84.7 Sum of lost time (s) 12.7Intersection Capacity Utilization 92.8% ICU Level of Service FAnalysis Period (min) 15c Critical Lane Group
![Page 68: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/68.jpg)
HCM Signalized Intersection Capacity Analysis Existing Conditions300: Veterans Memorial Pkwy & Hamilton Road PM Peak Hour
05/02/2014 Synchro 8 ReportPage 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 240 248 54 12 135 91 26 712 16 139 1134 382Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 1671 1863 1553 1671 1827 1568 1626 3252 1615 1770 3438 1583Flt Permitted 0.49 1.00 1.00 0.59 1.00 1.00 0.13 1.00 1.00 0.30 1.00 1.00Satd. Flow (perm) 862 1863 1553 1046 1827 1568 219 3252 1615 557 3438 1583Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93Adj. Flow (vph) 258 267 58 13 145 98 28 766 17 149 1219 411RTOR Reduction (vph) 0 0 25 0 0 83 0 0 10 0 0 238Lane Group Flow (vph) 258 267 33 13 145 15 28 766 7 149 1219 173Heavy Vehicles (%) 8% 2% 4% 8% 4% 3% 11% 11% 0% 2% 5% 2%Turn Type pm+pt NA Perm Perm NA Perm Perm NA Perm Perm NA PermProtected Phases 3 8 4 2 6Permitted Phases 8 8 4 4 2 2 6 6Actuated Green, G (s) 28.2 28.2 28.2 11.2 11.2 11.2 31.2 31.2 31.2 31.2 31.2 31.2Effective Green, g (s) 28.2 28.2 28.2 11.2 11.2 11.2 31.2 31.2 31.2 31.2 31.2 31.2Actuated g/C Ratio 0.38 0.38 0.38 0.15 0.15 0.15 0.42 0.42 0.42 0.42 0.42 0.42Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 470 709 591 158 276 237 92 1371 680 234 1449 667v/s Ratio Prot c0.10 0.14 0.08 0.24 c0.35v/s Ratio Perm c0.11 0.02 0.01 0.01 0.13 0.00 0.27 0.11v/c Ratio 0.55 0.38 0.06 0.08 0.53 0.06 0.30 0.56 0.01 0.64 0.84 0.26Uniform Delay, d1 16.9 16.5 14.5 27.0 28.9 26.9 14.2 16.2 12.4 16.9 19.2 13.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.3 0.3 0.0 0.2 1.8 0.1 8.3 1.6 0.0 12.5 6.1 0.9Delay (s) 18.2 16.9 14.5 27.2 30.8 27.0 22.5 17.8 12.5 29.4 25.2 14.8Level of Service B B B C C C C B B C C BApproach Delay (s) 17.2 29.1 17.9 23.2Approach LOS B C B C
Intersection SummaryHCM 2000 Control Delay 21.4 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.75Actuated Cycle Length (s) 74.0 Sum of lost time (s) 18.6Intersection Capacity Utilization 80.4% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 69: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/69.jpg)
HCM Signalized Intersection Capacity Analysis Existing Conditions600: Veterans Memorial Pkwy & Bradley Avenue PM Peak Hour
05/02/2014 Synchro 8 ReportPage 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 165 72 28 15 65 42 33 547 20 71 863 266Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 7.7 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 0.94 1.00 0.99 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1719 1845 1455 1805 1743 1570 3218 1805 3406 1553Flt Permitted 0.68 1.00 1.00 0.71 1.00 0.28 1.00 0.43 1.00 1.00Satd. Flow (perm) 1239 1845 1455 1344 1743 468 3218 810 3406 1553Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Adj. Flow (vph) 174 76 29 16 68 44 35 576 21 75 908 280RTOR Reduction (vph) 0 0 23 0 34 0 0 2 0 0 0 128Lane Group Flow (vph) 174 76 6 16 78 0 35 595 0 75 908 152Heavy Vehicles (%) 5% 3% 11% 0% 3% 2% 15% 12% 0% 0% 6% 4%Turn Type Perm NA Perm Perm NA Perm NA Perm NA PermProtected Phases 4 8 2 6Permitted Phases 4 4 8 2 6 6Actuated Green, G (s) 13.8 13.8 13.8 13.8 13.8 33.7 33.7 33.7 33.7 33.7Effective Green, g (s) 13.8 13.8 13.8 13.8 13.8 33.7 33.7 33.7 33.7 33.7Actuated g/C Ratio 0.22 0.22 0.22 0.22 0.22 0.54 0.54 0.54 0.54 0.54Clearance Time (s) 7.7 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 274 409 322 298 386 253 1743 438 1845 841v/s Ratio Prot 0.04 0.04 0.18 c0.27v/s Ratio Perm c0.14 0.00 0.01 0.07 0.09 0.10v/c Ratio 0.64 0.19 0.02 0.05 0.20 0.14 0.34 0.17 0.49 0.18Uniform Delay, d1 21.9 19.6 18.9 19.1 19.7 7.1 8.0 7.2 8.9 7.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 4.8 0.2 0.0 0.1 0.3 1.1 0.5 0.8 0.9 0.5Delay (s) 26.7 19.9 18.9 19.1 20.0 8.2 8.5 8.0 9.8 7.7Level of Service C B B B B A A A A AApproach Delay (s) 24.0 19.9 8.5 9.3Approach LOS C B A A
Intersection SummaryHCM 2000 Control Delay 11.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.53Actuated Cycle Length (s) 62.2 Sum of lost time (s) 14.7Intersection Capacity Utilization 63.6% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group
![Page 70: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/70.jpg)
HCM Unsignalized Intersection Capacity Analysis Existing Conditions200: Venture Gate & Hamilton Road PM Peak Hour
05/02/2014 Synchro 8 ReportPage 1
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (veh/h) 498 4 9 534 34 44Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 553 4 10 593 38 49PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 558 1167 553vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 558 1167 553tC, single (s) 4.4 6.4 6.2tC, 2 stage (s)tF (s) 2.5 3.5 3.3p0 queue free % 99 82 91cM capacity (veh/h) 875 211 532
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2Volume Total 553 4 10 593 38 49Volume Left 0 0 10 0 38 0Volume Right 0 4 0 0 0 49cSH 1700 1700 875 1700 211 532Volume to Capacity 0.33 0.00 0.01 0.35 0.18 0.09Queue Length 95th (m) 0.0 0.0 0.3 0.0 5.1 2.4Control Delay (s) 0.0 0.0 9.2 0.0 25.8 12.4Lane LOS A D BApproach Delay (s) 0.0 0.2 18.3Approach LOS C
Intersection SummaryAverage Delay 1.3Intersection Capacity Utilization 38.1% ICU Level of Service AAnalysis Period (min) 15
![Page 71: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/71.jpg)
HCM Unsignalized Intersection Capacity Analysis Existing Conditions400: Old Victoria Road & Bradley Avenue PM Peak Hour
05/02/2014 Synchro 8 ReportPage 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 54 224 11 59 298 8 9 37 30 5 52 65Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 59 243 12 64 324 9 10 40 33 5 57 71PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 333 255 918 828 249 870 829 328vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 333 255 918 828 249 870 829 328tC, single (s) 4.1 4.2 7.2 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.3 3.6 4.0 3.3 3.5 4.0 3.3p0 queue free % 95 95 94 86 96 97 80 90cM capacity (veh/h) 1238 1281 172 279 794 217 279 713
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1Volume Total 59 255 64 333 10 73 133Volume Left 59 0 64 0 10 0 5Volume Right 0 12 0 9 0 33 71cSH 1238 1700 1281 1700 172 394 406Volume to Capacity 0.05 0.15 0.05 0.20 0.06 0.18 0.33Queue Length 95th (m) 1.2 0.0 1.3 0.0 1.4 5.4 11.2Control Delay (s) 8.1 0.0 8.0 0.0 27.2 16.2 18.1Lane LOS A A D C CApproach Delay (s) 1.5 1.3 17.5 18.1Approach LOS C C
Intersection SummaryAverage Delay 5.2Intersection Capacity Utilization 40.6% ICU Level of Service AAnalysis Period (min) 15
![Page 72: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/72.jpg)
HCM Unsignalized Intersection Capacity Analysis Existing Conditions500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue PM Peak Hour
05/02/2014 Synchro 8 ReportPage 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 2 257 0 3 359 2 3 1 5 3 2 3Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 2 279 0 3 390 2 3 1 5 3 2 3PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 392 279 685 683 279 686 680 390vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 392 279 685 683 279 686 680 390tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 100 100 99 100 99 99 99 100cM capacity (veh/h) 1177 1295 360 373 764 359 374 663
Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1Volume Total 2 279 0 3 390 2 10 9Volume Left 2 0 0 3 0 0 3 3Volume Right 0 0 0 0 0 2 5 3cSH 1177 1700 1700 1295 1700 1700 513 439Volume to Capacity 0.00 0.16 0.00 0.00 0.23 0.00 0.02 0.02Queue Length 95th (m) 0.0 0.0 0.0 0.1 0.0 0.0 0.5 0.5Control Delay (s) 8.1 0.0 0.0 7.8 0.0 0.0 12.2 13.4Lane LOS A A B BApproach Delay (s) 0.1 0.1 12.2 13.4Approach LOS B B
Intersection SummaryAverage Delay 0.4Intersection Capacity Utilization 28.9% ICU Level of Service AAnalysis Period (min) 15
![Page 73: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/73.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Appendices
MMM Group Limited October 2014
Technical Appendix 2
ITE Trip Generation Rates for General Light Industrial (Land Use 110)
![Page 74: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/74.jpg)
• ............ -~-====--------------------
102
General Light Industrial (110)
Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area On a: Weekday
Number of Studies: 18 Average 1000 Sq. Feet GFA: 203
Directional Distribution: 50% entering, 50% exiting
Trip Generation per 1000 Sq. Feet Gross Floor Area
Average Rate Range of Rates Standard Deviation
6.97 1.58 - 16.88 4.24
Data Plot and Equation
7.000 -,-----------------------~---~--__,
'" '0 c: W c. ~ " (j :c: ~ " ~ ~ " f-
6.000
5,000
4,000
3,000
2,000
1,000
o
.... . ... ".- . .. . .. ...... . .. . . . - ,' . .......... . ... .
........... . . . ', - ' - '
if ... .. ~ ..
100 200 300
.r /.
400
.".'f ••
:x
x ... ... .... ' . ........ : . "' -./
"",""
-. /~ ;,.. .. ' ....... - . , . - ...... .
x
. .. - ." . ..... .
.', ..
500 600 700 800
x ~ 1000 Sq. Feet Gross Floor Area
X Actual Data Points --- Fitted Curve - - - - _ . Average Rate
Filled Curve Equation: T = 7.47(X) - 101.92 R2 = 0.81
Trip Generation, 9th Edition. Institute of Transportation Engineers
General Light Industrial (110)
Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area On a: Weekday,
Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m.
Number of Studies: 29 Average 1000 Sq. Feet GFA: 336
Directional Distribution: 88% entering, 12% exiting
Trip Generation per 1000 Sq. Feet Gross Floor Area
Average Rate Range of Rates Standard Deviation
0.92 0.17 4.00 1.07
Data Plot and Equation
'" '0 c: w .9-.= " (j :c: " >
" ~ ~
-0:
" f-
4.000 -,----- --------------------- ------,
x
3,000
2,000
1,000
O ~~-~-~---_,----~----_r----~---~
o 1000 2000 3000
x ~ 1000 Sq. Feet Gross Floor Area
X Actual Data Points --- Fitted Curve - - - - - - Average Rate
Filled Curve Equation: T = 1.18(X) - 89.28 R2 = 0.92
Trip Generation, 9th Edition • Institute of Transportation Engineers 103
![Page 75: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/75.jpg)
104
General Light Industrial (110)
Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area On a: Weekday,
Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m.
Number of Studies: 27 Average 1000 Sq. Feet GFA: 345
Directional Distribution: 12% entering, 88% exiting
Trip Generation per 1000 Sq. Feet Gross Floor Area
Average Rate Range of Rates Standard Deviation
0.97 0.08 4.50 1.16
Data Plot and Equation
U> '0 C
W "-~ " (3 :c ~ " g> (;;
~ " f-
5.000,----------- ----- - --- ----- -------,
x
4,000 ..... - - - - - ...... . .. - - - - - .. ' ..... . . . - . -. - . . _ . - .. . -. - .. .... - - - - . . ..... . - - - - ..... .
3,000 . . . . . . . . . - . - . . . . - . - . . - . . - '
2,000
1.000 .. - - -,.~ - - - ......... - - - ..... . . . . - - . _ .... - . - ... . .
/.' ,
x x x
x
O ~~~~~------_,,_------~------_r--------~----~
o 1000 2000 3000
x = 1000 Sq. Feet Gross Floor Area
X Actual Data Points --- Fitted Curve - - - - - - Average Rate
Fitted Curve Equation : T = 1.43(X) -157.36 R2 = 0.88
Trip Generation, 9th Edition. Institute of Transportation Engineers
General Light Industrial (110)
Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area On a: Weekday,
A.M. Peak Hour of Generator
Number of Studies: 27 Average 1000 Sq. Feet GFA: 358
Directional Distribution: 90% entering, 10% exiting
Trip Generation per 1000 Sq. Feet Gross Floor Area
Average Rate Range of Rates Standard Deviation
1.01 0.27 4.00 1.10
Data Plot and Equation
'" '0 C w .9-,:: " (3 :c " > " Ol
i"
~ " f-
4,000 -,---------------------:----------,
x
3,000
2,000 /~~>/~: ........ . - . ... . . . .. .
1,000 .... ' .".,' -.. x
0 ~2-----~--------,_------~------_r--------~----~
o 1000 2000 3000
x = 1000 Sq. Feet Gross Floor Area
X Actual Data Points --- Fitted Curve - - - - - - Average Rate
Fitted Curve Equation: T = 1.18(X) - 60.80 R2 = 0.92
Trip Generation, 9th Edition. Institute of Transportation Engineers 105
![Page 76: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/76.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Appendices
MMM Group Limited October 2014
Technical Appendix 3
Future (2018) Intersection Capacity Analysis Results for Scenario 1
![Page 77: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/77.jpg)
HCM 2010 Roundabout100: Old Victoria Road & Commissioners Road E & Hamilton Road 12/05/2014
2018-AM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 1
IntersectionIntersection Delay, s/veh 6.8Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 579 621 92 231Demand Flow Rate, veh/h 591 630 95 237Vehicles Circulating, veh/h 165 212 658 457Vehicles Exiting, veh/h 529 541 98 385Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 6.7 7.2 6.0 6.1Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.470 0.530 0.470 0.530 0.474 0.526 0.468 0.532Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 278 313 296 334 45 50 111 126Cap Entry Lane, veh/h 998 1007 964 974 690 713 802 821Entry HV Adj Factor 0.978 0.980 0.987 0.986 0.964 0.978 0.978 0.972Flow Entry, veh/h 272 307 292 329 43 49 109 122Cap Entry, veh/h 977 986 951 961 665 697 784 797V/C Ratio 2.78 0.311 3.07 0.343 0.65 0.070 1.38 0.154Control Delay, s/veh 6.5 6.8 7.0 7.4 6.1 5.9 6.0 6.1LOS A A A A A A A A95th %tile Queue, veh 0.1 1 0.1 2 0.0 0 0.0 1
![Page 78: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/78.jpg)
HCM Unsignalized Intersection Capacity Analysis200: Venture Gate & Hamilton Road 12/05/2014
2018-AM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 2
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (veh/h) 451 40 87 554 17 46Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91Hourly flow rate (vph) 496 44 96 609 19 51PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 540 1296 496vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 540 1296 496tC, single (s) 4.3 6.4 6.6tC, 2 stage (s)tF (s) 2.3 3.5 3.6p0 queue free % 90 89 90cM capacity (veh/h) 962 163 510
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2Volume Total 496 44 96 609 19 51Volume Left 0 0 96 0 19 0Volume Right 0 44 0 0 0 51cSH 1700 1700 962 1700 163 510Volume to Capacity 0.29 0.03 0.10 0.36 0.11 0.10Queue Length 95th (m) 0.0 0.0 2.6 0.0 3.0 2.6Control Delay (s) 0.0 0.0 9.2 0.0 30.0 12.8Lane LOS A D BApproach Delay (s) 0.0 1.2 17.5Approach LOS C
Intersection SummaryAverage Delay 1.6Intersection Capacity Utilization 41.9% ICU Level of Service AAnalysis Period (min) 15
![Page 79: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/79.jpg)
HCM Signalized Intersection Capacity Analysis300: Veterans Memorial Pkwy & Hamilton Road 12/05/2014
2018-AM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 331 115 51 14 316 146 75 1012 12 61 819 250Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3367 1776 1442 1656 1845 1553 1570 3282 1468 1612 3195 1509Flt Permitted 0.95 1.00 1.00 0.68 1.00 1.00 0.23 1.00 1.00 0.15 1.00 1.00Satd. Flow (perm) 3367 1776 1442 1180 1845 1553 387 3282 1468 254 3195 1509Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 360 125 55 15 343 159 82 1100 13 66 890 272RTOR Reduction (vph) 0 0 33 0 0 76 0 0 7 0 0 152Lane Group Flow (vph) 360 125 22 15 343 83 82 1100 6 66 890 120Heavy Vehicles (%) 4% 7% 12% 9% 3% 4% 15% 10% 10% 12% 13% 7%Turn Type Prot NA Perm Perm NA Perm Perm NA Perm Perm NA PermProtected Phases 3 8 4 2 6Permitted Phases 8 4 4 2 2 6 6Actuated Green, G (s) 11.8 34.9 34.9 19.1 19.1 19.1 39.0 39.0 39.0 39.0 39.0 39.0Effective Green, g (s) 11.8 34.9 34.9 19.1 19.1 19.1 39.0 39.0 39.0 39.0 39.0 39.0Actuated g/C Ratio 0.13 0.39 0.39 0.22 0.22 0.22 0.44 0.44 0.44 0.44 0.44 0.44Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 448 700 568 254 398 335 170 1446 646 111 1407 664v/s Ratio Prot c0.11 0.07 c0.19 c0.34 0.28v/s Ratio Perm 0.02 0.01 0.05 0.21 0.00 0.26 0.08v/c Ratio 0.80 0.18 0.04 0.06 0.86 0.25 0.48 0.76 0.01 0.59 0.63 0.18Uniform Delay, d1 37.2 17.5 16.5 27.6 33.4 28.7 17.6 20.8 13.9 18.8 19.2 15.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 10.0 0.1 0.0 0.1 17.2 0.4 9.5 3.8 0.0 21.3 2.2 0.6Delay (s) 47.3 17.6 16.5 27.7 50.6 29.1 27.1 24.6 13.9 40.1 21.4 15.6Level of Service D B B C D C C C B D C BApproach Delay (s) 37.3 43.3 24.7 21.1Approach LOS D D C C
Intersection SummaryHCM 2000 Control Delay 28.1 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.80Actuated Cycle Length (s) 88.5 Sum of lost time (s) 18.6Intersection Capacity Utilization 81.2% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 80: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/80.jpg)
HCM Unsignalized Intersection Capacity Analysis400: Old Victoria Road & Bradley Avenue 12/05/2014
2018-AM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 47 215 7 59 221 19 12 54 69 37 39 26Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 51 234 8 64 240 21 13 59 75 40 42 28PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 261 241 758 729 238 819 722 251vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 261 241 758 729 238 819 722 251tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 96 95 95 82 91 81 87 96cM capacity (veh/h) 1315 1308 264 322 799 216 320 793
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1Volume Total 51 241 64 261 13 134 111Volume Left 51 0 64 0 13 0 40Volume Right 0 8 0 21 0 75 28cSH 1315 1700 1308 1700 264 484 313Volume to Capacity 0.04 0.14 0.05 0.15 0.05 0.28 0.35Queue Length 95th (m) 1.0 0.0 1.2 0.0 1.2 8.9 12.4Control Delay (s) 7.8 0.0 7.9 0.0 19.3 15.3 22.7Lane LOS A A C C CApproach Delay (s) 1.4 1.6 15.6 22.7Approach LOS C C
Intersection SummaryAverage Delay 6.5Intersection Capacity Utilization 42.2% ICU Level of Service AAnalysis Period (min) 15
![Page 81: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/81.jpg)
HCM Unsignalized Intersection Capacity Analysis500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue 12/05/2014
2018-AM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 48 260 15 57 265 55 8 0 30 34 0 27Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 52 283 16 62 288 60 9 0 33 37 0 29PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 348 299 828 859 283 832 815 288vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 348 299 828 859 283 832 815 288tC, single (s) 4.1 4.4 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.5 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 96 94 97 100 96 86 100 96cM capacity (veh/h) 1222 1105 260 268 761 258 284 756
Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1Volume Total 52 283 16 62 288 60 41 66Volume Left 52 0 0 62 0 0 9 37Volume Right 0 0 16 0 0 60 33 29cSH 1222 1700 1700 1105 1700 1700 542 364Volume to Capacity 0.04 0.17 0.01 0.06 0.17 0.04 0.08 0.18Queue Length 95th (m) 1.1 0.0 0.0 1.4 0.0 0.0 2.0 5.3Control Delay (s) 8.1 0.0 0.0 8.5 0.0 0.0 12.2 17.1Lane LOS A A B CApproach Delay (s) 1.2 1.3 12.2 17.1Approach LOS B C
Intersection SummaryAverage Delay 3.0Intersection Capacity Utilization 35.3% ICU Level of Service AAnalysis Period (min) 15
![Page 82: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/82.jpg)
HCM Signalized Intersection Capacity Analysis600: Veterans Memorial Pkwy & Bradley Avenue 12/05/2014
2018-AM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 228 53 42 14 64 106 67 764 23 85 555 244Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 0.91 1.00 1.00 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1626 1827 1495 1357 1666 1656 3164 1736 3167 1404Flt Permitted 0.41 1.00 1.00 0.72 1.00 0.39 1.00 0.27 1.00 1.00Satd. Flow (perm) 703 1827 1495 1026 1666 688 3164 489 3167 1404Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 253 59 47 16 71 118 74 849 26 94 617 271RTOR Reduction (vph) 0 0 32 0 68 0 0 2 0 0 0 134Lane Group Flow (vph) 253 59 15 16 121 0 74 873 0 94 617 137Heavy Vehicles (%) 11% 4% 8% 33% 9% 0% 9% 12% 66% 4% 14% 15%Turn Type pm+pt NA Perm Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 4 8 2 6 6Actuated Green, G (s) 28.2 28.2 28.2 10.7 10.7 44.1 44.1 44.1 44.1 44.1Effective Green, g (s) 28.2 28.2 28.2 10.7 10.7 44.1 44.1 44.1 44.1 44.1Actuated g/C Ratio 0.32 0.32 0.32 0.12 0.12 0.51 0.51 0.51 0.51 0.51Clearance Time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 371 592 484 126 204 348 1603 247 1605 711v/s Ratio Prot c0.11 0.03 0.07 c0.28 0.19v/s Ratio Perm c0.12 0.01 0.02 0.11 0.19 0.10v/c Ratio 0.68 0.10 0.03 0.13 0.59 0.21 0.54 0.38 0.38 0.19Uniform Delay, d1 23.7 20.5 20.1 34.0 36.1 11.9 14.6 13.1 13.1 11.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 5.1 0.1 0.0 0.5 4.5 1.4 1.3 4.4 0.7 0.6Delay (s) 28.8 20.6 20.1 34.4 40.6 13.2 15.9 17.5 13.8 12.3Level of Service C C C C D B B B B BApproach Delay (s) 26.3 40.1 15.7 13.8Approach LOS C D B B
Intersection SummaryHCM 2000 Control Delay 18.5 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.62Actuated Cycle Length (s) 87.0 Sum of lost time (s) 18.7Intersection Capacity Utilization 71.6% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group
![Page 83: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/83.jpg)
HCM Unsignalized Intersection Capacity Analysis700: Bradley Avenue & Bonder Road 12/05/2014
2018-AM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 77 57 27 3 130 8 15 0 1 4 0 42Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 84 62 29 3 141 9 16 0 1 4 0 46PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 150 91 438 401 77 383 411 146vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 150 91 438 401 77 383 411 146tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 94 100 97 100 100 99 100 95cM capacity (veh/h) 1431 1504 479 505 984 548 499 901
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total 84 91 3 150 16 1 4 46Volume Left 84 0 3 0 16 0 4 0Volume Right 0 29 0 9 0 1 0 46cSH 1431 1700 1504 1700 479 984 548 901Volume to Capacity 0.06 0.05 0.00 0.09 0.03 0.00 0.01 0.05Queue Length 95th (m) 1.5 0.0 0.1 0.0 0.8 0.0 0.2 1.3Control Delay (s) 7.7 0.0 7.4 0.0 12.8 8.7 11.6 9.2Lane LOS A A B A B AApproach Delay (s) 3.7 0.2 12.5 9.4Approach LOS B A
Intersection SummaryAverage Delay 3.4Intersection Capacity Utilization 29.1% ICU Level of Service AAnalysis Period (min) 15
![Page 84: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/84.jpg)
HCM 2010 Roundabout100: Old Victoria Road & Commissioners Road E & Hamilton Road 12/05/2014
2018-PM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 1
IntersectionIntersection Delay, s/veh 7.8Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 552 699 134 458Demand Flow Rate, veh/h 556 702 134 458Vehicles Circulating, veh/h 316 242 711 558Vehicles Exiting, veh/h 700 603 161 386Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 7.4 7.9 6.4 8.4Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.469 0.531 0.470 0.530 0.470 0.530 0.469 0.531Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 261 295 330 372 63 71 215 243Cap Entry Lane, veh/h 892 906 942 954 663 687 744 765Entry HV Adj Factor 0.994 0.991 0.996 0.996 1.000 1.000 1.001 0.999Flow Entry, veh/h 259 292 329 370 63 71 215 243Cap Entry, veh/h 886 898 938 950 663 687 744 764V/C Ratio 2.93 0.326 3.50 0.390 0.95 0.103 2.89 0.318Control Delay, s/veh 7.2 7.6 7.6 8.1 6.5 6.4 8.2 8.5LOS A A A A A A A A95th %tile Queue, veh 0.1 1 0.2 2 0.0 0 0.1 1
![Page 85: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/85.jpg)
HCM Unsignalized Intersection Capacity Analysis200: Venture Gate & Hamilton Road 12/05/2014
2018-PM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 2
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (veh/h) 540 11 28 587 56 94Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 600 12 31 652 62 104PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 612 1314 600vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 612 1314 600tC, single (s) 4.4 6.4 6.2tC, 2 stage (s)tF (s) 2.5 3.5 3.3p0 queue free % 96 63 79cM capacity (veh/h) 833 167 501
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2Volume Total 600 12 31 652 62 104Volume Left 0 0 31 0 62 0Volume Right 0 12 0 0 0 104cSH 1700 1700 833 1700 167 501Volume to Capacity 0.35 0.01 0.04 0.38 0.37 0.21Queue Length 95th (m) 0.0 0.0 0.9 0.0 12.7 6.2Control Delay (s) 0.0 0.0 9.5 0.0 38.8 14.1Lane LOS A E BApproach Delay (s) 0.0 0.4 23.3Approach LOS C
Intersection SummaryAverage Delay 2.9Intersection Capacity Utilization 40.9% ICU Level of Service AAnalysis Period (min) 15
![Page 86: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/86.jpg)
HCM Signalized Intersection Capacity Analysis300: Veterans Memorial Pkwy & Hamilton Road 12/05/2014
2018-PM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 288 271 76 14 146 98 46 865 19 149 1256 422Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3242 1863 1553 1671 1827 1568 1626 3252 1615 1770 3438 1583Flt Permitted 0.95 1.00 1.00 0.58 1.00 1.00 0.12 1.00 1.00 0.26 1.00 1.00Satd. Flow (perm) 3242 1863 1553 1024 1827 1568 210 3252 1615 479 3438 1583Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93Adj. Flow (vph) 310 291 82 15 157 105 49 930 20 160 1351 454RTOR Reduction (vph) 0 0 34 0 0 87 0 0 9 0 0 205Lane Group Flow (vph) 310 291 48 15 157 18 49 930 11 160 1351 249Heavy Vehicles (%) 8% 2% 4% 8% 4% 3% 11% 11% 0% 2% 5% 2%Turn Type Prot NA Perm Perm NA Perm Perm NA Perm Perm NA PermProtected Phases 3 8 4 2 6Permitted Phases 8 4 4 2 2 6 6Actuated Green, G (s) 10.8 25.6 25.6 10.8 10.8 10.8 49.0 49.0 49.0 49.0 49.0 49.0Effective Green, g (s) 10.8 25.6 25.6 10.8 10.8 10.8 49.0 49.0 49.0 49.0 49.0 49.0Actuated g/C Ratio 0.12 0.29 0.29 0.12 0.12 0.12 0.55 0.55 0.55 0.55 0.55 0.55Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 392 534 445 123 221 189 115 1786 887 263 1888 869v/s Ratio Prot c0.10 0.16 c0.09 0.29 c0.39v/s Ratio Perm 0.03 0.01 0.01 0.23 0.01 0.33 0.16v/c Ratio 0.79 0.54 0.11 0.12 0.71 0.10 0.43 0.52 0.01 0.61 0.72 0.29Uniform Delay, d1 38.1 26.9 23.4 35.0 37.7 34.9 11.8 12.7 9.1 13.6 14.9 10.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 10.4 1.1 0.1 0.4 10.3 0.2 11.1 1.1 0.0 10.1 2.4 0.8Delay (s) 48.5 28.0 23.5 35.4 48.0 35.1 23.0 13.8 9.1 23.7 17.3 11.6Level of Service D C C D D D C B A C B BApproach Delay (s) 36.8 42.4 14.1 16.5Approach LOS D D B B
Intersection SummaryHCM 2000 Control Delay 21.2 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.73Actuated Cycle Length (s) 89.2 Sum of lost time (s) 18.6Intersection Capacity Utilization 85.0% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group
![Page 87: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/87.jpg)
HCM Unsignalized Intersection Capacity Analysis400: Old Victoria Road & Bradley Avenue 12/05/2014
2018-PM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 58 250 13 86 343 32 13 48 41 13 64 70Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 63 272 14 93 373 35 14 52 45 14 70 76PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 408 286 1076 999 279 1046 989 390vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 408 286 1076 999 279 1046 989 390tC, single (s) 4.1 4.2 7.2 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.3 3.6 4.0 3.3 3.5 4.0 3.3p0 queue free % 95 93 88 76 94 90 68 88cM capacity (veh/h) 1162 1248 115 215 765 145 218 658
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1Volume Total 63 286 93 408 14 97 160Volume Left 63 0 93 0 14 0 14Volume Right 0 14 0 35 0 45 76cSH 1162 1700 1248 1700 115 321 300Volume to Capacity 0.05 0.17 0.07 0.24 0.12 0.30 0.53Queue Length 95th (m) 1.4 0.0 1.9 0.0 3.3 9.9 23.5Control Delay (s) 8.3 0.0 8.1 0.0 40.8 21.0 29.9Lane LOS A A E C DApproach Delay (s) 1.5 1.5 23.5 29.9Approach LOS C D
Intersection SummaryAverage Delay 7.7Intersection Capacity Utilization 48.4% ICU Level of Service AAnalysis Period (min) 15
![Page 88: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/88.jpg)
HCM Unsignalized Intersection Capacity Analysis500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue 12/05/2014
2018-PM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 16 284 5 21 406 20 15 1 52 50 2 39Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 17 309 5 23 441 22 16 1 57 54 2 42PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 463 314 874 852 309 888 836 441vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 463 314 874 852 309 888 836 441tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 98 98 93 100 92 77 99 93cM capacity (veh/h) 1109 1258 246 289 736 239 295 620
Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1Volume Total 17 309 5 23 441 22 74 99Volume Left 17 0 0 23 0 0 16 54Volume Right 0 0 5 0 0 22 57 42cSH 1109 1700 1700 1258 1700 1700 503 327Volume to Capacity 0.02 0.18 0.00 0.02 0.26 0.01 0.15 0.30Queue Length 95th (m) 0.4 0.0 0.0 0.4 0.0 0.0 4.1 10.0Control Delay (s) 8.3 0.0 0.0 7.9 0.0 0.0 13.4 20.7Lane LOS A A B CApproach Delay (s) 0.4 0.4 13.4 20.7Approach LOS B C
Intersection SummaryAverage Delay 3.4Intersection Capacity Utilization 39.4% ICU Level of Service AAnalysis Period (min) 15
![Page 89: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/89.jpg)
HCM Signalized Intersection Capacity Analysis600: Veterans Memorial Pkwy & Bradley Avenue 12/05/2014
2018-PM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 238 91 56 34 92 98 45 593 29 96 941 309Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 0.92 1.00 0.99 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1719 1845 1455 1805 1711 1570 3217 1805 3406 1553Flt Permitted 0.44 1.00 1.00 0.69 1.00 0.20 1.00 0.36 1.00 1.00Satd. Flow (perm) 793 1845 1455 1320 1711 333 3217 690 3406 1553Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Adj. Flow (vph) 251 96 59 36 97 103 47 624 31 101 991 325RTOR Reduction (vph) 0 0 30 0 46 0 0 4 0 0 0 177Lane Group Flow (vph) 251 96 29 36 154 0 47 651 0 101 991 148Heavy Vehicles (%) 5% 3% 11% 0% 3% 2% 15% 12% 0% 0% 6% 4%Turn Type pm+pt NA Perm Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 4 8 2 6 6Actuated Green, G (s) 30.4 30.4 30.4 12.5 12.5 37.5 37.5 37.5 37.5 37.5Effective Green, g (s) 30.4 30.4 30.4 12.5 12.5 37.5 37.5 37.5 37.5 37.5Actuated g/C Ratio 0.37 0.37 0.37 0.15 0.15 0.45 0.45 0.45 0.45 0.45Clearance Time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 447 679 535 199 258 151 1460 313 1546 705v/s Ratio Prot c0.09 0.05 0.09 0.20 c0.29v/s Ratio Perm c0.11 0.02 0.03 0.14 0.15 0.10v/c Ratio 0.56 0.14 0.05 0.18 0.60 0.31 0.45 0.32 0.64 0.21Uniform Delay, d1 19.5 17.4 16.8 30.6 32.7 14.3 15.4 14.4 17.4 13.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.6 0.1 0.0 0.4 3.7 5.3 1.0 2.7 2.1 0.7Delay (s) 21.1 17.5 16.9 31.0 36.4 19.6 16.4 17.1 19.4 14.3Level of Service C B B C D B B B B BApproach Delay (s) 19.7 35.6 16.6 18.1Approach LOS B D B B
Intersection SummaryHCM 2000 Control Delay 19.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.64Actuated Cycle Length (s) 82.6 Sum of lost time (s) 18.7Intersection Capacity Utilization 77.3% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 90: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/90.jpg)
HCM Unsignalized Intersection Capacity Analysis700: Bradley Avenue & Bonder Road 12/05/2014
2018-PM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 25 181 9 1 133 3 24 0 2 7 0 67Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 27 197 10 1 145 3 26 0 2 8 0 73PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 148 207 476 406 202 402 409 146vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 148 207 476 406 202 402 409 146tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 98 100 94 100 100 99 100 92cM capacity (veh/h) 1434 1365 452 524 839 549 521 901
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total 27 207 1 148 26 2 8 73Volume Left 27 0 1 0 26 0 8 0Volume Right 0 10 0 3 0 2 0 73cSH 1434 1700 1365 1700 452 839 549 901Volume to Capacity 0.02 0.12 0.00 0.09 0.06 0.00 0.01 0.08Queue Length 95th (m) 0.5 0.0 0.0 0.0 1.5 0.1 0.3 2.1Control Delay (s) 7.6 0.0 7.6 0.0 13.4 9.3 11.6 9.3Lane LOS A A B A B AApproach Delay (s) 0.9 0.1 13.1 9.6Approach LOS B A
Intersection SummaryAverage Delay 2.8Intersection Capacity Utilization 31.4% ICU Level of Service AAnalysis Period (min) 15
![Page 91: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/91.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Appendices
MMM Group Limited October 2014
Technical Appendix 4
Future (2023) Intersection Capacity Analysis Results for Scenario 1
![Page 92: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/92.jpg)
HCM 2010 Roundabout100: Old Victoria Road & Commissioners Road E & Hamilton Road 12/05/2014
2023 - AM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 1
IntersectionIntersection Delay, s/veh 8.5Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 649 685 121 278Demand Flow Rate, veh/h 715 753 133 305Vehicles Circulating, veh/h 228 254 790 544Vehicles Exiting, veh/h 621 669 152 463Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 8.5 9.0 7.5 7.5Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.470 0.530 0.470 0.530 0.474 0.526 0.469 0.531Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 336 379 354 399 63 70 143 162Cap Entry Lane, veh/h 952 963 934 946 625 650 751 772Entry HV Adj Factor 0.908 0.908 0.909 0.910 0.901 0.915 0.913 0.908Flow Entry, veh/h 305 344 322 363 57 64 130 147Cap Entry, veh/h 865 875 849 860 563 595 686 701V/C Ratio 3.53 0.393 3.79 0.422 1.01 0.108 1.90 0.210Control Delay, s/veh 8.2 8.7 8.7 9.3 7.6 7.3 7.4 7.5LOS A A A A A A A A95th %tile Queue, veh 0.2 2 0.2 2 0.0 0 0.1 1
![Page 93: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/93.jpg)
HCM Signalized Intersection Capacity Analysis200: Venture Gate & Hamilton Road 13/05/2014
2023 - AM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 2
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 501 61 136 602 28 72Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 6.6 6.6 6.6 6.6 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1727 1468 1641 1727 1641 1468Flt Permitted 1.00 1.00 0.44 1.00 0.95 1.00Satd. Flow (perm) 1727 1468 757 1727 1641 1468Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91Adj. Flow (vph) 551 67 149 662 31 79RTOR Reduction (vph) 0 25 0 0 0 70Lane Group Flow (vph) 551 42 149 662 31 9Heavy Vehicles (%) 10% 10% 10% 10% 10% 10%Turn Type NA Perm Perm NA NA PermProtected Phases 2 6 8Permitted Phases 2 6 8Actuated Green, G (s) 29.2 29.2 29.2 29.2 5.5 5.5Effective Green, g (s) 29.2 29.2 29.2 29.2 5.5 5.5Actuated g/C Ratio 0.62 0.62 0.62 0.62 0.12 0.12Clearance Time (s) 6.6 6.6 6.6 6.6 5.7 5.7Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1072 912 470 1072 192 171v/s Ratio Prot 0.32 c0.38 c0.02v/s Ratio Perm 0.03 0.20 0.01v/c Ratio 0.51 0.05 0.32 0.62 0.16 0.05Uniform Delay, d1 5.0 3.5 4.2 5.5 18.7 18.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.0 0.4 1.1 0.4 0.1Delay (s) 5.4 3.5 4.6 6.5 19.1 18.6Level of Service A A A A B BApproach Delay (s) 5.2 6.2 18.7Approach LOS A A B
Intersection SummaryHCM 2000 Control Delay 6.7 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.54Actuated Cycle Length (s) 47.0 Sum of lost time (s) 12.3Intersection Capacity Utilization 55.5% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group
![Page 94: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/94.jpg)
HCM Signalized Intersection Capacity Analysis300: Veterans Memorial Pkwy & Hamilton Road 13/05/2014
2023 - AM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 369 125 79 17 342 156 102 1143 14 66 987 295Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 3282 1468 1641 3282 1468 1641 3282 1468 1641 3195 1468Flt Permitted 0.95 1.00 1.00 0.67 1.00 1.00 0.16 1.00 1.00 0.10 1.00 1.00Satd. Flow (perm) 3183 3282 1468 1150 3282 1468 269 3282 1468 177 3195 1468Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 401 136 86 18 372 170 111 1242 15 72 1073 321RTOR Reduction (vph) 0 0 59 0 0 125 0 0 8 0 0 182Lane Group Flow (vph) 401 136 27 18 372 45 111 1242 7 72 1073 139Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 13% 10%Turn Type Prot NA Perm Perm NA Perm pm+pt NA Perm pm+pt NA PermProtected Phases 3 8 4 5 2 1 6Permitted Phases 8 4 4 2 2 6 6Actuated Green, G (s) 12.0 28.3 28.3 12.3 12.3 12.3 43.1 39.1 39.1 43.1 39.1 39.1Effective Green, g (s) 12.0 28.3 28.3 12.3 12.3 12.3 43.1 39.1 39.1 43.1 39.1 39.1Actuated g/C Ratio 0.13 0.31 0.31 0.14 0.14 0.14 0.48 0.43 0.43 0.48 0.43 0.43Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 424 1032 461 157 448 200 189 1425 637 149 1388 637v/s Ratio Prot c0.13 0.04 c0.11 c0.03 c0.38 0.02 0.34v/s Ratio Perm 0.02 0.02 0.03 0.25 0.00 0.21 0.09v/c Ratio 0.95 0.13 0.06 0.11 0.83 0.22 0.59 0.87 0.01 0.48 0.77 0.22Uniform Delay, d1 38.7 22.1 21.5 34.1 37.8 34.6 15.0 23.2 14.5 16.1 21.7 15.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 30.0 0.1 0.1 0.3 12.3 0.6 4.6 7.6 0.0 2.5 4.2 0.8Delay (s) 68.7 22.1 21.6 34.4 50.2 35.2 19.6 30.7 14.5 18.5 25.9 16.7Level of Service E C C C D D B C B B C BApproach Delay (s) 52.0 45.1 29.7 23.5Approach LOS D D C C
Intersection SummaryHCM 2000 Control Delay 33.0 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.86Actuated Cycle Length (s) 90.0 Sum of lost time (s) 22.6Intersection Capacity Utilization 74.6% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 95: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/95.jpg)
HCM 2010 Roundabout400: Old Victoria Road & Bradley Avenue 13/05/2014
2023 - AM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 4
IntersectionIntersection Delay, s/veh 6.0Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 343 390 193 155Demand Flow Rate, veh/h 377 428 212 170Vehicles Circulating, veh/h 228 154 441 405Vehicles Exiting, veh/h 347 499 164 177Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 6.1 6.0 6.2 5.7Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT R LT TRRT ChannelizedLane Util 0.469 0.531 0.470 0.530 0.443 0.557 0.471 0.529Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 177 200 201 227 94 118 80 90Cap Entry Lane, veh/h 952 963 1007 1014 812 830 834 851Entry HV Adj Factor 0.912 0.910 0.912 0.910 0.913 0.907 0.908 0.910Flow Entry, veh/h 161 182 183 207 86 107 73 82Cap Entry, veh/h 868 876 918 923 741 752 757 775V/C Ratio 1.86 0.208 2.00 0.224 1.16 0.142 0.96 0.106Control Delay, s/veh 6.0 6.2 5.9 6.1 6.1 6.3 5.7 5.7LOS A A A A A A A A95th %tile Queue, veh 0.1 1 0.1 1 0.0 0 0.0 0
![Page 96: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/96.jpg)
HCM Signalized Intersection Capacity Analysis500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue 13/05/2014
2023 - AM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 85 306 27 103 298 101 14 0 55 60 0 47Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 0.89 0.94Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.99 0.97Satd. Flow (prot) 1641 1727 1468 1641 1727 1468 1525 1580Flt Permitted 0.56 1.00 1.00 0.56 1.00 1.00 0.94 0.85Satd. Flow (perm) 975 1727 1468 967 1727 1468 1447 1383Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 92 333 29 112 324 110 15 0 60 65 0 51RTOR Reduction (vph) 0 0 7 0 0 26 0 53 0 0 45 0Lane Group Flow (vph) 92 333 22 112 324 84 0 22 0 0 71 0Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%Turn Type Perm NA Perm Perm NA Perm Perm NA Perm NAProtected Phases 2 6 8 4Permitted Phases 2 2 6 6 8 4Actuated Green, G (s) 51.9 51.9 51.9 51.9 51.9 51.9 7.8 7.8Effective Green, g (s) 51.9 51.9 51.9 51.9 51.9 51.9 7.8 7.8Actuated g/C Ratio 0.77 0.77 0.77 0.77 0.77 0.77 0.12 0.12Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 747 1323 1125 741 1323 1125 166 159v/s Ratio Prot c0.19 0.19v/s Ratio Perm 0.09 0.02 0.12 0.06 0.02 c0.05v/c Ratio 0.12 0.25 0.02 0.15 0.24 0.07 0.13 0.45Uniform Delay, d1 2.0 2.3 1.9 2.1 2.3 2.0 26.9 27.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 0.5 0.0 0.4 0.4 0.1 0.4 2.0Delay (s) 2.4 2.7 1.9 2.5 2.7 2.1 27.3 29.9Level of Service A A A A A A C CApproach Delay (s) 2.6 2.5 27.3 29.9Approach LOS A A C C
Intersection SummaryHCM 2000 Control Delay 6.8 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.28Actuated Cycle Length (s) 67.7 Sum of lost time (s) 8.0Intersection Capacity Utilization 44.7% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group
![Page 97: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/97.jpg)
HCM Signalized Intersection Capacity Analysis600: Veterans Memorial Pkwy & Bradley Avenue 13/05/2014
2023 - AM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 275 88 58 28 89 155 97 831 51 164 600 318Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.7 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 1727 1468 1641 1727 1468 1656 3282 1468 1641 3282 1321Flt Permitted 0.95 1.00 1.00 0.69 1.00 1.00 0.40 1.00 1.00 0.19 1.00 1.00Satd. Flow (perm) 3183 1727 1468 1198 1727 1468 694 3282 1468 335 3282 1321Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 306 98 64 31 99 172 108 923 57 182 667 353RTOR Reduction (vph) 0 0 47 0 0 71 0 0 33 0 0 155Lane Group Flow (vph) 306 98 17 31 99 101 108 923 24 182 667 198Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 9% 10% 10% 10% 10% 10%Parking (#/hr) 0Turn Type Prot NA Perm Perm NA pt+ov Perm NA Perm pm+pt NA PermProtected Phases 7 4 8 8 1 2 1 6Permitted Phases 4 8 2 2 6 6Actuated Green, G (s) 11.6 24.3 24.3 8.7 8.7 24.2 38.2 38.2 38.2 50.0 50.0 50.0Effective Green, g (s) 11.6 24.3 24.3 8.7 8.7 24.2 38.2 38.2 38.2 50.0 50.0 50.0Actuated g/C Ratio 0.13 0.27 0.27 0.10 0.10 0.27 0.43 0.43 0.43 0.56 0.56 0.56Clearance Time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 414 471 400 117 168 399 297 1408 630 302 1843 742v/s Ratio Prot c0.10 0.06 c0.06 0.07 c0.28 c0.05 0.20v/s Ratio Perm 0.01 0.03 0.16 0.02 0.29 0.15v/c Ratio 0.74 0.21 0.04 0.26 0.59 0.25 0.36 0.66 0.04 0.60 0.36 0.27Uniform Delay, d1 37.2 24.9 23.8 37.2 38.4 25.3 17.2 20.2 14.7 11.7 10.7 10.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 6.8 0.2 0.0 1.2 5.2 0.3 3.4 2.4 0.1 3.4 0.6 0.9Delay (s) 44.0 25.2 23.8 38.4 43.6 25.7 20.6 22.6 14.9 15.1 11.3 10.9Level of Service D C C D D C C C B B B BApproach Delay (s) 37.3 32.9 22.0 11.8Approach LOS D C C B
Intersection SummaryHCM 2000 Control Delay 21.4 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.66Actuated Cycle Length (s) 89.0 Sum of lost time (s) 22.7Intersection Capacity Utilization 62.2% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group
![Page 98: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/98.jpg)
HCM Unsignalized Intersection Capacity Analysis700: Bradley Avenue & Bonder Road 13/05/2014
2023 - AM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 145 64 94 9 144 14 51 0 5 8 0 78Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 158 70 102 10 157 15 55 0 5 9 0 85PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 172 172 697 627 121 574 671 164vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 172 172 697 627 121 574 671 164tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 89 99 81 100 99 98 100 90cM capacity (veh/h) 1405 1405 292 353 931 388 333 880
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total 158 172 10 172 55 5 9 85Volume Left 158 0 10 0 55 0 9 0Volume Right 0 102 0 15 0 5 0 85cSH 1405 1700 1405 1700 292 931 388 880Volume to Capacity 0.11 0.10 0.01 0.10 0.19 0.01 0.02 0.10Queue Length 95th (m) 3.0 0.0 0.2 0.0 5.5 0.1 0.5 2.5Control Delay (s) 7.9 0.0 7.6 0.0 20.2 8.9 14.5 9.5Lane LOS A A C A B AApproach Delay (s) 3.8 0.4 19.2 10.0Approach LOS C A
Intersection SummaryAverage Delay 5.1Intersection Capacity Utilization 36.0% ICU Level of Service AAnalysis Period (min) 15
![Page 99: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/99.jpg)
HCM 2010 Roundabout100: Old Victoria Road & Commissioners Road E & Hamilton Road 12/05/2014
2023 - PM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 1
IntersectionIntersection Delay, s/veh 10.4Intersection LOS B
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 602 781 172 500Demand Flow Rate, veh/h 661 859 190 550Vehicles Circulating, veh/h 389 314 845 692Vehicles Exiting, veh/h 853 720 205 481Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 9.5 10.8 8.4 11.6Approach LOS A B A B
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.470 0.530 0.470 0.530 0.468 0.532 0.469 0.531Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 311 350 404 455 89 101 258 292Cap Entry Lane, veh/h 844 861 893 907 600 625 672 696Entry HV Adj Factor 0.909 0.911 0.908 0.910 0.911 0.905 0.911 0.907Flow Entry, veh/h 283 319 367 414 81 91 235 265Cap Entry, veh/h 768 784 811 825 546 566 612 632V/C Ratio 3.68 0.407 4.52 0.502 1.48 0.161 3.84 0.419Control Delay, s/veh 9.2 9.7 10.3 11.2 8.5 8.4 11.4 11.9LOS A A B B A A B B95th %tile Queue, veh 0.2 2 0.2 3 0.1 1 0.2 2
![Page 100: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/100.jpg)
HCM Signalized Intersection Capacity Analysis200: Venture Gate & Hamilton Road 13/05/2014
2023 - PM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 2
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 585 18 43 644 74 138Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 6.6 6.6 6.6 6.6 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1727 1468 1641 1727 1641 1468Flt Permitted 1.00 1.00 0.38 1.00 0.95 1.00Satd. Flow (perm) 1727 1468 664 1727 1641 1468Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91Adj. Flow (vph) 643 20 47 708 81 152RTOR Reduction (vph) 0 5 0 0 0 135Lane Group Flow (vph) 643 15 47 708 81 17Heavy Vehicles (%) 10% 10% 10% 10% 10% 10%Turn Type NA Perm Perm NA NA PermProtected Phases 2 6 8Permitted Phases 2 6 8Actuated Green, G (s) 67.7 67.7 67.7 67.7 10.0 10.0Effective Green, g (s) 67.7 67.7 67.7 67.7 10.0 10.0Actuated g/C Ratio 0.75 0.75 0.75 0.75 0.11 0.11Clearance Time (s) 6.6 6.6 6.6 6.6 5.7 5.7Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1299 1104 499 1299 182 163v/s Ratio Prot 0.37 c0.41 c0.05v/s Ratio Perm 0.01 0.07 0.01v/c Ratio 0.49 0.01 0.09 0.55 0.45 0.10Uniform Delay, d1 4.4 2.8 3.0 4.7 37.4 36.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.4 0.0 0.4 1.6 1.7 0.3Delay (s) 5.8 2.8 3.3 6.3 39.1 36.3Level of Service A A A A D DApproach Delay (s) 5.7 6.1 37.3Approach LOS A A D
Intersection SummaryHCM 2000 Control Delay 10.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.53Actuated Cycle Length (s) 90.0 Sum of lost time (s) 12.3Intersection Capacity Utilization 51.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group
![Page 101: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/101.jpg)
HCM Signalized Intersection Capacity Analysis300: Veterans Memorial Pkwy & Hamilton Road 13/05/2014
2023 - PM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 331 292 99 15 158 105 70 1022 21 160 1381 460Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 3282 1468 1641 3282 1468 1641 3282 1468 1641 3195 1468Flt Permitted 0.95 1.00 1.00 0.57 1.00 1.00 0.09 1.00 1.00 0.14 1.00 1.00Satd. Flow (perm) 3183 3282 1468 987 3282 1468 164 3282 1468 250 3195 1468Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 360 317 108 16 172 114 76 1111 23 174 1501 500RTOR Reduction (vph) 0 0 82 0 0 105 0 0 12 0 0 246Lane Group Flow (vph) 360 317 26 16 172 9 76 1111 11 174 1501 254Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 13% 10%Turn Type Prot NA Perm Perm NA Perm pm+pt NA Perm pm+pt NA PermProtected Phases 3 8 4 5 2 1 6Permitted Phases 8 4 4 2 2 6 6Actuated Green, G (s) 11.0 22.0 22.0 7.0 7.0 7.0 46.2 42.2 42.2 53.8 46.0 46.0Effective Green, g (s) 11.0 22.0 22.0 7.0 7.0 7.0 46.2 42.2 42.2 53.8 46.0 46.0Actuated g/C Ratio 0.12 0.24 0.24 0.08 0.08 0.08 0.51 0.47 0.47 0.59 0.51 0.51Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 386 796 356 76 253 113 148 1528 683 268 1622 745v/s Ratio Prot c0.11 0.10 c0.05 0.02 0.34 c0.06 c0.47v/s Ratio Perm 0.02 0.02 0.01 0.24 0.01 0.33 0.17v/c Ratio 0.93 0.40 0.07 0.21 0.68 0.08 0.51 0.73 0.02 0.65 0.93 0.34Uniform Delay, d1 39.4 28.8 26.4 39.2 40.7 38.8 15.4 19.5 13.0 12.0 20.7 13.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 29.2 0.3 0.1 1.4 7.1 0.3 3.0 3.1 0.0 5.3 10.5 1.2Delay (s) 68.6 29.1 26.5 40.6 47.8 39.1 18.4 22.6 13.1 17.4 31.2 14.5Level of Service E C C D D D B C B B C BApproach Delay (s) 46.9 44.1 22.2 26.3Approach LOS D D C C
Intersection SummaryHCM 2000 Control Delay 30.0 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.91Actuated Cycle Length (s) 90.6 Sum of lost time (s) 22.6Intersection Capacity Utilization 78.1% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 102: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/102.jpg)
HCM 2010 Roundabout400: Old Victoria Road & Bradley Avenue 13/05/2014
2023 - PM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 4
IntersectionIntersection Delay, s/veh 7.0Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 382 607 138 190Demand Flow Rate, veh/h 421 667 152 209Vehicles Circulating, veh/h 254 163 430 620Vehicles Exiting, veh/h 574 419 245 210Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 6.6 7.6 5.7 7.2Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.470 0.530 0.469 0.531 0.467 0.533 0.469 0.531Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 198 223 313 354 71 81 98 111Cap Entry Lane, veh/h 934 946 1000 1008 818 836 710 732Entry HV Adj Factor 0.907 0.908 0.911 0.908 0.911 0.901 0.910 0.906Flow Entry, veh/h 180 203 285 322 65 73 89 101Cap Entry, veh/h 847 859 911 916 746 753 646 663V/C Ratio 2.12 0.236 3.13 0.351 0.87 0.097 1.38 0.152Control Delay, s/veh 6.4 6.7 7.3 7.8 5.7 5.8 7.2 7.2LOS A A A A A A A A95th %tile Queue, veh 0.1 1 0.1 2 0.0 0 0.0 1
![Page 103: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/103.jpg)
HCM Signalized Intersection Capacity Analysis500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue 13/05/2014
2023 - PM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 28 314 9 36 459 35 26 1 94 90 2 71Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 0.89 0.94Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.99 0.97Satd. Flow (prot) 1641 1727 1468 1641 1727 1468 1529 1582Flt Permitted 0.44 1.00 1.00 0.55 1.00 1.00 0.92 0.72Satd. Flow (perm) 768 1727 1468 944 1727 1468 1419 1166Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 30 341 10 39 499 38 28 1 102 98 2 77RTOR Reduction (vph) 0 0 3 0 0 11 0 84 0 0 39 0Lane Group Flow (vph) 30 341 7 39 499 27 0 47 0 0 138 0Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%Turn Type Perm NA Perm Perm NA Perm Perm NA Perm NAProtected Phases 2 6 8 4Permitted Phases 2 2 6 6 8 4Actuated Green, G (s) 53.3 53.3 53.3 53.3 53.3 53.3 12.9 12.9Effective Green, g (s) 53.3 53.3 53.3 53.3 53.3 53.3 12.9 12.9Actuated g/C Ratio 0.72 0.72 0.72 0.72 0.72 0.72 0.17 0.17Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 551 1240 1054 678 1240 1054 246 202v/s Ratio Prot 0.20 c0.29v/s Ratio Perm 0.04 0.00 0.04 0.02 0.03 c0.12v/c Ratio 0.05 0.28 0.01 0.06 0.40 0.03 0.19 0.68Uniform Delay, d1 3.1 3.7 3.0 3.1 4.1 3.0 26.2 28.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.5 0.0 0.2 1.0 0.0 0.4 9.2Delay (s) 3.3 4.2 3.0 3.2 5.1 3.0 26.6 37.9Level of Service A A A A A A C DApproach Delay (s) 4.1 4.9 26.6 37.9Approach LOS A A C D
Intersection SummaryHCM 2000 Control Delay 11.5 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.46Actuated Cycle Length (s) 74.2 Sum of lost time (s) 8.0Intersection Capacity Utilization 52.7% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group
![Page 104: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/104.jpg)
HCM Signalized Intersection Capacity Analysis600: Veterans Memorial Pkwy & Bradley Avenue 13/05/2014
2023 - PM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 304 111 82 58 125 170 58 639 39 129 1017 350Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.7 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 1727 1468 1641 1727 1468 1656 3282 1468 1641 3282 1321Flt Permitted 0.95 1.00 1.00 0.68 1.00 1.00 0.22 1.00 1.00 0.30 1.00 1.00Satd. Flow (perm) 3183 1727 1468 1171 1727 1468 381 3282 1468 512 3282 1321Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 338 123 91 64 139 189 64 710 43 143 1130 389RTOR Reduction (vph) 0 0 64 0 0 83 0 0 24 0 0 179Lane Group Flow (vph) 338 123 27 64 139 106 64 710 19 143 1130 210Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 9% 10% 10% 10% 10% 10%Parking (#/hr) 0Turn Type Prot NA Perm Perm NA pt+ov Perm NA Perm pm+pt NA PermProtected Phases 7 4 8 8 1 2 1 6Permitted Phases 4 8 2 2 6 6Actuated Green, G (s) 11.8 26.3 26.3 10.5 10.5 22.2 40.0 40.0 40.0 48.0 48.0 48.0Effective Green, g (s) 11.8 26.3 26.3 10.5 10.5 22.2 40.0 40.0 40.0 48.0 48.0 48.0Actuated g/C Ratio 0.13 0.30 0.30 0.12 0.12 0.25 0.45 0.45 0.45 0.54 0.54 0.54Clearance Time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 422 510 433 138 203 366 171 1475 659 326 1770 712v/s Ratio Prot c0.11 0.07 c0.08 0.07 0.22 0.02 c0.34v/s Ratio Perm 0.02 0.05 0.17 0.01 0.22 0.16v/c Ratio 0.80 0.24 0.06 0.46 0.68 0.29 0.37 0.48 0.03 0.44 0.64 0.29Uniform Delay, d1 37.5 23.8 22.5 36.6 37.7 27.0 16.2 17.2 13.7 11.0 14.4 11.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 10.5 0.2 0.1 2.5 9.2 0.4 6.2 1.1 0.1 0.9 1.8 1.1Delay (s) 47.9 24.0 22.6 39.1 46.8 27.5 22.4 18.3 13.8 12.0 16.2 12.3Level of Service D C C D D C C B B B B BApproach Delay (s) 38.4 36.2 18.4 14.9Approach LOS D D B B
Intersection SummaryHCM 2000 Control Delay 22.0 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.71Actuated Cycle Length (s) 89.0 Sum of lost time (s) 22.7Intersection Capacity Utilization 70.6% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group
![Page 105: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/105.jpg)
HCM Unsignalized Intersection Capacity Analysis700: Bradley Avenue & Bonder Road 13/05/2014
2023 - PM Condition-35 ac rate Synchro 8 ReportMMM Group Limited Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 48 197 32 3 144 5 82 0 8 13 0 126Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 52 214 35 3 157 5 89 0 9 14 0 137PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 162 249 636 504 232 493 519 159vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 162 249 636 504 232 493 519 159tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 96 100 72 100 99 97 100 85cM capacity (veh/h) 1417 1317 320 452 808 467 443 886
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total 52 249 3 162 89 9 14 137Volume Left 52 0 3 0 89 0 14 0Volume Right 0 35 0 5 0 9 0 137cSH 1417 1700 1317 1700 320 808 467 886Volume to Capacity 0.04 0.15 0.00 0.10 0.28 0.01 0.03 0.15Queue Length 95th (m) 0.9 0.0 0.1 0.0 8.9 0.3 0.7 4.4Control Delay (s) 7.6 0.0 7.7 0.0 20.5 9.5 13.0 9.8Lane LOS A A C A B AApproach Delay (s) 1.3 0.2 19.5 10.1Approach LOS C B
Intersection SummaryAverage Delay 5.4Intersection Capacity Utilization 41.3% ICU Level of Service AAnalysis Period (min) 15
![Page 106: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/106.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Appendices
MMM Group Limited October 2014
Technical Appendix 5
Future (2033) Intersection Capacity Analysis Results for Scenario 1
![Page 107: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/107.jpg)
HCM 2010 Roundabout100: Old Victoria Road & Commissioners Road E & Hamilton Road 14/05/2014
2033 - AM Condition-Full Build-out Synchro 8 ReportMMM Group Limited Page 1
IntersectionIntersection Delay, s/veh 9.8Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 740 772 139 341Demand Flow Rate, veh/h 814 849 153 375Vehicles Circulating, veh/h 291 284 922 610Vehicles Exiting, veh/h 694 791 183 523Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 10.0 10.3 8.5 8.6Approach LOS A B A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.471 0.529 0.470 0.530 0.471 0.529 0.469 0.531Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 383 431 399 450 72 81 176 199Cap Entry Lane, veh/h 908 922 913 926 566 593 715 737Entry HV Adj Factor 0.908 0.910 0.909 0.909 0.909 0.911 0.910 0.908Flow Entry, veh/h 348 392 363 409 65 74 160 181Cap Entry, veh/h 825 839 830 842 514 540 651 669V/C Ratio 4.22 0.468 4.37 0.486 1.27 0.137 2.46 0.270Control Delay, s/veh 9.6 10.3 9.8 10.7 8.7 8.4 8.6 8.7LOS A B A B A A A A95th %tile Queue, veh 0.2 3 0.2 3 0.0 0 0.1 1
![Page 108: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/108.jpg)
HCM Signalized Intersection Capacity Analysis200: Venture Gate & Hamilton Road 14/05/2014
2033 - AM Condition-Full Build-out Synchro 8 ReportMMM Group Limited Page 2
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 593 66 148 681 29 79Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 6.6 6.6 6.6 6.6 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1727 1468 1641 1727 1641 1468Flt Permitted 1.00 1.00 0.37 1.00 0.95 1.00Satd. Flow (perm) 1727 1468 642 1727 1641 1468Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91Adj. Flow (vph) 652 73 163 748 32 87RTOR Reduction (vph) 0 26 0 0 0 77Lane Group Flow (vph) 652 47 163 748 32 10Heavy Vehicles (%) 10% 10% 10% 10% 10% 10%Turn Type NA Perm Perm NA NA PermProtected Phases 2 6 8Permitted Phases 2 6 8Actuated Green, G (s) 32.7 32.7 32.7 32.7 5.6 5.6Effective Green, g (s) 32.7 32.7 32.7 32.7 5.6 5.6Actuated g/C Ratio 0.65 0.65 0.65 0.65 0.11 0.11Clearance Time (s) 6.6 6.6 6.6 6.6 5.7 5.7Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1116 948 414 1116 181 162v/s Ratio Prot 0.38 c0.43 c0.02v/s Ratio Perm 0.03 0.25 0.01v/c Ratio 0.58 0.05 0.39 0.67 0.18 0.06Uniform Delay, d1 5.1 3.3 4.2 5.6 20.4 20.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.8 0.0 0.6 1.6 0.5 0.2Delay (s) 5.9 3.3 4.9 7.2 20.9 20.3Level of Service A A A A C CApproach Delay (s) 5.6 6.8 20.5Approach LOS A A C
Intersection SummaryHCM 2000 Control Delay 7.2 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.60Actuated Cycle Length (s) 50.6 Sum of lost time (s) 12.3Intersection Capacity Utilization 61.0% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group
![Page 109: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/109.jpg)
HCM Signalized Intersection Capacity Analysis300: Veterans Memorial Pkwy & Hamilton Road 14/05/2014
2033 - AM Condition-Full Build-out Synchro 8 ReportMMM Group Limited Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 401 136 135 18 372 170 137 1322 15 71 1218 320Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 3282 1468 1641 3282 1468 1641 3282 1468 1641 3195 1468Flt Permitted 0.95 1.00 1.00 0.66 1.00 1.00 0.10 1.00 1.00 0.10 1.00 1.00Satd. Flow (perm) 3183 3282 1468 1137 3282 1468 173 3282 1468 177 3195 1468Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 436 148 147 20 404 185 149 1437 16 77 1324 348RTOR Reduction (vph) 0 0 97 0 0 127 0 0 9 0 0 197Lane Group Flow (vph) 436 148 50 20 404 58 149 1437 7 77 1324 151Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 13% 10%Turn Type Prot NA Perm Perm NA Perm pm+pt NA Perm pm+pt NA PermProtected Phases 3 8 4 5 2 1 6Permitted Phases 8 4 4 2 2 6 6Actuated Green, G (s) 12.0 27.4 27.4 11.4 11.4 11.4 45.0 40.0 40.0 43.0 39.0 39.0Effective Green, g (s) 12.0 27.4 27.4 11.4 11.4 11.4 45.0 40.0 40.0 43.0 39.0 39.0Actuated g/C Ratio 0.13 0.30 0.30 0.13 0.13 0.13 0.50 0.44 0.44 0.48 0.43 0.43Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 424 999 446 144 415 185 168 1458 652 149 1384 636v/s Ratio Prot c0.14 0.05 c0.12 c0.05 c0.44 0.02 0.41v/s Ratio Perm 0.03 0.02 0.04 0.39 0.00 0.22 0.10v/c Ratio 1.03 0.15 0.11 0.14 0.97 0.32 0.89 0.99 0.01 0.52 0.96 0.24Uniform Delay, d1 39.0 22.8 22.5 34.9 39.1 35.8 17.8 24.7 14.0 17.9 24.7 16.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 51.1 0.1 0.1 0.4 37.0 1.0 38.6 20.4 0.0 3.0 15.8 0.9Delay (s) 90.1 22.9 22.7 35.4 76.1 36.7 56.4 45.1 14.0 20.9 40.5 17.0Level of Service F C C D E D E D B C D BApproach Delay (s) 63.0 62.8 45.8 35.0Approach LOS E E D C
Intersection SummaryHCM 2000 Control Delay 46.7 HCM 2000 Level of Service DHCM 2000 Volume to Capacity ratio 1.00Actuated Cycle Length (s) 90.0 Sum of lost time (s) 22.6Intersection Capacity Utilization 81.8% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 110: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/110.jpg)
HCM 2010 Roundabout400: Old Victoria Road & Bradley Avenue 14/05/2014
2033 - AM Condition-Full Build-out Synchro 8 ReportMMM Group Limited Page 4
IntersectionIntersection Delay, s/veh 6.8Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 407 469 243 183Demand Flow Rate, veh/h 447 516 268 201Vehicles Circulating, veh/h 285 170 533 482Vehicles Exiting, veh/h 398 631 199 204Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 6.9 6.6 7.2 6.3Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT R LT TRRT ChannelizedLane Util 0.470 0.530 0.471 0.529 0.388 0.612 0.468 0.532Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 210 237 243 273 104 164 94 107Cap Entry Lane, veh/h 912 926 995 1003 758 778 787 806Entry HV Adj Factor 0.910 0.909 0.907 0.910 0.906 0.909 0.915 0.907Flow Entry, veh/h 191 216 220 248 94 149 86 97Cap Entry, veh/h 830 842 902 913 686 707 721 731V/C Ratio 2.30 0.256 2.44 0.272 1.37 0.211 1.19 0.133Control Delay, s/veh 6.8 7.0 6.5 6.8 6.8 7.5 6.3 6.3LOS A A A A A A A A95th %tile Queue, veh 0.1 1 0.1 1 0.0 1 0.0 0
![Page 111: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/111.jpg)
HCM Signalized Intersection Capacity Analysis500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue 14/05/2014
2033 - AM Condition-Full Build-out Synchro 8 ReportMMM Group Limited Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 93 406 29 110 365 110 15 0 58 65 0 51Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 0.89 0.94Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.99 0.97Satd. Flow (prot) 1641 1727 1468 1641 1727 1468 1526 1581Flt Permitted 0.52 1.00 1.00 0.49 1.00 1.00 0.93 0.83Satd. Flow (perm) 900 1727 1468 853 1727 1468 1441 1345Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 101 441 32 120 397 120 16 0 63 71 0 55RTOR Reduction (vph) 0 0 7 0 0 28 0 55 0 0 41 0Lane Group Flow (vph) 101 441 25 120 397 92 0 24 0 0 85 0Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%Turn Type Perm NA Perm Perm NA Perm Perm NA Perm NAProtected Phases 2 6 8 4Permitted Phases 2 2 6 6 8 4Actuated Green, G (s) 55.4 55.4 55.4 55.4 55.4 55.4 8.7 8.7Effective Green, g (s) 55.4 55.4 55.4 55.4 55.4 55.4 8.7 8.7Actuated g/C Ratio 0.77 0.77 0.77 0.77 0.77 0.77 0.12 0.12Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 691 1326 1127 655 1326 1127 173 162v/s Ratio Prot c0.26 0.23v/s Ratio Perm 0.11 0.02 0.14 0.06 0.02 c0.06v/c Ratio 0.15 0.33 0.02 0.18 0.30 0.08 0.14 0.52Uniform Delay, d1 2.2 2.6 2.0 2.3 2.5 2.1 28.3 29.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.7 0.0 0.6 0.6 0.1 0.4 3.0Delay (s) 2.6 3.3 2.0 2.9 3.1 2.2 28.7 32.8Level of Service A A A A A A C CApproach Delay (s) 3.1 2.9 28.7 32.8Approach LOS A A C C
Intersection SummaryHCM 2000 Control Delay 7.1 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.36Actuated Cycle Length (s) 72.1 Sum of lost time (s) 8.0Intersection Capacity Utilization 50.9% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group
![Page 112: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/112.jpg)
HCM Signalized Intersection Capacity Analysis600: Veterans Memorial Pkwy & Bradley Avenue 14/05/2014
2033 - AM Condition-Full Build-out Synchro 8 ReportMMM Group Limited Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 297 169 63 68 138 274 104 902 122 375 653 343Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.7 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.97 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 1727 1468 1641 1727 1468 1656 3282 1468 3183 3282 1321Flt Permitted 0.95 1.00 1.00 0.64 1.00 1.00 0.38 1.00 1.00 0.95 1.00 1.00Satd. Flow (perm) 3183 1727 1468 1104 1727 1468 655 3282 1468 3183 3282 1321Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 330 188 70 76 153 304 116 1002 136 417 726 381RTOR Reduction (vph) 0 0 51 0 0 65 0 0 83 0 0 164Lane Group Flow (vph) 330 188 19 76 153 239 116 1002 53 417 726 217Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 9% 10% 10% 10% 10% 10%Parking (#/hr) 0Turn Type Prot NA Perm Perm NA pt+ov Perm NA Perm Prot NA PermProtected Phases 7 4 8 8 1 2 1 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 10.0 24.0 24.0 10.0 10.0 29.7 35.0 35.0 35.0 12.0 51.0 51.0Effective Green, g (s) 10.0 24.0 24.0 10.0 10.0 29.7 35.0 35.0 35.0 12.0 51.0 51.0Actuated g/C Ratio 0.11 0.27 0.27 0.11 0.11 0.33 0.39 0.39 0.39 0.13 0.57 0.57Clearance Time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 354 462 392 123 192 486 255 1280 572 425 1866 751v/s Ratio Prot c0.10 0.11 c0.09 0.16 c0.31 c0.13 0.22v/s Ratio Perm 0.01 0.07 0.18 0.04 0.16v/c Ratio 0.93 0.41 0.05 0.62 0.80 0.49 0.45 0.78 0.09 0.98 0.39 0.29Uniform Delay, d1 39.5 27.0 24.4 38.0 38.9 24.0 20.3 24.0 17.3 38.7 10.7 10.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 30.9 0.6 0.1 8.9 20.1 0.8 5.8 4.8 0.3 38.5 0.6 1.0Delay (s) 70.4 27.6 24.4 46.9 58.9 24.8 26.0 28.8 17.6 77.3 11.3 11.0Level of Service E C C D E C C C B E B BApproach Delay (s) 51.2 37.7 27.4 29.3Approach LOS D D C C
Intersection SummaryHCM 2000 Control Delay 33.1 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.84Actuated Cycle Length (s) 89.7 Sum of lost time (s) 22.7Intersection Capacity Utilization 72.4% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group
![Page 113: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/113.jpg)
HCM Signalized Intersection Capacity Analysis700: Bradley Avenue & Bonder Road 14/05/2014
2033 - AM Condition-Full Build-out Synchro 8 ReportMMM Group Limited Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 241 70 356 35 157 24 192 0 19 13 0 130Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.87 1.00 0.98 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1770 1629 1770 1826 1770 1583 1770 1583Flt Permitted 0.63 1.00 0.42 1.00 0.67 1.00 0.74 1.00Satd. Flow (perm) 1181 1629 774 1826 1243 1583 1385 1583Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 262 76 387 38 171 26 209 0 21 14 0 141RTOR Reduction (vph) 0 218 0 0 8 0 0 14 0 0 96 0Lane Group Flow (vph) 262 245 0 38 189 0 209 7 0 14 45 0Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 17.7 17.7 17.7 17.7 12.8 12.8 12.8 12.8Effective Green, g (s) 17.7 17.7 17.7 17.7 12.8 12.8 12.8 12.8Actuated g/C Ratio 0.44 0.44 0.44 0.44 0.32 0.32 0.32 0.32Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 516 711 338 798 392 500 437 500v/s Ratio Prot 0.15 0.10 0.00 0.03v/s Ratio Perm c0.22 0.05 c0.17 0.01v/c Ratio 0.51 0.34 0.11 0.24 0.53 0.01 0.03 0.09Uniform Delay, d1 8.2 7.6 6.7 7.2 11.4 9.5 9.6 9.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.8 0.3 0.1 0.2 1.4 0.0 0.0 0.1Delay (s) 9.0 7.8 6.9 7.3 12.8 9.5 9.6 9.8Level of Service A A A A B A A AApproach Delay (s) 8.3 7.2 12.5 9.8Approach LOS A A B A
Intersection SummaryHCM 2000 Control Delay 9.0 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.52Actuated Cycle Length (s) 40.5 Sum of lost time (s) 10.0Intersection Capacity Utilization 64.3% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group
![Page 114: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/114.jpg)
HCM 2010 Roundabout100: Old Victoria Road & Commissioners Road E & Hamilton Road 12/05/2014
2033 - PM Condition-Full Build-out Synchro 8 ReportMMM Group Limited Page 1
IntersectionIntersection Delay, s/veh 12.4Intersection LOS B
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 669 896 201 556Demand Flow Rate, veh/h 735 985 221 611Vehicles Circulating, veh/h 435 357 940 781Vehicles Exiting, veh/h 957 804 230 561Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 10.9 13.1 9.5 14.0Approach LOS B B A B
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.469 0.531 0.470 0.530 0.471 0.529 0.470 0.530Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 345 390 463 522 104 117 287 324Cap Entry Lane, veh/h 815 833 865 880 558 585 629 654Entry HV Adj Factor 0.911 0.909 0.909 0.909 0.910 0.912 0.910 0.909Flow Entry, veh/h 314 355 421 475 95 107 261 295Cap Entry, veh/h 743 758 786 800 508 534 572 595V/C Ratio 4.23 0.468 5.36 0.593 1.86 0.200 4.56 0.495Control Delay, s/veh 10.5 11.2 12.4 13.8 9.6 9.4 13.7 14.3LOS B B B B A A B B95th %tile Queue, veh 0.2 3 0.3 4 0.1 1 0.2 3
![Page 115: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/115.jpg)
HCM Signalized Intersection Capacity Analysis200: Venture Gate & Hamilton Road 14/05/2014
2033 - PM Condition-Full Build-out Synchro 8 ReportMMM Group Limited Page 2
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 652 20 48 742 81 150Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 6.6 6.6 6.6 6.6 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1727 1468 1641 1727 1641 1468Flt Permitted 1.00 1.00 0.34 1.00 0.95 1.00Satd. Flow (perm) 1727 1468 594 1727 1641 1468Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91Adj. Flow (vph) 716 22 53 815 89 165RTOR Reduction (vph) 0 6 0 0 0 146Lane Group Flow (vph) 716 16 53 815 89 19Heavy Vehicles (%) 10% 10% 10% 10% 10% 10%Turn Type NA Perm Perm NA NA PermProtected Phases 2 6 8Permitted Phases 2 6 8Actuated Green, G (s) 67.3 67.3 67.3 67.3 10.4 10.4Effective Green, g (s) 67.3 67.3 67.3 67.3 10.4 10.4Actuated g/C Ratio 0.75 0.75 0.75 0.75 0.12 0.12Clearance Time (s) 6.6 6.6 6.6 6.6 5.7 5.7Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1291 1097 444 1291 189 169v/s Ratio Prot 0.41 c0.47 c0.05v/s Ratio Perm 0.01 0.09 0.01v/c Ratio 0.55 0.01 0.12 0.63 0.47 0.11Uniform Delay, d1 4.9 2.9 3.1 5.4 37.2 35.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.7 0.0 0.5 2.4 1.9 0.3Delay (s) 6.6 2.9 3.7 7.8 39.1 36.0Level of Service A A A A D DApproach Delay (s) 6.5 7.5 37.1Approach LOS A A D
Intersection SummaryHCM 2000 Control Delay 11.2 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.61Actuated Cycle Length (s) 90.0 Sum of lost time (s) 12.3Intersection Capacity Utilization 56.0% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group
![Page 116: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/116.jpg)
HCM Signalized Intersection Capacity Analysis300: Veterans Memorial Pkwy & Hamilton Road 14/05/2014
2033 - PM Condition-Full Build-out Synchro 8 ReportMMM Group Limited Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 360 318 124 16 172 114 117 1238 24 174 1551 501Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 3282 1468 1641 3282 1468 1641 3282 1468 1641 3195 1468Flt Permitted 0.95 1.00 1.00 0.57 1.00 1.00 0.09 1.00 1.00 0.09 1.00 1.00Satd. Flow (perm) 3183 3282 1468 987 3282 1468 159 3282 1468 159 3195 1468Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 391 346 135 17 187 124 127 1346 26 189 1686 545RTOR Reduction (vph) 0 0 92 0 0 114 0 0 13 0 0 276Lane Group Flow (vph) 391 346 43 17 187 10 127 1346 13 189 1686 269Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 13% 10%Turn Type Prot NA Perm Perm NA Perm pm+pt NA Perm pm+pt NA PermProtected Phases 3 8 4 5 2 1 6Permitted Phases 8 4 4 2 2 6 6Actuated Green, G (s) 11.0 22.0 22.0 7.0 7.0 7.0 48.4 43.4 43.4 50.4 44.4 44.4Effective Green, g (s) 11.0 22.0 22.0 7.0 7.0 7.0 48.4 43.4 43.4 50.4 44.4 44.4Actuated g/C Ratio 0.12 0.24 0.24 0.08 0.08 0.08 0.54 0.48 0.48 0.56 0.49 0.49Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 389 802 358 76 255 114 167 1582 707 187 1576 724v/s Ratio Prot c0.12 0.11 c0.06 0.04 0.41 c0.07 c0.53v/s Ratio Perm 0.03 0.02 0.01 0.36 0.01 0.50 0.18v/c Ratio 1.01 0.43 0.12 0.22 0.73 0.08 0.76 0.85 0.02 1.01 1.07 0.37Uniform Delay, d1 39.5 28.7 26.5 38.9 40.6 38.5 18.9 20.5 12.2 19.9 22.8 14.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 46.9 0.4 0.2 1.5 10.4 0.3 18.3 6.0 0.0 68.6 43.9 1.5Delay (s) 86.4 29.1 26.6 40.4 51.0 38.8 37.1 26.4 12.2 88.5 66.7 15.6Level of Service F C C D D D D C B F E BApproach Delay (s) 54.4 45.8 27.1 56.9Approach LOS D D C E
Intersection SummaryHCM 2000 Control Delay 47.0 HCM 2000 Level of Service DHCM 2000 Volume to Capacity ratio 1.03Actuated Cycle Length (s) 90.0 Sum of lost time (s) 22.6Intersection Capacity Utilization 85.8% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group
![Page 117: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/117.jpg)
HCM 2010 Roundabout400: Old Victoria Road & Bradley Avenue 14/05/2014
2033 - PM Condition-Full Build-out Synchro 8 ReportMMM Group Limited Page 4
IntersectionIntersection Delay, s/veh 7.9Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 426 728 158 210Demand Flow Rate, veh/h 468 801 174 231Vehicles Circulating, veh/h 313 176 485 736Vehicles Exiting, veh/h 654 483 296 241Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 7.2 8.7 6.1 8.1Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.470 0.530 0.469 0.531 0.471 0.529 0.472 0.528Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 220 248 376 425 82 92 109 122Cap Entry Lane, veh/h 894 908 990 999 785 805 651 675Entry HV Adj Factor 0.909 0.909 0.910 0.908 0.907 0.911 0.906 0.913Flow Entry, veh/h 200 226 342 386 74 84 99 111Cap Entry, veh/h 812 825 901 907 712 733 589 616V/C Ratio 2.46 0.273 3.80 0.425 1.04 0.114 1.68 0.181Control Delay, s/veh 7.1 7.4 8.3 9.0 6.2 6.1 8.2 8.0LOS A A A A A A A A95th %tile Queue, veh 0.1 1 0.2 2 0.0 0 0.1 1
![Page 118: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/118.jpg)
HCM Signalized Intersection Capacity Analysis500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue 14/05/2014
2033 - PM Condition-Full Build-out Synchro 8 ReportMMM Group Limited Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 31 365 9 39 563 40 28 1 99 99 3 78Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 0.90 0.94Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.99 0.97Satd. Flow (prot) 1641 1727 1468 1641 1727 1468 1530 1583Flt Permitted 0.37 1.00 1.00 0.50 1.00 1.00 0.91 0.70Satd. Flow (perm) 643 1727 1468 871 1727 1468 1410 1138Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 34 397 10 42 612 43 30 1 108 108 3 85RTOR Reduction (vph) 0 0 3 0 0 12 0 87 0 0 36 0Lane Group Flow (vph) 34 397 7 42 612 31 0 52 0 0 160 0Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%Turn Type Perm NA Perm Perm NA Perm Perm NA Perm NAProtected Phases 2 6 8 4Permitted Phases 2 2 6 6 8 4Actuated Green, G (s) 56.8 56.8 56.8 56.8 56.8 56.8 15.2 15.2Effective Green, g (s) 56.8 56.8 56.8 56.8 56.8 56.8 15.2 15.2Actuated g/C Ratio 0.71 0.71 0.71 0.71 0.71 0.71 0.19 0.19Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 456 1226 1042 618 1226 1042 267 216v/s Ratio Prot 0.23 c0.35v/s Ratio Perm 0.05 0.00 0.05 0.02 0.04 c0.14v/c Ratio 0.07 0.32 0.01 0.07 0.50 0.03 0.19 0.74Uniform Delay, d1 3.6 4.4 3.4 3.5 5.2 3.4 27.2 30.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 0.7 0.0 0.2 1.5 0.1 0.4 12.9Delay (s) 3.9 5.1 3.4 3.7 6.7 3.5 27.6 43.4Level of Service A A A A A A C DApproach Delay (s) 4.9 6.3 27.6 43.4Approach LOS A A C D
Intersection SummaryHCM 2000 Control Delay 12.8 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.55Actuated Cycle Length (s) 80.0 Sum of lost time (s) 8.0Intersection Capacity Utilization 56.2% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group
![Page 119: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/119.jpg)
HCM Signalized Intersection Capacity Analysis600: Veterans Memorial Pkwy & Bradley Avenue 14/05/2014
2033 - PM Condition-Full Build-out Synchro 8 ReportMMM Group Limited Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 328 146 88 122 199 357 61 694 64 205 1106 380Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.7 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.97 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 1727 1468 1641 1727 1468 1656 3282 1468 3183 3282 1321Flt Permitted 0.95 1.00 1.00 0.65 1.00 1.00 0.18 1.00 1.00 0.95 1.00 1.00Satd. Flow (perm) 3183 1727 1468 1130 1727 1468 322 3282 1468 3183 3282 1321Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 364 162 98 136 221 397 68 771 71 228 1229 422RTOR Reduction (vph) 0 0 65 0 0 66 0 0 43 0 0 206Lane Group Flow (vph) 364 162 33 136 221 331 68 771 28 228 1229 216Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 9% 10% 10% 10% 10% 10%Parking (#/hr) 0Turn Type Prot NA Perm Perm NA pt+ov Perm NA Perm Prot NA PermProtected Phases 7 4 8 8 1 2 1 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 11.0 29.3 29.3 14.3 14.3 29.0 35.0 35.0 35.0 7.0 46.0 46.0Effective Green, g (s) 11.0 29.3 29.3 14.3 14.3 29.0 35.0 35.0 35.0 7.0 46.0 46.0Actuated g/C Ratio 0.12 0.33 0.33 0.16 0.16 0.32 0.39 0.39 0.39 0.08 0.51 0.51Clearance Time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 389 562 477 179 274 473 125 1276 570 247 1677 675v/s Ratio Prot c0.11 0.09 0.13 c0.23 0.23 0.07 c0.37v/s Ratio Perm 0.02 0.12 0.21 0.02 0.16v/c Ratio 0.94 0.29 0.07 0.76 0.81 0.70 0.54 0.60 0.05 0.92 0.73 0.32Uniform Delay, d1 39.1 22.6 20.9 36.2 36.5 26.7 21.3 22.0 17.1 41.2 17.2 12.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 29.6 0.3 0.1 16.8 15.8 4.6 15.9 2.1 0.2 36.9 2.9 1.2Delay (s) 68.7 22.9 21.0 53.0 52.3 31.3 37.3 24.1 17.3 78.1 20.1 14.1Level of Service E C C D D C D C B E C BApproach Delay (s) 49.3 41.4 24.5 25.8Approach LOS D D C C
Intersection SummaryHCM 2000 Control Delay 31.9 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.86Actuated Cycle Length (s) 90.0 Sum of lost time (s) 22.7Intersection Capacity Utilization 77.7% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 120: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/120.jpg)
HCM Signalized Intersection Capacity Analysis700: Bradley Avenue & Bonder Road 14/05/2014
2033 - PM Condition-Full Build-out Synchro 8 ReportMMM Group Limited Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 81 216 118 12 157 8 310 0 31 21 0 211Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.95 1.00 0.99 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1770 1764 1770 1849 1770 1583 1770 1583Flt Permitted 0.64 1.00 0.46 1.00 0.62 1.00 0.73 1.00Satd. Flow (perm) 1199 1764 860 1849 1147 1583 1369 1583Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 88 235 128 13 171 9 337 0 34 23 0 229RTOR Reduction (vph) 0 31 0 0 3 0 0 19 0 0 130 0Lane Group Flow (vph) 88 332 0 13 177 0 337 15 0 23 99 0Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 14.4 14.4 14.4 14.4 18.5 18.5 18.5 18.5Effective Green, g (s) 14.4 14.4 14.4 14.4 18.5 18.5 18.5 18.5Actuated g/C Ratio 0.34 0.34 0.34 0.34 0.43 0.43 0.43 0.43Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 402 592 288 620 494 682 590 682v/s Ratio Prot c0.19 0.10 0.01 0.06v/s Ratio Perm 0.07 0.02 c0.29 0.02v/c Ratio 0.22 0.56 0.05 0.29 0.68 0.02 0.04 0.14Uniform Delay, d1 10.2 11.7 9.6 10.5 9.8 7.0 7.1 7.4Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 1.2 0.1 0.3 3.9 0.0 0.0 0.1Delay (s) 10.5 12.9 9.7 10.7 13.7 7.0 7.1 7.5Level of Service B B A B B A A AApproach Delay (s) 12.4 10.7 13.1 7.5Approach LOS B B B A
Intersection SummaryHCM 2000 Control Delay 11.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.63Actuated Cycle Length (s) 42.9 Sum of lost time (s) 10.0Intersection Capacity Utilization 68.8% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group
![Page 121: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/121.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Appendices
MMM Group Limited October 2014
Technical Appendix 6
Future (2018) Intersection Capacity Analysis Results for Scenario 2
![Page 122: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/122.jpg)
HCM 2010 Roundabout100: Old Victoria Road & Commissioners Road E & Hamilton Road 12/05/2014
2018-AM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 1
IntersectionIntersection Delay, s/veh 6.8Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 589 626 99 240Demand Flow Rate, veh/h 601 635 102 246Vehicles Circulating, veh/h 175 217 666 461Vehicles Exiting, veh/h 532 551 110 391Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 6.8 7.3 6.1 6.1Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.469 0.531 0.469 0.531 0.471 0.529 0.472 0.528Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 282 319 298 337 48 54 116 130Cap Entry Lane, veh/h 991 1000 960 971 686 709 800 818Entry HV Adj Factor 0.981 0.978 0.988 0.985 0.971 0.973 0.972 0.978Flow Entry, veh/h 277 312 294 332 47 53 113 127Cap Entry, veh/h 972 978 949 956 666 690 778 801V/C Ratio 2.85 0.319 3.10 0.347 0.70 0.076 1.45 0.159Control Delay, s/veh 6.6 7.0 7.0 7.5 6.2 6.0 6.1 6.1LOS A A A A A A A A95th %tile Queue, veh 0.1 1 0.1 2 0.0 0 0.1 1
![Page 123: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/123.jpg)
HCM Unsignalized Intersection Capacity Analysis200: Venture Gate & Hamilton Road 12/05/2014
2018-AM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 2
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (veh/h) 455 46 102 557 20 54Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91Hourly flow rate (vph) 500 51 112 612 22 59PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 551 1336 500vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 551 1336 500tC, single (s) 4.3 6.4 6.6tC, 2 stage (s)tF (s) 2.3 3.5 3.6p0 queue free % 88 85 88cM capacity (veh/h) 953 151 507
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2Volume Total 500 51 112 612 22 59Volume Left 0 0 112 0 22 0Volume Right 0 51 0 0 0 59cSH 1700 1700 953 1700 151 507Volume to Capacity 0.29 0.03 0.12 0.36 0.15 0.12Queue Length 95th (m) 0.0 0.0 3.2 0.0 4.0 3.2Control Delay (s) 0.0 0.0 9.3 0.0 32.9 13.0Lane LOS A D BApproach Delay (s) 0.0 1.4 18.4Approach LOS C
Intersection SummaryAverage Delay 1.9Intersection Capacity Utilization 42.9% ICU Level of Service AAnalysis Period (min) 15
![Page 124: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/124.jpg)
HCM Signalized Intersection Capacity Analysis300: Veterans Memorial Pkwy & Hamilton Road 12/05/2014
2018-AM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 337 116 58 15 317 146 83 1032 12 61 852 260Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3367 1776 1442 1656 1845 1553 1570 3282 1468 1612 3195 1509Flt Permitted 0.95 1.00 1.00 0.68 1.00 1.00 0.22 1.00 1.00 0.14 1.00 1.00Satd. Flow (perm) 3367 1776 1442 1179 1845 1553 360 3282 1468 240 3195 1509Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 366 126 63 16 345 159 90 1122 13 66 926 283RTOR Reduction (vph) 0 0 38 0 0 76 0 0 7 0 0 158Lane Group Flow (vph) 366 126 25 16 345 83 90 1122 6 66 926 125Heavy Vehicles (%) 4% 7% 12% 9% 3% 4% 15% 10% 10% 12% 13% 7%Turn Type Prot NA Perm Perm NA Perm Perm NA Perm Perm NA PermProtected Phases 3 8 4 2 6Permitted Phases 8 4 4 2 2 6 6Actuated Green, G (s) 11.8 35.0 35.0 19.2 19.2 19.2 39.0 39.0 39.0 39.0 39.0 39.0Effective Green, g (s) 11.8 35.0 35.0 19.2 19.2 19.2 39.0 39.0 39.0 39.0 39.0 39.0Actuated g/C Ratio 0.13 0.40 0.40 0.22 0.22 0.22 0.44 0.44 0.44 0.44 0.44 0.44Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 448 701 569 255 399 336 158 1444 646 105 1406 664v/s Ratio Prot c0.11 0.07 c0.19 c0.34 0.29v/s Ratio Perm 0.02 0.01 0.05 0.25 0.00 0.27 0.08v/c Ratio 0.82 0.18 0.04 0.06 0.86 0.25 0.57 0.78 0.01 0.63 0.66 0.19Uniform Delay, d1 37.3 17.5 16.5 27.6 33.4 28.7 18.5 21.1 13.9 19.2 19.6 15.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 11.0 0.1 0.0 0.1 17.4 0.4 14.1 4.2 0.0 25.2 2.4 0.6Delay (s) 48.4 17.6 16.5 27.7 50.8 29.1 32.6 25.3 14.0 44.4 22.0 15.8Level of Service D B B C D C C C B D C BApproach Delay (s) 37.8 43.5 25.7 21.8Approach LOS D D C C
Intersection SummaryHCM 2000 Control Delay 28.8 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.81Actuated Cycle Length (s) 88.6 Sum of lost time (s) 18.6Intersection Capacity Utilization 82.0% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 125: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/125.jpg)
HCM Unsignalized Intersection Capacity Analysis400: Old Victoria Road & Bradley Avenue 12/05/2014
2018-AM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 47 222 8 63 225 22 12 57 76 46 42 26Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 51 241 9 68 245 24 13 62 83 50 46 28PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 268 250 780 753 246 851 746 257vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 268 250 780 753 246 851 746 257tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 96 95 95 80 90 75 85 96cM capacity (veh/h) 1307 1298 251 310 791 200 309 787
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1Volume Total 51 250 68 268 13 145 124Volume Left 51 0 68 0 13 0 50Volume Right 0 9 0 24 0 83 28cSH 1307 1700 1298 1700 251 475 286Volume to Capacity 0.04 0.15 0.05 0.16 0.05 0.30 0.43Queue Length 95th (m) 1.0 0.0 1.3 0.0 1.3 10.2 16.7Control Delay (s) 7.9 0.0 7.9 0.0 20.1 15.8 26.9Lane LOS A A C C DApproach Delay (s) 1.3 1.6 16.2 26.9Approach LOS C D
Intersection SummaryAverage Delay 7.4Intersection Capacity Utilization 43.8% ICU Level of Service AAnalysis Period (min) 15
![Page 126: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/126.jpg)
HCM Unsignalized Intersection Capacity Analysis500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue 12/05/2014
2018-AM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 59 267 19 72 269 70 10 0 38 42 0 33Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 64 290 21 78 292 76 11 0 41 46 0 36PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 368 311 903 943 290 909 888 292vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 368 311 903 943 290 909 888 292tC, single (s) 4.1 4.4 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.5 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 95 93 95 100 95 79 100 95cM capacity (veh/h) 1201 1093 225 232 754 221 250 752
Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1Volume Total 64 290 21 78 292 76 52 82Volume Left 64 0 0 78 0 0 11 46Volume Right 0 0 21 0 0 76 41 36cSH 1201 1700 1700 1093 1700 1700 506 321Volume to Capacity 0.05 0.17 0.01 0.07 0.17 0.04 0.10 0.25Queue Length 95th (m) 1.4 0.0 0.0 1.8 0.0 0.0 2.7 7.9Control Delay (s) 8.2 0.0 0.0 8.5 0.0 0.0 12.9 20.0Lane LOS A A B CApproach Delay (s) 1.4 1.5 12.9 20.0Approach LOS B C
Intersection SummaryAverage Delay 3.7Intersection Capacity Utilization 37.9% ICU Level of Service AAnalysis Period (min) 15
![Page 127: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/127.jpg)
HCM Signalized Intersection Capacity Analysis600: Veterans Memorial Pkwy & Bradley Avenue 12/05/2014
2018-AM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 239 61 48 18 70 116 77 769 30 102 558 264Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 0.91 1.00 0.99 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1626 1827 1495 1357 1666 1656 3149 1736 3167 1404Flt Permitted 0.37 1.00 1.00 0.71 1.00 0.39 1.00 0.26 1.00 1.00Satd. Flow (perm) 632 1827 1495 1018 1666 684 3149 477 3167 1404Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 266 68 53 20 78 129 86 854 33 113 620 293RTOR Reduction (vph) 0 0 36 0 68 0 0 3 0 0 0 145Lane Group Flow (vph) 266 68 17 20 139 0 86 884 0 113 620 148Heavy Vehicles (%) 11% 4% 8% 33% 9% 0% 9% 12% 66% 4% 14% 15%Turn Type pm+pt NA Perm Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 4 8 2 6 6Actuated Green, G (s) 28.7 28.7 28.7 11.1 11.1 44.1 44.1 44.1 44.1 44.1Effective Green, g (s) 28.7 28.7 28.7 11.1 11.1 44.1 44.1 44.1 44.1 44.1Actuated g/C Ratio 0.33 0.33 0.33 0.13 0.13 0.50 0.50 0.50 0.50 0.50Clearance Time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 361 599 490 129 211 344 1587 240 1596 707v/s Ratio Prot c0.11 0.04 0.08 c0.28 0.20v/s Ratio Perm c0.13 0.01 0.02 0.13 0.24 0.11v/c Ratio 0.74 0.11 0.04 0.16 0.66 0.25 0.56 0.47 0.39 0.21Uniform Delay, d1 23.9 20.5 20.0 34.0 36.4 12.3 15.0 14.1 13.4 12.0Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 7.6 0.1 0.0 0.6 7.2 1.7 1.4 6.5 0.7 0.7Delay (s) 31.5 20.6 20.0 34.6 43.6 14.1 16.4 20.6 14.1 12.7Level of Service C C C C D B B C B BApproach Delay (s) 28.0 42.8 16.2 14.4Approach LOS C D B B
Intersection SummaryHCM 2000 Control Delay 19.6 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.65Actuated Cycle Length (s) 87.5 Sum of lost time (s) 18.7Intersection Capacity Utilization 73.5% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 128: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/128.jpg)
HCM Unsignalized Intersection Capacity Analysis700: Bradley Avenue & Bonder Road 12/05/2014
2018-AM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 99 58 35 3 132 10 19 0 2 5 0 54Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 108 63 38 3 143 11 21 0 2 5 0 59PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 154 101 506 458 82 436 472 149vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 154 101 506 458 82 436 472 149tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 92 100 95 100 100 99 100 93cM capacity (veh/h) 1426 1491 419 460 978 498 452 898
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total 108 101 3 154 21 2 5 59Volume Left 108 0 3 0 21 0 5 0Volume Right 0 38 0 11 0 2 0 59cSH 1426 1700 1491 1700 419 978 498 898Volume to Capacity 0.08 0.06 0.00 0.09 0.05 0.00 0.01 0.07Queue Length 95th (m) 2.0 0.0 0.1 0.0 1.2 0.1 0.3 1.7Control Delay (s) 7.7 0.0 7.4 0.0 14.0 8.7 12.3 9.3Lane LOS A A B A B AApproach Delay (s) 4.0 0.2 13.5 9.5Approach LOS B A
Intersection SummaryAverage Delay 3.9Intersection Capacity Utilization 30.8% ICU Level of Service AAnalysis Period (min) 15
![Page 129: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/129.jpg)
HCM 2010 Roundabout100: Old Victoria Road & Commissioners Road E & Hamilton Road 12/05/2014
2018-PM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 1
IntersectionIntersection Delay, s/veh 7.9Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 557 709 144 458Demand Flow Rate, veh/h 561 712 144 458Vehicles Circulating, veh/h 318 251 713 568Vehicles Exiting, veh/h 708 606 166 395Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 7.4 8.1 6.5 8.4Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.471 0.529 0.471 0.529 0.472 0.528 0.469 0.531Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 264 297 335 377 68 76 215 243Cap Entry Lane, veh/h 890 904 936 948 662 686 738 759Entry HV Adj Factor 0.991 0.993 0.995 0.997 0.995 1.004 1.001 0.999Flow Entry, veh/h 262 295 333 376 68 76 215 243Cap Entry, veh/h 882 899 931 945 659 689 739 758V/C Ratio 2.97 0.328 3.58 0.398 1.03 0.111 2.91 0.320Control Delay, s/veh 7.3 7.6 7.8 8.3 6.6 6.4 8.3 8.6LOS A A A A A A A A95th %tile Queue, veh 0.1 1 0.2 2 0.0 0 0.1 1
![Page 130: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/130.jpg)
HCM Unsignalized Intersection Capacity Analysis200: Venture Gate & Hamilton Road 12/05/2014
2018-PM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 2
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (veh/h) 542 13 33 590 61 107Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 602 14 37 656 68 119PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 617 1331 602vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 617 1331 602tC, single (s) 4.4 6.4 6.2tC, 2 stage (s)tF (s) 2.5 3.5 3.3p0 queue free % 96 58 76cM capacity (veh/h) 830 162 499
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2Volume Total 602 14 37 656 68 119Volume Left 0 0 37 0 68 0Volume Right 0 14 0 0 0 119cSH 1700 1700 830 1700 162 499Volume to Capacity 0.35 0.01 0.04 0.39 0.42 0.24Queue Length 95th (m) 0.0 0.0 1.1 0.0 14.9 7.4Control Delay (s) 0.0 0.0 9.5 0.0 42.3 14.4Lane LOS A E BApproach Delay (s) 0.0 0.5 24.6Approach LOS C
Intersection SummaryAverage Delay 3.3Intersection Capacity Utilization 41.8% ICU Level of Service AAnalysis Period (min) 15
![Page 131: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/131.jpg)
HCM Signalized Intersection Capacity Analysis300: Veterans Memorial Pkwy & Hamilton Road 12/05/2014
2018-PM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 296 272 82 14 147 98 51 892 19 149 1267 426Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3242 1863 1553 1671 1827 1568 1626 3252 1615 1770 3438 1583Flt Permitted 0.95 1.00 1.00 0.58 1.00 1.00 0.12 1.00 1.00 0.25 1.00 1.00Satd. Flow (perm) 3242 1863 1553 1023 1827 1568 204 3252 1615 457 3438 1583Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93Adj. Flow (vph) 318 292 88 15 158 105 55 959 20 160 1362 458RTOR Reduction (vph) 0 0 34 0 0 85 0 0 9 0 0 207Lane Group Flow (vph) 318 292 54 15 158 20 55 959 11 160 1362 251Heavy Vehicles (%) 8% 2% 4% 8% 4% 3% 11% 11% 0% 2% 5% 2%Turn Type Prot NA Perm Perm NA Perm Perm NA Perm Perm NA PermProtected Phases 3 8 4 2 6Permitted Phases 8 4 4 2 2 6 6Actuated Green, G (s) 10.9 25.7 25.7 10.8 10.8 10.8 49.0 49.0 49.0 49.0 49.0 49.0Effective Green, g (s) 10.9 25.7 25.7 10.8 10.8 10.8 49.0 49.0 49.0 49.0 49.0 49.0Actuated g/C Ratio 0.12 0.29 0.29 0.12 0.12 0.12 0.55 0.55 0.55 0.55 0.55 0.55Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 395 536 446 123 220 189 111 1784 886 250 1886 868v/s Ratio Prot c0.10 0.16 c0.09 0.29 c0.40v/s Ratio Perm 0.03 0.01 0.01 0.27 0.01 0.35 0.16v/c Ratio 0.81 0.54 0.12 0.12 0.72 0.10 0.50 0.54 0.01 0.64 0.72 0.29Uniform Delay, d1 38.2 26.9 23.5 35.0 37.8 34.9 12.5 12.9 9.2 14.0 15.1 10.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 11.3 1.1 0.1 0.4 10.7 0.2 14.9 1.2 0.0 11.9 2.4 0.8Delay (s) 49.5 28.0 23.6 35.5 48.4 35.2 27.4 14.1 9.2 25.9 17.5 11.7Level of Service D C C D D D C B A C B BApproach Delay (s) 37.2 42.7 14.7 16.8Approach LOS D D B B
Intersection SummaryHCM 2000 Control Delay 21.6 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.73Actuated Cycle Length (s) 89.3 Sum of lost time (s) 18.6Intersection Capacity Utilization 85.3% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group
![Page 132: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/132.jpg)
HCM Unsignalized Intersection Capacity Analysis400: Old Victoria Road & Bradley Avenue 12/05/2014
2018-PM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 58 252 13 93 350 38 14 51 43 16 67 70Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 63 274 14 101 380 41 15 55 47 17 73 76PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 422 288 1102 1031 281 1078 1017 401vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 422 288 1102 1031 281 1078 1017 401tC, single (s) 4.1 4.2 7.2 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.3 3.6 4.0 3.3 3.5 4.0 3.3p0 queue free % 95 92 86 73 94 87 65 88cM capacity (veh/h) 1148 1246 106 204 763 133 208 649
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1Volume Total 63 288 101 422 15 102 166Volume Left 63 0 101 0 15 0 17Volume Right 0 14 0 41 0 47 76cSH 1148 1700 1246 1700 106 307 278Volume to Capacity 0.05 0.17 0.08 0.25 0.14 0.33 0.60Queue Length 95th (m) 1.4 0.0 2.1 0.0 3.9 11.3 28.5Control Delay (s) 8.3 0.0 8.1 0.0 44.7 22.5 35.6Lane LOS A A E C EApproach Delay (s) 1.5 1.6 25.4 35.6Approach LOS D E
Intersection SummaryAverage Delay 8.8Intersection Capacity Utilization 49.4% ICU Level of Service AAnalysis Period (min) 15
![Page 133: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/133.jpg)
HCM Unsignalized Intersection Capacity Analysis500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue 12/05/2014
2018-PM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 20 286 6 26 412 25 19 1 65 63 2 50Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 22 311 7 28 448 27 21 1 71 68 2 54PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 475 317 914 886 311 930 865 448vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 475 317 914 886 311 930 865 448tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 98 98 91 100 90 69 99 91cM capacity (veh/h) 1098 1254 224 274 734 218 281 615
Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1Volume Total 22 311 7 28 448 27 92 125Volume Left 22 0 0 28 0 0 21 68Volume Right 0 0 7 0 0 27 71 54cSH 1098 1700 1700 1254 1700 1700 481 304Volume to Capacity 0.02 0.18 0.00 0.02 0.26 0.02 0.19 0.41Queue Length 95th (m) 0.5 0.0 0.0 0.6 0.0 0.0 5.6 15.4Control Delay (s) 8.3 0.0 0.0 7.9 0.0 0.0 14.3 24.8Lane LOS A A B CApproach Delay (s) 0.5 0.4 14.3 24.8Approach LOS B C
Intersection SummaryAverage Delay 4.6Intersection Capacity Utilization 41.7% ICU Level of Service AAnalysis Period (min) 15
![Page 134: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/134.jpg)
HCM Signalized Intersection Capacity Analysis600: Veterans Memorial Pkwy & Bradley Avenue 12/05/2014
2018-PM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 255 94 64 39 99 112 48 595 30 102 945 316Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 0.92 1.00 0.99 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1719 1845 1455 1805 1706 1570 3216 1805 3406 1553Flt Permitted 0.40 1.00 1.00 0.69 1.00 0.20 1.00 0.36 1.00 1.00Satd. Flow (perm) 717 1845 1455 1317 1706 325 3216 682 3406 1553Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Adj. Flow (vph) 268 99 67 41 104 118 51 626 32 107 995 333RTOR Reduction (vph) 0 0 30 0 49 0 0 4 0 0 0 184Lane Group Flow (vph) 268 99 37 41 173 0 51 654 0 107 995 149Heavy Vehicles (%) 5% 3% 11% 0% 3% 2% 15% 12% 0% 0% 6% 4%Turn Type pm+pt NA Perm Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 4 8 2 6 6Actuated Green, G (s) 31.4 31.4 31.4 13.2 13.2 37.5 37.5 37.5 37.5 37.5Effective Green, g (s) 31.4 31.4 31.4 13.2 13.2 37.5 37.5 37.5 37.5 37.5Actuated g/C Ratio 0.38 0.38 0.38 0.16 0.16 0.45 0.45 0.45 0.45 0.45Clearance Time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 439 692 546 207 269 145 1442 305 1527 696v/s Ratio Prot c0.10 0.05 0.10 0.20 c0.29v/s Ratio Perm c0.13 0.03 0.03 0.16 0.16 0.10v/c Ratio 0.61 0.14 0.07 0.20 0.64 0.35 0.45 0.35 0.65 0.21Uniform Delay, d1 19.6 17.2 16.7 30.6 33.0 15.1 16.0 15.1 18.0 14.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 2.5 0.1 0.1 0.5 5.2 6.6 1.0 3.2 2.2 0.7Delay (s) 22.1 17.3 16.8 31.1 38.2 21.7 17.0 18.2 20.1 14.8Level of Service C B B C D C B B C BApproach Delay (s) 20.2 37.1 17.3 18.7Approach LOS C D B B
Intersection SummaryHCM 2000 Control Delay 20.3 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.66Actuated Cycle Length (s) 83.6 Sum of lost time (s) 18.7Intersection Capacity Utilization 79.6% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 135: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/135.jpg)
HCM Unsignalized Intersection Capacity Analysis700: Bradley Avenue & Bonder Road 12/05/2014
2018-PM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 33 182 12 1 134 3 30 0 3 9 0 86Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 36 198 13 1 146 3 33 0 3 10 0 93PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 149 211 517 427 204 422 432 147vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 149 211 517 427 204 422 432 147tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 97 100 92 100 100 98 100 90cM capacity (veh/h) 1433 1360 412 506 836 529 503 900
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total 36 211 1 149 33 3 10 93Volume Left 36 0 1 0 33 0 10 0Volume Right 0 13 0 3 0 3 0 93cSH 1433 1700 1360 1700 412 836 529 900Volume to Capacity 0.03 0.12 0.00 0.09 0.08 0.00 0.02 0.10Queue Length 95th (m) 0.6 0.0 0.0 0.0 2.1 0.1 0.5 2.8Control Delay (s) 7.6 0.0 7.6 0.0 14.5 9.3 11.9 9.5Lane LOS A A B A B AApproach Delay (s) 1.1 0.1 14.0 9.7Approach LOS B A
Intersection SummaryAverage Delay 3.3Intersection Capacity Utilization 32.0% ICU Level of Service AAnalysis Period (min) 15
![Page 136: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/136.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Appendices
MMM Group Limited October 2014
Technical Appendix 7
Future (2023) Intersection Capacity Analysis Results for Scenario 2
![Page 137: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/137.jpg)
HCM 2010 Roundabout100: Old Victoria Road & Commissioners Road E & Hamilton Road 14/05/2014
2023 - AM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 1
IntersectionIntersection Delay, s/veh 8.7Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 666 698 126 301Demand Flow Rate, veh/h 733 768 139 331Vehicles Circulating, veh/h 254 259 822 554Vehicles Exiting, veh/h 631 702 165 473Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 8.9 9.2 7.7 7.8Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.471 0.529 0.470 0.530 0.468 0.532 0.471 0.529Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 345 388 361 407 65 74 156 175Cap Entry Lane, veh/h 934 946 930 943 610 636 746 767Entry HV Adj Factor 0.908 0.910 0.909 0.909 0.910 0.901 0.908 0.912Flow Entry, veh/h 313 353 328 370 59 67 142 160Cap Entry, veh/h 848 861 846 857 555 573 677 700V/C Ratio 3.69 0.410 3.88 0.432 1.07 0.116 2.09 0.228Control Delay, s/veh 8.6 9.1 8.9 9.5 7.8 7.7 7.8 7.8LOS A A A A A A A A95th %tile Queue, veh 0.2 2 0.2 2 0.0 0 0.1 1
![Page 138: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/138.jpg)
HCM Signalized Intersection Capacity Analysis200: Venture Gate & Hamilton Road 14/05/2014
2023 - AM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 2
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 524 64 145 615 29 77Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 6.6 6.6 6.6 6.6 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1727 1468 1641 1727 1641 1468Flt Permitted 1.00 1.00 0.43 1.00 0.95 1.00Satd. Flow (perm) 1727 1468 749 1727 1641 1468Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91Adj. Flow (vph) 576 70 159 676 32 85RTOR Reduction (vph) 0 15 0 0 0 79Lane Group Flow (vph) 576 55 159 676 32 6Heavy Vehicles (%) 10% 10% 10% 10% 10% 10%Turn Type NA Perm Perm NA NA PermProtected Phases 2 6 8Permitted Phases 2 6 8Actuated Green, G (s) 71.2 71.2 71.2 71.2 6.5 6.5Effective Green, g (s) 71.2 71.2 71.2 71.2 6.5 6.5Actuated g/C Ratio 0.79 0.79 0.79 0.79 0.07 0.07Clearance Time (s) 6.6 6.6 6.6 6.6 5.7 5.7Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1366 1161 592 1366 118 106v/s Ratio Prot 0.33 c0.39 c0.02v/s Ratio Perm 0.04 0.21 0.00v/c Ratio 0.42 0.05 0.27 0.49 0.27 0.06Uniform Delay, d1 2.9 2.0 2.5 3.2 39.5 38.9Progression Factor 1.00 1.00 0.76 1.21 1.00 1.00Incremental Delay, d2 1.0 0.1 0.8 1.0 1.2 0.2Delay (s) 3.9 2.1 2.7 4.9 40.8 39.1Level of Service A A A A D DApproach Delay (s) 3.7 4.5 39.6Approach LOS A A D
Intersection SummaryHCM 2000 Control Delay 6.7 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.48Actuated Cycle Length (s) 90.0 Sum of lost time (s) 12.3Intersection Capacity Utilization 57.2% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group
![Page 139: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/139.jpg)
HCM Signalized Intersection Capacity Analysis300: Veterans Memorial Pkwy & Hamilton Road 14/05/2014
2023 - AM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 372 126 104 17 343 156 117 1186 14 66 1064 300Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 3282 1468 1641 3282 1468 1641 3282 1468 1641 3195 1468Flt Permitted 0.95 1.00 1.00 0.67 1.00 1.00 0.12 1.00 1.00 0.10 1.00 1.00Satd. Flow (perm) 3183 3282 1468 1149 3282 1468 211 3282 1468 177 3195 1468Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 404 137 113 18 373 170 127 1289 15 72 1157 326RTOR Reduction (vph) 0 0 79 0 0 127 0 0 8 0 0 185Lane Group Flow (vph) 404 137 34 18 373 43 127 1289 7 72 1157 141Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 13% 10%Turn Type Prot NA Perm Perm NA Perm pm+pt NA Perm pm+pt NA PermProtected Phases 3 8 4 5 2 1 6Permitted Phases 8 4 4 2 2 6 6Actuated Green, G (s) 12.0 27.4 27.4 11.4 11.4 11.4 45.0 40.0 40.0 43.0 39.0 39.0Effective Green, g (s) 12.0 27.4 27.4 11.4 11.4 11.4 45.0 40.0 40.0 43.0 39.0 39.0Actuated g/C Ratio 0.13 0.30 0.30 0.13 0.13 0.13 0.50 0.44 0.44 0.48 0.43 0.43Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 424 999 446 145 415 185 184 1458 652 149 1384 636v/s Ratio Prot c0.13 0.04 c0.11 c0.04 c0.39 0.02 0.36v/s Ratio Perm 0.02 0.02 0.03 0.31 0.00 0.21 0.10v/c Ratio 0.95 0.14 0.08 0.12 0.90 0.23 0.69 0.88 0.01 0.48 0.84 0.22Uniform Delay, d1 38.7 22.7 22.3 34.9 38.7 35.4 15.4 22.9 14.0 16.2 22.7 16.0Progression Factor 0.93 0.90 1.34 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 30.5 0.1 0.1 0.4 21.5 0.7 10.6 8.1 0.0 2.5 6.1 0.8Delay (s) 66.6 20.6 30.0 35.3 60.3 36.0 26.0 31.0 14.0 18.6 28.8 16.8Level of Service E C C D E D C C B B C BApproach Delay (s) 50.6 52.1 30.4 25.8Approach LOS D D C C
Intersection SummaryHCM 2000 Control Delay 34.7 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.90Actuated Cycle Length (s) 90.0 Sum of lost time (s) 22.6Intersection Capacity Utilization 75.9% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 140: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/140.jpg)
HCM 2010 Roundabout400: Old Victoria Road & Bradley Avenue 14/05/2014
2023 - AM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 4
IntersectionIntersection Delay, s/veh 6.3Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 364 417 215 164Demand Flow Rate, veh/h 400 458 236 180Vehicles Circulating, veh/h 249 157 473 429Vehicles Exiting, veh/h 360 552 176 186Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 6.4 6.2 6.6 5.9Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT R LT TRRT ChannelizedLane Util 0.470 0.530 0.469 0.531 0.411 0.589 0.472 0.528Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 188 212 215 243 97 139 85 95Cap Entry Lane, veh/h 937 949 1004 1012 792 811 819 837Entry HV Adj Factor 0.911 0.911 0.911 0.909 0.914 0.906 0.904 0.912Flow Entry, veh/h 171 193 196 221 89 126 77 87Cap Entry, veh/h 854 865 915 920 724 736 741 764V/C Ratio 2.01 0.223 2.14 0.240 1.22 0.171 1.04 0.114Control Delay, s/veh 6.3 6.5 6.1 6.3 6.3 6.8 5.9 5.9LOS A A A A A A A A95th %tile Queue, veh 0.1 1 0.1 1 0.0 1 0.0 0
![Page 141: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/141.jpg)
HCM Signalized Intersection Capacity Analysis500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue 14/05/2014
2023 - AM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 92 340 29 109 317 110 15 0 58 65 0 51Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 0.89 0.94Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.99 0.97Satd. Flow (prot) 1641 1727 1468 1641 1727 1468 1526 1581Flt Permitted 0.55 1.00 1.00 0.54 1.00 1.00 0.94 0.83Satd. Flow (perm) 956 1727 1468 930 1727 1468 1442 1356Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 100 370 32 118 345 120 16 0 63 71 0 55RTOR Reduction (vph) 0 0 8 0 0 28 0 55 0 0 43 0Lane Group Flow (vph) 100 370 24 118 345 92 0 24 0 0 83 0Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%Turn Type Perm NA Perm Perm NA Perm Perm NA Perm NAProtected Phases 2 6 8 4Permitted Phases 2 2 6 6 8 4Actuated Green, G (s) 53.4 53.4 53.4 53.4 53.4 53.4 8.5 8.5Effective Green, g (s) 53.4 53.4 53.4 53.4 53.4 53.4 8.5 8.5Actuated g/C Ratio 0.76 0.76 0.76 0.76 0.76 0.76 0.12 0.12Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 730 1319 1121 710 1319 1121 175 164v/s Ratio Prot c0.21 0.20v/s Ratio Perm 0.10 0.02 0.13 0.06 0.02 c0.06v/c Ratio 0.14 0.28 0.02 0.17 0.26 0.08 0.14 0.51Uniform Delay, d1 2.2 2.5 2.0 2.2 2.4 2.1 27.4 28.7Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.5 0.0 0.5 0.5 0.1 0.4 2.4Delay (s) 2.6 3.0 2.0 2.7 2.9 2.2 27.8 31.2Level of Service A A A A A A C CApproach Delay (s) 2.9 2.7 27.8 31.2Approach LOS A A C C
Intersection SummaryHCM 2000 Control Delay 7.1 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.31Actuated Cycle Length (s) 69.9 Sum of lost time (s) 8.0Intersection Capacity Utilization 47.3% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group
![Page 142: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/142.jpg)
HCM Signalized Intersection Capacity Analysis600: Veterans Memorial Pkwy & Bradley Avenue 14/05/2014
2023 - AM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 280 123 61 46 109 204 100 833 82 255 602 326Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.7 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 1727 1468 1641 1727 1468 1656 3282 1468 1641 3282 1321Flt Permitted 0.95 1.00 1.00 0.67 1.00 1.00 0.40 1.00 1.00 0.16 1.00 1.00Satd. Flow (perm) 3183 1727 1468 1156 1727 1468 693 3282 1468 282 3282 1321Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 311 137 68 51 121 227 111 926 91 283 669 362RTOR Reduction (vph) 0 0 49 0 0 108 0 0 57 0 0 162Lane Group Flow (vph) 311 137 19 51 121 119 111 926 34 283 669 200Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 9% 10% 10% 10% 10% 10%Parking (#/hr) 0Turn Type Prot NA Perm Perm NA pt+ov Perm NA Perm pm+pt NA PermProtected Phases 7 4 8 8 1 2 1 6Permitted Phases 4 8 2 2 6 6Actuated Green, G (s) 11.6 25.1 25.1 9.5 9.5 21.2 33.4 33.4 33.4 49.1 49.1 49.1Effective Green, g (s) 11.6 25.1 25.1 9.5 9.5 21.2 33.4 33.4 33.4 49.1 49.1 49.1Actuated g/C Ratio 0.13 0.28 0.28 0.11 0.11 0.24 0.38 0.38 0.38 0.55 0.55 0.55Clearance Time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 415 487 414 123 184 350 260 1233 551 334 1812 729v/s Ratio Prot c0.10 0.08 c0.07 0.08 0.28 c0.11 0.20v/s Ratio Perm 0.01 0.04 0.16 0.02 c0.36 0.15v/c Ratio 0.75 0.28 0.05 0.41 0.66 0.34 0.43 0.75 0.06 0.85 0.37 0.27Uniform Delay, d1 37.2 24.9 23.2 37.1 38.1 28.0 20.6 24.1 17.7 14.6 11.2 10.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 7.3 0.3 0.0 2.3 8.2 0.6 5.1 4.2 0.2 17.7 0.6 0.9Delay (s) 44.5 25.2 23.2 39.4 46.3 28.6 25.7 28.4 18.0 32.3 11.8 11.4Level of Service D C C D D C C C B C B BApproach Delay (s) 36.6 35.4 27.3 16.1Approach LOS D D C B
Intersection SummaryHCM 2000 Control Delay 25.3 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.84Actuated Cycle Length (s) 88.9 Sum of lost time (s) 22.7Intersection Capacity Utilization 71.5% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group
![Page 143: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/143.jpg)
HCM Signalized Intersection Capacity Analysis700: Bradley Avenue & Bonder Road 14/05/2014
2023 - AM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 230 65 166 16 145 23 89 0 9 12 0 125Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.89 1.00 0.98 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1770 1662 1770 1825 1770 1583 1770 1583Flt Permitted 0.64 1.00 0.60 1.00 0.67 1.00 0.75 1.00Satd. Flow (perm) 1196 1662 1124 1825 1248 1583 1399 1583Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 250 71 180 17 158 25 97 0 10 13 0 136RTOR Reduction (vph) 0 91 0 0 8 0 0 8 0 0 108 0Lane Group Flow (vph) 250 160 0 17 175 0 97 2 0 13 28 0Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 16.7 16.7 16.7 16.7 6.9 6.9 6.9 6.9Effective Green, g (s) 16.7 16.7 16.7 16.7 6.9 6.9 6.9 6.9Actuated g/C Ratio 0.50 0.50 0.50 0.50 0.21 0.21 0.21 0.21Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 594 826 558 907 256 325 287 325v/s Ratio Prot 0.10 0.10 0.00 0.02v/s Ratio Perm c0.21 0.02 c0.08 0.01v/c Ratio 0.42 0.19 0.03 0.19 0.38 0.01 0.05 0.09Uniform Delay, d1 5.4 4.7 4.3 4.7 11.5 10.6 10.7 10.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.5 0.1 0.0 0.1 0.9 0.0 0.1 0.1Delay (s) 5.9 4.8 4.3 4.8 12.4 10.6 10.8 10.9Level of Service A A A A B B B BApproach Delay (s) 5.3 4.8 12.3 10.9Approach LOS A A B B
Intersection SummaryHCM 2000 Control Delay 6.9 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.41Actuated Cycle Length (s) 33.6 Sum of lost time (s) 10.0Intersection Capacity Utilization 51.1% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group
![Page 144: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/144.jpg)
HCM 2010 Roundabout100: Old Victoria Road & Commissioners Road E & Hamilton Road 14/05/2014
2023 - PM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 1
IntersectionIntersection Delay, s/veh 10.7Intersection LOS B
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 608 804 183 505Demand Flow Rate, veh/h 669 885 202 556Vehicles Circulating, veh/h 396 325 855 708Vehicles Exiting, veh/h 868 731 210 501Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 9.7 11.2 8.6 12.0Approach LOS A B A B
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.469 0.531 0.470 0.530 0.470 0.530 0.469 0.531Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 314 355 416 469 95 107 261 295Cap Entry Lane, veh/h 840 856 886 900 595 621 664 688Entry HV Adj Factor 0.911 0.908 0.909 0.909 0.907 0.908 0.909 0.907Flow Entry, veh/h 286 322 378 426 86 97 237 268Cap Entry, veh/h 765 778 805 818 540 564 604 624V/C Ratio 3.74 0.415 4.70 0.521 1.60 0.172 3.93 0.429Control Delay, s/veh 9.4 9.9 10.7 11.7 8.7 8.6 11.7 12.2LOS A A B B A A B B95th %tile Queue, veh 0.2 2 0.3 3 0.1 1 0.2 2
![Page 145: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/145.jpg)
HCM Signalized Intersection Capacity Analysis200: Venture Gate & Hamilton Road 14/05/2014
2023 - PM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 2
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 592 20 47 664 77 146Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 6.6 6.6 6.6 6.6 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1727 1468 1641 1727 1641 1468Flt Permitted 1.00 1.00 0.38 1.00 0.95 1.00Satd. Flow (perm) 1727 1468 655 1727 1641 1468Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91Adj. Flow (vph) 651 22 52 730 85 160RTOR Reduction (vph) 0 6 0 0 0 142Lane Group Flow (vph) 651 17 52 730 85 18Heavy Vehicles (%) 10% 10% 10% 10% 10% 10%Turn Type NA Perm Perm NA NA PermProtected Phases 2 6 8Permitted Phases 2 6 8Actuated Green, G (s) 67.5 67.5 67.5 67.5 10.2 10.2Effective Green, g (s) 67.5 67.5 67.5 67.5 10.2 10.2Actuated g/C Ratio 0.75 0.75 0.75 0.75 0.11 0.11Clearance Time (s) 6.6 6.6 6.6 6.6 5.7 5.7Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1295 1101 491 1295 185 166v/s Ratio Prot 0.38 c0.42 c0.05v/s Ratio Perm 0.01 0.08 0.01v/c Ratio 0.50 0.01 0.11 0.56 0.46 0.11Uniform Delay, d1 4.5 2.8 3.1 4.9 37.3 35.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.4 0.0 0.4 1.8 1.8 0.3Delay (s) 5.9 2.9 3.5 6.7 39.1 36.1Level of Service A A A A D DApproach Delay (s) 5.8 6.4 37.2Approach LOS A A D
Intersection SummaryHCM 2000 Control Delay 10.6 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.55Actuated Cycle Length (s) 90.0 Sum of lost time (s) 12.3Intersection Capacity Utilization 55.1% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group
![Page 146: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/146.jpg)
HCM Signalized Intersection Capacity Analysis300: Veterans Memorial Pkwy & Hamilton Road 14/05/2014
2023 - PM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 336 293 108 15 158 105 90 1090 22 160 1407 462Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 3282 1468 1641 3282 1468 1641 3282 1468 1641 3195 1468Flt Permitted 0.95 1.00 1.00 0.57 1.00 1.00 0.09 1.00 1.00 0.13 1.00 1.00Satd. Flow (perm) 3183 3282 1468 987 3282 1468 160 3282 1468 222 3195 1468Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 365 318 117 16 172 114 98 1185 24 174 1529 502RTOR Reduction (vph) 0 0 89 0 0 105 0 0 13 0 0 247Lane Group Flow (vph) 365 318 28 16 172 9 98 1185 11 174 1529 255Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 13% 10%Turn Type Prot NA Perm Perm NA Perm pm+pt NA Perm pm+pt NA PermProtected Phases 3 8 4 5 2 1 6Permitted Phases 8 4 4 2 2 6 6Actuated Green, G (s) 11.0 22.0 22.0 7.0 7.0 7.0 47.2 43.2 43.2 53.2 46.2 46.2Effective Green, g (s) 11.0 22.0 22.0 7.0 7.0 7.0 47.2 43.2 43.2 53.2 46.2 46.2Actuated g/C Ratio 0.12 0.24 0.24 0.08 0.08 0.08 0.52 0.48 0.48 0.59 0.51 0.51Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 385 795 355 76 253 113 148 1561 698 239 1625 746v/s Ratio Prot c0.11 0.10 c0.05 0.03 0.36 c0.06 c0.48v/s Ratio Perm 0.02 0.02 0.01 0.31 0.01 0.37 0.17v/c Ratio 0.95 0.40 0.08 0.21 0.68 0.08 0.66 0.76 0.02 0.73 0.94 0.34Uniform Delay, d1 39.6 28.9 26.6 39.3 40.8 38.9 16.1 19.5 12.6 13.0 21.0 13.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 32.4 0.3 0.1 1.4 7.1 0.3 10.6 3.5 0.0 10.5 12.1 1.3Delay (s) 72.0 29.2 26.7 40.7 47.9 39.2 26.7 23.1 12.6 23.6 33.1 14.5Level of Service E C C D D D C C B C C BApproach Delay (s) 48.3 44.2 23.1 28.1Approach LOS D D C C
Intersection SummaryHCM 2000 Control Delay 31.3 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.93Actuated Cycle Length (s) 90.8 Sum of lost time (s) 22.6Intersection Capacity Utilization 79.6% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 147: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/147.jpg)
HCM 2010 Roundabout400: Old Victoria Road & Bradley Avenue 14/05/2014
2023 - PM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 4
IntersectionIntersection Delay, s/veh 7.3Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 388 646 145 194Demand Flow Rate, veh/h 428 711 160 213Vehicles Circulating, veh/h 277 164 440 656Vehicles Exiting, veh/h 592 435 264 219Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 6.7 7.9 5.8 7.4Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.470 0.530 0.470 0.530 0.469 0.531 0.469 0.531Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 201 227 334 377 75 85 100 113Cap Entry Lane, veh/h 918 931 999 1007 812 830 691 714Entry HV Adj Factor 0.908 0.907 0.909 0.908 0.912 0.907 0.910 0.908Flow Entry, veh/h 183 206 304 342 68 77 91 103Cap Entry, veh/h 834 844 908 915 740 753 629 648V/C Ratio 2.19 0.244 3.34 0.374 0.92 0.102 1.45 0.158Control Delay, s/veh 6.6 6.9 7.6 8.1 5.8 5.8 7.4 7.4LOS A A A A A A A A95th %tile Queue, veh 0.1 1 0.1 2 0.0 0 0.1 1
![Page 148: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/148.jpg)
HCM Signalized Intersection Capacity Analysis500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue 14/05/2014
2023 - PM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 30 325 9 38 489 39 27 1 99 98 2 77Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 0.89 0.94Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.99 0.97Satd. Flow (prot) 1641 1727 1468 1641 1727 1468 1529 1582Flt Permitted 0.42 1.00 1.00 0.54 1.00 1.00 0.92 0.71Satd. Flow (perm) 725 1727 1468 925 1727 1468 1417 1153Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 33 353 10 41 532 42 29 1 108 107 2 84RTOR Reduction (vph) 0 0 3 0 0 12 0 88 0 0 38 0Lane Group Flow (vph) 33 353 7 41 532 30 0 50 0 0 155 0Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%Turn Type Perm NA Perm Perm NA Perm Perm NA Perm NAProtected Phases 2 6 8 4Permitted Phases 2 2 6 6 8 4Actuated Green, G (s) 52.8 52.8 52.8 52.8 52.8 52.8 14.0 14.0Effective Green, g (s) 52.8 52.8 52.8 52.8 52.8 52.8 14.0 14.0Actuated g/C Ratio 0.71 0.71 0.71 0.71 0.71 0.71 0.19 0.19Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 511 1219 1036 652 1219 1036 265 215v/s Ratio Prot 0.20 c0.31v/s Ratio Perm 0.05 0.00 0.04 0.02 0.04 c0.13v/c Ratio 0.06 0.29 0.01 0.06 0.44 0.03 0.19 0.72Uniform Delay, d1 3.4 4.1 3.3 3.4 4.7 3.3 25.6 28.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.6 0.0 0.2 1.1 0.1 0.3 11.0Delay (s) 3.6 4.7 3.3 3.6 5.8 3.4 26.0 39.5Level of Service A A A A A A C DApproach Delay (s) 4.5 5.5 26.0 39.5Approach LOS A A C D
Intersection SummaryHCM 2000 Control Delay 12.2 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.50Actuated Cycle Length (s) 74.8 Sum of lost time (s) 8.0Intersection Capacity Utilization 55.2% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group
![Page 149: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/149.jpg)
HCM Signalized Intersection Capacity Analysis600: Veterans Memorial Pkwy & Bradley Avenue 14/05/2014
2023 - PM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 312 124 85 86 155 249 58 639 49 159 1019 353Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.7 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 1727 1468 1641 1727 1468 1656 3282 1468 1641 3282 1321Flt Permitted 0.95 1.00 1.00 0.67 1.00 1.00 0.22 1.00 1.00 0.28 1.00 1.00Satd. Flow (perm) 3183 1727 1468 1155 1727 1468 377 3282 1468 490 3282 1321Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 347 138 94 96 172 277 64 710 54 177 1132 392RTOR Reduction (vph) 0 0 64 0 0 70 0 0 31 0 0 189Lane Group Flow (vph) 347 138 30 96 172 207 64 710 23 177 1132 203Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 9% 10% 10% 10% 10% 10%Parking (#/hr) 0Turn Type Prot NA Perm Perm NA pt+ov Perm NA Perm pm+pt NA PermProtected Phases 7 4 8 8 1 2 1 6Permitted Phases 4 8 2 2 6 6Actuated Green, G (s) 11.8 28.0 28.0 12.2 12.2 24.9 37.0 37.0 37.0 46.0 46.0 46.0Effective Green, g (s) 11.8 28.0 28.0 12.2 12.2 24.9 37.0 37.0 37.0 46.0 46.0 46.0Actuated g/C Ratio 0.13 0.32 0.32 0.14 0.14 0.28 0.42 0.42 0.42 0.52 0.52 0.52Clearance Time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 423 545 463 158 237 412 157 1369 612 318 1702 685v/s Ratio Prot c0.11 0.08 c0.10 0.14 0.22 0.03 c0.34v/s Ratio Perm 0.02 0.08 0.17 0.02 0.26 0.15v/c Ratio 0.82 0.25 0.06 0.61 0.73 0.50 0.41 0.52 0.04 0.56 0.67 0.30Uniform Delay, d1 37.4 22.6 21.2 36.0 36.6 26.7 18.2 19.2 15.3 12.6 15.7 12.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 12.0 0.2 0.1 6.5 10.5 1.0 7.7 1.4 0.1 2.1 2.1 1.1Delay (s) 49.5 22.8 21.3 42.5 47.2 27.7 25.8 20.6 15.4 14.7 17.8 13.3Level of Service D C C D D C C C B B B BApproach Delay (s) 38.5 36.4 20.7 16.4Approach LOS D D C B
Intersection SummaryHCM 2000 Control Delay 23.9 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.74Actuated Cycle Length (s) 88.7 Sum of lost time (s) 22.7Intersection Capacity Utilization 72.5% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group
![Page 150: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/150.jpg)
HCM Signalized Intersection Capacity Analysis700: Bradley Avenue & Bonder Road 14/05/2014
2023 - PM Condition-45 ac rate Synchro 8 ReportMMM Group Limited Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 77 199 56 5 144 8 145 0 14 20 0 201Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.97 1.00 0.99 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1770 1801 1770 1848 1770 1583 1770 1583Flt Permitted 0.65 1.00 0.59 1.00 0.62 1.00 0.75 1.00Satd. Flow (perm) 1215 1801 1098 1848 1158 1583 1393 1583Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 84 216 61 5 157 9 158 0 15 22 0 218RTOR Reduction (vph) 0 14 0 0 3 0 0 11 0 0 160 0Lane Group Flow (vph) 84 263 0 5 163 0 158 4 0 22 58 0Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 13.4 13.4 13.4 13.4 8.4 8.4 8.4 8.4Effective Green, g (s) 13.4 13.4 13.4 13.4 8.4 8.4 8.4 8.4Actuated g/C Ratio 0.42 0.42 0.42 0.42 0.26 0.26 0.26 0.26Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 511 758 462 778 305 418 367 418v/s Ratio Prot c0.15 0.09 0.00 0.04v/s Ratio Perm 0.07 0.00 c0.14 0.02v/c Ratio 0.16 0.35 0.01 0.21 0.52 0.01 0.06 0.14Uniform Delay, d1 5.7 6.2 5.3 5.8 10.0 8.6 8.7 8.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.3 0.0 0.1 1.5 0.0 0.1 0.2Delay (s) 5.9 6.5 5.4 6.0 11.5 8.6 8.8 9.1Level of Service A A A A B A A AApproach Delay (s) 6.4 6.0 11.2 9.1Approach LOS A A B A
Intersection SummaryHCM 2000 Control Delay 7.9 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.41Actuated Cycle Length (s) 31.8 Sum of lost time (s) 10.0Intersection Capacity Utilization 54.4% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group
![Page 151: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/151.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Appendices
MMM Group Limited October 2014
Technical Appendix 8
Future (2018) Intersection Capacity Analysis Results for Scenario 3
![Page 152: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/152.jpg)
HCM 2010 Roundabout100: Old Victoria Road & Commissioners Road E & Hamilton Road 12/05/2014
2018-AM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 1
IntersectionIntersection Delay, s/veh 6.9Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 598 632 106 250Demand Flow Rate, veh/h 610 641 109 256Vehicles Circulating, veh/h 186 222 675 468Vehicles Exiting, veh/h 538 562 121 395Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 6.9 7.4 6.2 6.2Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.470 0.530 0.470 0.530 0.468 0.532 0.469 0.531Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 287 323 301 340 51 58 120 136Cap Entry Lane, veh/h 983 992 957 967 681 704 795 814Entry HV Adj Factor 0.979 0.981 0.987 0.986 0.978 0.969 0.979 0.974Flow Entry, veh/h 281 317 297 335 50 56 118 132Cap Entry, veh/h 962 973 945 954 666 683 779 793V/C Ratio 2.92 0.326 3.15 0.351 0.75 0.082 1.51 0.167Control Delay, s/veh 6.7 7.1 7.1 7.6 6.2 6.2 6.2 6.3LOS A A A A A A A A95th %tile Queue, veh 0.1 1 0.1 2 0.0 0 0.1 1
![Page 153: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/153.jpg)
HCM Unsignalized Intersection Capacity Analysis200: Venture Gate & Hamilton Road 12/05/2014
2018-AM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 2
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (veh/h) 459 52 117 558 23 62Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91Hourly flow rate (vph) 504 57 129 613 25 68PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 562 1375 504vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 562 1375 504tC, single (s) 4.3 6.4 6.6tC, 2 stage (s)tF (s) 2.3 3.5 3.6p0 queue free % 86 82 86cM capacity (veh/h) 943 140 504
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2Volume Total 504 57 129 613 25 68Volume Left 0 0 129 0 25 0Volume Right 0 57 0 0 0 68cSH 1700 1700 943 1700 140 504Volume to Capacity 0.30 0.03 0.14 0.36 0.18 0.14Queue Length 95th (m) 0.0 0.0 3.8 0.0 5.1 3.7Control Delay (s) 0.0 0.0 9.4 0.0 36.3 13.3Lane LOS A E BApproach Delay (s) 0.0 1.6 19.5Approach LOS C
Intersection SummaryAverage Delay 2.2Intersection Capacity Utilization 44.0% ICU Level of Service AAnalysis Period (min) 15
![Page 154: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/154.jpg)
HCM Signalized Intersection Capacity Analysis300: Veterans Memorial Pkwy & Hamilton Road 12/05/2014
2018-AM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 342 117 64 15 319 146 88 1049 13 61 884 269Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3367 1776 1442 1656 1845 1553 1570 3282 1468 1612 3195 1509Flt Permitted 0.95 1.00 1.00 0.68 1.00 1.00 0.20 1.00 1.00 0.13 1.00 1.00Satd. Flow (perm) 3367 1776 1442 1178 1845 1553 335 3282 1468 229 3195 1509Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 372 127 70 16 347 159 96 1140 14 66 961 292RTOR Reduction (vph) 0 0 34 0 0 76 0 0 8 0 0 164Lane Group Flow (vph) 372 127 36 16 347 83 96 1140 6 66 961 128Heavy Vehicles (%) 4% 7% 12% 9% 3% 4% 15% 10% 10% 12% 13% 7%Turn Type Prot NA Perm Perm NA Perm Perm NA Perm Perm NA PermProtected Phases 3 8 4 2 6Permitted Phases 8 4 4 2 2 6 6Actuated Green, G (s) 11.9 35.2 35.2 19.3 19.3 19.3 39.0 39.0 39.0 39.0 39.0 39.0Effective Green, g (s) 11.9 35.2 35.2 19.3 19.3 19.3 39.0 39.0 39.0 39.0 39.0 39.0Actuated g/C Ratio 0.13 0.40 0.40 0.22 0.22 0.22 0.44 0.44 0.44 0.44 0.44 0.44Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 451 704 571 256 400 337 147 1441 644 100 1403 662v/s Ratio Prot c0.11 0.07 c0.19 c0.35 0.30v/s Ratio Perm 0.03 0.01 0.05 0.29 0.00 0.29 0.08v/c Ratio 0.82 0.18 0.06 0.06 0.87 0.25 0.65 0.79 0.01 0.66 0.68 0.19Uniform Delay, d1 37.4 17.4 16.6 27.6 33.5 28.7 19.6 21.4 14.0 19.7 20.0 15.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 11.7 0.1 0.0 0.1 17.6 0.4 20.4 4.5 0.0 29.3 2.7 0.7Delay (s) 49.1 17.5 16.6 27.7 51.2 29.1 40.0 25.9 14.0 49.0 22.7 15.9Level of Service D B B C D C D C B D C BApproach Delay (s) 38.1 43.7 26.9 22.5Approach LOS D D C C
Intersection SummaryHCM 2000 Control Delay 29.4 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.82Actuated Cycle Length (s) 88.8 Sum of lost time (s) 18.6Intersection Capacity Utilization 82.7% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group
![Page 155: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/155.jpg)
HCM Unsignalized Intersection Capacity Analysis400: Old Victoria Road & Bradley Avenue 12/05/2014
2018-AM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 47 230 9 68 230 26 13 60 84 53 45 26Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 51 250 10 74 250 28 14 65 91 58 49 28PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 278 260 808 783 255 888 774 264vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 278 260 808 783 255 888 774 264tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 96 94 94 78 88 68 83 96cM capacity (veh/h) 1296 1287 236 297 781 182 296 779
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1Volume Total 51 260 74 278 14 157 135Volume Left 51 0 74 0 14 0 58Volume Right 0 10 0 28 0 91 28cSH 1296 1700 1287 1700 236 465 260Volume to Capacity 0.04 0.15 0.06 0.16 0.06 0.34 0.52Queue Length 95th (m) 1.0 0.0 1.5 0.0 1.5 11.7 22.0Control Delay (s) 7.9 0.0 8.0 0.0 21.2 16.6 32.8Lane LOS A A C C DApproach Delay (s) 1.3 1.7 17.0 32.8Approach LOS C D
Intersection SummaryAverage Delay 8.6Intersection Capacity Utilization 45.5% ICU Level of Service AAnalysis Period (min) 15
![Page 156: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/156.jpg)
HCM Unsignalized Intersection Capacity Analysis500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue 12/05/2014
2018-AM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 71 273 23 87 272 85 12 0 46 50 0 39Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 77 297 25 95 296 92 13 0 50 54 0 42PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 388 322 978 1028 297 986 961 296vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 388 322 978 1028 297 986 961 296tC, single (s) 4.1 4.4 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.5 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 93 91 93 100 93 71 100 94cM capacity (veh/h) 1181 1083 194 201 747 189 220 748
Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1Volume Total 77 297 25 95 296 92 63 97Volume Left 77 0 0 95 0 0 13 54Volume Right 0 0 25 0 0 92 50 42cSH 1181 1700 1700 1083 1700 1700 470 282Volume to Capacity 0.07 0.17 0.01 0.09 0.17 0.05 0.13 0.34Queue Length 95th (m) 1.7 0.0 0.0 2.3 0.0 0.0 3.7 11.8Control Delay (s) 8.3 0.0 0.0 8.6 0.0 0.0 13.8 24.3Lane LOS A A B CApproach Delay (s) 1.6 1.7 13.8 24.3Approach LOS B C
Intersection SummaryAverage Delay 4.5Intersection Capacity Utilization 41.0% ICU Level of Service AAnalysis Period (min) 15
![Page 157: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/157.jpg)
HCM Signalized Intersection Capacity Analysis600: Veterans Memorial Pkwy & Bradley Avenue 12/05/2014
2018-AM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 250 69 52 21 75 125 85 773 35 119 560 284Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 0.91 1.00 0.99 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1626 1827 1495 1357 1666 1656 3137 1736 3167 1404Flt Permitted 0.34 1.00 1.00 0.71 1.00 0.39 1.00 0.26 1.00 1.00Satd. Flow (perm) 577 1827 1495 1010 1666 680 3137 466 3167 1404Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 278 77 58 23 83 139 94 859 39 132 622 316RTOR Reduction (vph) 0 0 39 0 69 0 0 3 0 0 0 158Lane Group Flow (vph) 278 77 19 23 153 0 94 895 0 132 622 158Heavy Vehicles (%) 11% 4% 8% 33% 9% 0% 9% 12% 66% 4% 14% 15%Turn Type pm+pt NA Perm Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 4 8 2 6 6Actuated Green, G (s) 29.2 29.2 29.2 11.5 11.5 44.1 44.1 44.1 44.1 44.1Effective Green, g (s) 29.2 29.2 29.2 11.5 11.5 44.1 44.1 44.1 44.1 44.1Actuated g/C Ratio 0.33 0.33 0.33 0.13 0.13 0.50 0.50 0.50 0.50 0.50Clearance Time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 354 606 496 131 217 340 1572 233 1587 703v/s Ratio Prot c0.12 0.04 0.09 c0.29 0.20v/s Ratio Perm c0.14 0.01 0.02 0.14 0.28 0.11v/c Ratio 0.79 0.13 0.04 0.18 0.71 0.28 0.57 0.57 0.39 0.23Uniform Delay, d1 24.1 20.5 19.9 34.0 36.6 12.7 15.3 15.3 13.6 12.3Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 10.9 0.1 0.0 0.6 10.0 2.0 1.5 9.6 0.7 0.7Delay (s) 35.0 20.6 19.9 34.7 46.7 14.7 16.8 24.9 14.4 13.1Level of Service C C B C D B B C B BApproach Delay (s) 30.2 45.5 16.6 15.3Approach LOS C D B B
Intersection SummaryHCM 2000 Control Delay 20.8 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.68Actuated Cycle Length (s) 88.0 Sum of lost time (s) 18.7Intersection Capacity Utilization 76.0% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 158: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/158.jpg)
HCM Unsignalized Intersection Capacity Analysis700: Bradley Avenue & Bonder Road 12/05/2014
2018-AM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 122 60 42 4 134 12 23 0 2 6 0 66Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 133 65 46 4 146 13 25 0 2 7 0 72PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 159 111 579 521 88 493 537 152vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 159 111 579 521 88 493 537 152tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 91 100 93 100 100 99 100 92cM capacity (veh/h) 1421 1479 363 416 970 449 407 894
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total 133 111 4 159 25 2 7 72Volume Left 133 0 4 0 25 0 7 0Volume Right 0 46 0 13 0 2 0 72cSH 1421 1700 1479 1700 363 970 449 894Volume to Capacity 0.09 0.07 0.00 0.09 0.07 0.00 0.01 0.08Queue Length 95th (m) 2.5 0.0 0.1 0.0 1.8 0.1 0.4 2.1Control Delay (s) 7.8 0.0 7.4 0.0 15.6 8.7 13.1 9.4Lane LOS A A C A B AApproach Delay (s) 4.2 0.2 15.1 9.7Approach LOS C A
Intersection SummaryAverage Delay 4.4Intersection Capacity Utilization 32.5% ICU Level of Service AAnalysis Period (min) 15
![Page 159: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/159.jpg)
HCM 2010 Roundabout100: Old Victoria Road & Commissioners Road E & Hamilton Road 12/05/2014
2018-PM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 1
IntersectionIntersection Delay, s/veh 7.9Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 563 717 151 462Demand Flow Rate, veh/h 567 720 151 462Vehicles Circulating, veh/h 323 257 718 576Vehicles Exiting, veh/h 715 612 172 401Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 7.5 8.2 6.6 8.6Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.469 0.531 0.469 0.531 0.470 0.530 0.470 0.530Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 266 301 338 382 71 80 217 245Cap Entry Lane, veh/h 887 901 932 944 659 684 734 755Entry HV Adj Factor 0.994 0.991 0.997 0.995 1.000 1.000 1.001 0.999Flow Entry, veh/h 264 298 337 380 71 80 217 245Cap Entry, veh/h 882 893 929 939 659 684 734 755V/C Ratio 3.00 0.334 3.63 0.405 1.08 0.117 2.96 0.325Control Delay, s/veh 7.3 7.7 7.9 8.4 6.7 6.5 8.4 8.7LOS A A A A A A A A95th %tile Queue, veh 0.1 1 0.2 2 0.0 0 0.1 1
![Page 160: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/160.jpg)
HCM Unsignalized Intersection Capacity Analysis200: Venture Gate & Hamilton Road 12/05/2014
2018-PM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 2
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (veh/h) 543 15 38 594 66 120Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 603 17 42 660 73 133PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 620 1348 603vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 620 1348 603tC, single (s) 4.4 6.4 6.2tC, 2 stage (s)tF (s) 2.5 3.5 3.3p0 queue free % 95 53 73cM capacity (veh/h) 827 157 499
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2Volume Total 603 17 42 660 73 133Volume Left 0 0 42 0 73 0Volume Right 0 17 0 0 0 133cSH 1700 1700 827 1700 157 499Volume to Capacity 0.35 0.01 0.05 0.39 0.47 0.27Queue Length 95th (m) 0.0 0.0 1.3 0.0 17.4 8.6Control Delay (s) 0.0 0.0 9.6 0.0 46.5 14.8Lane LOS A E BApproach Delay (s) 0.0 0.6 26.1Approach LOS D
Intersection SummaryAverage Delay 3.8Intersection Capacity Utilization 42.7% ICU Level of Service AAnalysis Period (min) 15
![Page 161: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/161.jpg)
HCM Signalized Intersection Capacity Analysis300: Veterans Memorial Pkwy & Hamilton Road 12/05/2014
2018-PM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 305 273 87 14 147 98 56 920 20 149 1279 429Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3242 1863 1553 1671 1827 1568 1626 3252 1615 1770 3438 1583Flt Permitted 0.95 1.00 1.00 0.58 1.00 1.00 0.12 1.00 1.00 0.23 1.00 1.00Satd. Flow (perm) 3242 1863 1553 1021 1827 1568 198 3252 1615 436 3438 1583Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93Adj. Flow (vph) 328 294 94 15 158 105 60 989 22 160 1375 461RTOR Reduction (vph) 0 0 34 0 0 85 0 0 10 0 0 208Lane Group Flow (vph) 328 294 60 15 158 20 60 989 12 160 1375 253Heavy Vehicles (%) 8% 2% 4% 8% 4% 3% 11% 11% 0% 2% 5% 2%Turn Type Prot NA Perm Perm NA Perm Perm NA Perm Perm NA PermProtected Phases 3 8 4 2 6Permitted Phases 8 4 4 2 2 6 6Actuated Green, G (s) 11.0 25.8 25.8 10.8 10.8 10.8 49.0 49.0 49.0 49.0 49.0 49.0Effective Green, g (s) 11.0 25.8 25.8 10.8 10.8 10.8 49.0 49.0 49.0 49.0 49.0 49.0Actuated g/C Ratio 0.12 0.29 0.29 0.12 0.12 0.12 0.55 0.55 0.55 0.55 0.55 0.55Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 7.0 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 398 537 448 123 220 189 108 1782 885 238 1884 867v/s Ratio Prot c0.10 0.16 c0.09 0.30 c0.40v/s Ratio Perm 0.04 0.01 0.01 0.30 0.01 0.37 0.16v/c Ratio 0.82 0.55 0.13 0.12 0.72 0.10 0.56 0.55 0.01 0.67 0.73 0.29Uniform Delay, d1 38.3 26.9 23.5 35.1 37.8 35.0 13.1 13.1 9.2 14.5 15.2 10.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 13.0 1.1 0.1 0.4 10.7 0.2 19.0 1.3 0.0 14.2 2.5 0.9Delay (s) 51.2 28.0 23.7 35.5 48.5 35.2 32.1 14.4 9.2 28.6 17.7 11.7Level of Service D C C D D D C B A C B BApproach Delay (s) 38.1 42.8 15.3 17.2Approach LOS D D B B
Intersection SummaryHCM 2000 Control Delay 22.1 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.74Actuated Cycle Length (s) 89.4 Sum of lost time (s) 18.6Intersection Capacity Utilization 85.7% ICU Level of Service EAnalysis Period (min) 15c Critical Lane Group
![Page 162: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/162.jpg)
HCM Unsignalized Intersection Capacity Analysis400: Old Victoria Road & Bradley Avenue 12/05/2014
2018-PM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 58 255 14 99 356 46 15 54 46 20 69 70Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 63 277 15 108 387 50 16 59 50 22 75 76PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 437 292 1127 1063 285 1110 1046 412vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 437 292 1127 1063 285 1110 1046 412tC, single (s) 4.1 4.2 7.2 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.3 3.6 4.0 3.3 3.5 4.0 3.3p0 queue free % 94 91 83 70 93 82 62 88cM capacity (veh/h) 1134 1241 98 194 759 121 199 640
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1Volume Total 63 292 108 437 16 109 173Volume Left 63 0 108 0 16 0 22Volume Right 0 15 0 50 0 50 76cSH 1134 1700 1241 1700 98 295 256Volume to Capacity 0.06 0.17 0.09 0.26 0.17 0.37 0.68Queue Length 95th (m) 1.4 0.0 2.3 0.0 4.5 13.1 35.1Control Delay (s) 8.4 0.0 8.2 0.0 48.9 24.1 44.1Lane LOS A A E C EApproach Delay (s) 1.5 1.6 27.4 44.1Approach LOS D E
Intersection SummaryAverage Delay 10.4Intersection Capacity Utilization 50.5% ICU Level of Service AAnalysis Period (min) 15
![Page 163: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/163.jpg)
HCM Unsignalized Intersection Capacity Analysis500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue 12/05/2014
2018-PM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 24 288 7 31 417 30 22 1 78 76 2 60Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 26 313 8 34 453 33 24 1 85 83 2 65PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 486 321 952 918 313 971 893 453vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 486 321 952 918 313 971 893 453tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 98 97 88 100 88 58 99 89cM capacity (veh/h) 1088 1251 206 260 732 198 269 611
Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1Volume Total 26 313 8 34 453 33 110 150Volume Left 26 0 0 34 0 0 24 83Volume Right 0 0 8 0 0 33 85 65cSH 1088 1700 1700 1251 1700 1700 465 282Volume to Capacity 0.02 0.18 0.00 0.03 0.27 0.02 0.24 0.53Queue Length 95th (m) 0.6 0.0 0.0 0.7 0.0 0.0 7.3 23.2Control Delay (s) 8.4 0.0 0.0 8.0 0.0 0.0 15.1 31.3Lane LOS A A C DApproach Delay (s) 0.6 0.5 15.1 31.3Approach LOS C D
Intersection SummaryAverage Delay 6.1Intersection Capacity Utilization 47.1% ICU Level of Service AAnalysis Period (min) 15
![Page 164: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/164.jpg)
HCM Signalized Intersection Capacity Analysis600: Veterans Memorial Pkwy & Bradley Avenue 12/05/2014
2018-PM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 273 98 72 44 104 128 51 596 33 108 949 323Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 0.92 1.00 0.99 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1719 1845 1455 1805 1701 1570 3216 1805 3406 1553Flt Permitted 0.36 1.00 1.00 0.69 1.00 0.19 1.00 0.35 1.00 1.00Satd. Flow (perm) 651 1845 1455 1312 1701 317 3216 673 3406 1553Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95Adj. Flow (vph) 287 103 76 46 109 135 54 627 35 114 999 340RTOR Reduction (vph) 0 0 30 0 53 0 0 4 0 0 0 189Lane Group Flow (vph) 287 103 46 46 191 0 54 658 0 114 999 151Heavy Vehicles (%) 5% 3% 11% 0% 3% 2% 15% 12% 0% 0% 6% 4%Turn Type pm+pt NA Perm Perm NA Perm NA Perm NA PermProtected Phases 7 4 8 2 6Permitted Phases 4 4 8 2 6 6Actuated Green, G (s) 32.3 32.3 32.3 14.0 14.0 37.4 37.4 37.4 37.4 37.4Effective Green, g (s) 32.3 32.3 32.3 14.0 14.0 37.4 37.4 37.4 37.4 37.4Actuated g/C Ratio 0.38 0.38 0.38 0.17 0.17 0.44 0.44 0.44 0.44 0.44Clearance Time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 430 706 556 217 282 140 1425 298 1509 688v/s Ratio Prot c0.11 0.06 0.11 0.20 c0.29v/s Ratio Perm c0.14 0.03 0.04 0.17 0.17 0.10v/c Ratio 0.67 0.15 0.08 0.21 0.68 0.39 0.46 0.38 0.66 0.22Uniform Delay, d1 19.7 17.0 16.6 30.4 33.1 15.8 16.5 15.8 18.5 14.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 3.9 0.1 0.1 0.5 6.4 7.9 1.1 3.7 2.3 0.7Delay (s) 23.6 17.1 16.7 30.9 39.4 23.6 17.5 19.5 20.8 15.2Level of Service C B B C D C B B C BApproach Delay (s) 21.1 38.1 18.0 19.4Approach LOS C D B B
Intersection SummaryHCM 2000 Control Delay 21.2 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.70Actuated Cycle Length (s) 84.4 Sum of lost time (s) 18.7Intersection Capacity Utilization 81.9% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 165: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/165.jpg)
HCM Unsignalized Intersection Capacity Analysis700: Bradley Avenue & Bonder Road 12/05/2014
2018-PM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 41 184 15 1 134 4 37 0 4 10 0 106Sign Control Free Free Stop StopGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 45 200 16 1 146 4 40 0 4 11 0 115PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 150 216 560 449 208 443 455 148vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 150 216 560 449 208 443 455 148tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2tC, 2 stage (s)tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3p0 queue free % 97 100 89 100 99 98 100 87cM capacity (veh/h) 1431 1353 373 489 832 509 485 899
Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total 45 216 1 150 40 4 11 115Volume Left 45 0 1 0 40 0 11 0Volume Right 0 16 0 4 0 4 0 115cSH 1431 1700 1353 1700 373 832 509 899Volume to Capacity 0.03 0.13 0.00 0.09 0.11 0.01 0.02 0.13Queue Length 95th (m) 0.8 0.0 0.0 0.0 2.9 0.1 0.5 3.5Control Delay (s) 7.6 0.0 7.7 0.0 15.8 9.3 12.2 9.6Lane LOS A A C A B AApproach Delay (s) 1.3 0.1 15.2 9.8Approach LOS C A
Intersection SummaryAverage Delay 3.9Intersection Capacity Utilization 32.6% ICU Level of Service AAnalysis Period (min) 15
![Page 166: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/166.jpg)
Traffic Impact Study for Innovation Industrial Park City of London Appendices
MMM Group Limited October 2014
Technical Appendix 9
Future (2023) Intersection Capacity Analysis Results for Scenario 3
![Page 167: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/167.jpg)
HCM 2010 Roundabout100: Old Victoria Road & Commissioners Road E & Hamilton Road 14/05/2014
2023 - AM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 1
IntersectionIntersection Delay, s/veh 9.0Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 686 716 132 321Demand Flow Rate, veh/h 755 787 145 353Vehicles Circulating, veh/h 276 265 855 566Vehicles Exiting, veh/h 643 735 176 486Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 9.3 9.4 8.0 8.1Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.470 0.530 0.470 0.530 0.469 0.531 0.470 0.530Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 355 400 370 417 68 77 166 187Cap Entry Lane, veh/h 919 931 926 939 595 621 739 760Entry HV Adj Factor 0.909 0.909 0.909 0.910 0.911 0.907 0.910 0.911Flow Entry, veh/h 323 364 336 379 62 70 151 170Cap Entry, veh/h 835 847 842 854 542 563 672 692V/C Ratio 3.86 0.429 3.99 0.444 1.14 0.124 2.25 0.246Control Delay, s/veh 8.9 9.6 9.1 9.8 8.1 7.9 8.0 8.1LOS A A A A A A A A95th %tile Queue, veh 0.2 2 0.2 2 0.0 0 0.1 1
![Page 168: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/168.jpg)
HCM Signalized Intersection Capacity Analysis200: Venture Gate & Hamilton Road 14/05/2014
2023 - AM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 2
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 551 64 145 630 29 77Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 6.6 6.6 6.6 6.6 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1727 1468 1641 1727 1641 1468Flt Permitted 1.00 1.00 0.42 1.00 0.95 1.00Satd. Flow (perm) 1727 1468 722 1727 1641 1468Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91Adj. Flow (vph) 605 70 159 692 32 85RTOR Reduction (vph) 0 15 0 0 0 79Lane Group Flow (vph) 605 55 159 692 32 6Heavy Vehicles (%) 10% 10% 10% 10% 10% 10%Turn Type NA Perm Perm NA NA PermProtected Phases 2 6 8Permitted Phases 2 6 8Actuated Green, G (s) 71.2 71.2 71.2 71.2 6.5 6.5Effective Green, g (s) 71.2 71.2 71.2 71.2 6.5 6.5Actuated g/C Ratio 0.79 0.79 0.79 0.79 0.07 0.07Clearance Time (s) 6.6 6.6 6.6 6.6 5.7 5.7Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1366 1161 571 1366 118 106v/s Ratio Prot 0.35 c0.40 c0.02v/s Ratio Perm 0.04 0.22 0.00v/c Ratio 0.44 0.05 0.28 0.51 0.27 0.06Uniform Delay, d1 3.0 2.0 2.5 3.3 39.5 38.9Progression Factor 1.00 1.00 0.81 1.26 1.00 1.00Incremental Delay, d2 1.0 0.1 0.9 1.0 1.2 0.2Delay (s) 4.1 2.1 2.9 5.1 40.8 39.1Level of Service A A A A D DApproach Delay (s) 3.9 4.7 39.6Approach LOS A A D
Intersection SummaryHCM 2000 Control Delay 6.8 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.49Actuated Cycle Length (s) 90.0 Sum of lost time (s) 12.3Intersection Capacity Utilization 58.6% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group
![Page 169: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/169.jpg)
HCM Signalized Intersection Capacity Analysis300: Veterans Memorial Pkwy & Hamilton Road 14/05/2014
2023 - AM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 372 126 131 17 343 156 132 1231 14 66 1148 300Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 3282 1468 1641 3282 1468 1641 3282 1468 1641 3195 1468Flt Permitted 0.95 1.00 1.00 0.67 1.00 1.00 0.10 1.00 1.00 0.10 1.00 1.00Satd. Flow (perm) 3183 3282 1468 1149 3282 1468 173 3282 1468 177 3195 1468Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 404 137 142 18 373 170 143 1338 15 72 1248 326RTOR Reduction (vph) 0 0 99 0 0 127 0 0 8 0 0 185Lane Group Flow (vph) 404 137 43 18 373 43 143 1338 7 72 1248 141Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 13% 10%Turn Type Prot NA Perm Perm NA Perm pm+pt NA Perm pm+pt NA PermProtected Phases 3 8 4 5 2 1 6Permitted Phases 8 4 4 2 2 6 6Actuated Green, G (s) 12.0 27.4 27.4 11.4 11.4 11.4 45.0 40.0 40.0 43.0 39.0 39.0Effective Green, g (s) 12.0 27.4 27.4 11.4 11.4 11.4 45.0 40.0 40.0 43.0 39.0 39.0Actuated g/C Ratio 0.13 0.30 0.30 0.13 0.13 0.13 0.50 0.44 0.44 0.48 0.43 0.43Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 424 999 446 145 415 185 168 1458 652 149 1384 636v/s Ratio Prot c0.13 0.04 c0.11 c0.05 c0.41 0.02 0.39v/s Ratio Perm 0.03 0.02 0.03 0.38 0.00 0.21 0.10v/c Ratio 0.95 0.14 0.10 0.12 0.90 0.23 0.85 0.92 0.01 0.48 0.90 0.22Uniform Delay, d1 38.7 22.7 22.4 34.9 38.7 35.4 16.9 23.5 14.0 16.7 23.7 16.0Progression Factor 0.93 0.89 1.40 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 30.3 0.1 0.1 0.4 21.5 0.7 31.6 10.7 0.0 2.5 9.8 0.8Delay (s) 66.3 20.2 31.4 35.3 60.3 36.0 48.6 34.1 14.0 19.1 33.5 16.8Level of Service E C C D E D D C B B C BApproach Delay (s) 49.8 52.1 35.3 29.6Approach LOS D D D C
Intersection SummaryHCM 2000 Control Delay 37.6 HCM 2000 Level of Service DHCM 2000 Volume to Capacity ratio 0.93Actuated Cycle Length (s) 90.0 Sum of lost time (s) 22.6Intersection Capacity Utilization 78.0% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 170: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/170.jpg)
HCM 2010 Roundabout400: Old Victoria Road & Bradley Avenue 14/05/2014
2023 - AM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 4
IntersectionIntersection Delay, s/veh 6.5Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 381 440 232 174Demand Flow Rate, veh/h 418 484 254 191Vehicles Circulating, veh/h 270 157 502 448Vehicles Exiting, veh/h 369 599 186 193Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 6.6 6.4 6.9 6.1Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT R L TRRT ChannelizedLane Util 0.469 0.531 0.469 0.531 0.382 0.618 0.513 0.487Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 196 222 227 257 97 157 98 93Cap Entry Lane, veh/h 923 935 1004 1012 775 795 807 826Entry HV Adj Factor 0.913 0.909 0.911 0.907 0.914 0.911 0.908 0.909Flow Entry, veh/h 179 202 207 233 89 143 89 85Cap Entry, veh/h 842 850 915 918 709 724 733 751V/C Ratio 2.12 0.237 2.26 0.254 1.25 0.197 1.21 0.113Control Delay, s/veh 6.5 6.7 6.2 6.5 6.4 7.2 6.2 6.0LOS A A A A A A A A95th %tile Queue, veh 0.1 1 0.1 1 0.0 1 0.0 0
![Page 171: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/171.jpg)
HCM Signalized Intersection Capacity Analysis500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue 14/05/2014
2023 - AM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 92 382 29 109 340 110 15 0 58 65 0 51Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 0.89 0.94Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.99 0.97Satd. Flow (prot) 1641 1727 1468 1641 1727 1468 1526 1581Flt Permitted 0.54 1.00 1.00 0.51 1.00 1.00 0.93 0.83Satd. Flow (perm) 929 1727 1468 881 1727 1468 1441 1345Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 100 415 32 118 370 120 16 0 63 71 0 55RTOR Reduction (vph) 0 0 7 0 0 28 0 55 0 0 41 0Lane Group Flow (vph) 100 415 25 118 370 92 0 24 0 0 85 0Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%Turn Type Perm NA Perm Perm NA Perm Perm NA Perm NAProtected Phases 2 6 8 4Permitted Phases 2 2 6 6 8 4Actuated Green, G (s) 55.4 55.4 55.4 55.4 55.4 55.4 8.7 8.7Effective Green, g (s) 55.4 55.4 55.4 55.4 55.4 55.4 8.7 8.7Actuated g/C Ratio 0.77 0.77 0.77 0.77 0.77 0.77 0.12 0.12Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 713 1326 1127 676 1326 1127 173 162v/s Ratio Prot c0.24 0.21v/s Ratio Perm 0.11 0.02 0.13 0.06 0.02 c0.06v/c Ratio 0.14 0.31 0.02 0.17 0.28 0.08 0.14 0.52Uniform Delay, d1 2.2 2.5 2.0 2.2 2.5 2.1 28.3 29.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.4 0.6 0.0 0.6 0.5 0.1 0.4 3.0Delay (s) 2.6 3.2 2.0 2.8 3.0 2.2 28.7 32.8Level of Service A A A A A A C CApproach Delay (s) 3.0 2.8 28.7 32.8Approach LOS A A C C
Intersection SummaryHCM 2000 Control Delay 7.2 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.34Actuated Cycle Length (s) 72.1 Sum of lost time (s) 8.0Intersection Capacity Utilization 49.5% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group
![Page 172: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/172.jpg)
HCM Signalized Intersection Capacity Analysis600: Veterans Memorial Pkwy & Bradley Avenue 14/05/2014
2023 - AM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 280 165 61 66 132 264 100 833 120 367 602 326Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.7 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.97 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 1727 1468 1641 1727 1468 1656 3282 1468 3183 3282 1321Flt Permitted 0.95 1.00 1.00 0.64 1.00 1.00 0.40 1.00 1.00 0.95 1.00 1.00Satd. Flow (perm) 3183 1727 1468 1109 1727 1468 693 3282 1468 3183 3282 1321Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 311 183 68 73 147 293 111 926 133 408 669 362RTOR Reduction (vph) 0 0 49 0 0 104 0 0 84 0 0 159Lane Group Flow (vph) 311 183 19 73 147 189 111 926 49 408 669 203Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 9% 10% 10% 10% 10% 10%Parking (#/hr) 0Turn Type Prot NA Perm Perm NA pt+ov Perm NA Perm Prot NA PermProtected Phases 7 4 8 8 1 2 1 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 10.0 24.6 24.6 10.6 10.6 23.6 33.0 33.0 33.0 13.0 50.0 50.0Effective Green, g (s) 10.0 24.6 24.6 10.6 10.6 23.6 33.0 33.0 33.0 13.0 50.0 50.0Actuated g/C Ratio 0.11 0.28 0.28 0.12 0.12 0.26 0.37 0.37 0.37 0.15 0.56 0.56Clearance Time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 356 475 404 131 204 387 256 1212 542 463 1837 739v/s Ratio Prot c0.10 0.11 c0.09 0.13 c0.28 c0.13 0.20v/s Ratio Perm 0.01 0.07 0.16 0.03 0.15v/c Ratio 0.87 0.39 0.05 0.56 0.72 0.49 0.43 0.76 0.09 0.88 0.36 0.27Uniform Delay, d1 39.0 26.2 23.7 37.1 37.9 27.7 21.1 24.7 18.4 37.4 10.9 10.2Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 20.4 0.5 0.0 5.1 11.8 1.0 5.3 4.6 0.3 17.5 0.6 0.9Delay (s) 59.4 26.7 23.8 42.2 49.7 28.7 26.4 29.3 18.7 54.9 11.4 11.1Level of Service E C C D D C C C B D B BApproach Delay (s) 44.5 36.7 27.9 23.7Approach LOS D D C C
Intersection SummaryHCM 2000 Control Delay 30.0 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.80Actuated Cycle Length (s) 89.3 Sum of lost time (s) 22.7Intersection Capacity Utilization 70.0% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group
![Page 173: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/173.jpg)
HCM Signalized Intersection Capacity Analysis700: Bradley Avenue & Bonder Road 14/05/2014
2023 - AM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 241 65 347 34 145 24 187 0 19 13 0 130Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.87 1.00 0.98 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1770 1628 1770 1823 1770 1583 1770 1583Flt Permitted 0.64 1.00 0.43 1.00 0.67 1.00 0.74 1.00Satd. Flow (perm) 1195 1628 808 1823 1243 1583 1385 1583Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 262 71 377 37 158 26 203 0 21 14 0 141RTOR Reduction (vph) 0 211 0 0 8 0 0 14 0 0 97 0Lane Group Flow (vph) 262 237 0 37 176 0 203 7 0 14 44 0Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 17.7 17.7 17.7 17.7 12.5 12.5 12.5 12.5Effective Green, g (s) 17.7 17.7 17.7 17.7 12.5 12.5 12.5 12.5Actuated g/C Ratio 0.44 0.44 0.44 0.44 0.31 0.31 0.31 0.31Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 526 716 355 802 386 492 430 492v/s Ratio Prot 0.15 0.10 0.00 0.03v/s Ratio Perm c0.22 0.05 c0.16 0.01v/c Ratio 0.50 0.33 0.10 0.22 0.53 0.01 0.03 0.09Uniform Delay, d1 8.1 7.4 6.6 7.0 11.4 9.6 9.6 9.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.7 0.3 0.1 0.1 1.3 0.0 0.0 0.1Delay (s) 8.8 7.6 6.7 7.1 12.7 9.6 9.7 9.9Level of Service A A A A B A A AApproach Delay (s) 8.1 7.0 12.4 9.9Approach LOS A A B A
Intersection SummaryHCM 2000 Control Delay 8.9 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.51Actuated Cycle Length (s) 40.2 Sum of lost time (s) 10.0Intersection Capacity Utilization 63.2% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group
![Page 174: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/174.jpg)
HCM 2010 Roundabout100: Old Victoria Road & Commissioners Road E & Hamilton Road 14/05/2014
2023 - PM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 1
IntersectionIntersection Delay, s/veh 11.0Intersection LOS B
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 618 831 190 511Demand Flow Rate, veh/h 679 914 209 562Vehicles Circulating, veh/h 402 333 866 724Vehicles Exiting, veh/h 884 742 215 522Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 9.8 11.7 8.8 12.3Approach LOS A B A B
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.470 0.530 0.470 0.530 0.469 0.531 0.470 0.530Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 319 360 430 484 98 111 264 298Cap Entry Lane, veh/h 836 853 880 895 590 616 657 681Entry HV Adj Factor 0.910 0.910 0.909 0.910 0.913 0.909 0.910 0.909Flow Entry, veh/h 290 327 391 441 89 101 240 271Cap Entry, veh/h 761 776 800 815 539 560 597 619V/C Ratio 3.82 0.422 4.89 0.541 1.66 0.180 4.02 0.438Control Delay, s/veh 9.5 10.1 11.2 12.2 8.8 8.7 12.0 12.5LOS A B B B A A B B95th %tile Queue, veh 0.2 2 0.3 3 0.1 1 0.2 2
![Page 175: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/175.jpg)
HCM Signalized Intersection Capacity Analysis200: Venture Gate & Hamilton Road 14/05/2014
2023 - PM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 2
Movement EBT EBR WBL WBT NBL NBRLane ConfigurationsVolume (vph) 602 20 47 687 77 146Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900Total Lost time (s) 6.6 6.6 6.6 6.6 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 1.00 1.00 0.85Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1727 1468 1641 1727 1641 1468Flt Permitted 1.00 1.00 0.37 1.00 0.95 1.00Satd. Flow (perm) 1727 1468 645 1727 1641 1468Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91Adj. Flow (vph) 662 22 52 755 85 160RTOR Reduction (vph) 0 6 0 0 0 142Lane Group Flow (vph) 662 17 52 755 85 18Heavy Vehicles (%) 10% 10% 10% 10% 10% 10%Turn Type NA Perm Perm NA NA PermProtected Phases 2 6 8Permitted Phases 2 6 8Actuated Green, G (s) 67.5 67.5 67.5 67.5 10.2 10.2Effective Green, g (s) 67.5 67.5 67.5 67.5 10.2 10.2Actuated g/C Ratio 0.75 0.75 0.75 0.75 0.11 0.11Clearance Time (s) 6.6 6.6 6.6 6.6 5.7 5.7Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 1295 1101 483 1295 185 166v/s Ratio Prot 0.38 c0.44 c0.05v/s Ratio Perm 0.01 0.08 0.01v/c Ratio 0.51 0.01 0.11 0.58 0.46 0.11Uniform Delay, d1 4.6 2.8 3.1 5.0 37.3 35.8Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.4 0.0 0.4 1.9 1.8 0.3Delay (s) 6.0 2.9 3.5 6.9 39.1 36.1Level of Service A A A A D DApproach Delay (s) 5.9 6.7 37.2Approach LOS A A D
Intersection SummaryHCM 2000 Control Delay 10.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.57Actuated Cycle Length (s) 90.0 Sum of lost time (s) 12.3Intersection Capacity Utilization 55.1% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group
![Page 176: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/176.jpg)
HCM Signalized Intersection Capacity Analysis300: Veterans Memorial Pkwy & Hamilton Road 14/05/2014
2023 - PM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 336 293 118 15 158 105 113 1164 22 160 1436 462Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 3282 1468 1641 3282 1468 1641 3282 1468 1641 3195 1468Flt Permitted 0.95 1.00 1.00 0.57 1.00 1.00 0.09 1.00 1.00 0.11 1.00 1.00Satd. Flow (perm) 3183 3282 1468 987 3282 1468 163 3282 1468 184 3195 1468Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 365 318 128 16 172 114 123 1265 24 174 1561 502RTOR Reduction (vph) 0 0 97 0 0 105 0 0 13 0 0 254Lane Group Flow (vph) 365 318 31 16 172 9 123 1265 11 174 1561 248Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 13% 10%Turn Type Prot NA Perm Perm NA Perm pm+pt NA Perm pm+pt NA PermProtected Phases 3 8 4 5 2 1 6Permitted Phases 8 4 4 2 2 6 6Actuated Green, G (s) 11.0 22.0 22.0 7.0 7.0 7.0 47.4 42.4 42.4 51.4 44.4 44.4Effective Green, g (s) 11.0 22.0 22.0 7.0 7.0 7.0 47.4 42.4 42.4 51.4 44.4 44.4Actuated g/C Ratio 0.12 0.24 0.24 0.08 0.08 0.08 0.53 0.47 0.47 0.57 0.49 0.49Clearance Time (s) 4.0 7.6 7.6 7.6 7.6 7.6 4.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 389 802 358 76 255 114 167 1546 691 218 1576 724v/s Ratio Prot c0.11 0.10 c0.05 0.04 0.39 c0.06 c0.49v/s Ratio Perm 0.02 0.02 0.01 0.35 0.01 0.39 0.17v/c Ratio 0.94 0.40 0.09 0.21 0.67 0.08 0.74 0.82 0.02 0.80 0.99 0.34Uniform Delay, d1 39.2 28.4 26.2 38.9 40.4 38.5 17.1 20.5 12.7 14.7 22.6 13.9Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 30.0 0.3 0.1 1.4 6.9 0.3 15.5 4.9 0.0 18.1 20.5 1.3Delay (s) 69.2 28.8 26.4 40.3 47.3 38.8 32.6 25.4 12.7 32.8 43.1 15.2Level of Service E C C D D D C C B C D BApproach Delay (s) 46.6 43.7 25.8 36.0Approach LOS D D C D
Intersection SummaryHCM 2000 Control Delay 35.3 HCM 2000 Level of Service DHCM 2000 Volume to Capacity ratio 0.96Actuated Cycle Length (s) 90.0 Sum of lost time (s) 22.6Intersection Capacity Utilization 81.7% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 177: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/177.jpg)
HCM 2010 Roundabout400: Old Victoria Road & Bradley Avenue 14/05/2014
2023 - PM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 4
IntersectionIntersection Delay, s/veh 7.5Intersection LOS A
Approach EB WB NB SBEntry Lanes 2 2 2 2Conflicting Circle Lanes 2 2 2 2Adj Approach Flow, veh/h 394 687 150 199Demand Flow Rate, veh/h 434 755 166 218Vehicles Circulating, veh/h 301 164 452 692Vehicles Exiting, veh/h 609 453 283 227Follow-Up Headway, s 3.186 3.186 3.186 3.186Ped Vol Crossing Leg, #/h 0 0 0 0Ped Cap Adj 1.000 1.000 1.000 1.000Approach Delay, s/veh 6.9 8.2 5.9 7.7Approach LOS A A A A
Lane Left Right Left Right Left Right Left RightDesignated Moves LT TR LT TR LT TR LT TRAssumed Moves LT TR LT TR LT TR LT TRRT ChannelizedLane Util 0.470 0.530 0.470 0.530 0.470 0.530 0.468 0.532Critical Headway, s 4.293 4.113 4.293 4.113 4.293 4.113 4.293 4.113Entry Flow, veh/h 204 230 355 400 78 88 102 116Cap Entry Lane, veh/h 902 915 999 1007 805 823 672 696Entry HV Adj Factor 0.908 0.908 0.909 0.910 0.907 0.906 0.915 0.908Flow Entry, veh/h 185 209 323 364 71 80 93 105Cap Entry, veh/h 818 831 908 916 730 746 615 632V/C Ratio 2.26 0.251 3.55 0.397 0.97 0.107 1.52 0.167Control Delay, s/veh 6.8 7.0 7.9 8.5 5.9 5.9 7.7 7.7LOS A A A A A A A A95th %tile Queue, veh 0.1 1 0.2 2 0.0 0 0.1 1
![Page 178: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/178.jpg)
HCM Signalized Intersection Capacity Analysis500: Dr. Oetker Gate/Innovation Gate & Bradley Avenue 14/05/2014
2023 - PM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 30 339 9 38 525 39 27 1 99 98 2 77Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 0.89 0.94Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.99 0.97Satd. Flow (prot) 1641 1727 1468 1641 1727 1468 1529 1582Flt Permitted 0.40 1.00 1.00 0.52 1.00 1.00 0.92 0.70Satd. Flow (perm) 685 1727 1468 906 1727 1468 1416 1144Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 33 368 10 41 571 42 29 1 108 107 2 84RTOR Reduction (vph) 0 0 3 0 0 12 0 88 0 0 37 0Lane Group Flow (vph) 33 368 7 41 571 30 0 50 0 0 156 0Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%Turn Type Perm NA Perm Perm NA Perm Perm NA Perm NAProtected Phases 2 6 8 4Permitted Phases 2 2 6 6 8 4Actuated Green, G (s) 54.8 54.8 54.8 54.8 54.8 54.8 14.5 14.5Effective Green, g (s) 54.8 54.8 54.8 54.8 54.8 54.8 14.5 14.5Actuated g/C Ratio 0.71 0.71 0.71 0.71 0.71 0.71 0.19 0.19Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 485 1224 1040 642 1224 1040 265 214v/s Ratio Prot 0.21 c0.33v/s Ratio Perm 0.05 0.00 0.05 0.02 0.04 c0.14v/c Ratio 0.07 0.30 0.01 0.06 0.47 0.03 0.19 0.73Uniform Delay, d1 3.4 4.2 3.3 3.4 4.9 3.3 26.5 29.6Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 0.6 0.0 0.2 1.3 0.1 0.3 12.1Delay (s) 3.7 4.8 3.3 3.6 6.2 3.4 26.8 41.7Level of Service A A A A A A C DApproach Delay (s) 4.7 5.8 26.8 41.7Approach LOS A A C D
Intersection SummaryHCM 2000 Control Delay 12.5 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.52Actuated Cycle Length (s) 77.3 Sum of lost time (s) 8.0Intersection Capacity Utilization 55.2% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group
![Page 179: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/179.jpg)
HCM Signalized Intersection Capacity Analysis600: Veterans Memorial Pkwy & Bradley Avenue 14/05/2014
2023 - PM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 312 138 85 119 191 347 58 639 62 196 1019 353Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 4.0 7.7 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Lane Util. Factor 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.97 0.95 1.00Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00Satd. Flow (prot) 3183 1727 1468 1641 1727 1468 1656 3282 1468 3183 3282 1321Flt Permitted 0.95 1.00 1.00 0.66 1.00 1.00 0.22 1.00 1.00 0.95 1.00 1.00Satd. Flow (perm) 3183 1727 1468 1140 1727 1468 379 3282 1468 3183 3282 1321Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 347 153 94 132 212 386 64 710 69 218 1132 392RTOR Reduction (vph) 0 0 62 0 0 64 0 0 44 0 0 199Lane Group Flow (vph) 347 153 32 132 212 322 64 710 25 218 1132 193Heavy Vehicles (%) 10% 10% 10% 10% 10% 10% 9% 10% 10% 10% 10% 10%Parking (#/hr) 0Turn Type Prot NA Perm Perm NA pt+ov Perm NA Perm Prot NA PermProtected Phases 7 4 8 8 1 2 1 6Permitted Phases 4 8 2 2 6Actuated Green, G (s) 11.0 30.6 30.6 15.6 15.6 30.3 32.9 32.9 32.9 7.0 43.9 43.9Effective Green, g (s) 11.0 30.6 30.6 15.6 15.6 30.3 32.9 32.9 32.9 7.0 43.9 43.9Actuated g/C Ratio 0.12 0.34 0.34 0.17 0.17 0.34 0.37 0.37 0.37 0.08 0.49 0.49Clearance Time (s) 4.0 7.7 7.7 7.7 7.7 7.0 7.0 7.0 4.0 7.0 7.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 392 592 503 199 302 498 139 1210 541 249 1615 650v/s Ratio Prot c0.11 0.09 0.12 c0.22 0.22 0.07 c0.34v/s Ratio Perm 0.02 0.12 0.17 0.02 0.15v/c Ratio 0.89 0.26 0.06 0.66 0.70 0.65 0.46 0.59 0.05 0.88 0.70 0.30Uniform Delay, d1 38.5 21.1 19.7 34.3 34.6 24.9 21.4 22.7 18.1 40.7 17.6 13.5Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 20.5 0.2 0.1 8.1 7.2 2.9 10.6 2.1 0.2 27.1 2.6 1.2Delay (s) 59.0 21.4 19.7 42.4 41.8 27.8 32.0 24.8 18.2 67.8 20.1 14.6Level of Service E C B D D C C C B E C BApproach Delay (s) 43.1 34.5 24.8 24.9Approach LOS D C C C
Intersection SummaryHCM 2000 Control Delay 29.4 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.81Actuated Cycle Length (s) 89.2 Sum of lost time (s) 22.7Intersection Capacity Utilization 74.4% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group
![Page 180: Traffic Impact Study for Innovation Industrial Park, London · Traffic Impact Study for Innovation Industrial Park City of London Introduction MMM Group Limited October 2014 Page](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e726473c121273a82471756/html5/thumbnails/180.jpg)
HCM Signalized Intersection Capacity Analysis700: Bradley Avenue & Bonder Road 14/05/2014
2023 - PM Condition-55 ac rate Synchro 8 ReportMMM Group Limited Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 81 199 116 11 144 8 302 0 30 21 0 211Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.94 1.00 0.99 1.00 0.85 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00Satd. Flow (prot) 1770 1760 1770 1848 1770 1583 1770 1583Flt Permitted 0.65 1.00 0.49 1.00 0.62 1.00 0.74 1.00Satd. Flow (perm) 1215 1760 917 1848 1147 1583 1370 1583Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 88 216 126 12 157 9 328 0 33 23 0 229RTOR Reduction (vph) 0 33 0 0 3 0 0 19 0 0 130 0Lane Group Flow (vph) 88 309 0 12 163 0 328 14 0 23 99 0Turn Type Perm NA Perm NA Perm NA Perm NAProtected Phases 4 8 2 6Permitted Phases 4 8 2 6Actuated Green, G (s) 13.4 13.4 13.4 13.4 17.8 17.8 17.8 17.8Effective Green, g (s) 13.4 13.4 13.4 13.4 17.8 17.8 17.8 17.8Actuated g/C Ratio 0.33 0.33 0.33 0.33 0.43 0.43 0.43 0.43Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Lane Grp Cap (vph) 395 572 298 601 495 683 591 683v/s Ratio Prot c0.18 0.09 0.01 0.06v/s Ratio Perm 0.07 0.01 c0.29 0.02v/c Ratio 0.22 0.54 0.04 0.27 0.66 0.02 0.04 0.14Uniform Delay, d1 10.1 11.4 9.5 10.3 9.3 6.7 6.8 7.1Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.3 1.0 0.1 0.2 3.3 0.0 0.0 0.1Delay (s) 10.4 12.4 9.6 10.5 12.6 6.7 6.8 7.2Level of Service B B A B B A A AApproach Delay (s) 12.0 10.5 12.1 7.2Approach LOS B B B A
Intersection SummaryHCM 2000 Control Delay 10.8 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.61Actuated Cycle Length (s) 41.2 Sum of lost time (s) 10.0Intersection Capacity Utilization 67.3% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group